[{"id":1801,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"1000 Mile Solar","state":"TX","name":"1000 Mile Solar (Solar Photovoltaic, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"1000 Mile Solar, Yoakum County, TX","lat":33.02248,"lng":-102.7089,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 93. Plant 68847 1000 Mile Solar (1000 Mile Solar, LLC), Yoakum County, TX; balancing authority SWPP. Planned operation 2026-09.\nGenerator PV1: 300 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1016,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"11601 Copenhagen Ct","state":"IL","name":"Copenhagen Ct (Solar Photovoltaic, 3.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Copenhagen Ct, Cook County, IL","lat":41.939381,"lng":-87.91775,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 166. Plant 70185 Copenhagen Ct (11601 Copenhagen Ct, LLC), Cook County, IL; balancing authority PJM. Planned operation 2026-09.\nGenerator PV1: 3.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":663,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"174 Power Global","state":"AZ","name":"Atlas (Solar Photovoltaic, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Atlas, La Paz County, AZ","lat":33.94345,"lng":-113.7917,"route":null,"cost_usd":null,"start_date":"2026-08-01","end_date":"2026-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 4. Plant 63798 Atlas (174 Power Global Corp.), La Paz County, AZ; balancing authority AZPS. Planned operation 2026-08.\nGenerator ATL01: 300 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":884,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"174 Power Global","state":"CO","name":"Turkey Creek Solar Project (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Turkey Creek Solar Project, Pueblo County, CO","lat":38.382137,"lng":-104.9141,"route":null,"cost_usd":null,"start_date":"2027-02-01","end_date":"2027-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 649. Plant 64744 Turkey Creek Solar Project (174 Power Global Corp.), Pueblo County, CO; balancing authority WACM. Planned operation 2027-02.\nGenerator TC001: 200 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1465,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"174 Power Global","state":"NV","name":"Boulder Solar III LLC (Batteries, Solar Photovoltaic, 256 MW)","type":"generation","voltage_kv":null,"location_ref":"Boulder Solar III LLC, Clark County, NV","lat":35.838769,"lng":-114.9642,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 849, 850. Plant 65141 Boulder Solar III LLC (174 Power Global Corp.), Clark County, NV; balancing authority NEVP. Planned operation 2027-06.\nGenerator BS301: 128 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated\nGenerator BS3ES: 128 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1447,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"201lc 8me","state":"NM","name":"Rockmont Solar and Storage Project (Batteries, Solar Photovoltaic, 130 MW)","type":"generation","voltage_kv":null,"location_ref":"Rockmont Solar and Storage Project, San Juan County, NM","lat":36.776579,"lng":-108.3751,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1220, 1221. Plant 64216 Rockmont Solar and Storage Project (201LC 8me LLC), San Juan County, NM; balancing authority PNM. Planned operation 2027-12.\nGenerator 201LC: 100 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction\nGenerator 309SJ: 30 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1942,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"229hd 8me","state":"TX","name":"Holstein 2 Battery Storage (Batteries, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Holstein 2 Battery Storage, Nolan County, TX","lat":32.081901,"lng":-100.159,"route":null,"cost_usd":null,"start_date":"2029-05-01","end_date":"2029-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1896. Plant 67896 Holstein 2 Battery Storage (229HD 8me, LLC), Nolan County, TX; balancing authority ERCO. Planned operation 2029-05.\nGenerator 229HD: 100 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":804,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"22sv 8me","state":"CA","name":"Rexford 2 Solar Farm (Batteries, Solar Photovoltaic, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"Rexford 2 Solar Farm, Tulare County, CA","lat":35.893525,"lng":-119.0805,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1791, 1792. Plant 68485 Rexford 2 Solar Farm (22SV 8ME LLC), Tulare County, CA; balancing authority CISO. Planned operation 2028-12.\nGenerator 22SVA: 200 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated\nGenerator 22SVB: 200 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":714,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"26sb 8me","state":"CA","name":"Bellefield 2 Solar & Energy Storage Farm (Batteries, Solar Photovoltaic, 1000 MW)","type":"generation","voltage_kv":null,"location_ref":"Bellefield 2 Solar & Energy Storage Farm, Kern County, CA","lat":35.017779,"lng":-118.0687,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 449, 450. Plant 64209 Bellefield 2 Solar & Energy Storage Farm (26SB 8me LLC), Kern County, CA; balancing authority CISO. Planned operation 2026-12.\nGenerator 26SBA: 500 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete\nGenerator 26SBB: 500 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1476,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"300ms 8me","state":"NV","name":"Southern Bighorn Solar Hybrid (Batteries, Solar Photovoltaic, 600 MW)","type":"generation","voltage_kv":null,"location_ref":"Southern Bighorn Solar Hybrid, Clark County, NV","lat":36.304793,"lng":-114.4728,"route":null,"cost_usd":null,"start_date":"2028-07-01","end_date":"2028-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1587, 1588. Plant 63113 Southern Bighorn Solar Hybrid (300MS 8me LLC), Clark County, NV; balancing authority NEVP. Planned operation 2028-07.\nGenerator BESS: 300 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator SBS: 300 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":679,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"301ak 8me","state":"AZ","name":"Kitt Solar (Batteries, Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Kitt Solar, Pinal County, AZ","lat":32.73353,"lng":-111.5691,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 500, 501. Plant 68452 Kitt Solar (301AK 8me LLC), Pinal County, AZ; balancing authority AZPS. Planned operation 2026-12.\nGenerator KITTB: 100 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator KITTS: 100 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":684,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"302pn 8me","state":"AZ","name":"Red Antelope Solar & Energy Storage Farm (Batteries, Solar Photovoltaic, 700 MW)","type":"generation","voltage_kv":null,"location_ref":"Red Antelope Solar & Energy Storage Farm, Coconino County, AZ","lat":36.7,"lng":-111.28,"route":null,"cost_usd":null,"start_date":"2028-05-01","end_date":"2028-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1515, 1516. Plant 64208 Red Antelope Solar & Energy Storage Farm (302PN 8me LLC), Coconino County, AZ; balancing authority AZPS. Planned operation 2028-05.\nGenerator 30PNA: 400 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated\nGenerator 30PNB: 300 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1462,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"326fw 8me","state":"NV","name":"Arida Solar (Hybrid) (Batteries, Solar Photovoltaic, 740 MW)","type":"generation","voltage_kv":null,"location_ref":"Arida Solar (Hybrid), Clark County, NV","lat":35.092036,"lng":-114.6888,"route":null,"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1908, 1909. Plant 63841 Arida Solar (Hybrid) (326FW 8me LLC), Clark County, NV; balancing authority CISO. Planned operation 2029-06.\nGenerator ARIDA: 370 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated\nGenerator BESS: 370 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2143,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"33ui 8me","state":"UT","name":"Gale 1 Solar (Batteries, Solar Photovoltaic, 450 MW)","type":"generation","voltage_kv":null,"location_ref":"Gale 1 Solar, Millard County, UT","lat":39.523,"lng":-112.546,"route":null,"cost_usd":null,"start_date":"2030-08-01","end_date":"2030-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2076, 2077. Plant 61170 Gale 1 Solar (33UI 8me LLC), Millard County, UT; balancing authority LDWP. Planned operation 2030-08.\nGenerator 33UI8: 300 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated\nGenerator 33UI9: 150 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1030,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"38dn Asset Management","state":"IL","name":"Gillard (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Gillard, Grundy County, IL","lat":41.19401,"lng":-88.29454,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 347. Plant 67637 Gillard (38DN Asset Management LLC), Grundy County, IL; balancing authority PJM. Planned operation 2026-11.\nGenerator GILLD: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1109,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"38dn Asset Management","state":"IL","name":"Solitude (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Solitude, LaSalle County, IL","lat":41.130185,"lng":-89.04407,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 348. Plant 67643 Solitude (38DN Asset Management LLC), LaSalle County, IL; balancing authority PJM. Planned operation 2026-11.\nGenerator SOLIT: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1475,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"425lm 8me","state":"NV","name":"Southern Bighorn Solar 2 (Batteries, Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Southern Bighorn Solar 2, Clark County, NV","lat":36.56117,"lng":-114.7413,"route":null,"cost_usd":null,"start_date":"2028-07-01","end_date":"2028-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1624, 1625. Plant 69762 Southern Bighorn Solar 2 (425LM 8ME LLC), Clark County, NV; balancing authority NEVP. Planned operation 2028-07.\nGenerator 425LM: 100 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction\nGenerator BESS2: 100 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":820,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"44st 8me","state":"CA","name":"Sienna 2 Solar and Storage Project (Batteries, Solar Photovoltaic, 110 MW)","type":"generation","voltage_kv":null,"location_ref":"Sienna 2 Solar and Storage Project, San Bernardino County, CA","lat":34.506711,"lng":-116.8901,"route":null,"cost_usd":null,"start_date":"2029-03-01","end_date":"2029-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1870, 1871. Plant 68486 Sienna 2 Solar and Storage Project (44ST 8ME LLC), San Bernardino County, CA; balancing authority CISO. Planned operation 2029-03.\nGenerator 44STA: 55 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated\nGenerator 44STB: 55 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":707,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"45mg 8me","state":"CA","name":"Aratina Solar Center 2 (Batteries, Solar Photovoltaic, 263 MW)","type":"generation","voltage_kv":null,"location_ref":"Aratina Solar Center 2, Kern County, CA","lat":35.062965,"lng":-118.0878,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 451, 452. Plant 64215 Aratina Solar Center 2 (45MG 8me LLC), Kern County, CA; balancing authority CISO. Planned operation 2026-12.\nGenerator 45MGA: 150 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete\nGenerator 45MGB: 113 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":715,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"51lv 8me","state":"CA","name":"Bellefield 3 Solar and Battery Storage (Batteries, Solar Photovoltaic, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Bellefield 3 Solar and Battery Storage, Kern County, CA","lat":35.029153,"lng":-117.9926,"route":null,"cost_usd":null,"start_date":"2030-05-01","end_date":"2030-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2060, 2061. Plant 67894 Bellefield 3 Solar and Battery Storage (51LV 8me, LLC), Kern County, CA; balancing authority CISO. Planned operation 2030-05.\nGenerator 51LVA: 150 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated\nGenerator 51LVB: 150 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1124,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"555 W 167th St Solar","state":"IL","name":"W 167th St (Solar Photovoltaic, 1.5 MW)","type":"generation","voltage_kv":null,"location_ref":"W 167th St, Cook County, IL","lat":41.59009,"lng":-87.63044,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 177. Plant 70445 W 167th St (555 W 167th St Solar, LLC), Cook County, IL; balancing authority PJM. Planned operation 2026-09.\nGenerator PV1: 1.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":772,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"90fi 8me","state":"CA","name":"Kingsley Solar Farm (Batteries, Solar Photovoltaic, 299 MW)","type":"generation","voltage_kv":null,"location_ref":"Kingsley Solar Farm, Imperial County, CA","lat":32.742036,"lng":-115.7354,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1747, 1748. Plant 64634 Kingsley Solar Farm (90FI 8me, LLC), Imperial County, CA; balancing authority CISO. Planned operation 2028-12.\nGenerator 90FI8: 225 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated\nGenerator 90FIB: 74 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":821,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"99mt 8me","state":"CA","name":"Sienna Solar Farm (Batteries, Solar Photovoltaic, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"Sienna Solar Farm, San Bernardino County, CA","lat":34.493659,"lng":-116.915,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1745, 1746. Plant 64632 Sienna Solar Farm (99MT 8me, LLC), San Bernardino County, CA; balancing authority CISO. Planned operation 2028-12.\nGenerator 99MT8: 200 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated\nGenerator 99MTB: 200 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1802,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Abeja Solar Farm","state":"TX","name":"Abeja Solar Farm (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Abeja Solar Farm, Bee County, TX","lat":28.288244,"lng":-97.84019,"route":null,"cost_usd":null,"start_date":"2028-07-01","end_date":"2028-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1608. Plant 68347 Abeja Solar Farm (Abeja Solar Farm LLC), Bee County, TX; balancing authority ERCO. Planned operation 2028-07.\nGenerator ABPV1: 200 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1803,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ables Springs Solar","state":"TX","name":"Ables Springs Solar & Storage (Solar Photovoltaic, 151 MW)","type":"generation","voltage_kv":null,"location_ref":"Ables Springs Solar & Storage, Kaufman County, TX","lat":32.819566,"lng":-96.18484,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 209. Plant 66905 Ables Springs Solar & Storage (Ables Springs Solar, LLC), Kaufman County, TX; balancing authority ERCO. Planned operation 2026-10.\nGenerator SOLAR: 151 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1804,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Accalia Point Solar","state":"TX","name":"Accalia Point Solar, LLC (Solar Photovoltaic, 190.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Accalia Point Solar, LLC, Cameron County, TX","lat":26.098075,"lng":-97.83752,"route":null,"cost_usd":null,"start_date":"2028-05-01","end_date":"2028-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1517. Plant 66673 Accalia Point Solar, LLC (Accalia Point Solar, LLC), Cameron County, TX; balancing authority ERCO. Planned operation 2028-05.\nGenerator 66666: 190.5 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1165,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Acciona Energy Usa Global","state":"KY","name":"AEUG Fleming Solar, LLC (Solar Photovoltaic, 188.5 MW)","type":"generation","voltage_kv":null,"location_ref":"AEUG Fleming Solar, LLC, Fleming County, KY","lat":38.429925,"lng":-83.77156,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 848. Plant 64658 AEUG Fleming Solar, LLC (Acciona Energy USA Global, LLC), Fleming County, KY; balancing authority PJM. Planned operation 2027-06.\nGenerator AFS: 188.5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1166,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Acciona Energy Usa Global","state":"KY","name":"AEUG Madison Solar, LLC (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"AEUG Madison Solar, LLC, Madison County, KY","lat":37.822029,"lng":-84.30052,"route":null,"cost_usd":null,"start_date":"2028-09-01","end_date":"2028-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1661. Plant 64659 AEUG Madison Solar, LLC (Acciona Energy USA Global, LLC), Madison County, KY; balancing authority PJM. Planned operation 2028-09.\nGenerator AMS: 100 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1806,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Acciona Energy Usa Global","state":"TX","name":"Adelite Storage Project LLC (Batteries, 230 MW)","type":"generation","voltage_kv":null,"location_ref":"Adelite Storage Project LLC, Milam County, TX","lat":30.622383,"lng":-97.2105,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1473. Plant 69004 Adelite Storage Project LLC (Acciona Energy USA Global, LLC), Milam County, TX; balancing authority ERCO. Planned operation 2028-03.\nGenerator ADELI: 230 MW Batteries; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1877,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Acciona Energy Usa Global","state":"TX","name":"Coneflower Storage Project LLC (Batteries, 170.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Coneflower Storage Project LLC, Chambers County, TX","lat":29.8547,"lng":-94.9254,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1023. Plant 69110 Coneflower Storage Project LLC (Acciona Energy USA Global, LLC), Chambers County, TX; balancing authority ERCO. Planned operation 2027-09.\nGenerator CONEF: 170.9 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1818,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Actx Bess Project","state":"TX","name":"Ash Creek BESS (Batteries, 306 MW)","type":"generation","voltage_kv":null,"location_ref":"Ash Creek BESS, Hill County, TX","lat":31.900218,"lng":-97.01642,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1458. Plant 66391 Ash Creek BESS (ACTX BESS Project LLC), Hill County, TX; balancing authority ERCO. Planned operation 2028-03.\nGenerator BESS: 306 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1805,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Adams Creek Solar Project","state":"TX","name":"Adams Creek Solar Project (Solar Photovoltaic, 250 MW)","type":"generation","voltage_kv":null,"location_ref":"Adams Creek Solar Project, Wilbarger County, TX","lat":34.15382,"lng":-98.96333,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 902. Plant 70300 Adams Creek Solar Project (Adams Creek Solar Project, LLC), Wilbarger County, TX; balancing authority ERCO. Planned operation 2027-06.\nGenerator USADC: 250 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":711,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Aes Clean Energy","state":"CA","name":"Baldy Mesa Storage (Batteries, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"Baldy Mesa Storage, San Bernardino County, CA","lat":34.6029,"lng":-117.449,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 151. Plant 69964 Baldy Mesa Storage (AES Clean Energy), San Bernardino County, CA; balancing authority CISO. Planned operation 2026-09.\nGenerator BALBE: 50 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":767,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Aes Clean Energy","state":"CA","name":"Jasmine (Batteries, Solar Photovoltaic, 134.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Jasmine, Kern County, CA","lat":35.1006,"lng":-119.1187,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1391, 1392. Plant 70109 Jasmine (AES Clean Energy), Kern County, CA; balancing authority CISO. Planned operation 2027-12.\nGenerator JASBE: 64.4 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator JASMI: 70 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":965,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Aes Clean Energy","state":"HI","name":"Keamuku (Batteries, Solar Photovoltaic, 172 MW)","type":"generation","voltage_kv":null,"location_ref":"Keamuku, Hawaii County, HI","lat":19.8799,"lng":-155.7373,"route":null,"cost_usd":null,"start_date":"2030-05-01","end_date":"2030-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2062, 2063. Plant 69795 Keamuku (AES Clean Energy), Hawaii County, HI; balancing authority HECO. Planned operation 2030-05.\nGenerator KEABE: 86 MW Batteries; (L) Regulatory approvals pending. Not under construction\nGenerator KEAMU: 86 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":966,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Aes Clean Energy","state":"HI","name":"Kuihelani Phase 2 (Solar Photovoltaic, 40 MW)","type":"generation","voltage_kv":null,"location_ref":"Kuihelani Phase 2, Maui County, HI","lat":20.8026,"lng":-156.4984,"route":null,"cost_usd":null,"start_date":"2028-11-01","end_date":"2028-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1729. Plant 69743 Kuihelani Phase 2 (AES Clean Energy), Maui County, HI; balancing authority HECO. Planned operation 2028-11.\nGenerator KUIHE: 40 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":986,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Aes Clean Energy","state":"IL","name":"Allen CSG (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Allen CSG, Peoria County, IL","lat":40.9166,"lng":-89.5273,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 643. Plant 70177 Allen CSG (AES Clean Energy), Peoria County, IL; balancing authority MISO. Planned operation 2027-01.\nGenerator ALLEN: 5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1048,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Aes Clean Energy","state":"IL","name":"Kieser (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Kieser, McLean County, IL","lat":40.4396,"lng":-89.0078,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 303. Plant 70176 Kieser (AES Clean Energy), McLean County, IL; balancing authority MISO. Planned operation 2026-10.\nGenerator KIESE: 5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1375,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Aes Clean Energy","state":"NC","name":"Halifax County Solar (Solar Photovoltaic, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"Halifax County Solar, Halifax County, NC","lat":36.2537,"lng":-77.6884,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 110. Plant 69197 Halifax County Solar (AES Clean Energy), Halifax County, NC; balancing authority PJM. Planned operation 2026-09.\nGenerator HALIF: 80 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1389,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Aes Clean Energy","state":"NC","name":"Robeson Solar I (Batteries, Solar Photovoltaic, 108 MW)","type":"generation","voltage_kv":null,"location_ref":"Robeson Solar I, Robeson County, NC","lat":34.614574,"lng":-78.93468,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1775, 1776. Plant 68043 Robeson Solar I (AES Clean Energy), Robeson County, NC; balancing authority CPLE. Planned operation 2028-12.\nGenerator ROBES: 80 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated\nGenerator ROBSS: 28 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1479,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Aes Clean Energy","state":"NY","name":"AES Glengarry Farms Solar CSG (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"AES Glengarry Farms Solar CSG, Franklin County, NY","lat":44.9183,"lng":-74.1477,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 76. Plant 68389 AES Glengarry Farms Solar CSG (AES Clean Energy), Franklin County, NY; balancing authority NYIS. Planned operation 2026-09.\nGenerator GLENG: 5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1480,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Aes Clean Energy","state":"NY","name":"AES Rt 5 Solar CSG (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"AES Rt 5 Solar CSG, Genesee County, NY","lat":42.97347,"lng":-78.01527,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 75. Plant 68388 AES Rt 5 Solar CSG (AES Clean Energy), Genesee County, NY; balancing authority NYIS. Planned operation 2026-09.\nGenerator RT5SS: 5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1494,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Aes Clean Energy","state":"NY","name":"Brookside Solar (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Brookside Solar, Franklin County, NY","lat":44.932,"lng":-74.1302,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1018. Plant 68473 Brookside Solar (AES Clean Energy), Franklin County, NY; balancing authority NYIS. Planned operation 2027-09.\nGenerator BROOK: 100 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1506,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Aes Clean Energy","state":"NY","name":"Empire Solar (NY) (Solar Photovoltaic, 125 MW)","type":"generation","voltage_kv":null,"location_ref":"Empire Solar (NY), Chautauqua County, NY","lat":42.2596,"lng":-79.6142,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1257. Plant 66663 Empire Solar (NY) (AES Clean Energy), Chautauqua County, NY; balancing authority NYIS. Planned operation 2027-12.\nGenerator EMPIR: 125 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1564,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Aes Clean Energy","state":"NY","name":"Riverside Solar LLC (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Riverside Solar LLC, St Lawrence County, NY","lat":44.06585,"lng":-76.1222,"route":null,"cost_usd":null,"start_date":"2029-07-01","end_date":"2029-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1942. Plant 67325 Riverside Solar LLC (AES Clean Energy), St Lawrence County, NY; balancing authority NYIS. Planned operation 2029-07.\nGenerator NYRIV: 100 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1578,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Aes Clean Energy","state":"NY","name":"Somerset Solar LLC (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Somerset Solar LLC, Niagara County, NY","lat":43.352072,"lng":-78.61036,"route":null,"cost_usd":null,"start_date":"2029-10-01","end_date":"2029-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1981. Plant 67324 Somerset Solar LLC (AES Clean Energy), Niagara County, NY; balancing authority NYIS. Planned operation 2029-10.\nGenerator NYSOM: 100 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1816,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Aes Clean Energy","state":"TX","name":"Armadillo Solar Center (Solar Photovoltaic, 175 MW)","type":"generation","voltage_kv":null,"location_ref":"Armadillo Solar Center, Navarro County, TX","lat":32.00014,"lng":-96.2027,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 750. Plant 64349 Armadillo Solar Center (AES Clean Energy), Navarro County, TX; balancing authority ERCO. Planned operation 2027-04.\nGenerator 6666: 175 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2128,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Aes Clean Energy","state":"TX","name":"Willow Beach Wind (Onshore Wind Turbine, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Willow Beach Wind, Brazoria County, TX","lat":29.249522,"lng":-95.13416,"route":null,"cost_usd":null,"start_date":"2029-02-01","end_date":"2029-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1852. Plant 68090 Willow Beach Wind (AES Clean Energy), Brazoria County, TX; balancing authority ERCO. Planned operation 2029-02.\nGenerator WILLO: 200 MW Onshore Wind Turbine; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2175,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Aes Clean Energy","state":"VA","name":"Hecate Energy Pulaski 1 (Solar Photovoltaic, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Hecate Energy Pulaski 1, Pulaski County, VA","lat":37.139595,"lng":-80.68741,"route":null,"cost_usd":null,"start_date":"2028-04-01","end_date":"2028-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1494. Plant 65665 Hecate Energy Pulaski 1 (AES Clean Energy), Pulaski County, VA; balancing authority PJM. Planned operation 2028-04.\nGenerator HEPU1: 150 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2198,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Aes Clean Energy","state":"VA","name":"Sycamore Cross Solar (Solar Photovoltaic, 208.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Sycamore Cross Solar, Isle of Wight County, VA","lat":37.017425,"lng":-76.74399,"route":null,"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1912. Plant 68040 Sycamore Cross Solar (AES Clean Energy), Isle of Wight County, VA; balancing authority PJM. Planned operation 2029-06.\nGenerator SYCAM: 208.2 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":958,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Aes Distributed Energy","state":"HI","name":"AES Mountain View Solar (Batteries, Solar Photovoltaic, 14 MW)","type":"generation","voltage_kv":null,"location_ref":"AES Mountain View Solar, Honolulu County, HI","lat":21.45799,"lng":-158.1767,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 336, 337. Plant 66002 AES Mountain View Solar (AES Distributed Energy), Honolulu County, HI; balancing authority HECO. Planned operation 2026-11.\nGenerator MVSBA: 7 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator MVSPV: 7 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":959,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Aes Distributed Energy","state":"HI","name":"AES Waiawa Phase 2 Solar (Batteries, Solar Photovoltaic, 60 MW)","type":"generation","voltage_kv":null,"location_ref":"AES Waiawa Phase 2 Solar, Honolulu County, HI","lat":21.43026,"lng":-157.9779,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 35, 36. Plant 66066 AES Waiawa Phase 2 Solar (AES Distributed Energy), Honolulu County, HI; balancing authority HECO. Planned operation 2026-09.\nGenerator WAIBA: 30 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator WAIPV: 30 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2144,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Aes Distributed Energy","state":"UT","name":"Glen Canyon Solar A, LLC (Solar Photovoltaic, 95 MW)","type":"generation","voltage_kv":null,"location_ref":"Glen Canyon Solar A, LLC, Kane County, UT","lat":37.091539,"lng":-111.7255,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1761. Plant 66484 Glen Canyon Solar A, LLC (AES Distributed Energy), Kane County, UT; balancing authority PACE. Planned operation 2028-12.\nGenerator GCA: 95 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1448,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Affordable Solar Silver City","state":"NM","name":"SLO-2 (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"SLO-2, Sandoval County, NM","lat":35.363052,"lng":-106.631,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 105. Plant 69105 SLO-2 (Affordable Solar Silver City, LLC), Sandoval County, NM; balancing authority PNM. Planned operation 2026-09.\nGenerator SLO-2: 5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1214,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Agilitas Energy","state":"MA","name":"Braley Hill North Solar (Batteries, Solar Photovoltaic, 10 MW)","type":"generation","voltage_kv":null,"location_ref":"Braley Hill North Solar, Plymouth County, MA","lat":41.776,"lng":-70.904,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 708, 709. Plant 68215 Braley Hill North Solar (Agilitas Energy, Inc.), Plymouth County, MA; balancing authority ISNE. Planned operation 2027-03.\nGenerator BRAES: 5 MW Batteries; (L) Regulatory approvals pending. Not under construction\nGenerator BRAPV: 5 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1228,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Agilitas Energy","state":"MA","name":"Snipatuit Road Solar (Batteries, Solar Photovoltaic, 8 MW)","type":"generation","voltage_kv":null,"location_ref":"Snipatuit Road Solar, Plymouth County, MA","lat":41.768,"lng":-70.882,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 714, 715. Plant 68219 Snipatuit Road Solar (Agilitas Energy, Inc.), Plymouth County, MA; balancing authority ISNE. Planned operation 2027-03.\nGenerator SNIES: 4 MW Batteries; (L) Regulatory approvals pending. Not under construction\nGenerator SNIPV: 4 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1542,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Agilitas Energy","state":"NY","name":"Manorville II (Batteries, Solar Photovoltaic, 1.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Manorville II, Suffolk County, NY","lat":40.834,"lng":-72.7819,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1225, 1226. Plant 64758 Manorville II (Agilitas Energy, Inc.), Suffolk County, NY; balancing authority NYIS. Planned operation 2027-12.\nGenerator MAN: 0.6 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction\nGenerator MANB: 0.8 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2255,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Agilitas Energy","state":"WV","name":"Tygart Hydropower (Conventional Hydroelectric, 30 MW)","type":"generation","voltage_kv":null,"location_ref":"Tygart Hydropower, Taylor County, WV","lat":39.279354,"lng":-80.00891,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 687, 688, 689. Plant 64171 Tygart Hydropower (Agilitas Energy, Inc.), Taylor County, WV; balancing authority PJM. Planned operation 2027-03.\nGenerator 1: 10 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator 2: 10 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator 3: 10 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":623,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Alabama Creek Solar","state":"AL","name":"Alabama Creek Solar (Solar Photovoltaic, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"Alabama Creek Solar, Dallas County, AL","lat":32.315548,"lng":-87.22312,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1091. Plant 68057 Alabama Creek Solar (Alabama Creek Solar, LLC), Dallas County, AL; balancing authority SOCO. Planned operation 2027-10.\nGenerator BAMA1: 80 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1807,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Alamo City Ess","state":"TX","name":"Alamo City ESS (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Alamo City ESS, Bexar County, TX","lat":29.345305,"lng":-98.31948,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 932. Plant 68348 Alamo City ESS (Alamo City ESS LLC), Bexar County, TX; balancing authority ERCO. Planned operation 2027-07.\nGenerator ACESS: 200 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1482,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Alfred Oaks Solar","state":"NY","name":"Alfred Oaks Solar, LLC (Solar Photovoltaic, 115.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Alfred Oaks Solar, LLC, Allegany County, NY","lat":42.21,"lng":-77.82,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2015. Plant 66675 Alfred Oaks Solar, LLC (Alfred Oaks Solar, LLC), Allegany County, NY; balancing authority NYIS. Planned operation 2029-12.\nGenerator ALOAK: 115.2 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1809,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Alina Energy","state":"TX","name":"Alina Energy LLC (Batteries, Solar Photovoltaic, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"Alina Energy LLC, Wilson County, TX","lat":29.161128,"lng":-98.08988,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1559, 1560. Plant 67250 Alina Energy LLC (Alina Energy LLC), Wilson County, TX; balancing authority ERCO. Planned operation 2028-06.\nGenerator ALIBS: 200 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator ALIPV: 200 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1670,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Allegheny Hydro Group Lock and Dam 4","state":"PA","name":"Allegheny Lock and Dam 4 (Conventional Hydroelectric, 6.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Allegheny Lock and Dam 4, Allegheny County, PA","lat":40.613718,"lng":-79.71829,"route":null,"cost_usd":null,"start_date":"2031-02-01","end_date":"2031-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2266, 2267, 2268, 2269, 2270, 2271, 2272, 2273. Plant 69694 Allegheny Lock and Dam 4 (Allegheny Hydro Group Lock and Dam 4, Inc), Allegheny County, PA; balancing authority PJM. Planned operation 2031-02.\nGenerator AL4-1: 0.8 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator AL4-2: 0.8 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator AL4-3: 0.8 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator AL4-4: 0.8 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator AL4-5: 0.8 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator AL4-6: 0.8 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator AL4-7: 0.8 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator AL4-8: 0.8 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":936,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Alligator Creek Solar","state":"GA","name":"Alligator Creek Solar (Solar Photovoltaic, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"Alligator Creek Solar, Wheeler County, GA","lat":32.104,"lng":-82.844,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 160. Plant 70084 Alligator Creek Solar (Alligator Creek Solar, LLC), Wheeler County, GA; balancing authority SOCO. Planned operation 2026-09.\nGenerator AC: 80 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1576,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Altus Power America Management","state":"NY","name":"Scipio Solar (Solar Photovoltaic, 18 MW)","type":"generation","voltage_kv":null,"location_ref":"Scipio Solar, Cayuga County, NY","lat":42.78732,"lng":-76.32378,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 645. Plant 70260 Scipio Solar (Altus Power America Management, LLC), Cayuga County, NY; balancing authority NYIS. Planned operation 2027-01.\nGenerator SCIPI: 18 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1580,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Altus Power America Management","state":"NY","name":"SunEast Dog Corners Solar Project (Solar Photovoltaic, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"SunEast Dog Corners Solar Project, Cayuga County, NY","lat":42.744301,"lng":-76.66531,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 610. Plant 62823 SunEast Dog Corners Solar Project (Altus Power America Management, LLC), Cayuga County, NY; balancing authority NYIS. Planned operation 2027-01.\nGenerator Q584: 20 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1581,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Altus Power America Management","state":"NY","name":"SunEast Flat Hill Solar Project (Solar Photovoltaic, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"SunEast Flat Hill Solar Project, Herkimer County, NY","lat":43.044363,"lng":-74.79632,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 921. Plant 63901 SunEast Flat Hill Solar Project (Altus Power America Management, LLC), Herkimer County, NY; balancing authority NYIS. Planned operation 2027-07.\nGenerator Q#865: 20 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1586,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Altus Power America Management","state":"NY","name":"SunEast Valley Solar Project (Solar Photovoltaic, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"SunEast Valley Solar Project, Tioga County, NY","lat":42.083795,"lng":-76.2477,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 805. Plant 63862 SunEast Valley Solar Project (Altus Power America Management, LLC), Tioga County, NY; balancing authority NYIS. Planned operation 2027-05.\nGenerator Q#828: 20 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":703,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ameresco Ox Mountain Energy","state":"CA","name":"Ameresco Ox Mountain (Landfill Gas, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Ameresco Ox Mountain, San Mateo County, CA","lat":37.5,"lng":-122.4,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 999. Plant 56895 Ameresco Ox Mountain (AMERESCO Ox Mountain Energy LLC), San Mateo County, CA; balancing authority CISO. Planned operation 2027-09.\nGenerator 7: 3 MW Landfill Gas; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":699,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Amiscope Nordhoff Lp","state":"CA","name":"20525 Nordhoff PV (North) (Solar Photovoltaic, 1.9 MW)","type":"generation","voltage_kv":null,"location_ref":"20525 Nordhoff PV (North), Los Angeles County, CA","lat":34.235572,"lng":-118.5811,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 551. Plant 69591 20525 Nordhoff PV (North) (Amiscope Nordhoff, LP), Los Angeles County, CA; balancing authority LDWP. Planned operation 2026-12.\nGenerator 20525: 1.9 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1813,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Anson Solar Center 2","state":"TX","name":"Anson 2 Solar (Solar Photovoltaic, 218.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Anson 2 Solar, Jones County, TX","lat":32.805609,"lng":-99.91901,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 107. Plant 69149 Anson 2 Solar (Anson Solar Center 2, LLC), Jones County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator ANSN2: 218.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2170,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Antares Group","state":"VA","name":"Elm Spring Solar 1 (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Elm Spring Solar 1, Augusta County, VA","lat":38.0945,"lng":-78.9595,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1753. Plant 65313 Elm Spring Solar 1 (Antares Group Inc), Augusta County, VA; balancing authority PJM. Planned operation 2028-12.\nGenerator ES: 3 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2192,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Antares Group","state":"VA","name":"Shenvalee Solar (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Shenvalee Solar, Augusta County, VA","lat":38.0249,"lng":-79.0335,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2010. Plant 65312 Shenvalee Solar (Antares Group Inc), Augusta County, VA; balancing authority PJM. Planned operation 2029-12.\nGenerator SV: 3 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1814,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Apache Hill Energy Center","state":"TX","name":"Apache Hill Energy Center (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Apache Hill Energy Center, Hood County, TX","lat":32.380005,"lng":-97.72782,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 375. Plant 69155 Apache Hill Energy Center (Apache Hill Energy Center), Hood County, TX; balancing authority ERCO. Planned operation 2026-11.\nGenerator AHBA1: 200 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1815,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Apple Infra","state":"TX","name":"Apple BESS (Batteries, 9.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Apple BESS, Ector County, TX","lat":31.675697,"lng":-102.3638,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 118. Plant 69318 Apple BESS (Apple Infra, LLC), Ector County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator APPLE: 9.9 MW Batteries; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1866,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ap Solar 4","state":"TX","name":"Charger Solar (Solar Photovoltaic, 394.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Charger Solar, Refugio County, TX","lat":28.416661,"lng":-97.03519,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 148. Plant 69877 Charger Solar (AP Solar 4 LLC), Refugio County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator CHPV1: 394.4 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1355,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Arfl Bn","state":"MT","name":"Anthelope Hills Solar Generation BESS (Batteries, Solar Photovoltaic, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"Anthelope Hills Solar Generation BESS, Beaverhead County, MT","lat":45.05029,"lng":-113.0588,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1312, 1313. Plant 68315 Anthelope Hills Solar Generation BESS (ARFL bn, LLC), Beaverhead County, MT; balancing authority NWMT. Planned operation 2027-12.\nGenerator ARFL1: 200 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction\nGenerator ARFL2: 200 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":987,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Argenta Solar","state":"IL","name":"Argenta Solar (Solar Photovoltaic, 1.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Argenta Solar, Macon County, IL","lat":39.989915,"lng":-88.81196,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 405. Plant 69813 Argenta Solar (Argenta Solar, LLC), Macon County, IL; balancing authority MISO. Planned operation 2026-11.\nGenerator ARGEN: 1.5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":682,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Arizona Electric Pwr Coop","state":"AZ","name":"Mohave Energy Park (Natural Gas Fired Combustion Turbine, 242 MW)","type":"generation","voltage_kv":null,"location_ref":"Mohave Energy Park, Mohave County, AZ","lat":34.932499,"lng":-114.548,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1362, 1363, 1364, 1365. Plant 69773 Mohave Energy Park (Arizona Electric Pwr Coop Inc), Mohave County, AZ; balancing authority WALC. Planned operation 2027-12.\nGenerator GT1: 60.5 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator GT2: 60.5 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator GT3: 60.5 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator GT4: 60.5 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":662,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Arizona Public Service","state":"AZ","name":"Agave (Batteries, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Agave, Maricopa County, AZ","lat":33.32389,"lng":-112.8397,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 215. Plant 67964 Agave (Arizona Public Service Co), Maricopa County, AZ; balancing authority AZPS. Planned operation 2026-10.\nGenerator A400M: 150 MW Batteries; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":678,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Arizona Public Service","state":"AZ","name":"Ironwood Solar (Solar Photovoltaic, 168 MW)","type":"generation","voltage_kv":null,"location_ref":"Ironwood Solar, Yuma County, AZ","lat":32.915556,"lng":-113.5778,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 357. Plant 68397 Ironwood Solar (Arizona Public Service Co), Yuma County, AZ; balancing authority AZPS. Planned operation 2026-11.\nGenerator I168M: 168 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":685,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Arizona Public Service","state":"AZ","name":"Red Hawk (Natural Gas Fired Combustion Turbine, 392 MW)","type":"generation","voltage_kv":null,"location_ref":"Red Hawk, Maricopa County, AZ","lat":33.334562,"lng":-112.8406,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1064, 1065, 1066, 1067, 1068, 1069, 1070, 1071. Plant 55455 Red Hawk (Arizona Public Service Co), Maricopa County, AZ; balancing authority SRP. Planned operation 2027-10.\nGenerator CT10: 49 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete\nGenerator CT3: 49 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete\nGenerator CT4: 49 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete\nGenerator CT5: 49 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete\nGenerator CT6: 49 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete\nGenerator CT7: 49 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete\nGenerator CT8: 49 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete\nGenerator CT9: 49 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":636,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Arkana Solar","state":"AR","name":"Arkana Solar (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Arkana Solar, Columbia County, AR","lat":33.04521,"lng":-93.44841,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2040. Plant 69642 Arkana Solar (Arkana Solar LLC), Columbia County, AR; balancing authority MISO. Planned operation 2029-12.\nGenerator 96513: 100 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":656,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Arkansas Electric Coop","state":"AR","name":"Thomas Fitzhugh (Natural Gas Fired Combustion Turbine, 69.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Thomas Fitzhugh, Franklin County, AR","lat":35.462382,"lng":-93.80493,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 181. Plant 201 Thomas Fitzhugh (Arkansas Electric Coop Corp), Franklin County, AR; balancing authority SWPP. Planned operation 2026-10.\nGenerator 4: 69.3 MW Natural Gas Fired Combustion Turbine; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2001,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Arkansas Electric Coop","state":"TX","name":"Naples Power Plant (Natural Gas Fired Combustion Turbine, 900 MW)","type":"generation","voltage_kv":null,"location_ref":"Naples Power Plant, Morris County, TX","lat":33.21964,"lng":-94.70564,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1785, 1786. Plant 68273 Naples Power Plant (Arkansas Electric Coop Corp), Morris County, TX; balancing authority SWPP. Planned operation 2028-12.\nGenerator 1: 450 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator 2: 450 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1328,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Associated Electric Coop","state":"MO","name":"Turney Energy Center (Natural Gas Fired Combustion Turbine, 419 MW)","type":"generation","voltage_kv":null,"location_ref":"Turney Energy Center, Clinton County, MO","lat":39.615,"lng":-94.351,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 928. Plant 67263 Turney Energy Center (Associated Electric Coop, Inc), Clinton County, MO; balancing authority AECI. Planned operation 2027-07.\nGenerator TN1: 419 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1642,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Associated Electric Coop","state":"OK","name":"Ripley Energy Center (Natural Gas Fired Combustion Turbine, 419 MW)","type":"generation","voltage_kv":null,"location_ref":"Ripley Energy Center, Payne County, OK","lat":36.116,"lng":-96.902,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 702. Plant 67262 Ripley Energy Center (Associated Electric Coop, Inc), Payne County, OK; balancing authority AECI. Planned operation 2027-03.\nGenerator RP1: 419 MW Natural Gas Fired Combustion Turbine; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2696,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Associated Electric Cooperative","state":null,"name":"Gainesville #2 - Bull Shoals 161 Kv Transmission Line, Rebuild","type":"transmission line","voltage_kv":161,"location_ref":"Gainesville #2 - Bull Shoals (MO/AR/OK)","lat":36.507,"lng":-92.517,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":1,"raw_excerpt":"SERTP AECI Balancing Authority Area, page 1.\nIn-Service Year: 2027\nProject Name: GAINESVILLE #2 - BULL SHOALS 161 KV TRANSMISSION LINE, REBUILD\nDescription: Rebuild the 24.42 mile-long Gainesville #2 - Bull Shoals 161 kV transmission line 795 ACSR at 100°C.\nSupporting Statement: The Gainesville - Bull Shoals 161 kV transmission line overloads under contingency.\nLocated: BULL SHOALS = OSM substation 'Bull Shoals Substation' (AR); GAINESVILLE #2 ~ Ozark County, MO (county centre) (nearest of 2) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2697,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Associated Electric Cooperative","state":null,"name":"Mansfield - Gainesville #2 161 Kv Transmission Line, Rebuild","type":"transmission line","voltage_kv":161,"location_ref":"Mansfield - Gainesville #2 (MO/AR/OK)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":1,"raw_excerpt":"SERTP AECI Balancing Authority Area, page 1.\nIn-Service Year: 2027\nProject Name: MANSFIELD - GAINESVILLE #2 161 KV TRANSMISSION LINE, REBUILD\nDescription: Rebuild the 31.58 mile-long Mansfield - Gainesville #2 161 kV transmission line with 795 ACSR at 100°C.\nSupporting Statement: The Mansfield - Gainesville 161 kV transmission line can overload under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2698,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Associated Electric Cooperative","state":null,"name":"Morgan - Brookline 161 Kv Transmission Line, Rebuild","type":"transmission line","voltage_kv":161,"location_ref":"Morgan - Brookline (MO/AR/OK)","lat":37.331,"lng":-93.498,"route":[[37.49,-93.621],[37.171,-93.375]],"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":1,"raw_excerpt":"SERTP AECI Balancing Authority Area, page 1.\nIn-Service Year: 2028\nProject Name: MORGAN - BROOKLINE 161 KV TRANSMISSION LINE, REBUILD\nDescription: Rebuild the 26.49 mile-long Morgan - Brookline 161 kV transmission line with 795 ACSR at 100°C.\nSupporting Statement: The Morgan - Brookline 161 kV transmission line overloads under contingency.\nLocated: MORGAN = OSM substation 'Morgan Substation' (MO); BROOKLINE = OSM substation 'Brookline Substation' (MO) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":664,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Atlas Bess Iv","state":"AZ","name":"Atlas BESS IV LLC (Batteries, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Atlas BESS IV LLC, La Paz County, AZ","lat":33.582903,"lng":-113.5769,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 716. Plant 68321 Atlas BESS IV LLC (ATLAS BESS IV, LLC), La Paz County, AZ; balancing authority CISO. Planned operation 2027-03.\nGenerator ALT4: 150 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":657,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Atlas Solar Ii","state":"AZ","name":"ATLAS II (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"ATLAS II, La Paz County, AZ","lat":33.582903,"lng":-113.5769,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 373. Plant 69054 ATLAS II (ATLAS Solar II, LLC), La Paz County, AZ; balancing authority CISO. Planned operation 2026-11.\nGenerator ALT2: 100 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":658,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Atlas Solar Iv","state":"AZ","name":"ATLAS SOLAR IV (Solar Photovoltaic, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"ATLAS SOLAR IV, La Paz County, AZ","lat":33.582903,"lng":-113.5769,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 720. Plant 69055 ATLAS SOLAR IV (ATLAS SOLAR IV, LLC), La Paz County, AZ; balancing authority CISO. Planned operation 2027-03.\nGenerator ALTS4: 300 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":660,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Atlas Solar Manager","state":"AZ","name":"ATLAS Solar X, LLC (Solar Photovoltaic, 225 MW)","type":"generation","voltage_kv":null,"location_ref":"ATLAS Solar X, LLC, La Paz County, AZ","lat":33.546706,"lng":-113.5562,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1355. Plant 69198 ATLAS Solar X, LLC (ATLAS Solar Manager, LLC), La Paz County, AZ; balancing authority CISO. Planned operation 2027-12.\nGenerator ATL10: 225 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":661,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Atlas Solar Manager","state":"AZ","name":"ATLAS Solar XI, LLC (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"ATLAS Solar XI, LLC, La Paz County, AZ","lat":33.553361,"lng":-113.5803,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1356. Plant 69199 ATLAS Solar XI, LLC (ATLAS Solar Manager, LLC), La Paz County, AZ; balancing authority CISO. Planned operation 2027-12.\nGenerator ATL11: 200 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":659,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Atlas Solar Vi","state":"AZ","name":"ATLAS Solar VI, LLC (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"ATLAS Solar VI, LLC, La Paz County, AZ","lat":33.579227,"lng":-113.5742,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 112. Plant 69238 ATLAS Solar VI, LLC (ATLAS Solar VI, LLC), La Paz County, AZ; balancing authority CISO. Planned operation 2026-09.\nGenerator ATL6: 100 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":665,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Atlas Viii","state":"AZ","name":"Atlas VIII (Batteries, 210 MW)","type":"generation","voltage_kv":null,"location_ref":"Atlas VIII, La Paz County, AZ","lat":33.582903,"lng":-113.5769,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 496. Plant 68323 Atlas VIII (Atlas VIII LLC), La Paz County, AZ; balancing authority CISO. Planned operation 2026-12.\nGenerator ALT8A: 210 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":666,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Atlas Viii","state":"AZ","name":"Atlas VIII (Batteries, 172.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Atlas VIII, La Paz County, AZ","lat":33.582903,"lng":-113.5769,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 623. Plant 68323 Atlas VIII (Atlas VIII LLC), La Paz County, AZ; balancing authority CISO. Planned operation 2027-01.\nGenerator ALT8B: 172.4 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":985,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Avangrid Power","state":"IL","name":"Allen Acres Solar (Solar Photovoltaic, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Allen Acres Solar, LaSalle County, IL","lat":41.11792,"lng":-88.64038,"route":null,"cost_usd":null,"start_date":"2029-05-01","end_date":"2029-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1898. Plant 70055 Allen Acres Solar (Avangrid Power LLC), LaSalle County, IL; balancing authority PJM. Planned operation 2029-05.\nGenerator AA1: 150 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1072,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Avangrid Power","state":"IL","name":"Osagrove Flats Wind (Onshore Wind Turbine, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Osagrove Flats Wind, LaSalle County, IL","lat":40.941383,"lng":-88.97152,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 472. Plant 67347 Osagrove Flats Wind (Avangrid Power LLC), LaSalle County, IL; balancing authority PJM. Planned operation 2026-12.\nGenerator OF1: 150 MW Onshore Wind Turbine; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1168,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Avangrid Power","state":"KY","name":"Bright Mountain Solar (Solar Photovoltaic, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"Bright Mountain Solar, Perry County, KY","lat":37.29003,"lng":-83.28286,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1289. Plant 67990 Bright Mountain Solar (Avangrid Power LLC), Perry County, KY; balancing authority PJM. Planned operation 2027-12.\nGenerator BM1: 80 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1545,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Avangrid Power","state":"NY","name":"Mohawk Solar (Solar Photovoltaic, 90.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Mohawk Solar, Montgomery County, NY","lat":42.887133,"lng":-74.63781,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1222. Plant 64253 Mohawk Solar (Avangrid Power LLC), Montgomery County, NY; balancing authority NYIS. Planned operation 2027-12.\nGenerator S1: 90.5 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1612,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Avangrid Power","state":"OH","name":"Great Bear Solar, LLC (Solar Photovoltaic, 46 MW)","type":"generation","voltage_kv":null,"location_ref":"Great Bear Solar, LLC, Van Wert County, OH","lat":40.9397,"lng":-84.5828,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1219. Plant 64073 Great Bear Solar, LLC (Avangrid Power LLC), Van Wert County, OH; balancing authority PJM. Planned operation 2027-12.\nGenerator GBS: 46 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1658,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Avangrid Power","state":"OR","name":"Oregon Trail Solar (Solar Photovoltaic, 41 MW)","type":"generation","voltage_kv":null,"location_ref":"Oregon Trail Solar, Gilliam County, OR","lat":45.553436,"lng":-120.1861,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 777. Plant 69294 Oregon Trail Solar (Avangrid Power LLC), Gilliam County, OR; balancing authority BPAT. Planned operation 2027-04.\nGenerator OTS: 41 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1661,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Avangrid Power","state":"OR","name":"Shutler Energy Storage (Batteries, 41 MW)","type":"generation","voltage_kv":null,"location_ref":"Shutler Energy Storage, Gilliam County, OR","lat":45.54,"lng":-120.18,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1490. Plant 70225 Shutler Energy Storage (Avangrid Power LLC), Gilliam County, OR; balancing authority AVRN. Planned operation 2028-03.\nGenerator SES: 41 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1662,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Avangrid Power","state":"OR","name":"Sunset Solar (Solar Photovoltaic, 103 MW)","type":"generation","voltage_kv":null,"location_ref":"Sunset Solar, Wasco County, OR","lat":45.165062,"lng":-120.8804,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1754. Plant 65326 Sunset Solar (Avangrid Power LLC), Wasco County, OR; balancing authority BPAT. Planned operation 2028-12.\nGenerator SS1: 103 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2211,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Avangrid Power","state":"WA","name":"Bluebird Solar (Solar Photovoltaic, 140 MW)","type":"generation","voltage_kv":null,"location_ref":"Bluebird Solar, Klickitat County, WA","lat":45.896375,"lng":-120.3031,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1359. Plant 69482 Bluebird Solar (Avangrid Power LLC), Klickitat County, WA; balancing authority BPAT. Planned operation 2027-12.\nGenerator BBS1: 140 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1820,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Avant Prairie Ess","state":"TX","name":"Avant Prairie ESS (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Avant Prairie ESS, Freestone County, TX","lat":31.625891,"lng":-96.12222,"route":null,"cost_usd":null,"start_date":"2029-07-01","end_date":"2029-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1945. Plant 68349 Avant Prairie ESS (Avant Prairie ESS LLC), Freestone County, TX; balancing authority ERCO. Planned operation 2029-07.\nGenerator AVBS1: 200 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1822,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Backbone Bess","state":"TX","name":"Backbone Creek BESS (Batteries, 121 MW)","type":"generation","voltage_kv":null,"location_ref":"Backbone Creek BESS, Burnet County, TX","lat":30.550207,"lng":-98.25687,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 520. Plant 69167 Backbone Creek BESS (Backbone BESS LLC), Burnet County, TX; balancing authority ERCO. Planned operation 2026-12.\nGenerator BCKBN: 121 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2222,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Badger State Solar","state":"WI","name":"Badger State Solar LLC (Solar Photovoltaic, 149 MW)","type":"generation","voltage_kv":null,"location_ref":"Badger State Solar LLC, Jefferson County, WI","lat":43.012287,"lng":-88.86356,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1101. Plant 68900 Badger State Solar LLC (Badger State Solar LLC), Jefferson County, WI; balancing authority MISO. Planned operation 2027-10.\nGenerator BSS: 149 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":773,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Balboa Avenue I Solar Project 2023","state":"CA","name":"L3 Harris San Diego (Solar Photovoltaic, 1.6 MW)","type":"generation","voltage_kv":null,"location_ref":"L3 Harris San Diego, San Diego County, CA","lat":32.822588,"lng":-117.1352,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 283. Plant 69711 L3 Harris San Diego (Balboa Avenue I Solar Project 2023, LLC), San Diego County, CA; balancing authority CISO. Planned operation 2026-10.\nGenerator 6672: 1.6 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1485,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Bartell South Pv I","state":"NY","name":"Bartell South PV I (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Bartell South PV I, Onondaga County, NY","lat":43.208874,"lng":-76.12219,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 262. Plant 69369 Bartell South PV I (Bartell South PV I LLC), Onondaga County, NY; balancing authority NYIS. Planned operation 2026-10.\nGenerator BARTE: 3 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1825,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Barton Branch Ia","state":"TX","name":"Barton Branch IA (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Barton Branch IA, Robertson County, TX","lat":31.103064,"lng":-96.66494,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 391. Plant 69392 Barton Branch IA (Barton Branch IA LLC), Robertson County, TX; balancing authority ERCO. Planned operation 2026-11.\nGenerator BBIA: 200 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1404,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Basin Electric Power Coop","state":"ND","name":"Bison Generation Station (Natural Gas Fired Combined Cycle, 759 MW)","type":"generation","voltage_kv":null,"location_ref":"Bison Generation Station, Williams County, ND","lat":48.327932,"lng":-103.3127,"route":null,"cost_usd":null,"start_date":"2029-02-01","end_date":"2029-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1856, 1857. Plant 69071 Bison Generation Station (Basin Electric Power Coop), Williams County, ND; balancing authority SWPP. Planned operation 2029-02.\nGenerator CA1: 263 MW Natural Gas Fired Combined Cycle; (L) Regulatory approvals pending. Not under construction\nGenerator CT1: 496 MW Natural Gas Fired Combined Cycle; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1405,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Basin Electric Power Coop","state":"ND","name":"Bison Generation Station (Natural Gas Fired Combined Cycle, 759 MW)","type":"generation","voltage_kv":null,"location_ref":"Bison Generation Station, Williams County, ND","lat":48.327932,"lng":-103.3127,"route":null,"cost_usd":null,"start_date":"2030-03-01","end_date":"2030-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2052, 2053. Plant 69071 Bison Generation Station (Basin Electric Power Coop), Williams County, ND; balancing authority SWPP. Planned operation 2030-03.\nGenerator CA2: 263 MW Natural Gas Fired Combined Cycle; (L) Regulatory approvals pending. Not under construction\nGenerator CT2: 496 MW Natural Gas Fired Combined Cycle; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1299,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Baxter Healthcare of Puerto Rico / Jayuya","state":"MN","name":"Kraemer Garden (Solar Photovoltaic, 4 MW)","type":"generation","voltage_kv":null,"location_ref":"Kraemer Garden, Stearns County, MN","lat":45.53123,"lng":-94.24932,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 319. Plant 70380 Kraemer Garden (Baxter Healthcare of Puerto Rico/Jayuya), Stearns County, MN; balancing authority MISO. Planned operation 2026-10.\nGenerator GEN4: 4 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1241,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Bd Solar Auburn","state":"ME","name":"Auburn PV - BD Solar Auburn LLC (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Auburn PV - BD Solar Auburn LLC, Androscoggin County, ME","lat":44.05,"lng":-70.3,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1454. Plant 64067 Auburn PV - BD Solar Auburn LLC (BD Solar Auburn LLC), Androscoggin County, ME; balancing authority ISNE. Planned operation 2028-03.\nGenerator AUBPV: 5 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1247,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Bd Solar Lewiston Junction","state":"ME","name":"Lewiston Jn PV - BD Solar Lewiston Jn LL (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Lewiston Jn PV - BD Solar Lewiston Jn LL, Androscoggin County, ME","lat":44.05,"lng":-70.3,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1455. Plant 64071 Lewiston Jn PV - BD Solar Lewiston Jn LL (BD Solar Lewiston Junction LLC), Androscoggin County, ME; balancing authority ISNE. Planned operation 2028-03.\nGenerator LJNPV: 5 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1366,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Bear Branch Solar","state":"NC","name":"Bear Branch Solar (Solar Photovoltaic, 34.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Bear Branch Solar, Stokes County, NC","lat":36.340427,"lng":-80.12974,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 611. Plant 64168 Bear Branch Solar (Bear Branch Solar LLC), Stokes County, NC; balancing authority DUK. Planned operation 2027-01.\nGenerator GEN: 34.5 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1356,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Beartooth Energy Storage","state":"MT","name":"Beartooth Energy Storage LLC (Batteries, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"Beartooth Energy Storage LLC, Yellowstone County, MT","lat":45.7843,"lng":-108.7178,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1236. Plant 65407 Beartooth Energy Storage LLC (Beartooth Energy Storage, LLC), Yellowstone County, MT; balancing authority NWMT. Planned operation 2027-12.\nGenerator BEAR1: 50 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":713,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Bear Valley Electric Service","state":"CA","name":"Bear Valley Battery Plant (Batteries, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Bear Valley Battery Plant, San Bernardino County, CA","lat":34.25,"lng":-116.86,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 755. Plant 67257 Bear Valley Battery Plant (Bear Valley Electric Service), San Bernardino County, CA; balancing authority CISO. Planned operation 2027-04.\nGenerator BVEB1: 5 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1313,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Beavertail Solar","state":"MO","name":"Beavertail Solar (Solar Photovoltaic, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"Beavertail Solar, Henry County, MO","lat":38.311814,"lng":-93.93546,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 772. Plant 68917 Beavertail Solar (Beavertail Solar, LLC), Henry County, MO; balancing authority SPA. Planned operation 2027-04.\nGenerator BS: 400 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2246,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Bedington Energy Facility","state":"WV","name":"Bedington Energy Facility, LLC (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Bedington Energy Facility, LLC, Berkeley County, WV","lat":39.531839,"lng":-77.88709,"route":null,"cost_usd":null,"start_date":"2028-10-01","end_date":"2028-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1684. Plant 64848 Bedington Energy Facility, LLC (Bedington Energy Facility, LLC), Berkeley County, WV; balancing authority PJM. Planned operation 2028-10.\nGenerator BEF1: 100 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1826,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Bee Branch Ia","state":"TX","name":"Bee Branch IA (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Bee Branch IA, Robertson County, TX","lat":31.104838,"lng":-96.66477,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 905. Plant 70400 Bee Branch IA (Bee Branch IA, LLC), Robertson County, TX; balancing authority ERCO. Planned operation 2027-06.\nGenerator BEE1A: 200 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1187,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Beekman Pv I","state":"LA","name":"Beekman Solar (Solar Photovoltaic, 206.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Beekman Solar, Morehouse County, LA","lat":32.989386,"lng":-91.94288,"route":null,"cost_usd":null,"start_date":"2027-02-01","end_date":"2027-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 659. Plant 69589 Beekman Solar (Beekman PV I, LLC), Morehouse County, LA; balancing authority MISO. Planned operation 2027-02.\nGenerator BEEK1: 206.8 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1972,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Belgian Renewable Energy Group (breg)","state":"TX","name":"Leuven Solar LLC (Solar Photovoltaic, 217 MW)","type":"generation","voltage_kv":null,"location_ref":"Leuven Solar LLC, Nolan County, TX","lat":32.49301,"lng":-100.2463,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2022. Plant 67996 Leuven Solar LLC (Belgian Renewable Energy Group (BREG)), Nolan County, TX; balancing authority ERCO. Planned operation 2029-12.\nGenerator SEPAS: 217 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1935,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Bell 1 Solar","state":"TX","name":"Hermes Solar PV (Solar Photovoltaic, 100.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Hermes Solar PV, Bell County, TX","lat":30.989842,"lng":-97.14982,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 94. Plant 68851 Hermes Solar PV (Bell 1 Solar, LLC), Bell County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator HSPV1: 100.4 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1936,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Bell 1 Storage","state":"TX","name":"Hermes Storage BESS (Batteries, 100.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Hermes Storage BESS, Bell County, TX","lat":30.981595,"lng":-97.1429,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 241. Plant 68852 Hermes Storage BESS (Bell 1 Storage, LLC), Bell County, TX; balancing authority ERCO. Planned operation 2026-10.\nGenerator HSBE1: 100.4 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1848,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Belltown Power Texas 2","state":"TX","name":"Brotherton Storage (Batteries, 176.1 MW)","type":"generation","voltage_kv":null,"location_ref":"Brotherton Storage, Anderson County, TX","lat":31.687913,"lng":-95.73988,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1302. Plant 68165 Brotherton Storage (Belltown Power Texas 2, LLC), Anderson County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator BROBA: 176.1 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1892,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Belltown Power Texas 2","state":"TX","name":"Dolomite Storage (Batteries, 125.7 MW)","type":"generation","voltage_kv":null,"location_ref":"Dolomite Storage, Ellis County, TX","lat":32.456144,"lng":-96.73774,"route":null,"cost_usd":null,"start_date":"2028-07-01","end_date":"2028-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1607. Plant 68166 Dolomite Storage (Belltown Power Texas 2, LLC), Ellis County, TX; balancing authority ERCO. Planned operation 2028-07.\nGenerator DOLBA: 125.7 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1958,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Belltown Power Texas 2","state":"TX","name":"Kahla Storage (Batteries, 200.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Kahla Storage, Leon County, TX","lat":31.325705,"lng":-96.26071,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1777. Plant 68168 Kahla Storage (Belltown Power Texas 2, LLC), Leon County, TX; balancing authority ERCO. Planned operation 2028-12.\nGenerator KAHBA: 200.9 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1989,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Belltown Power Texas 2","state":"TX","name":"Mcmurtre Storage (Batteries, 176.1 MW)","type":"generation","voltage_kv":null,"location_ref":"Mcmurtre Storage, Hunt County, TX","lat":33.179664,"lng":-95.80922,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1303. Plant 68171 Mcmurtre Storage (Belltown Power Texas 2, LLC), Hunt County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator MCMBA: 176.1 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1997,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Belltown Power Texas 2","state":"TX","name":"Myers Solar and Storage (Batteries, Solar Photovoltaic, 176.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Myers Solar and Storage, Goliad County, TX","lat":28.420043,"lng":-97.70934,"route":null,"cost_usd":null,"start_date":"2028-08-01","end_date":"2028-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1633, 1634. Plant 68172 Myers Solar and Storage (Belltown Power Texas 2, LLC), Goliad County, TX; balancing authority ERCO. Planned operation 2028-08.\nGenerator MYEBT: 75.7 MW Batteries; (L) Regulatory approvals pending. Not under construction\nGenerator MYEPV: 100.9 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2072,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Belltown Power Texas 2","state":"TX","name":"Sandford Solar and Storage (Batteries, Solar Photovoltaic, 227.1 MW)","type":"generation","voltage_kv":null,"location_ref":"Sandford Solar and Storage, Wise County, TX","lat":33.30726,"lng":-97.52777,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1778, 1779. Plant 68173 Sandford Solar and Storage (Belltown Power Texas 2, LLC), Wise County, TX; balancing authority ERCO. Planned operation 2028-12.\nGenerator SANBT: 100.9 MW Batteries; (L) Regulatory approvals pending. Not under construction\nGenerator SANPV: 126.2 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2095,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Belltown Power Texas 2","state":"TX","name":"Symank Solar (Solar Photovoltaic, 66.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Symank Solar, Bosque County, TX","lat":31.626039,"lng":-97.64211,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1304. Plant 68175 Symank Solar (Belltown Power Texas 2, LLC), Bosque County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator SYMPV: 66.6 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2127,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Belltown Power Texas 2","state":"TX","name":"Willis Storage (Batteries, 176.1 MW)","type":"generation","voltage_kv":null,"location_ref":"Willis Storage, Rains County, TX","lat":32.870406,"lng":-95.74785,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1015. Plant 68176 Willis Storage (Belltown Power Texas 2, LLC), Rains County, TX; balancing authority ERCO. Planned operation 2027-09.\nGenerator WILBA: 176.1 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2134,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Belltown Power Texas 2","state":"TX","name":"Yooperlite Storage (Batteries, 175.7 MW)","type":"generation","voltage_kv":null,"location_ref":"Yooperlite Storage, Wise County, TX","lat":33.033186,"lng":-97.88031,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1305. Plant 68178 Yooperlite Storage (Belltown Power Texas 2, LLC), Wise County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator YOOBA: 175.7 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":638,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Big Creek Solar","state":"AR","name":"Big Creek Solar LLC (Solar Photovoltaic, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"Big Creek Solar LLC, Lee County, AR","lat":34.870404,"lng":-117.9656,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 923. Plant 64670 Big Creek Solar LLC (Big Creek Solar LLC), Lee County, AR; balancing authority MISO. Planned operation 2027-07.\nGenerator KOV4A: 400 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1755,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Big Fork Solar","state":"SC","name":"Big Fork Solar (Batteries, 74.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Big Fork Solar, Barnwell County, SC","lat":33.135275,"lng":-81.23911,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 684. Plant 62184 Big Fork Solar (Big Fork Solar), Barnwell County, SC; balancing authority SCEG. Planned operation 2027-03.\nGenerator 27: 74.9 MW Batteries; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1756,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Big Fork Solar","state":"SC","name":"Big Fork Solar (Solar Photovoltaic, 74.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Big Fork Solar, Barnwell County, SC","lat":33.135275,"lng":-81.23911,"route":null,"cost_usd":null,"start_date":"2028-11-01","end_date":"2028-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1704. Plant 62184 Big Fork Solar (Big Fork Solar), Barnwell County, SC; balancing authority SCEG. Planned operation 2028-11.\nGenerator 26: 74.9 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1649,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Bigl Bn","state":"OR","name":"Biglow Solar Generation and BESS (Batteries, Solar Photovoltaic, 250 MW)","type":"generation","voltage_kv":null,"location_ref":"Biglow Solar Generation and BESS, Sherman County, OR","lat":45.606,"lng":-120.625,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1314, 1315. Plant 68316 Biglow Solar Generation and BESS (BIGL bn, LLC), Sherman County, OR; balancing authority PGE. Planned operation 2027-12.\nGenerator BIGL1: 125 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction\nGenerator BIGL2: 125 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1000,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Big Muddy Solar Project","state":"IL","name":"Big Muddy Solar (Solar Photovoltaic, 95 MW)","type":"generation","voltage_kv":null,"location_ref":"Big Muddy Solar, Jackson County, IL","lat":37.86,"lng":-89.3,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 281. Plant 69629 Big Muddy Solar (Big Muddy Solar Project, LLC), Jackson County, IL; balancing authority MISO. Planned operation 2026-10.\nGenerator BIGM1: 95 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1829,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Big Sampson Wind Project","state":"TX","name":"Big Sampson Wind (Onshore Wind Turbine, 265 MW)","type":"generation","voltage_kv":null,"location_ref":"Big Sampson Wind, Crockett County, TX","lat":30.981883,"lng":-101.8505,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 96. Plant 68873 Big Sampson Wind (Big Sampson Wind Project, LLC), Crockett County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator BIGS: 265 MW Onshore Wind Turbine; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1001,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Birch Creek Development","state":"IL","name":"Blue Branch Solar (Solar Photovoltaic, 35.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Blue Branch Solar, Johnson County, IL","lat":37.467778,"lng":-88.96889,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 638. Plant 69977 Blue Branch Solar (Birch Creek Development), Johnson County, IL; balancing authority MISO. Planned operation 2027-01.\nGenerator BBPV: 35.9 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1089,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Birch Creek Development","state":"IL","name":"Ruby Solar, LLC (Solar Photovoltaic, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"Ruby Solar, LLC, Clinton County, IL","lat":38.595759,"lng":-89.16983,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 97. Plant 68929 Ruby Solar, LLC (Birch Creek Development), Clinton County, IL; balancing authority MISO. Planned operation 2026-09.\nGenerator RUBY: 50 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1113,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Birch Creek Development","state":"IL","name":"Station Solar (Solar Photovoltaic, 40 MW)","type":"generation","voltage_kv":null,"location_ref":"Station Solar, Mercer County, IL","lat":41.0777,"lng":-90.55,"route":null,"cost_usd":null,"start_date":"2027-08-01","end_date":"2027-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 988. Plant 69978 Station Solar (Birch Creek Development), Mercer County, IL; balancing authority MISO. Planned operation 2027-08.\nGenerator STPV: 40 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1314,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Birch Creek Development","state":"MO","name":"Blue Jay Road Solar, LLC (Solar Photovoltaic, 66 MW)","type":"generation","voltage_kv":null,"location_ref":"Blue Jay Road Solar, LLC, Ralls County, MO","lat":39.380782,"lng":-91.53206,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 367. Plant 68926 Blue Jay Road Solar, LLC (Birch Creek Development), Ralls County, MO; balancing authority MISO. Planned operation 2026-11.\nGenerator BLUEJ: 66 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1905,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Birch Creek Development","state":"TX","name":"Elm Flats Solar (Batteries, Solar Photovoltaic, 175 MW)","type":"generation","voltage_kv":null,"location_ref":"Elm Flats Solar, Navarro County, TX","lat":32.113579,"lng":-96.30476,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 56, 57. Plant 67552 Elm Flats Solar (Birch Creek Development), Navarro County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator ELMBA: 50 MW Batteries; (U) Under construction, less than or equal to 50 percent complete\nGenerator ELMFL: 125 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1754,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"B & K Solar","state":"SC","name":"B & K Solar (Solar Photovoltaic, 74.9 MW)","type":"generation","voltage_kv":null,"location_ref":"B & K Solar, Darlington County, SC","lat":34.423425,"lng":-80.06213,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 331. Plant 62181 B & K Solar (B & K Solar), Darlington County, SC; balancing authority CPLE. Planned operation 2026-11.\nGenerator 23: 74.9 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1785,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Black Hills Power","state":"SD","name":"Lange Generating Station (Natural Gas Internal Combustion Engine, 99.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Lange Generating Station, Pennington County, SD","lat":44.1218,"lng":-103.2641,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 435, 436, 437, 438, 439, 440. Plant 55478 Lange Generating Station (Black Hills Power, Inc.), Pennington County, SD; balancing authority WACM. Planned operation 2026-12.\nGenerator IC01: 16.6 MW Natural Gas Internal Combustion Engine; (V) Under construction, more than 50 percent complete\nGenerator IC02: 16.6 MW Natural Gas Internal Combustion Engine; (V) Under construction, more than 50 percent complete\nGenerator IC03: 16.6 MW Natural Gas Internal Combustion Engine; (V) Under construction, more than 50 percent complete\nGenerator IC04: 16.6 MW Natural Gas Internal Combustion Engine; (V) Under construction, more than 50 percent complete\nGenerator IC05: 16.6 MW Natural Gas Internal Combustion Engine; (V) Under construction, more than 50 percent complete\nGenerator IC06: 16.6 MW Natural Gas Internal Combustion Engine; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":873,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Black Hills Service","state":"CO","name":"Pueblo Airport Generating Station (Batteries, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"Pueblo Airport Generating Station, Pueblo County, CO","lat":38.320833,"lng":-104.5264,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1199. Plant 56998 Pueblo Airport Generating Station (Black Hills Service Company LLC), Pueblo County, CO; balancing authority PSCO. Planned operation 2027-12.\nGenerator BA7: 50 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2258,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Black Hills Service","state":"WY","name":"Cheyenne Prairie Generating Station (Natural Gas Fired Combustion Turbine, 120 MW)","type":"generation","voltage_kv":null,"location_ref":"Cheyenne Prairie Generating Station, Laramie County, WY","lat":41.123611,"lng":-104.72,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1731, 1732, 1733. Plant 57703 Cheyenne Prairie Generating Station (Black Hills Service Company LLC), Laramie County, WY; balancing authority WACM. Planned operation 2028-12.\nGenerator 02B: 40 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator 03A: 40 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator 03B: 40 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":980,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Blacks Creek Energy Center","state":"ID","name":"Blacks Creek Solar (Solar Photovoltaic, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"Blacks Creek Solar, Ada County, ID","lat":43.499,"lng":-116.1918,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 885. Plant 69553 Blacks Creek Solar (Blacks Creek Energy Center, LLC), Ada County, ID; balancing authority IPCO. Planned operation 2027-06.\nGenerator BCS: 400 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1436,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Blackwater Solar Center","state":"NM","name":"Blackwater Solar Center - NM (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Blackwater Solar Center - NM, Roosevelt County, NM","lat":34.292324,"lng":-103.1657,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1408. Plant 70297 Blackwater Solar Center - NM (Blackwater Solar Center, LLC), Roosevelt County, NM; balancing authority SWPP. Planned operation 2027-12.\nGenerator BWTS: 200 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1488,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Bloomfield Solar","state":"NY","name":"Bloomfield Solar (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Bloomfield Solar, Saratoga County, NY","lat":42.989691,"lng":-73.88121,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 824. Plant 68863 Bloomfield Solar (Bloomfield Solar, LLC), Saratoga County, NY; balancing authority NYIS. Planned operation 2027-05.\nGenerator PV1: 5 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1836,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Blue Jay Solar I","state":"TX","name":"Blue Jay Solar I, LLC (Solar Photovoltaic, 210 MW)","type":"generation","voltage_kv":null,"location_ref":"Blue Jay Solar I, LLC, Grimes County, TX","lat":30.705329,"lng":-96.06983,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 25. Plant 64672 Blue Jay Solar I, LLC (Blue Jay Solar I, LLC), Grimes County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator BLUJS: 210 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1167,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Blue Moon Energy","state":"KY","name":"Blue Moon (Solar Photovoltaic, 70 MW)","type":"generation","voltage_kv":null,"location_ref":"Blue Moon, Harrison County, KY","lat":38.37118,"lng":-84.2578,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 63. Plant 68000 Blue Moon (Blue Moon Energy LLC), Harrison County, KY; balancing authority PJM. Planned operation 2026-09.\nGenerator BLUMN: 70 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2102,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Bnb Tennyson Solar","state":"TX","name":"Tennyson Solar (Solar Photovoltaic, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Tennyson Solar, Coke County, TX","lat":31.726229,"lng":-100.2771,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 554. Plant 69605 Tennyson Solar (BNB Tennyson Solar LLC), Coke County, TX; balancing authority ERCO. Planned operation 2026-12.\nGenerator TENN: 150 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":974,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Board of Water Electric & Communications","state":"IA","name":"Muscatine Plant #1 (Natural Gas Fired Combustion Turbine, 35 MW)","type":"generation","voltage_kv":null,"location_ref":"Muscatine Plant #1, Muscatine County, IA","lat":41.3917,"lng":-91.0569,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 996. Plant 1167 Muscatine Plant #1 (Board of Water Electric & Communications), Muscatine County, IA; balancing authority MISO. Planned operation 2027-09.\nGenerator 10: 35 MW Natural Gas Fired Combustion Turbine; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1838,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Bob Creek Wind","state":"TX","name":"Bob Creek Wind, LLC (Onshore Wind Turbine, 175 MW)","type":"generation","voltage_kv":null,"location_ref":"Bob Creek Wind, LLC, Sterling County, TX","lat":31.868813,"lng":-101.2275,"route":null,"cost_usd":null,"start_date":"2028-04-01","end_date":"2028-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1503. Plant 68459 Bob Creek Wind, LLC (Bob Creek Wind, LLC), Sterling County, TX; balancing authority ERCO. Planned operation 2028-04.\nGenerator 5961: 175 MW Onshore Wind Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1839,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Bocanova Power Ii","state":"TX","name":"Bocanova Energy Storage II (Batteries, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Bocanova Energy Storage II, Brazoria County, TX","lat":29.435422,"lng":-95.2511,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 121. Plant 69423 Bocanova Energy Storage II (Bocanova Power II LLC), Brazoria County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator BCNV2: 150 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1840,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Bodkin Bess","state":"TX","name":"Bodkin BESS (Batteries, 75 MW)","type":"generation","voltage_kv":null,"location_ref":"Bodkin BESS, Brazoria County, TX","lat":29.292,"lng":-95.301,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1834. Plant 70365 Bodkin BESS (Bodkin BESS LLC), Brazoria County, TX; balancing authority ERCO. Planned operation 2028-12.\nGenerator BODES: 75 MW Batteries; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1155,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Boot Hill Energy Storage","state":"KS","name":"Boot Hill Energy Storage (Batteries, 75 MW)","type":"generation","voltage_kv":null,"location_ref":"Boot Hill Energy Storage, Ford County, KS","lat":37.704,"lng":-99.977,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1835. Plant 70366 Boot Hill Energy Storage (Boot Hill Energy Storage LLC), Ford County, KS; balancing authority SWPP. Planned operation 2028-12.\nGenerator BHBES: 75 MW Batteries; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1512,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Boralex Us Operations","state":"NY","name":"Foothills Solar (NY) (Solar Photovoltaic, 40 MW)","type":"generation","voltage_kv":null,"location_ref":"Foothills Solar (NY), Fulton County, NY","lat":43.113678,"lng":-74.24503,"route":null,"cost_usd":null,"start_date":"2030-12-01","end_date":"2030-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2107. Plant 67221 Foothills Solar (NY) (Boralex US Operations LLC), Fulton County, NY; balancing authority NYIS. Planned operation 2030-12.\nGenerator NY128: 40 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1608,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Border Basin","state":"OH","name":"Border Basin Solar (Solar Photovoltaic, 120 MW)","type":"generation","voltage_kv":null,"location_ref":"Border Basin Solar, Hancock County, OH","lat":41.107431,"lng":-83.5722,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 245. Plant 68968 Border Basin Solar (Border Basin, LLC), Hancock County, OH; balancing authority PJM. Planned operation 2026-10.\nGenerator ENX37: 120 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1464,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Boulder Flats Solar","state":"NV","name":"Boulder Flats Solar (Solar Photovoltaic, 113 MW)","type":"generation","voltage_kv":null,"location_ref":"Boulder Flats Solar, Clark County, NV","lat":35.878865,"lng":-114.9833,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1757. Plant 65977 Boulder Flats Solar (Boulder Flats Solar, LLC), Clark County, NV; balancing authority NEVP. Planned operation 2028-12.\nGenerator BF1PV: 113 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1841,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Boxcar Energy Storage","state":"TX","name":"Boxcar Energy Storage (Batteries, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Boxcar Energy Storage, Collin County, TX","lat":33.018516,"lng":-96.52003,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 838. Plant 70377 Boxcar Energy Storage (Boxcar Energy Storage, LLC), Collin County, TX; balancing authority ERCO. Planned operation 2027-05.\nGenerator BES: 150 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1672,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Boyles Run Solar I","state":"PA","name":"BAI-Boyles Run-Phase I (Solar Photovoltaic, 15.9 MW)","type":"generation","voltage_kv":null,"location_ref":"BAI-Boyles Run-Phase I, Northumberland County, PA","lat":40.771847,"lng":-76.78119,"route":null,"cost_usd":null,"start_date":"2028-09-01","end_date":"2028-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1666. Plant 67954 BAI-Boyles Run-Phase I (Boyles Run Solar I, LLC), Northumberland County, PA; balancing authority PJM. Planned operation 2028-09.\nGenerator BRPV1: 15.9 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1671,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Boyles Run Solar Ii","state":"PA","name":"BAI-Boyles Run-Phase 2 (Solar Photovoltaic, 15.9 MW)","type":"generation","voltage_kv":null,"location_ref":"BAI-Boyles Run-Phase 2, Northumberland County, PA","lat":40.771847,"lng":-76.78119,"route":null,"cost_usd":null,"start_date":"2028-09-01","end_date":"2028-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1667. Plant 67955 BAI-Boyles Run-Phase 2 (Boyles Run Solar II, LLC), Northumberland County, PA; balancing authority PJM. Planned operation 2028-09.\nGenerator BRPV2: 15.9 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1619,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Bq Energy Development","state":"OH","name":"Nottingham Solar (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Nottingham Solar, Harrison County, OH","lat":40.189455,"lng":-81.04111,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 467. Plant 66658 Nottingham Solar (BQ Energy Development), Harrison County, OH; balancing authority PJM. Planned operation 2026-12.\nGenerator NOTT: 100 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1629,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Bq Energy Development","state":"OH","name":"Steubenville Solar (Solar Photovoltaic, 43 MW)","type":"generation","voltage_kv":null,"location_ref":"Steubenville Solar, Jefferson County, OH","lat":40.351722,"lng":-80.67036,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 698. Plant 66657 Steubenville Solar (BQ Energy Development), Jefferson County, OH; balancing authority PJM. Planned operation 2027-03.\nGenerator STEUB: 43 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2173,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Bq Energy Development","state":"VA","name":"Greater Wise Solar Project (Solar Photovoltaic, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"Greater Wise Solar Project, Wise County, VA","lat":36.932469,"lng":-82.6769,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1309. Plant 68278 Greater Wise Solar Project (BQ Energy Development), Wise County, VA; balancing authority LGEE. Planned operation 2027-12.\nGenerator 21066: 20 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1844,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Bravo Ess","state":"TX","name":"Bravo ESS (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Bravo ESS, Zapata County, TX","lat":27.285037,"lng":-99.41187,"route":null,"cost_usd":null,"start_date":"2029-07-01","end_date":"2029-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1946. Plant 68350 Bravo ESS (Bravo ESS LLC), Zapata County, TX; balancing authority ERCO. Planned operation 2029-07.\nGenerator BESS1: 200 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1845,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Brazoria Solar I","state":"TX","name":"Brazoria Solar I (Solar Photovoltaic, 250 MW)","type":"generation","voltage_kv":null,"location_ref":"Brazoria Solar I, Brazoria County, TX","lat":29.138777,"lng":-95.37108,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 78, 79. Plant 68410 Brazoria Solar I (Brazoria Solar i, LLC), Brazoria County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator BRAZ: 125 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation\nGenerator BRAZ2: 125 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1492,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Bridgewater Solar","state":"NY","name":"Bridgewater 1 (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Bridgewater 1, Saratoga County, NY","lat":42.831613,"lng":-73.67479,"route":null,"cost_usd":null,"start_date":"2030-12-01","end_date":"2030-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2114. Plant 68865 Bridgewater 1 (Bridgewater Solar, LLC), Saratoga County, NY; balancing authority NYIS. Planned operation 2030-12.\nGenerator PV1: 5 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1493,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Bridgewater Solar 2","state":"NY","name":"Bridgewater 2 (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Bridgewater 2, Saratoga County, NY","lat":42.831613,"lng":-73.67479,"route":null,"cost_usd":null,"start_date":"2030-12-01","end_date":"2030-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2113. Plant 68864 Bridgewater 2 (Bridgewater Solar 2, LLC), Saratoga County, NY; balancing authority NYIS. Planned operation 2030-12.\nGenerator PV1: 5 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2138,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Brigham City","state":"UT","name":"Brigham City Gas (Natural Gas Internal Combustion Engine, 7.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Brigham City Gas, Box Elder County, UT","lat":41.507163,"lng":-112.0027,"route":null,"cost_usd":null,"start_date":"2028-08-01","end_date":"2028-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1646, 1647, 1648. Plant 69668 Brigham City Gas (Brigham City Corporation), Box Elder County, UT; balancing authority PACE. Planned operation 2028-08.\nGenerator BCIC1: 2.5 MW Natural Gas Internal Combustion Engine; (U) Under construction, less than or equal to 50 percent complete\nGenerator BCIC2: 2.5 MW Natural Gas Internal Combustion Engine; (U) Under construction, less than or equal to 50 percent complete\nGenerator BCIC3: 2.5 MW Natural Gas Internal Combustion Engine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":944,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Brightnight Power","state":"GA","name":"Pepper Hammock Solar and Storage (Batteries, Solar Photovoltaic, 2500 MW)","type":"generation","voltage_kv":null,"location_ref":"Pepper Hammock Solar and Storage, Wayne County, GA","lat":31.331,"lng":-81.759,"route":null,"cost_usd":null,"start_date":"2029-09-01","end_date":"2029-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1972, 1973, 1974. Plant 68367 Pepper Hammock Solar and Storage (BrightNight Power), Wayne County, GA; balancing authority SOCO. Planned operation 2029-09.\nGenerator PEHA: 900 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction\nGenerator PEHA1: 1200 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction\nGenerator PEHA2: 400 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1181,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Brightnight Power","state":"KY","name":"Mayfield Solar and Storage (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Mayfield Solar and Storage, McCracken County, KY","lat":36.8864,"lng":-88.659,"route":null,"cost_usd":null,"start_date":"2029-10-01","end_date":"2029-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1988. Plant 68368 Mayfield Solar and Storage (BrightNight Power), McCracken County, KY; balancing authority MISO. Planned operation 2029-10.\nGenerator MYSO: 200 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1185,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Brightnight Power","state":"KY","name":"Starfire Mountain Solar (Solar Photovoltaic, 410 MW)","type":"generation","voltage_kv":null,"location_ref":"Starfire Mountain Solar, Perry County, KY","lat":37.4119,"lng":-83.1206,"route":null,"cost_usd":null,"start_date":"2029-09-01","end_date":"2029-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1975. Plant 68369 Starfire Mountain Solar (BrightNight Power), Perry County, KY; balancing authority PJM. Planned operation 2029-09.\nGenerator STMO: 410 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1660,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Brightnight Power","state":"OR","name":"Salmonfly Solar and Storage (Batteries, Solar Photovoltaic, 494 MW)","type":"generation","voltage_kv":null,"location_ref":"Salmonfly Solar and Storage, Jefferson County, OR","lat":44.6157,"lng":-121.3436,"route":null,"cost_usd":null,"start_date":"2029-02-01","end_date":"2029-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1854, 1855. Plant 68370 Salmonfly Solar and Storage (BrightNight Power), Jefferson County, OR; balancing authority PGE. Planned operation 2029-02.\nGenerator SALM: 247 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction\nGenerator SALM2: 247 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2149,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Brightnight Power","state":"UT","name":"Red Butte Solar and Storage (Batteries, Solar Photovoltaic, 600 MW)","type":"generation","voltage_kv":null,"location_ref":"Red Butte Solar and Storage, Iron County, UT","lat":37.6134,"lng":-113.644,"route":null,"cost_usd":null,"start_date":"2029-04-01","end_date":"2029-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1889, 1890. Plant 68371 Red Butte Solar and Storage (BrightNight Power), Iron County, UT; balancing authority PACE. Planned operation 2029-04.\nGenerator REBU: 300 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction\nGenerator REBU2: 300 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2209,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Brightnight Power","state":"WA","name":"AGATE BESS (Batteries, 170 MW)","type":"generation","voltage_kv":null,"location_ref":"AGATE BESS, Kitsap County, WA","lat":47.76879,"lng":-122.6078,"route":null,"cost_usd":null,"start_date":"2029-02-01","end_date":"2029-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1853. Plant 68366 AGATE BESS (BrightNight Power), Kitsap County, WA; balancing authority PSEI. Planned operation 2029-02.\nGenerator AGAT: 170 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":889,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Broadleaf Solar","state":"CT","name":"Broadleaf Solar (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Broadleaf Solar, Hartford County, CT","lat":41.9241,"lng":-72.7824,"route":null,"cost_usd":null,"start_date":"2028-04-01","end_date":"2028-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1504. Plant 68490 Broadleaf Solar (Broadleaf Solar, LLC), Hartford County, CT; balancing authority ISNE. Planned operation 2028-04.\nGenerator BLS: 200 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1811,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Bt Amador Storage","state":"TX","name":"Amador BESS (Batteries, 220 MW)","type":"generation","voltage_kv":null,"location_ref":"Amador BESS, Van Zandt County, TX","lat":32.479347,"lng":-96.0321,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 780. Plant 69520 Amador BESS (BT Amador Storage LLC), Van Zandt County, TX; balancing authority ERCO. Planned operation 2027-04.\nGenerator AMDRB: 220 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1817,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Bt Cantwell Solar","state":"TX","name":"Arroyo Storage (Batteries, 180 MW)","type":"generation","voltage_kv":null,"location_ref":"Arroyo Storage, Cameron County, TX","lat":26.264311,"lng":-97.61156,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 374. Plant 69151 Arroyo Storage (BT Cantwell Solar, LLC), Cameron County, TX; balancing authority ERCO. Planned operation 2026-11.\nGenerator ARY_B: 180 MW Batteries; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1650,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Buckaroo Solar 1","state":"OR","name":"Buckaroo Solar 1 (Solar Photovoltaic, 2.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Buckaroo Solar 1, Umatilla County, OR","lat":45.660992,"lng":-118.7721,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 841. Plant 70452 Buckaroo Solar 1 (Buckaroo Solar 1, LLC), Umatilla County, OR; balancing authority PACW. Planned operation 2027-05.\nGenerator OCS62: 2.4 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1437,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Buena Vista Energy Center Iii","state":"NM","name":"Buena Vista Energy Center III (Batteries, Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Buena Vista Energy Center III, Otero County, NM","lat":32.06659,"lng":-106.2853,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 539, 540. Plant 69517 Buena Vista Energy Center III (Buena Vista Energy Center III, LLC), Otero County, NM; balancing authority EPE. Planned operation 2026-12.\nGenerator BV3BA: 100 MW Batteries; (U) Under construction, less than or equal to 50 percent complete\nGenerator BV3SO: 100 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1315,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Buffalo Branch Wind and Solar","state":"MO","name":"Buffalo Branch Wind and Solar LLC (Onshore Wind Turbine, 247 MW)","type":"generation","voltage_kv":null,"location_ref":"Buffalo Branch Wind and Solar LLC, Dade County, MO","lat":37.38332,"lng":-93.92999,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2016. Plant 66701 Buffalo Branch Wind and Solar LLC (Buffalo Branch Wind and Solar LLC), Dade County, MO; balancing authority AECI. Planned operation 2029-12.\nGenerator BB1: 247 MW Onshore Wind Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1291,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Bullrock-nxtgenrea","state":"MN","name":"Carver Garden (Solar Photovoltaic, 1 MW)","type":"generation","voltage_kv":null,"location_ref":"Carver Garden, Rice County, MN","lat":44.29848,"lng":-93.2408,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 320. Plant 70381 Carver Garden (Bullrock-NxtGenREA), Rice County, MN; balancing authority MISO. Planned operation 2026-10.\nGenerator GEN1: 1 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1292,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Bullrock-nxtgenrea","state":"MN","name":"Crane Creek Garden (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Crane Creek Garden, Waseca County, MN","lat":44.09501,"lng":-93.65467,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 428. Plant 70378 Crane Creek Garden (Bullrock-NxtGenREA), Waseca County, MN; balancing authority MISO. Planned operation 2026-11.\nGenerator GEN5: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1297,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Bullrock-nxtgenrea","state":"MN","name":"Fuller Garden (Solar Photovoltaic, 1 MW)","type":"generation","voltage_kv":null,"location_ref":"Fuller Garden, Sherburne County, MN","lat":45.45357,"lng":-94.00707,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 429. Plant 70379 Fuller Garden (Bullrock-NxtGenREA), Sherburne County, MN; balancing authority MISO. Planned operation 2026-11.\nGenerator GEN2: 1 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1302,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Bullrock-nxtgenrea","state":"MN","name":"Mazaska Garden (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Mazaska Garden, Rice County, MN","lat":44.48723,"lng":-93.13416,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 430. Plant 70382 Mazaska Garden (Bullrock-NxtGenREA), Rice County, MN; balancing authority MISO. Planned operation 2026-11.\nGenerator GEN3: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":890,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Caa Ct Solar One","state":"CT","name":"CT Airport Authority Solar One (Solar Photovoltaic, 4 MW)","type":"generation","voltage_kv":null,"location_ref":"CT Airport Authority Solar One, Hartford County, CT","lat":41.933776,"lng":-72.6714,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1231. Plant 65146 CT Airport Authority Solar One (CAA CT Solar One, LLC), Hartford County, CT; balancing authority ISNE. Planned operation 2027-12.\nGenerator VCP16: 4 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":937,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cabokenze Energy Storage","state":"GA","name":"Cabokenze Energy Storage (Batteries, 76 MW)","type":"generation","voltage_kv":null,"location_ref":"Cabokenze Energy Storage, Burke County, GA","lat":33.037636,"lng":-82.11924,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1148. Plant 69823 Cabokenze Energy Storage (Cabokenze Energy Storage, LLC), Burke County, GA; balancing authority SOCO. Planned operation 2027-11.\nGenerator CABOK: 76 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2160,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Caden Energix New Kent","state":"VA","name":"Caden Energix New Kent, LLC (Solar Photovoltaic, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"Caden Energix New Kent, LLC, New Kent County, VA","lat":37.49004,"lng":-77.0616,"route":null,"cost_usd":null,"start_date":"2028-08-01","end_date":"2028-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1630. Plant 64036 Caden Energix New Kent, LLC (Caden Energix New Kent, LLC), New Kent County, VA; balancing authority PJM. Planned operation 2028-08.\nGenerator ENX08: 20 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2161,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Caden Energix Piney River","state":"VA","name":"Caden Energix Piney River LLC (Solar Photovoltaic, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"Caden Energix Piney River LLC, Amherst County, VA","lat":37.696818,"lng":-79.02306,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1752. Plant 65286 Caden Energix Piney River LLC (Caden Energix Piney River LLC), Amherst County, VA; balancing authority PJM. Planned operation 2028-12.\nGenerator ENX18: 50 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":722,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"California Ethanol Power","state":"CA","name":"CE&P Imperial Valley 1 (All Other, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"CE&P Imperial Valley 1, Imperial County, CA","lat":32.912778,"lng":-115.5183,"route":null,"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1907. Plant 60670 CE&P Imperial Valley 1 (California Ethanol Power, LLC), Imperial County, CA; balancing authority IID. Planned operation 2029-06.\nGenerator 1: 50 MW All Other; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1852,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Callisto Ii Energy Center","state":"TX","name":"Callisto II Energy Center (Batteries, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"Callisto II Energy Center, Harris County, TX","lat":29.645345,"lng":-95.45025,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 358. Plant 68422 Callisto II Energy Center (Callisto II Energy Center LLC), Harris County, TX; balancing authority ERCO. Planned operation 2026-11.\nGenerator CALII: 400 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":716,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Camino Ramon Br 3-ff Solar Project 2020","state":"CA","name":"Bishop Ranch - BR 3-FF (Batteries, Solar Photovoltaic, 1.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Bishop Ranch - BR 3-FF, Contra Costa County, CA","lat":37.768388,"lng":-121.959,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 951, 952, 953. Plant 69710 Bishop Ranch - BR 3-FF (Camino Ramon BR 3-FF Solar Project 2020, LLC), Contra Costa County, CA; balancing authority CISO. Planned operation 2027-07.\nGenerator 4148B: 0.6 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator 4148C: 0.6 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete\nGenerator 4148R: 0.2 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":717,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Camino Ramon Br 3-gg Solar Project 2020","state":"CA","name":"Bishop Ranch - BR 3-GG (Batteries, Solar Photovoltaic, 1.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Bishop Ranch - BR 3-GG, Contra Costa County, CA","lat":37.767242,"lng":-121.9582,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 945, 946, 947. Plant 69706 Bishop Ranch - BR 3-GG (Camino Ramon BR 3-GG Solar Project 2020, LLC), Contra Costa County, CA; balancing authority CISO. Planned operation 2027-07.\nGenerator 4149B: 0.6 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator 4149C: 1.1 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete\nGenerator 4149R: 0.2 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":718,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Camino Ramon Br 3-hh Solar Project 2020","state":"CA","name":"Bishop Ranch - BR 3-HH (Batteries, Solar Photovoltaic, 1.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Bishop Ranch - BR 3-HH, Contra Costa County, CA","lat":37.766297,"lng":-121.9582,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 948, 949, 950. Plant 69708 Bishop Ranch - BR 3-HH (Camino Ramon BR 3-HH Solar Project 2020, LLC), Contra Costa County, CA; balancing authority CISO. Planned operation 2027-07.\nGenerator 4150B: 0.6 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator 4150C: 0.6 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete\nGenerator 4150R: 0.2 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1473,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Candela Renewables","state":"NV","name":"Rough Hat (Solar Photovoltaic, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"Rough Hat, Clark County, NV","lat":36.09907,"lng":-115.8337,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1218. Plant 63782 Rough Hat (Candela Renewables, LLC), Clark County, NV; balancing authority CISO. Planned operation 2027-12.\nGenerator RH1: 400 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1854,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cantaloupe Solar - Ercot","state":"TX","name":"Cantaloupe Solar (Solar Photovoltaic, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Cantaloupe Solar, Reeves County, TX","lat":31.05668,"lng":-103.6634,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1402. Plant 70204 Cantaloupe Solar (Cantaloupe Solar - ERCOT), Reeves County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator CANPV: 300 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":845,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Canyonland Solar","state":"CO","name":"Canyonland Solar (Solar Photovoltaic, 140 MW)","type":"generation","voltage_kv":null,"location_ref":"Canyonland Solar, Montezuma County, CO","lat":37.431,"lng":-108.724,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1227. Plant 64857 Canyonland Solar (Canyonland Solar LLC), Montezuma County, CO; balancing authority WACM. Planned operation 2027-12.\nGenerator C0513: 140 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2139,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cape Holdco","state":"UT","name":"Cape Generating Station (Geothermal, 43 MW)","type":"generation","voltage_kv":null,"location_ref":"Cape Generating Station, Beaver County, UT","lat":38.506706,"lng":-112.9175,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 218. Plant 68068 Cape Generating Station (Cape HoldCo LLC), Beaver County, UT; balancing authority LDWP. Planned operation 2026-10.\nGenerator CP1G1: 43 MW Geothermal; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2140,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cape Holdco","state":"UT","name":"Cape Generating Station (Geothermal, 86 MW)","type":"generation","voltage_kv":null,"location_ref":"Cape Generating Station, Beaver County, UT","lat":38.506706,"lng":-112.9175,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 617, 618. Plant 68068 Cape Generating Station (Cape HoldCo LLC), Beaver County, UT; balancing authority LDWP. Planned operation 2027-01.\nGenerator CP1G2: 43 MW Geothermal; (TS) Construction complete, but not yet in commercial operation\nGenerator CP1G3: 43 MW Geothermal; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1380,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Capital Power","state":"NC","name":"Maple Leaf Solar (Solar Photovoltaic, 73 MW)","type":"generation","voltage_kv":null,"location_ref":"Maple Leaf Solar, Johnston County, NC","lat":35.595,"lng":-78.317,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 754. Plant 67195 Maple Leaf Solar (Capital Power Corporation), Johnston County, NC; balancing authority DUK. Planned operation 2027-04.\nGenerator GEN: 73 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2016,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cardinal Investment","state":"TX","name":"Oystercatcher Solar (Solar Photovoltaic, 197 MW)","type":"generation","voltage_kv":null,"location_ref":"Oystercatcher Solar, Ellis County, TX","lat":32.192556,"lng":-96.91867,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 727. Plant 69780 Oystercatcher Solar (Cardinal Investment Company, Inc.), Ellis County, TX; balancing authority ERCO. Planned operation 2027-03.\nGenerator OCPV1: 197 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1855,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Carol Wind","state":"TX","name":"Carol Wind, LLC (Onshore Wind Turbine, 167.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Carol Wind, LLC, Potter County, TX","lat":35.259819,"lng":-102.0643,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1271. Plant 66976 Carol Wind, LLC (Carol Wind, LLC), Potter County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator WAPPA: 167.8 MW Onshore Wind Turbine; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":846,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Carousel Energy Storage","state":"CO","name":"Carousel Energy Storage, LLC (Batteries, 149.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Carousel Energy Storage, LLC, Kit Carson County, CO","lat":39.213298,"lng":-102.1036,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1410. Plant 70340 Carousel Energy Storage, LLC (Carousel Energy Storage, LLC), Kit Carson County, CO; balancing authority SWPP. Planned operation 2027-12.\nGenerator CAR15: 149.6 MW Batteries; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1652,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cartwright Solar Ii","state":"OR","name":"Cartwright Solar II (Solar Photovoltaic, 17.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Cartwright Solar II, Crook County, OR","lat":44.244,"lng":-120.938,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 402. Plant 69782 Cartwright Solar II (Cartwright Solar II LLC), Crook County, OR; balancing authority BPAT. Planned operation 2026-11.\nGenerator CW216: 17.6 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":719,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Catalyze Bloomington 2551 S Lilac Avenue Microgrid","state":"CA","name":"CA Bloomington 2551 S Lilac Avenue Micro (Batteries, Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"CA Bloomington 2551 S Lilac Avenue Micro, San Bernardino County, CA","lat":34.05523,"lng":-117.3778,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 338, 339. Plant 66475 CA Bloomington 2551 S Lilac Avenue Micro (Catalyze Bloomington 2551 S Lilac Avenue Microgrid LLC), San Bernardino County, CA; balancing authority CISO. Planned operation 2026-11.\nGenerator 18263: 1.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete\nGenerator B8263: 1.5 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2098,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Catalyze Dallas 7750 Dynasty Drive Microgrid","state":"TX","name":"TX Dallas 7750 Dynasty Drive (Solar Photovoltaic, 2.3 MW)","type":"generation","voltage_kv":null,"location_ref":"TX Dallas 7750 Dynasty Drive, Dallas County, TX","lat":32.652269,"lng":-96.75577,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 43. Plant 66516 TX Dallas 7750 Dynasty Drive (Catalyze Dallas 7750 Dynasty Drive Microgrid, LLC), Dallas County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator 19500: 2.3 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":720,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Catalyze National City Terminal Avenue Microgrid","state":"CA","name":"CA National City Terminal Ave (Solar Photovoltaic, 1.1 MW)","type":"generation","voltage_kv":null,"location_ref":"CA National City Terminal Ave, San Diego County, CA","lat":32.654,"lng":-117.119,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 394. Plant 69533 CA National City Terminal Ave (Catalyze National City Terminal Avenue Microgrid, LLC), San Diego County, CA; balancing authority CISO. Planned operation 2026-11.\nGenerator 21938: 1.1 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":721,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Catalyze Riverside 2356 Fleetwood Drive Microgrid","state":"CA","name":"CA Riverside 2356 Fleetwood Dr. (Batteries, Solar Photovoltaic, 4 MW)","type":"generation","voltage_kv":null,"location_ref":"CA Riverside 2356 Fleetwood Dr., Riverside County, CA","lat":34.012142,"lng":-117.3811,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 340, 341. Plant 66511 CA Riverside 2356 Fleetwood Dr. (Catalyze Riverside 2356 Fleetwood Drive Microgrid LLC), Riverside County, CA; balancing authority CISO. Planned operation 2026-11.\nGenerator 18262: 2 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete\nGenerator B8262: 2 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1858,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cattlemen Solar Park","state":"TX","name":"Cattlemen Solar Park (Solar Photovoltaic, 240 MW)","type":"generation","voltage_kv":null,"location_ref":"Cattlemen Solar Park, Milam County, TX","lat":31.045676,"lng":-96.85863,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 204. Plant 66168 Cattlemen Solar Park (Cattlemen Solar Park LLC), Milam County, TX; balancing authority ERCO. Planned operation 2026-10.\nGenerator GEN01: 240 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1857,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cattlemen Solar Park Ii","state":"TX","name":"Cattlemen Solar II (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Cattlemen Solar II, Milam County, TX","lat":31.083559,"lng":-96.85732,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 216. Plant 67976 Cattlemen Solar II (Cattlemen Solar Park II LLC), Milam County, TX; balancing authority ERCO. Planned operation 2026-10.\nGenerator GEN01: 200 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1495,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cavern Solar","state":"NY","name":"Cavern (Solar Photovoltaic, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"Cavern, Clinton County, NY","lat":44.711557,"lng":-73.54126,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1338. Plant 68858 Cavern (Cavern Solar, LLC), Clinton County, NY; balancing authority NYIS. Planned operation 2027-12.\nGenerator PV1: 2 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1859,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cazadores Solar","state":"TX","name":"Cazadores Solar (Solar Photovoltaic, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Cazadores Solar, Duval County, TX","lat":27.392246,"lng":-98.50107,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2039. Plant 69640 Cazadores Solar (Cazadores Solar LLC), Duval County, TX; balancing authority ERCO. Planned operation 2029-12.\nGenerator 73509: 300 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1982,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cc Polymers","state":"TX","name":"M&G Resins USA (All Other, 28.6 MW)","type":"generation","voltage_kv":null,"location_ref":"M&G Resins USA, Nueces County, TX","lat":27.833756,"lng":-97.49652,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1736, 1737. Plant 60642 M&G Resins USA (CC Polymers LLC), Nueces County, TX; balancing authority ERCO. Planned operation 2028-12.\nGenerator 1: 14.3 MW All Other; (U) Under construction, less than or equal to 50 percent complete\nGenerator 2: 14.3 MW All Other; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":838,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cdh Vidal","state":"CA","name":"Vidal Energy Center (Batteries, Solar Photovoltaic, 320 MW)","type":"generation","voltage_kv":null,"location_ref":"Vidal Energy Center, San Bernardino County, CA","lat":34.084796,"lng":-114.4707,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 510, 511. Plant 68907 Vidal Energy Center (CDH Vidal LLC), San Bernardino County, CA; balancing authority CISO. Planned operation 2026-12.\nGenerator 1: 160 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator 2: 160 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1860,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cedar Bayou 5","state":"TX","name":"Cedar Bayou 5 (Natural Gas Fired Combined Cycle, 721 MW)","type":"generation","voltage_kv":null,"location_ref":"Cedar Bayou 5, Chambers County, TX","lat":29.751132,"lng":-94.92114,"route":null,"cost_usd":null,"start_date":"2028-08-01","end_date":"2028-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1638. Plant 68606 Cedar Bayou 5 (Cedar Bayou 5 LLC), Chambers County, TX; balancing authority ERCO. Planned operation 2028-08.\nGenerator 5: 721 MW Natural Gas Fired Combined Cycle; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1861,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cedar Hill Ess Assets","state":"TX","name":"Cedar Hill ESS (Batteries, 10 MW)","type":"generation","voltage_kv":null,"location_ref":"Cedar Hill ESS, Dallas County, TX","lat":32.612139,"lng":-96.92511,"route":null,"cost_usd":null,"start_date":"2030-06-01","end_date":"2030-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2067. Plant 67570 Cedar Hill ESS (Cedar Hill ESS Assets, LLC), Dallas County, TX; balancing authority ERCO. Planned operation 2030-06.\nGenerator 3004: 10 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1653,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cedar Island Solar","state":"OR","name":"Cedar Island Solar LLC (Solar Photovoltaic, 800 MW)","type":"generation","voltage_kv":null,"location_ref":"Cedar Island Solar LLC, Sherman County, OR","lat":45.233717,"lng":-120.8985,"route":null,"cost_usd":null,"start_date":"2031-12-01","end_date":"2031-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2299. Plant 66011 Cedar Island Solar LLC (Cedar Island Solar LLC), Sherman County, OR; balancing authority BPAT. Planned operation 2031-12.\nGenerator PV1: 800 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1862,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cedar Range","state":"TX","name":"Cedar Range Solar (Solar Photovoltaic, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Cedar Range Solar, Hopkins County, TX","lat":33.057483,"lng":-95.82701,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1020. Plant 68901 Cedar Range Solar (Cedar Range LLC), Hopkins County, TX; balancing authority ERCO. Planned operation 2027-09.\nGenerator PVCLA: 150 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2213,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cent Bn","state":"WA","name":"Centralia Battery Energy Storage System (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Centralia Battery Energy Storage System, Thurston County, WA","lat":46.779823,"lng":-122.8848,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1787. Plant 68282 Centralia Battery Energy Storage System (CENT bn, LLC), Thurston County, WA; balancing authority PSEI. Planned operation 2028-12.\nGenerator CENT: 200 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":639,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Chalk Bluff Solar Energy","state":"AR","name":"Chalk Bluff Solar (Solar Photovoltaic, 450 MW)","type":"generation","voltage_kv":null,"location_ref":"Chalk Bluff Solar, St Francis County, AR","lat":35.051606,"lng":-90.43254,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 875. Plant 68772 Chalk Bluff Solar (Chalk Bluff Solar Energy LLC), St Francis County, AR; balancing authority MISO. Planned operation 2027-06.\nGenerator CHALK: 450 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2163,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Chester Solar Technology Park","state":"VA","name":"Chester Solar Technology Park, LLC (Solar Photovoltaic, 160 MW)","type":"generation","voltage_kv":null,"location_ref":"Chester Solar Technology Park, LLC, Chesterfield County, VA","lat":37.317,"lng":-77.466,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1103. Plant 69582 Chester Solar Technology Park, LLC (Chester Solar Technology Park, LLC), Chesterfield County, VA; balancing authority PJM. Planned operation 2027-10.\nGenerator CSTP: 160 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1867,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Chillingham Solar","state":"TX","name":"Chillingham Solar (Solar Photovoltaic, 350 MW)","type":"generation","voltage_kv":null,"location_ref":"Chillingham Solar, Bell County, TX","lat":31.006,"lng":-97.262,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 66. Plant 68065 Chillingham Solar (Chillingham Solar LLC), Bell County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator CHILS: 350 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1153,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"City of Belleville - (ks)","state":"KS","name":"Belleville (Petroleum Liquids, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Belleville, Republic County, KS","lat":39.832769,"lng":-97.63204,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 678. Plant 1263 Belleville (City of Belleville - (KS)), Republic County, KS; balancing authority SWPP. Planned operation 2027-03.\nGenerator 9: 3 MW Petroleum Liquids; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1154,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"City of Belleville - (ks)","state":"KS","name":"Belleville (Petroleum Liquids, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Belleville, Republic County, KS","lat":39.832769,"lng":-97.63204,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1417. Plant 1263 Belleville (City of Belleville - (KS)), Republic County, KS; balancing authority SWPP. Planned operation 2028-01.\nGenerator 7A: 3 MW Petroleum Liquids; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1006,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"City of Bushnell - (il)","state":"IL","name":"Bushnell (Petroleum Liquids, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Bushnell, McDonough County, IL","lat":40.548586,"lng":-90.51381,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 842. Plant 935 Bushnell (City of Bushnell - (IL)), McDonough County, IL; balancing authority MISO. Planned operation 2027-06.\nGenerator 8: 2.5 MW Petroleum Liquids; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1156,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"City of Chanute (ks)","state":"KS","name":"Chanute 1 (Petroleum Liquids, 6.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Chanute 1, Neosho County, KS","lat":37.683333,"lng":-95.45472,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 324, 325, 326. Plant 1267 Chanute 1 (City of Chanute (KS)), Neosho County, KS; balancing authority SWPP. Planned operation 2026-11.\nGenerator 15: 2.2 MW Petroleum Liquids; (V) Under construction, more than 50 percent complete\nGenerator 16: 2.2 MW Petroleum Liquids; (V) Under construction, more than 50 percent complete\nGenerator 17: 2.2 MW Petroleum Liquids; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":856,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"City of Colorado Springs - ( )","state":"CO","name":"Horizon (Natural Gas Fired Combustion Turbine, 480 MW)","type":"generation","voltage_kv":null,"location_ref":"Horizon, El Paso County, CO","lat":38.775,"lng":-104.6668,"route":null,"cost_usd":null,"start_date":"2028-07-01","end_date":"2028-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1610, 1611, 1612, 1613, 1614, 1615, 1616, 1617, 1618, 1619. Plant 68705 Horizon (City of Colorado Springs - (CO)), El Paso County, CO; balancing authority WACM. Planned operation 2028-07.\nGenerator H01: 48 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator H02: 48 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator H03: 48 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator H04: 48 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator H05: 48 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator H06: 48 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator H07: 48 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator H08: 48 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator H09: 48 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator H10: 48 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":819,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"City of Glendale - (ca)","state":"CA","name":"Scholl Canyon (Landfill Gas, 12 MW)","type":"generation","voltage_kv":null,"location_ref":"Scholl Canyon, Los Angeles County, CA","lat":34.15638,"lng":-118.1927,"route":null,"cost_usd":null,"start_date":"2027-02-01","end_date":"2027-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 662, 663, 664, 665. Plant 69749 Scholl Canyon (City of Glendale - (CA)), Los Angeles County, CA; balancing authority LDWP. Planned operation 2027-02.\nGenerator U1: 3 MW Landfill Gas; (V) Under construction, more than 50 percent complete\nGenerator U2: 3 MW Landfill Gas; (V) Under construction, more than 50 percent complete\nGenerator U3: 3 MW Landfill Gas; (V) Under construction, more than 50 percent complete\nGenerator U4: 3 MW Landfill Gas; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1157,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"City of Iola - (ks)","state":"KS","name":"Iola (Petroleum Liquids, 8 MW)","type":"generation","voltage_kv":null,"location_ref":"Iola, Allen County, KS","lat":37.923076,"lng":-95.42557,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 182, 183, 184, 185. Plant 1291 Iola (City of Iola - (KS)), Allen County, KS; balancing authority SWPP. Planned operation 2026-10.\nGenerator 17: 2 MW Petroleum Liquids; (U) Under construction, less than or equal to 50 percent complete\nGenerator 18: 2 MW Petroleum Liquids; (U) Under construction, less than or equal to 50 percent complete\nGenerator 19: 2 MW Petroleum Liquids; (U) Under construction, less than or equal to 50 percent complete\nGenerator 20: 2 MW Petroleum Liquids; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":640,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"City of Little Rock - (ar)","state":"AR","name":"City of Little Rock Solar Array (Solar Photovoltaic, 4.9 MW)","type":"generation","voltage_kv":null,"location_ref":"City of Little Rock Solar Array, Pulaski County, AR","lat":34.69761,"lng":-92.21437,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 354. Plant 68208 City of Little Rock Solar Array (City of Little Rock - (AR)), Pulaski County, AR; balancing authority MISO. Planned operation 2026-11.\nGenerator LRZBR: 4.9 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1414,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"City of Omaha - (ne)","state":"NE","name":"Papillion Creek Wastewater (Natural Gas Internal Combustion Engine, 7.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Papillion Creek Wastewater, Sarpy County, NE","lat":41.0772,"lng":-95.87,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 328, 329, 330. Plant 55027 Papillion Creek Wastewater (City of Omaha - (NE)), Sarpy County, NE; balancing authority SWPP. Planned operation 2026-11.\nGenerator 1600B: 2.5 MW Natural Gas Internal Combustion Engine; (V) Under construction, more than 50 percent complete\nGenerator 1600C: 2.5 MW Natural Gas Internal Combustion Engine; (V) Under construction, more than 50 percent complete\nGenerator 1600D: 2.5 MW Natural Gas Internal Combustion Engine; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1418,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"City of Tecumseh - (ne)","state":"NE","name":"Tecumseh (Petroleum Liquids, 4.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Tecumseh, Johnson County, NE","lat":40.3664,"lng":-96.19,"route":null,"cost_usd":null,"start_date":"2027-08-01","end_date":"2027-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 969, 970. Plant 2308 Tecumseh (City of Tecumseh - (NE)), Johnson County, NE; balancing authority SWPP. Planned operation 2027-08.\nGenerator 6: 2.1 MW Petroleum Liquids; (U) Under construction, less than or equal to 50 percent complete\nGenerator 7: 2.1 MW Petroleum Liquids; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1421,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"City of Wisner (ne)","state":"NE","name":"Wisner (Petroleum Liquids, 1.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Wisner, Cuming County, NE","lat":41.988069,"lng":-96.91599,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 433. Plant 2316 Wisner (City of Wisner (NE)), Cuming County, NE; balancing authority SWPP. Planned operation 2026-12.\nGenerator 6: 1.5 MW Petroleum Liquids; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1320,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"City Utilities of Springfield - (mo)","state":"MO","name":"James River Power Station (Batteries, 31 MW)","type":"generation","voltage_kv":null,"location_ref":"James River Power Station, Greene County, MO","lat":37.108611,"lng":-93.26194,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 605. Plant 2161 James River Power Station (City Utilities of Springfield - (MO)), Greene County, MO; balancing authority SWPP. Planned operation 2027-01.\nGenerator BAT1: 31 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1324,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"City Utilities of Springfield - (mo)","state":"MO","name":"McCartney (Natural Gas Fired Combustion Turbine, 146.7 MW)","type":"generation","voltage_kv":null,"location_ref":"McCartney, Greene County, MO","lat":37.248431,"lng":-93.17084,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 606, 607, 608. Plant 7903 McCartney (City Utilities of Springfield - (MO)), Greene County, MO; balancing authority SWPP. Planned operation 2027-01.\nGenerator MGS3: 48.9 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete\nGenerator MGS4: 48.9 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete\nGenerator MGS5: 48.9 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1870,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Clairemont Solar","state":"TX","name":"Clairemont Solar (Solar Photovoltaic, 250 MW)","type":"generation","voltage_kv":null,"location_ref":"Clairemont Solar, Kent County, TX","lat":33.371565,"lng":-100.9758,"route":null,"cost_usd":null,"start_date":"2029-07-01","end_date":"2029-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1947. Plant 68351 Clairemont Solar (Clairemont Solar LLC), Kent County, TX; balancing authority ERCO. Planned operation 2029-07.\nGenerator CLAPV: 250 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":852,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Clay Creek Energy","state":"CO","name":"Fort Lyon Solar (Solar Photovoltaic, 1.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Fort Lyon Solar, Bent County, CO","lat":38.081,"lng":-103.133,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 735. Plant 70115 Fort Lyon Solar (Clay Creek Energy, LLC), Bent County, CO; balancing authority WACM. Planned operation 2027-03.\nGenerator GEN1: 1.8 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":858,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Clay Creek Energy","state":"CO","name":"La Junta Solar (Solar Photovoltaic, 4.8 MW)","type":"generation","voltage_kv":null,"location_ref":"La Junta Solar, Otero County, CO","lat":38.038,"lng":-103.5237,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 736. Plant 70116 La Junta Solar (Clay Creek Energy, LLC), Otero County, CO; balancing authority WACM. Planned operation 2027-03.\nGenerator GEN1: 4.8 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":859,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Clay Creek Energy","state":"CO","name":"Lamar Solar (Solar Photovoltaic, 4.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Lamar Solar, Prowers County, CO","lat":38.043192,"lng":-102.5922,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 737. Plant 70117 Lamar Solar (Clay Creek Energy, LLC), Prowers County, CO; balancing authority WACM. Planned operation 2027-03.\nGenerator GEN1: 4.8 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":883,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Clay Creek Energy","state":"CO","name":"Trinidad Solar (Solar Photovoltaic, 1.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Trinidad Solar, Las Animas County, CO","lat":37.185879,"lng":-104.4924,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 738. Plant 70118 Trinidad Solar (Clay Creek Energy, LLC), Las Animas County, CO; balancing authority WACM. Planned operation 2027-03.\nGenerator GEN1: 1.8 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1394,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cleanchoice Energy","state":"NC","name":"Sweetleaf Solar LLC (Solar Photovoltaic, 93 MW)","type":"generation","voltage_kv":null,"location_ref":"Sweetleaf Solar LLC, Halifax County, NC","lat":36.220711,"lng":-77.68863,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1308. Plant 68271 Sweetleaf Solar LLC (CleanChoice Energy), Halifax County, NC; balancing authority PJM. Planned operation 2027-12.\nGenerator SWLS1: 93 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1871,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Clear Fork","state":"TX","name":"Clear Fork Creek Solar and BESS SLF (Batteries, Solar Photovoltaic, 1200 MW)","type":"generation","voltage_kv":null,"location_ref":"Clear Fork Creek Solar and BESS SLF, Wilson County, TX","lat":29.263568,"lng":-97.78055,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 693, 694. Plant 65842 Clear Fork Creek Solar and BESS SLF (Clear Fork), Wilson County, TX; balancing authority ERCO. Planned operation 2027-03.\nGenerator CFCBS: 600 MW Batteries; (U) Under construction, less than or equal to 50 percent complete\nGenerator CFCPV: 600 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1497,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Clear View Solar","state":"NY","name":"Clear View Solar (Solar Photovoltaic, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"Clear View Solar, Steuben County, NY","lat":42.57062,"lng":-77.46378,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1243. Plant 65931 Clear View Solar (Clear View Solar, LLC), Steuben County, NY; balancing authority NYIS. Planned operation 2027-12.\nGenerator 3: 20 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":667,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Clenera Devco","state":"AZ","name":"CO Bar C Solar and BESS (Batteries, Solar Photovoltaic, 412 MW)","type":"generation","voltage_kv":null,"location_ref":"CO Bar C Solar and BESS, Coconino County, AZ","lat":35.636594,"lng":-111.8835,"route":null,"cost_usd":null,"start_date":"2027-08-01","end_date":"2027-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 978, 979. Plant 69058 CO Bar C Solar and BESS (Clenera DevCo LLC), Coconino County, AZ; balancing authority AZPS. Planned operation 2027-08.\nGenerator CBCBA: 206 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator CBCPV: 206 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":668,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Clenera Devco","state":"AZ","name":"CO Bar D Solar and BESS (Batteries, Solar Photovoltaic, 788 MW)","type":"generation","voltage_kv":null,"location_ref":"CO Bar D Solar and BESS, Coconino County, AZ","lat":35.636594,"lng":-111.8835,"route":null,"cost_usd":null,"start_date":"2028-05-01","end_date":"2028-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1529, 1530. Plant 69057 CO Bar D Solar and BESS (Clenera DevCo LLC), Coconino County, AZ; balancing authority AZPS. Planned operation 2028-05.\nGenerator CBDBA: 394 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator CBDPV: 394 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":669,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Clenera Devco","state":"AZ","name":"CO Bar Solar and BESS (Batteries, Solar Photovoltaic, 800 MW)","type":"generation","voltage_kv":null,"location_ref":"CO Bar Solar and BESS, Coconino County, AZ","lat":35.636594,"lng":-111.8835,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1350, 1351. Plant 69056 CO Bar Solar and BESS (Clenera DevCo LLC), Coconino County, AZ; balancing authority AZPS. Planned operation 2027-12.\nGenerator CBBA: 400 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator CBPV: 400 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":693,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Clenera Devco","state":"AZ","name":"Snowflake A Solar and BESS (Batteries, Solar Photovoltaic, 950 MW)","type":"generation","voltage_kv":null,"location_ref":"Snowflake A Solar and BESS, Navajo County, AZ","lat":34.998055,"lng":-110.1255,"route":null,"cost_usd":null,"start_date":"2027-08-01","end_date":"2027-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 980, 981. Plant 69060 Snowflake A Solar and BESS (Clenera DevCo LLC), Navajo County, AZ; balancing authority AZPS. Planned operation 2027-08.\nGenerator SNFA: 475 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction\nGenerator SNFBA: 475 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":726,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Clenera Devco","state":"CA","name":"Country Acres Clean Power LLC (Batteries, Solar Photovoltaic, 516 MW)","type":"generation","voltage_kv":null,"location_ref":"Country Acres Clean Power LLC, Placer County, CA","lat":38.751744,"lng":-121.4221,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 513, 514. Plant 68940 Country Acres Clean Power LLC (Clenera DevCo LLC), Placer County, CA; balancing authority BANC. Planned operation 2026-12.\nGenerator CABS: 172 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator CAPV: 344 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":969,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Clenera Devco","state":"IA","name":"Coggon Solar LLC (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Coggon Solar LLC, Linn County, IA","lat":42.290594,"lng":-91.57266,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1348. Plant 68939 Coggon Solar LLC (Clenera DevCo LLC), Linn County, IA; balancing authority MISO. Planned operation 2027-12.\nGenerator COGPV: 100 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":981,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Clenera Devco","state":"ID","name":"Crimson Orchard Solar and BESS (Batteries, Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Crimson Orchard Solar and BESS, Elmore County, ID","lat":43.181239,"lng":-115.7465,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 775, 776. Plant 69059 Crimson Orchard Solar and BESS (Clenera DevCo LLC), Elmore County, ID; balancing authority IPCO. Planned operation 2027-04.\nGenerator COBA: 100 MW Batteries; (L) Regulatory approvals pending. Not under construction\nGenerator COPV: 100 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1147,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Clenera Devco","state":"IN","name":"Rustic Hills Solar I (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Rustic Hills Solar I, Warrick County, IN","lat":37.96707,"lng":-87.30739,"route":null,"cost_usd":null,"start_date":"2028-10-01","end_date":"2028-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1697. Plant 69021 Rustic Hills Solar I (Clenera DevCo LLC), Warrick County, IN; balancing authority MISO. Planned operation 2028-10.\nGenerator RH1PV: 100 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1148,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Clenera Devco","state":"IN","name":"Rustic Hills Solar II LLC (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Rustic Hills Solar II LLC, Warrick County, IN","lat":37.974259,"lng":-87.32197,"route":null,"cost_usd":null,"start_date":"2028-10-01","end_date":"2028-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1698. Plant 69022 Rustic Hills Solar II LLC (Clenera DevCo LLC), Warrick County, IN; balancing authority MISO. Planned operation 2028-10.\nGenerator RH2PV: 100 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1265,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Clenera Devco","state":"MI","name":"Gemstone Solar LLC (Solar Photovoltaic, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Gemstone Solar LLC, Cass County, MI","lat":41.896754,"lng":-86.0488,"route":null,"cost_usd":null,"start_date":"2028-10-01","end_date":"2028-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1694. Plant 68061 Gemstone Solar LLC (Clenera DevCo LLC), Cass County, MI; balancing authority PJM. Planned operation 2028-10.\nGenerator GEMPV: 150 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1646,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Clenera Devco","state":"OK","name":"Solstice Solar LLC (Batteries, Solar Photovoltaic, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"Solstice Solar LLC, Le Flore County, OK","lat":35.291043,"lng":-94.77891,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2043, 2044. Plant 70186 Solstice Solar LLC (Clenera DevCo LLC), Le Flore County, OK; balancing authority SWPP. Planned operation 2029-12.\nGenerator SOLBS: 200 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator SOLPV: 200 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1685,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Clermont Solar","state":"PA","name":"Clermont Solar (Solar Photovoltaic, 120 MW)","type":"generation","voltage_kv":null,"location_ref":"Clermont Solar, McKean County, PA","lat":41.656025,"lng":-78.56731,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 349. Plant 67870 Clermont Solar (Clermont Solar, LLC), McKean County, PA; balancing authority PJM. Planned operation 2026-11.\nGenerator ENX34: 120 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1183,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Clover Creek Solar Project D / B / A New Frontiers Solar Park","state":"KY","name":"New Frontiers Solar (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"New Frontiers Solar, Breckinridge County, KY","lat":37.79502,"lng":-86.5068,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 877. Plant 68897 New Frontiers Solar (Clover Creek Solar Project LLC d/b/a New Frontiers Solar Park), Breckinridge County, KY; balancing authority MISO. Planned operation 2027-06.\nGenerator PVSI: 100 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":700,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Coast Energy Holdings","state":"CA","name":"7999 Gateway Solar (Solar Photovoltaic, 4.6 MW)","type":"generation","voltage_kv":null,"location_ref":"7999 Gateway Solar, Alameda County, CA","lat":37.5215,"lng":-122.0397,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 150. Plant 69896 7999 Gateway Solar (Coast Energy Holdings, LLC), Alameda County, CA; balancing authority CISO. Planned operation 2026-09.\nGenerator 7999G: 4.6 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":750,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Coast Energy Holdings","state":"CA","name":"Gateway#1&2 (Newark CA) (Solar Photovoltaic, 1.1 MW)","type":"generation","voltage_kv":null,"location_ref":"Gateway#1&2 (Newark CA), Alameda County, CA","lat":37.540903,"lng":-122.0617,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 783. Plant 69895 Gateway#1&2 (Newark CA) (Coast Energy Holdings, LLC), Alameda County, CA; balancing authority CISO. Planned operation 2027-04.\nGenerator Gy1a2: 1.1 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":954,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cobb Electric Membership","state":"GA","name":"Solar BESS Hybrid (Natural Gas Fired Combustion Turbine, 6 MW)","type":"generation","voltage_kv":null,"location_ref":"Solar BESS Hybrid, Cobb County, GA","lat":33.979348,"lng":-84.55613,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 802, 803, 804. Plant 63535 Solar BESS Hybrid (Cobb Electric Membership Corporation), Cobb County, GA; balancing authority SOCO. Planned operation 2027-05.\nGenerator GEN02: 2 MW Natural Gas Fired Combustion Turbine; (V) Under construction, more than 50 percent complete\nGenerator GEN03: 2 MW Natural Gas Fired Combustion Turbine; (V) Under construction, more than 50 percent complete\nGenerator GEN04: 2 MW Natural Gas Fired Combustion Turbine; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1015,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Coles Wind","state":"IL","name":"Coles Wind (Onshore Wind Turbine, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Coles Wind, Coles County, IL","lat":39.605953,"lng":-88.18026,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 816. Plant 68184 Coles Wind (Coles Wind, LLC), Coles County, IL; balancing authority MISO. Planned operation 2027-05.\nGenerator COLES: 300 MW Onshore Wind Turbine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1758,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Colleton Solar","state":"SC","name":"Colleton Solar (Solar Photovoltaic, 74.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Colleton Solar, Colleton County, SC","lat":33.123794,"lng":-80.84248,"route":null,"cost_usd":null,"start_date":"2028-11-01","end_date":"2028-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1705. Plant 62188 Colleton Solar (Colleton Solar), Colleton County, SC; balancing authority SCEG. Planned operation 2028-11.\nGenerator 30: 74.9 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1977,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Concho County Solar 1","state":"TX","name":"Lucy Solar (Solar Photovoltaic, 351.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Lucy Solar, Concho County, TX","lat":31.472348,"lng":-99.99328,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 960. Plant 70200 Lucy Solar (Concho County Solar 1 LLC), Concho County, TX; balancing authority ERCO. Planned operation 2027-07.\nGenerator 64205: 351.3 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1876,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cone Renewable Energy Project","state":"TX","name":"Cone Renewable Energy Project, LLC (Onshore Wind Turbine, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Cone Renewable Energy Project, LLC, Crosby County, TX","lat":33.8093,"lng":-101.3424,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1117. Plant 60272 Cone Renewable Energy Project, LLC (Cone Renewable Energy Project, LLC), Crosby County, TX; balancing authority ERCO. Planned operation 2027-11.\nGenerator WT1: 150 MW Onshore Wind Turbine; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1271,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Consumers Energy - (mi)","state":"MI","name":"Karn Solar Energy Center (Solar Photovoltaic, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"Karn Solar Energy Center, Bay County, MI","lat":43.644996,"lng":-83.84007,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 481. Plant 67998 Karn Solar Energy Center (Consumers Energy Co - (MI)), Bay County, MI; balancing authority MISO. Planned operation 2026-12.\nGenerator KSEC: 80 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1272,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Consumers Energy - (mi)","state":"MI","name":"Liberty Solar Energy Center (Solar Photovoltaic, 220 MW)","type":"generation","voltage_kv":null,"location_ref":"Liberty Solar Energy Center, Kalamazoo County, MI","lat":42.3631,"lng":-85.474,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1336. Plant 68744 Liberty Solar Energy Center (Consumers Energy Co - (MI)), Kalamazoo County, MI; balancing authority MISO. Planned operation 2027-12.\nGenerator LSEC: 220 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1280,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Consumers Energy - (mi)","state":"MI","name":"Spring Creek Agri-Energy Center (Solar Photovoltaic, 140 MW)","type":"generation","voltage_kv":null,"location_ref":"Spring Creek Agri-Energy Center, Calhoun County, MI","lat":42.2024,"lng":-85.23803,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 482. Plant 67999 Spring Creek Agri-Energy Center (Consumers Energy Co - (MI)), Calhoun County, MI; balancing authority MISO. Planned operation 2026-12.\nGenerator SCAEC: 140 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1282,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Consumers Energy - (mi)","state":"MI","name":"Sunfish Solar 2 (Solar Photovoltaic, 360 MW)","type":"generation","voltage_kv":null,"location_ref":"Sunfish Solar 2, Calhoun County, MI","lat":42.24653,"lng":-85.00559,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 507. Plant 68745 Sunfish Solar 2 (Consumers Energy Co - (MI)), Calhoun County, MI; balancing authority MISO. Planned operation 2026-12.\nGenerator SS2: 360 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":844,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Contour Global","state":"CO","name":"Black Hollow Sun (Solar Photovoltaic, 107 MW)","type":"generation","voltage_kv":null,"location_ref":"Black Hollow Sun, Weld County, CO","lat":40.616742,"lng":-104.8489,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 26. Plant 64745 Black Hollow Sun (Contour Global), Weld County, CO; balancing authority PSCO. Planned operation 2026-09.\nGenerator BHS02: 107 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1487,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Convergent Energy and Power Lp","state":"NY","name":"Bensonhurst Energy Storage 1 LLC (Batteries, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Bensonhurst Energy Storage 1 LLC, Kings County, NY","lat":40.636787,"lng":-73.93435,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 42. Plant 66497 Bensonhurst Energy Storage 1 LLC (Convergent Energy and Power LP), Kings County, NY; balancing authority ISNE. Planned operation 2026-09.\nGenerator BHBA1: 5 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":670,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Copia Power","state":"AZ","name":"Centennial Flats (Batteries, Solar Photovoltaic, 255.7 MW)","type":"generation","voltage_kv":null,"location_ref":"Centennial Flats, La Paz County, AZ","lat":33.588334,"lng":-113.5283,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 80, 81. Plant 68466 Centennial Flats (Copia Power), La Paz County, AZ; balancing authority AZPS. Planned operation 2026-09.\nGenerator CFB3: 89 MW Batteries; (U) Under construction, less than or equal to 50 percent complete\nGenerator CFPV3: 166.7 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":688,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Copia Power","state":"AZ","name":"Saddleback Generation Station (Natural Gas Fired Combined Cycle, 1250 MW)","type":"generation","voltage_kv":null,"location_ref":"Saddleback Generation Station, Maricopa County, AZ","lat":33.410034,"lng":-113.1694,"route":null,"cost_usd":null,"start_date":"2030-12-01","end_date":"2030-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2115, 2116, 2117, 2118. Plant 69595 Saddleback Generation Station (Copia Power), Maricopa County, AZ; balancing authority AZPS. Planned operation 2030-12.\nGenerator GTGEN: 375 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator GTGN2: 375 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator STGEN: 250 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator STGN2: 250 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1438,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Corazon Energy Storage","state":"NM","name":"Corazon Energy Storage (Batteries, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Corazon Energy Storage, Bernalillo County, NM","lat":35.003482,"lng":-106.742,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1057. Plant 69974 Corazon Energy Storage (Corazon Energy Storage, LLC), Bernalillo County, NM; balancing authority PNM. Planned operation 2027-09.\nGenerator CRZN1: 150 MW Batteries; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1759,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cotton Solar","state":"SC","name":"Cotton Solar (Solar Photovoltaic, 16 MW)","type":"generation","voltage_kv":null,"location_ref":"Cotton Solar, Dillon County, SC","lat":34.455,"lng":-79.41028,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 844. Plant 59572 Cotton Solar (Cotton Solar, LLC), Dillon County, SC; balancing authority CPLE. Planned operation 2027-06.\nGenerator PV1: 16 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1879,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cottonwood Bayou Solar","state":"TX","name":"Cottonwood Bayou Solar (Solar Photovoltaic, 350 MW)","type":"generation","voltage_kv":null,"location_ref":"Cottonwood Bayou Solar, Brazoria County, TX","lat":29.263123,"lng":-95.258,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 53. Plant 66915 Cottonwood Bayou Solar (Cottonwood Bayou Solar, LLC), Brazoria County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator CTW: 350 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2262,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cowboy Solar I","state":"WY","name":"Cowboy Solar I (Solar Photovoltaic, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"Cowboy Solar I, Laramie County, WY","lat":41.032968,"lng":-104.3816,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1468. Plant 68022 Cowboy Solar I (Cowboy Solar I), Laramie County, WY; balancing authority WACM. Planned operation 2028-03.\nGenerator CLP20: 400 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2263,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cowboy Solar I","state":"WY","name":"Cowboy Solar I (Batteries, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"Cowboy Solar I, Laramie County, WY","lat":41.032968,"lng":-104.3816,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1774. Plant 68022 Cowboy Solar I (Cowboy Solar I), Laramie County, WY; balancing authority WACM. Planned operation 2028-12.\nGenerator CLPBS: 400 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1593,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cp Tully Five","state":"NY","name":"Tully 5 (Solar Photovoltaic, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"Tully 5, Onondaga County, NY","lat":42.810918,"lng":-76.12014,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1340. Plant 68860 Tully 5 (CP Tully Five LLC), Onondaga County, NY; balancing authority NYIS. Planned operation 2027-12.\nGenerator PV1: 2 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1592,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cp Tully Four","state":"NY","name":"Tully 4 (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Tully 4, Onondaga County, NY","lat":42.810918,"lng":-76.12014,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1341. Plant 68861 Tully 4 (CP Tully Four LLC), Onondaga County, NY; balancing authority NYIS. Planned operation 2027-12.\nGenerator PV1: 5 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1849,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cpv Basin Ranch","state":"TX","name":"CPV Basin Ranch Energy Center (Natural Gas Fired Combined Cycle, 1445 MW)","type":"generation","voltage_kv":null,"location_ref":"CPV Basin Ranch Energy Center, Ward County, TX","lat":31.506094,"lng":-103.4875,"route":null,"cost_usd":null,"start_date":"2029-02-01","end_date":"2029-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1858, 1859. Plant 69566 CPV Basin Ranch Energy Center (CPV Basin Ranch), Ward County, TX; balancing authority ERCO. Planned operation 2029-02.\nGenerator GEN1: 722.5 MW Natural Gas Fired Combined Cycle; (U) Under construction, less than or equal to 50 percent complete\nGenerator GEN2: 722.5 MW Natural Gas Fired Combined Cycle; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2159,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cpv County Line Solar","state":"VA","name":"CPV County Line Solar, LLC (Solar Photovoltaic, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"CPV County Line Solar, LLC, Charlotte County, VA","lat":37.190161,"lng":-78.68228,"route":null,"cost_usd":null,"start_date":"2030-12-01","end_date":"2030-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2108. Plant 67352 CPV County Line Solar, LLC (CPV County Line Solar, LLC), Charlotte County, VA; balancing authority PJM. Planned operation 2030-12.\nGenerator CPVCL: 150 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":624,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Crawfish Creek Energy Storage","state":"AL","name":"Crawfish Creek Energy Storage (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Crawfish Creek Energy Storage, Jackson County, AL","lat":34.83057,"lng":-85.66845,"route":null,"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1935. Plant 70138 Crawfish Creek Energy Storage (Crawfish Creek Energy Storage LLC), Jackson County, AL; balancing authority TVA. Planned operation 2029-06.\nGenerator CRAW1: 200 MW Batteries; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1130,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Crawfordsville Energy","state":"IN","name":"Crawfordsville Power Plant (Natural Gas Fired Combined Cycle, 16.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Crawfordsville Power Plant, Montgomery County, IN","lat":40.048889,"lng":-86.8992,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 677. Plant 1024 Crawfordsville Power Plant (Crawfordsville Energy LLC), Montgomery County, IN; balancing authority MISO. Planned operation 2027-03.\nGenerator 8: 16.3 MW Natural Gas Fired Combined Cycle; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":939,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Crossroads Bn","state":"GA","name":"Crossroads Solar - GA (Solar Photovoltaic, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Crossroads Solar - GA, Liberty County, GA","lat":31.71,"lng":-81.66,"route":null,"cost_usd":null,"start_date":"2029-07-01","end_date":"2029-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1944. Plant 68333 Crossroads Solar - GA (Crossroads bn, LLC), Liberty County, GA; balancing authority SOCO. Planned operation 2029-07.\nGenerator CROS: 150 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1760,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Crossroads Solar","state":"SC","name":"Crossroads Solar (Solar Photovoltaic, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"Crossroads Solar, Barnwell County, SC","lat":33.368886,"lng":-81.36497,"route":null,"cost_usd":null,"start_date":"2028-11-01","end_date":"2028-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1706. Plant 62190 Crossroads Solar (Crossroads Solar), Barnwell County, SC; balancing authority SCEG. Planned operation 2028-11.\nGenerator 32: 50 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1131,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Crossvine Solar 1","state":"IN","name":"Crossvine Solar (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Crossvine Solar, Dubois County, IN","lat":38.264271,"lng":-87.00189,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 695. Plant 66441 Crossvine Solar (Crossvine Solar 1 LLC), Dubois County, IN; balancing authority MISO. Planned operation 2027-03.\nGenerator INCV1: 100 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1761,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Culpepper Solar","state":"SC","name":"Culpepper Solar (Solar Photovoltaic, 74.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Culpepper Solar, Darlington County, SC","lat":34.465864,"lng":-79.96044,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1118. Plant 62221 Culpepper Solar (Culpepper Solar), Darlington County, SC; balancing authority CPLE. Planned operation 2027-11.\nGenerator 33: 74.9 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1321,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Curators of University of Missouri","state":"MO","name":"MU Combined Heat and Power Plant (Natural Gas Steam Turbine, 9 MW)","type":"generation","voltage_kv":null,"location_ref":"MU Combined Heat and Power Plant, Boone County, MO","lat":38.9461,"lng":-92.3328,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 327. Plant 50969 MU Combined Heat and Power Plant (Curators of the University of Missouri), Boone County, MO; balancing authority MISO. Planned operation 2026-11.\nGenerator GEN10: 9 MW Natural Gas Steam Turbine; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2250,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Current Hydro Project 19","state":"WV","name":"New Cumberland Hydroelectric Project (Conventional Hydroelectric, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"New Cumberland Hydroelectric Project, Hancock County, WV","lat":40.52821,"lng":-80.62574,"route":null,"cost_usd":null,"start_date":"2029-04-01","end_date":"2029-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1892, 1893. Plant 69701 New Cumberland Hydroelectric Project (Current Hydro Project 19, LLC), Hancock County, WV; balancing authority PJM. Planned operation 2029-04.\nGenerator NC-1: 10 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator NC-2: 10 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1563,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cve Us Ny Riverhead 215","state":"NY","name":"Riverhead - CVE (Batteries, Solar Photovoltaic, 8.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Riverhead - CVE, Suffolk County, NY","lat":40.94233,"lng":-72.71824,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 171, 172. Plant 70242 Riverhead - CVE (CVE US NY Riverhead 215 LLC), Suffolk County, NY; balancing authority NYIS. Planned operation 2026-09.\nGenerator 215: 4.9 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete\nGenerator 216: 4 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1601,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cve Us Ny Westhampton 243","state":"NY","name":"Westhampton - NY 0243 (Giaquinto 1) (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Westhampton - NY 0243 (Giaquinto 1), Suffolk County, NY","lat":40.83636,"lng":-72.69044,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1061. Plant 70134 Westhampton - NY 0243 (Giaquinto 1) (CVE US NY Westhampton 243 LLC), Suffolk County, NY; balancing authority NYIS. Planned operation 2027-09.\nGenerator 243: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1675,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cve Us Pa Bigler 409","state":"PA","name":"Bigler - PA 0409 (Flango 1) (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Bigler - PA 0409 (Flango 1), Clearfield County, PA","lat":40.803436,"lng":-78.42275,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1150. Plant 70075 Bigler - PA 0409 (Flango 1) (CVE US PA Bigler 409 LLC), Clearfield County, PA; balancing authority PJM. Planned operation 2027-11.\nGenerator 409: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1676,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cve Us Pa Bigler 436","state":"PA","name":"Bigler - PA 0436 (Flango 2) (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Bigler - PA 0436 (Flango 2), Clearfield County, PA","lat":40.80344,"lng":-78.42252,"route":null,"cost_usd":null,"start_date":"2028-02-01","end_date":"2028-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1446. Plant 70076 Bigler - PA 0436 (Flango 2) (CVE US PA Bigler 436 LLC), Clearfield County, PA; balancing authority PJM. Planned operation 2028-02.\nGenerator 436: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1677,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cve Us Pa Bigler 437","state":"PA","name":"Bigler - PA 0437 (Flango 3) (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Bigler - PA 0437 (Flango 3), Clearfield County, PA","lat":40.80344,"lng":-78.42275,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1387. Plant 70077 Bigler - PA 0437 (Flango 3) (CVE US PA Bigler 437 LLC), Clearfield County, PA; balancing authority PJM. Planned operation 2027-12.\nGenerator 437: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1678,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cve Us Pa Bigler 438","state":"PA","name":"Bigler - PA 0438 (Flango 4) (Solar Photovoltaic, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"Bigler - PA 0438 (Flango 4), Clearfield County, PA","lat":40.80344,"lng":-78.42275,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1388. Plant 70078 Bigler - PA 0438 (Flango 4) (CVE US PA Bigler 438 LLC), Clearfield County, PA; balancing authority PJM. Planned operation 2027-12.\nGenerator 438: 2 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1681,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cve Us Pa Buckingham 151","state":"PA","name":"Buckingham - PA 0151 (Crea) (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Buckingham - PA 0151 (Crea), Wayne County, PA","lat":41.86605,"lng":-78.42275,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1151. Plant 70079 Buckingham - PA 0151 (Crea) (CVE US PA BUCKINGHAM 151 LLC), Wayne County, PA; balancing authority PJM. Planned operation 2027-11.\nGenerator 151: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1682,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cve Us Pa Burrell 396","state":"PA","name":"Burrell - PA 0396 (Copeland) (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Burrell - PA 0396 (Copeland), Armstrong County, PA","lat":40.65921,"lng":-79.43822,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1152. Plant 70080 Burrell - PA 0396 (Copeland) (CVE US PA Burrell 396 LLC), Armstrong County, PA; balancing authority PJM. Planned operation 2027-11.\nGenerator 396: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1683,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cve Us Pa Dayton 379","state":"PA","name":"CVE US PA Dayton 379 (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"CVE US PA Dayton 379, Armstrong County, PA","lat":40.89056,"lng":-79.27027,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1153. Plant 70081 CVE US PA Dayton 379 (CVE US PA Dayton 379 LLC), Armstrong County, PA; balancing authority PJM. Planned operation 2027-11.\nGenerator 379: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1687,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cve Us Pa Dayton 404","state":"PA","name":"Dayton - PA 0404 (Good East) (Solar Photovoltaic, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Dayton - PA 0404 (Good East), Armstrong County, PA","lat":40.89056,"lng":-79.27027,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1389. Plant 70082 Dayton - PA 0404 (Good East) (CVE US PA Dayton 404 LLC), Armstrong County, PA; balancing authority PJM. Planned operation 2027-12.\nGenerator 404: 2.5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1706,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cve Us Pa Jones 399","state":"PA","name":"Jones - PA 0399 (Rhodes) (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Jones - PA 0399 (Rhodes), Elk County, PA","lat":41.564214,"lng":-78.69733,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1154. Plant 70083 Jones - PA 0399 (Rhodes) (CVE US PA Jones 399 LLC), Elk County, PA; balancing authority PJM. Planned operation 2027-11.\nGenerator 399: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1707,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cve Us Pa Jones 429","state":"PA","name":"Jones - PA 0429 (Rhodes South) (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Jones - PA 0429 (Rhodes South), Elk County, PA","lat":41.56421,"lng":-78.69733,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1111. Plant 70170 Jones - PA 0429 (Rhodes South) (CVE US PA Jones 429 LLC), Elk County, PA; balancing authority PJM. Planned operation 2027-10.\nGenerator 429: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1751,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cve Us Pa Kane 187","state":"PA","name":"Wetmore - PA 0187 (Chittester) (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Wetmore - PA 0187 (Chittester), McKean County, PA","lat":41.66753,"lng":-78.73295,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1159. Plant 70171 Wetmore - PA 0187 (Chittester) (CVE US PA Kane 187 LLC), McKean County, PA; balancing authority PJM. Planned operation 2027-11.\nGenerator 187: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1708,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cve Us Pa Kittanning 383","state":"PA","name":"Kittanning - PA 0383 (Hoeter) (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Kittanning - PA 0383 (Hoeter), Armstrong County, PA","lat":40.82161,"lng":-79.33393,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1160. Plant 70172 Kittanning - PA 0383 (Hoeter) (CVE US PA Kittanning 383 LLC), Armstrong County, PA; balancing authority PJM. Planned operation 2027-11.\nGenerator 383: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1709,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cve Us Pa Kittanning 406","state":"PA","name":"Kittanning - PA 0406 (Hoeter B) (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Kittanning - PA 0406 (Hoeter B), Armstrong County, PA","lat":40.82161,"lng":-79.33393,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1831. Plant 70164 Kittanning - PA 0406 (Hoeter B) (CVE US PA Kittanning 406 LLC), Armstrong County, PA; balancing authority PJM. Planned operation 2028-12.\nGenerator 406: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1710,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cve Us Pa Kittanning 407","state":"PA","name":"Kittanning - PA 0407 (Hoeter C) (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Kittanning - PA 0407 (Hoeter C), Armstrong County, PA","lat":40.82161,"lng":-79.33393,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1832. Plant 70165 Kittanning - PA 0407 (Hoeter C) (CVE US PA Kittanning 407 LLC), Armstrong County, PA; balancing authority PJM. Planned operation 2028-12.\nGenerator 407: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1747,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cve Us Pa Latrobe 385","state":"PA","name":"Unity - PA 0385 (Soccerhound) (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Unity - PA 0385 (Soccerhound), Clearfield County, PA","lat":40.25174,"lng":-79.35354,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1158. Plant 70166 Unity - PA 0385 (Soccerhound) (CVE US PA Latrobe 385 LLC), Clearfield County, PA; balancing authority PJM. Planned operation 2027-11.\nGenerator 385: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1711,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cve Us Pa Latrobe 408","state":"PA","name":"Latrobe - PA 0408 (Soccerhound B) (Solar Photovoltaic, 1 MW)","type":"generation","voltage_kv":null,"location_ref":"Latrobe - PA 0408 (Soccerhound B), Clearfield County, PA","lat":40.25174,"lng":-79.35354,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1398. Plant 70167 Latrobe - PA 0408 (Soccerhound B) (CVE US PA Latrobe 408 LLC), Clearfield County, PA; balancing authority PJM. Planned operation 2027-12.\nGenerator 408: 1 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1724,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cve Us Pa Monroe 485","state":"PA","name":"Monroe - PA 0485 (Lawrence) (Solar Photovoltaic, 2.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Monroe - PA 0485 (Lawrence), Clarion County, PA","lat":41.11339,"lng":-79.4146,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1399. Plant 70168 Monroe - PA 0485 (Lawrence) (CVE US PA Monroe 485 LLC), Clarion County, PA; balancing authority PJM. Planned operation 2027-12.\nGenerator 485: 2.4 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1725,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cve Us Pa Monroe 486","state":"PA","name":"Monroe - PA 0486 (Acey) (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Monroe - PA 0486 (Acey), Clarion County, PA","lat":41.13178,"lng":-79.4476,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1400. Plant 70169 Monroe - PA 0486 (Acey) (CVE US PA Monroe 486 LLC), Clarion County, PA; balancing authority PJM. Planned operation 2027-12.\nGenerator 486: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1735,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cve Us Pa New Alexandria 185","state":"PA","name":"New Alexandria - PA 0185 (Weimer) (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"New Alexandria - PA 0185 (Weimer), Westmoreland County, PA","lat":40.40255,"lng":-79.42805,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1394. Plant 70120 New Alexandria - PA 0185 (Weimer) (CVE US PA New Alexandria 185 LLC), Westmoreland County, PA; balancing authority PJM. Planned operation 2027-12.\nGenerator 185: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1734,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cve Us Pa New Alexandria 363","state":"PA","name":"New Alexandria  - PA 0363 (Weimer North) (Solar Photovoltaic, 1.5 MW)","type":"generation","voltage_kv":null,"location_ref":"New Alexandria  - PA 0363 (Weimer North), Westmoreland County, PA","lat":40.40255,"lng":-79.42806,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1393. Plant 70114 New Alexandria  - PA 0363 (Weimer North) (CVE US PA New Alexandria 363 LLC), Westmoreland County, PA; balancing authority PJM. Planned operation 2027-12.\nGenerator 363: 1.5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1743,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cve Us Pa Roulette 467","state":"PA","name":"Roulette - PA 0467 (Solar Photovoltaic, 2.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Roulette - PA 0467, Potter County, PA","lat":41.777,"lng":-78.1995,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1396. Plant 70126 Roulette - PA 0467 (CVE US PA Roulette 467 LLC), Potter County, PA; balancing authority PJM. Planned operation 2027-12.\nGenerator 467: 2.6 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1744,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cve Us Pa Roulette 479","state":"PA","name":"Roulette - PA 0479 (Solar Photovoltaic, 1.1 MW)","type":"generation","voltage_kv":null,"location_ref":"Roulette - PA 0479, Potter County, PA","lat":41.777,"lng":-78.1995,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1397. Plant 70128 Roulette - PA 0479 (CVE US PA Roulette 479 LLC), Potter County, PA; balancing authority PJM. Planned operation 2027-12.\nGenerator 479: 1.1 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2201,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cve Us Va Patterson 426","state":"VA","name":"Waynesboro - VA 0426 (Patterson B) (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Waynesboro - VA 0426 (Patterson B), Augusta County, VA","lat":38.14701,"lng":-78.87457,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1157. Plant 70132 Waynesboro - VA 0426 (Patterson B) (CVE US VA Patterson 426 LLC), Augusta County, VA; balancing authority PJM. Planned operation 2027-11.\nGenerator 426: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2181,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cve Us Va Petersburg 224","state":"VA","name":"Petersburg - VA 0224 (Murphy) (Solar Photovoltaic, 2.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Petersburg - VA 0224 (Murphy), Chesterfield County, VA","lat":37.24348,"lng":-77.43647,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1395. Plant 70123 Petersburg - VA 0224 (Murphy) (CVE US VA Petersburg 224 LLC), Chesterfield County, VA; balancing authority PJM. Planned operation 2027-12.\nGenerator 224: 2.6 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2193,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cve Us Va Suffolk 141","state":"VA","name":"Suffolk - VA 0141 (Johnson South) (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Suffolk - VA 0141 (Johnson South), Suffolk City County, VA","lat":36.70257,"lng":-76.79211,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1156. Plant 70130 Suffolk - VA 0141 (Johnson South) (CVE US VA Suffolk 141 LLC), Suffolk City County, VA; balancing authority TVA. Planned operation 2027-11.\nGenerator 141: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":912,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"CVSO","state":"FL","name":"Caverns Solar (Solar Photovoltaic, 75 MW)","type":"generation","voltage_kv":null,"location_ref":"Caverns Solar, Jackson County, FL","lat":30.871983,"lng":-85.29425,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2028. Plant 68331 Caverns Solar (CVSO, LLC), Jackson County, FL; balancing authority FPL. Planned operation 2029-12.\nGenerator CVSO: 75 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1684,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"C W Bill Young Hydropower Group","state":"PA","name":"CW Bill Young Hydropower Project (Conventional Hydroelectric, 8.4 MW)","type":"generation","voltage_kv":null,"location_ref":"CW Bill Young Hydropower Project, Allegheny County, PA","lat":40.54028,"lng":-79.81556,"route":null,"cost_usd":null,"start_date":"2031-10-01","end_date":"2031-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2281, 2282, 2283, 2284, 2285, 2286, 2287. Plant 69697 CW Bill Young Hydropower Project (C.W. Bill Young Hydropower Group, Inc), Allegheny County, PA; balancing authority PJM. Planned operation 2031-10.\nGenerator CW-1: 1.2 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator CW-2: 1.2 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator CW-3: 1.2 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator CW-4: 1.2 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator CW-5: 1.2 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator CW-6: 1.2 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator CW-7: 1.2 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":653,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"AR","name":"Steel River Solar Phase 1 (Batteries, Solar Photovoltaic, 750 MW)","type":"generation","voltage_kv":null,"location_ref":"Steel River Solar Phase 1, Mississippi County, AR","lat":35.578637,"lng":-90.09763,"route":null,"cost_usd":null,"start_date":"2028-08-01","end_date":"2028-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1657, 1658. Plant 70397 Steel River Solar Phase 1 (Cypress Creek Renewables), Mississippi County, AR; balancing authority MISO. Planned operation 2028-08.\nGenerator SRSB1: 250 MW Batteries; (U) Under construction, less than or equal to 50 percent complete\nGenerator SRSP1: 500 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":654,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"AR","name":"Steel River Solar Phase 2 (Batteries, Solar Photovoltaic, 750 MW)","type":"generation","voltage_kv":null,"location_ref":"Steel River Solar Phase 2, Mississippi County, AR","lat":35.578637,"lng":-90.09763,"route":null,"cost_usd":null,"start_date":"2029-07-01","end_date":"2029-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1955, 1956. Plant 70398 Steel River Solar Phase 2 (Cypress Creek Renewables), Mississippi County, AR; balancing authority MISO. Planned operation 2029-07.\nGenerator SRSB2: 250 MW Batteries; (U) Under construction, less than or equal to 50 percent complete\nGenerator SRSP2: 500 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":655,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"AR","name":"Steel River Solar Phase 3 (Batteries, Solar Photovoltaic, 750 MW)","type":"generation","voltage_kv":null,"location_ref":"Steel River Solar Phase 3, Mississippi County, AR","lat":35.578637,"lng":-90.09763,"route":null,"cost_usd":null,"start_date":"2030-07-01","end_date":"2030-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2074, 2075. Plant 70399 Steel River Solar Phase 3 (Cypress Creek Renewables), Mississippi County, AR; balancing authority MISO. Planned operation 2030-07.\nGenerator SRSB3: 250 MW Batteries; (U) Under construction, less than or equal to 50 percent complete\nGenerator SRSP3: 500 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":851,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"CO","name":"Elk Run (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Elk Run, Las Animas County, CO","lat":37.454588,"lng":-104.4887,"route":null,"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1911. Plant 67655 Elk Run (Cypress Creek Renewables), Las Animas County, CO; balancing authority PSCO. Planned operation 2029-06.\nGenerator ELKRN: 200 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":881,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"CO","name":"Sundance (CO) (Batteries, Solar Photovoltaic, 124.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Sundance (CO), Elbert County, CO","lat":39.414779,"lng":-104.4481,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 58, 59. Plant 67666 Sundance (CO) (Cypress Creek Renewables), Elbert County, CO; balancing authority PSCO. Planned operation 2026-09.\nGenerator SUNBA: 50 MW Batteries; (U) Under construction, less than or equal to 50 percent complete\nGenerator SUNDN: 74.9 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1123,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"IL","name":"Varnsen (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Varnsen, Winnebago County, IL","lat":42.315822,"lng":-89.31315,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 929. Plant 67645 Varnsen (Cypress Creek Renewables), Winnebago County, IL; balancing authority MISO. Planned operation 2027-07.\nGenerator TWNDA: 5 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1367,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"NC","name":"Black Walnut Solar, LLC (Solar Photovoltaic, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"Black Walnut Solar, LLC, Jones County, NC","lat":35.050032,"lng":-77.15218,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1133. Plant 66363 Black Walnut Solar, LLC (Cypress Creek Renewables), Jones County, NC; balancing authority DUK. Planned operation 2027-11.\nGenerator GEN1: 80 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1368,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"NC","name":"Black Walnut Solar, LLC (Batteries, 32 MW)","type":"generation","voltage_kv":null,"location_ref":"Black Walnut Solar, LLC, Jones County, NC","lat":35.050032,"lng":-77.15218,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1759. Plant 66363 Black Walnut Solar, LLC (Cypress Creek Renewables), Jones County, NC; balancing authority DUK. Planned operation 2028-12.\nGenerator GEN1B: 32 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1376,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"NC","name":"Healing Springs Solar, LLC (Solar Photovoltaic, 55 MW)","type":"generation","voltage_kv":null,"location_ref":"Healing Springs Solar, LLC, Davidson County, NC","lat":35.623627,"lng":-80.15972,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1249. Plant 66382 Healing Springs Solar, LLC (Cypress Creek Renewables), Davidson County, NC; balancing authority DUK. Planned operation 2027-12.\nGenerator GEN1: 55 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1378,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"NC","name":"Hyco Solar LLC (Solar Photovoltaic, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"Hyco Solar LLC, Person County, NC","lat":36.484574,"lng":-79.13311,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1134. Plant 66383 Hyco Solar LLC (Cypress Creek Renewables), Person County, NC; balancing authority DUK. Planned operation 2027-11.\nGenerator GEN1: 80 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1385,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"NC","name":"Panther Branch Solar, LLC (Solar Photovoltaic, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"Panther Branch Solar, LLC, Duplin County, NC","lat":35.145344,"lng":-78.15963,"route":null,"cost_usd":null,"start_date":"2028-08-01","end_date":"2028-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1632. Plant 66385 Panther Branch Solar, LLC (Cypress Creek Renewables), Duplin County, NC; balancing authority DUK. Planned operation 2028-08.\nGenerator GEN1: 80 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1386,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"NC","name":"Panther Branch Solar, LLC (Batteries, 32 MW)","type":"generation","voltage_kv":null,"location_ref":"Panther Branch Solar, LLC, Duplin County, NC","lat":35.145344,"lng":-78.15963,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2014. Plant 66385 Panther Branch Solar, LLC (Cypress Creek Renewables), Duplin County, NC; balancing authority DUK. Planned operation 2029-12.\nGenerator GEN1B: 32 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1390,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"NC","name":"Scotch Grove Solar (Solar Photovoltaic, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"Scotch Grove Solar, Scotland County, NC","lat":34.84957,"lng":-79.44656,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1011. Plant 67663 Scotch Grove Solar (Cypress Creek Renewables), Scotland County, NC; balancing authority CPLE. Planned operation 2027-09.\nGenerator SGROV: 80 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1392,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"NC","name":"South Davidson (Solar Photovoltaic, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"South Davidson, Davidson County, NC","lat":35.618203,"lng":-80.10797,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1084. Plant 67665 South Davidson (Cypress Creek Renewables), Davidson County, NC; balancing authority DUK. Planned operation 2027-10.\nGenerator SDAVI: 80 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1393,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"NC","name":"Stevens Mill Solar (Solar Photovoltaic, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"Stevens Mill Solar, Wayne County, NC","lat":35.35546,"lng":-78.1192,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 823. Plant 68812 Stevens Mill Solar (Cypress Creek Renewables), Wayne County, NC; balancing authority CPLE. Planned operation 2027-05.\nGenerator STVML: 80 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1397,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"NC","name":"Timber Mill Solar (Batteries, Solar Photovoltaic, 112 MW)","type":"generation","voltage_kv":null,"location_ref":"Timber Mill Solar, Jones County, NC","lat":34.96634,"lng":-77.21299,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1796, 1797. Plant 68871 Timber Mill Solar (Cypress Creek Renewables), Jones County, NC; balancing authority CPLE. Planned operation 2028-12.\nGenerator TIMIB: 32 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator TIMIL: 80 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1478,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"NV","name":"Vitex Storage (Batteries, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Vitex Storage, Clark County, NV","lat":36.382286,"lng":-114.9102,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1573. Plant 68813 Vitex Storage (Cypress Creek Renewables), Clark County, NV; balancing authority NEVP. Planned operation 2028-06.\nGenerator VITEX: 300 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1486,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"NY","name":"Bear Ridge (Solar Photovoltaic, 93 MW)","type":"generation","voltage_kv":null,"location_ref":"Bear Ridge, Niagara County, NY","lat":43.14244,"lng":-78.79106,"route":null,"cost_usd":null,"start_date":"2028-05-01","end_date":"2028-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1519. Plant 67650 Bear Ridge (Cypress Creek Renewables), Niagara County, NY; balancing authority NYIS. Planned operation 2028-05.\nGenerator BEARR: 93 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1555,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"NY","name":"Oxbow Hill (Solar Photovoltaic, 140 MW)","type":"generation","voltage_kv":null,"location_ref":"Oxbow Hill, Niagara County, NY","lat":42.9711,"lng":-75.73553,"route":null,"cost_usd":null,"start_date":"2029-05-01","end_date":"2029-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1895. Plant 67661 Oxbow Hill (Cypress Creek Renewables), Niagara County, NY; balancing authority NYIS. Planned operation 2029-05.\nGenerator OXHIL: 140 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1732,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"PA","name":"Mora Solar (Solar Photovoltaic, 60 MW)","type":"generation","voltage_kv":null,"location_ref":"Mora Solar, Carbon County, PA","lat":41.062982,"lng":-75.63435,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1337. Plant 68810 Mora Solar (Cypress Creek Renewables), Carbon County, PA; balancing authority PJM. Planned operation 2027-12.\nGenerator MORA: 60 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1812,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"TX","name":"Amerada (Solar Photovoltaic, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Amerada, Freestone County, TX","lat":31.861926,"lng":-96.11463,"route":null,"cost_usd":null,"start_date":"2029-07-01","end_date":"2029-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1943. Plant 67649 Amerada (Cypress Creek Renewables), Freestone County, TX; balancing authority ERCO. Planned operation 2029-07.\nGenerator AMERA: 300 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1828,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"TX","name":"Bhalu (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Bhalu, Howard County, TX","lat":32.31219,"lng":-101.3378,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1281. Plant 67652 Bhalu (Cypress Creek Renewables), Howard County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator BHALU: 200 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1928,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"TX","name":"Hanson (Solar Photovoltaic, 396 MW)","type":"generation","voltage_kv":null,"location_ref":"Hanson, Coleman County, TX","lat":31.690367,"lng":-99.51389,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 930. Plant 67657 Hanson (Cypress Creek Renewables), Coleman County, TX; balancing authority ERCO. Planned operation 2027-07.\nGenerator HANSO: 396 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2080,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"TX","name":"Soleil (Solar Photovoltaic, 450 MW)","type":"generation","voltage_kv":null,"location_ref":"Soleil, Clay County, TX","lat":33.799253,"lng":-98.04552,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1769. Plant 67664 Soleil (Cypress Creek Renewables), Clay County, TX; balancing authority ERCO. Planned operation 2028-12.\nGenerator SOLEI: 450 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2104,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"TX","name":"Third Coast BESS, LLC (Batteries, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Third Coast BESS, LLC, Jackson County, TX","lat":28.852327,"lng":-96.55642,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1136. Plant 67667 Third Coast BESS, LLC (Cypress Creek Renewables), Jackson County, TX; balancing authority ERCO. Planned operation 2027-11.\nGenerator 3COAS: 100 MW Batteries; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2179,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"VA","name":"Kinglet (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Kinglet, Stafford County, VA","lat":38.350511,"lng":-77.47619,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1280. Plant 67647 Kinglet (Cypress Creek Renewables), Stafford County, VA; balancing authority PJM. Planned operation 2027-12.\nGenerator KINGL: 5 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2212,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"WA","name":"Carriger (Solar Photovoltaic, 160 MW)","type":"generation","voltage_kv":null,"location_ref":"Carriger, Klickitat County, WA","lat":45.8777,"lng":-120.8865,"route":null,"cost_usd":null,"start_date":"2028-11-01","end_date":"2028-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1723. Plant 67653 Carriger (Cypress Creek Renewables), Klickitat County, WA; balancing authority BPAT. Planned operation 2028-11.\nGenerator CARRI: 160 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2215,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Cypress Creek Renewables","state":"WA","name":"High Top Solar (Solar Photovoltaic, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"High Top Solar, Yakima County, WA","lat":46.522974,"lng":-119.9586,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1840. Plant 65325 High Top Solar (Cypress Creek Renewables), Yakima County, WA; balancing authority PACW. Planned operation 2029-01.\nGenerator 98936: 80 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1885,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dahlia Energy","state":"TX","name":"Dahlia Energy (Batteries, Solar Photovoltaic, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Dahlia Energy, La Salle County, TX","lat":28.369598,"lng":-98.96762,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1571, 1572. Plant 68604 Dahlia Energy (Dahlia Energy LLC), La Salle County, TX; balancing authority ERCO. Planned operation 2028-06.\nGenerator DALBS: 100 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator DALPV: 200 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2958,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Dalton Utilities","state":"GA","name":"Dawson Crossing - Nelson (White) 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Dawson Crossing - Nelson (White) (GA)","lat":34.38,"lng":-84.252,"route":[[34.378,-84.134],[34.383,-84.37]],"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":72,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 72.\nIn-Service Year: 2030\nProject Name: DU: DAWSON CROSSING - NELSON (WHITE) 115 KV REBUILD\nDescription: Rebuild approximately 15.7 miles of the Dawson Crossing - Nelson (White) 115 kV line with 200°C 1351 ACSS Martin.\nSupporting Statement: The Dawson Crossing - Nelson (White) 115 kV line overloads under contingency.\nLocated: DAWSON CROSSING = OSM substation 'Dawson Crossing Substation' (GA); NELSON (WHITE) = OSM substation 'Nelson Substation' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":1886,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Danish Fields Solar","state":"TX","name":"Danish Fields Solar, LLC (Solar Photovoltaic, 600 MW)","type":"generation","voltage_kv":null,"location_ref":"Danish Fields Solar, LLC, Wharton County, TX","lat":29.013637,"lng":-96.22054,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 52. Plant 66914 Danish Fields Solar, LLC (Danish Fields Solar, LLC), Wharton County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator DAN: 600 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2168,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Danville Va Bess 2","state":"VA","name":"Danville VA BESS 2 (Batteries, 11 MW)","type":"generation","voltage_kv":null,"location_ref":"Danville VA BESS 2, Pittsylvania County, VA","lat":36.6052,"lng":-79.4358,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 272. Plant 69552 Danville VA BESS 2 (Danville VA BESS 2 LLC), Pittsylvania County, VA; balancing authority PJM. Planned operation 2026-10.\nGenerator 90916: 11 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1686,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dashields Hydropower Corporations","state":"PA","name":"Dashields Hydroelectric Project (Conventional Hydroelectric, 8.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Dashields Hydroelectric Project, Allegheny County, PA","lat":40.549546,"lng":-80.20544,"route":null,"cost_usd":null,"start_date":"2030-08-01","end_date":"2030-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2078, 2079, 2080, 2081, 2082, 2083, 2084, 2085. Plant 69698 Dashields Hydroelectric Project (Dashields Hydropower Corporations), Allegheny County, PA; balancing authority PJM. Planned operation 2030-08.\nGenerator DAS-1: 1.1 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator DAS-2: 1.1 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator DAS-3: 1.1 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator DAS-4: 1.1 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator DAS-5: 1.1 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator DAS-6: 1.1 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator DAS-7: 1.1 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator DAS-8: 1.1 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2227,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dawn Break Solar","state":"WI","name":"Dawn Break Solar (Batteries, Solar Photovoltaic, 360 MW)","type":"generation","voltage_kv":null,"location_ref":"Dawn Break Solar, Waushara County, WI","lat":44.140833,"lng":-89.46472,"route":null,"cost_usd":null,"start_date":"2029-09-01","end_date":"2029-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1976, 1977. Plant 69761 Dawn Break Solar (Dawn Break Solar, LLC), Waushara County, WI; balancing authority MISO. Planned operation 2029-09.\nGenerator DBBES: 180 MW Batteries; (L) Regulatory approvals pending. Not under construction\nGenerator DBSOL: 180 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1654,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dech Bn","state":"OR","name":"Deschutes Solar and BESS (Batteries, Solar Photovoltaic, 2000 MW)","type":"generation","voltage_kv":null,"location_ref":"Deschutes Solar and BESS, Wasco County, OR","lat":45.157,"lng":-121.136,"route":null,"cost_usd":null,"start_date":"2029-11-01","end_date":"2029-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1995, 1996. Plant 68763 Deschutes Solar and BESS (DECH bn, LLC), Wasco County, OR; balancing authority BPAT. Planned operation 2029-11.\nGenerator DECH1: 1000 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction\nGenerator DECH2: 1000 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":848,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Deep Space Solar","state":"CO","name":"Deep Space Solar (Solar Photovoltaic, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Deep Space Solar, Kiowa County, CO","lat":38.402141,"lng":-103.286,"route":null,"cost_usd":null,"start_date":"2030-12-01","end_date":"2030-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2124. Plant 69643 Deep Space Solar (Deep Space Solar LLC), Kiowa County, CO; balancing authority PSCO. Planned operation 2030-12.\nGenerator 60215: 300 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":625,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dega Bn","state":"AL","name":"Dega Solar and Storage (Batteries, Solar Photovoltaic, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"Dega Solar and Storage, Talladega County, AL","lat":33.537201,"lng":-86.0855,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2029, 2030. Plant 68332 Dega Solar and Storage (DEGA bn, LLC), Talladega County, AL; balancing authority SOCO. Planned operation 2029-12.\nGenerator DEGA1: 200 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction\nGenerator DEGA2: 200 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":901,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Delaware Ave Solar","state":"DE","name":"Delaware Ave Solar (Solar Photovoltaic, 4 MW)","type":"generation","voltage_kv":null,"location_ref":"Delaware Ave Solar, Kent County, DE","lat":38.930578,"lng":-75.57075,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 224. Plant 68195 Delaware Ave Solar (Delaware Ave Solar, LLC), Kent County, DE; balancing authority PJM. Planned operation 2026-10.\nGenerator DEAVE: 4 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2122,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Delaware Ranch Solar","state":"TX","name":"Wallace Solar - (TX) (Solar Photovoltaic, 36 MW)","type":"generation","voltage_kv":null,"location_ref":"Wallace Solar - (TX), Culberson County, TX","lat":31.917641,"lng":-104.3148,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 416. Plant 70093 Wallace Solar - (TX) (Delaware Ranch Solar, LLC), Culberson County, TX; balancing authority ERCO. Planned operation 2026-11.\nGenerator WSPV1: 36 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":673,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Desa Bn","state":"AZ","name":"Desert Sand BESS (Batteries, Solar Photovoltaic, 600 MW)","type":"generation","voltage_kv":null,"location_ref":"Desert Sand BESS, Maricopa County, AZ","lat":33.497049,"lng":-113.0514,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1788, 1789. Plant 68283 Desert Sand BESS (DESA bn, LLC), Maricopa County, AZ; balancing authority AZPS. Planned operation 2028-12.\nGenerator DESA: 300 MW Batteries; (L) Regulatory approvals pending. Not under construction\nGenerator DESA1: 300 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1889,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Diamondback Solar","state":"TX","name":"Diamondback Solar (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Diamondback Solar, Starr County, TX","lat":26.426684,"lng":-98.70102,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1384. Plant 69982 Diamondback Solar (Diamondback Solar, LLC), Starr County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator 3569: 200 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1371,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dill Holdings","state":"NC","name":"Dill Holdings LLC (Solar Photovoltaic, 10 MW)","type":"generation","voltage_kv":null,"location_ref":"Dill Holdings LLC, Iredell County, NC","lat":35.966645,"lng":-80.71882,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 866. Plant 67858 Dill Holdings LLC (Dill Holdings LLC), Iredell County, NC; balancing authority DUK. Planned operation 2027-06.\nGenerator DILL1: 10 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1002,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"IL","name":"Bluestar Solar Project, LLC (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Bluestar Solar Project, LLC, Montgomery County, IL","lat":39.150212,"lng":-89.45092,"route":null,"cost_usd":null,"start_date":"2026-08-01","end_date":"2026-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 6. Plant 69841 Bluestar Solar Project, LLC (Dimension Energy LLC), Montgomery County, IL; balancing authority MISO. Planned operation 2026-08.\nGenerator BLUST: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1012,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"IL","name":"Cincinnati CSG 1 LLC (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Cincinnati CSG 1 LLC, Tazewell County, IL","lat":40.526203,"lng":-89.63886,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 299. Plant 70025 Cincinnati CSG 1 LLC (Dimension Energy LLC), Tazewell County, IL; balancing authority MISO. Planned operation 2026-10.\nGenerator CINC1: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1013,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"IL","name":"Cincinnati CSG 2 LLC (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Cincinnati CSG 2 LLC, Tazewell County, IL","lat":40.526203,"lng":-89.63886,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 300. Plant 70026 Cincinnati CSG 2 LLC (Dimension Energy LLC), Tazewell County, IL; balancing authority MISO. Planned operation 2026-10.\nGenerator CINC2: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1025,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"IL","name":"Falconhead Solar, LLC (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Falconhead Solar, LLC, Will County, IL","lat":41.43149,"lng":-87.63821,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 287. Plant 69837 Falconhead Solar, LLC (Dimension Energy LLC), Will County, IL; balancing authority PJM. Planned operation 2026-10.\nGenerator FALCH: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1026,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"IL","name":"Fast Ave Solar LLC (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Fast Ave Solar LLC, Tazewell County, IL","lat":40.534803,"lng":-89.28959,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 583. Plant 69997 Fast Ave Solar LLC (Dimension Energy LLC), Tazewell County, IL; balancing authority MISO. Planned operation 2026-12.\nGenerator FASTA: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1034,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"IL","name":"Harper Creek Solar, LLC (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Harper Creek Solar, LLC, Jefferson County, IL","lat":38.301552,"lng":-88.91451,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 584. Plant 70001 Harper Creek Solar, LLC (Dimension Energy LLC), Jefferson County, IL; balancing authority MISO. Planned operation 2026-12.\nGenerator HARPC: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1036,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"IL","name":"Horseshoe Solar Project, LLC (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Horseshoe Solar Project, LLC, Montgomery County, IL","lat":39.14706,"lng":-89.4426,"route":null,"cost_usd":null,"start_date":"2026-08-01","end_date":"2026-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 7. Plant 69844 Horseshoe Solar Project, LLC (Dimension Energy LLC), Montgomery County, IL; balancing authority MISO. Planned operation 2026-08.\nGenerator HORSE: 5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1056,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"IL","name":"McCray Solar 1, LLC (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"McCray Solar 1, LLC, Bond County, IL","lat":38.892269,"lng":-89.41314,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 146. Plant 69852 McCray Solar 1, LLC (Dimension Energy LLC), Bond County, IL; balancing authority MISO. Planned operation 2026-09.\nGenerator MCCR1: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1111,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"IL","name":"Spillertown CSG 1 LLC (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Spillertown CSG 1 LLC, Williamson County, IL","lat":37.761959,"lng":-88.9226,"route":null,"cost_usd":null,"start_date":"2026-08-01","end_date":"2026-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 8. Plant 69848 Spillertown CSG 1 LLC (Dimension Energy LLC), Williamson County, IL; balancing authority MISO. Planned operation 2026-08.\nGenerator SPIL1: 5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1112,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"IL","name":"Spillertown CSG 2 LLC (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Spillertown CSG 2 LLC, Williamson County, IL","lat":37.771487,"lng":-88.91635,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 145. Plant 69847 Spillertown CSG 2 LLC (Dimension Energy LLC), Williamson County, IL; balancing authority MISO. Planned operation 2026-09.\nGenerator SPIL2: 5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1126,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"IL","name":"Willis Solar 1, LLC - (IL) (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Willis Solar 1, LLC - (IL), Macoupin County, IL","lat":39.118354,"lng":-89.84199,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 639. Plant 70009 Willis Solar 1, LLC - (IL) (Dimension Energy LLC), Macoupin County, IL; balancing authority MISO. Planned operation 2027-01.\nGenerator WILL1: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1127,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"IL","name":"Zebrawood Solar, LLC (Solar Photovoltaic, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Zebrawood Solar, LLC, Hancock County, IL","lat":40.613821,"lng":-91.28497,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 302. Plant 70031 Zebrawood Solar, LLC (Dimension Energy LLC), Hancock County, IL; balancing authority MISO. Planned operation 2026-10.\nGenerator ZEBRA: 2.5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1427,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"NJ","name":"Carneys Point Solar 1 LLC (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Carneys Point Solar 1 LLC, Salem County, NJ","lat":39.685579,"lng":-75.41956,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 144. Plant 69842 Carneys Point Solar 1 LLC (Dimension Energy LLC), Salem County, NJ; balancing authority PJM. Planned operation 2026-09.\nGenerator CARN1: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1428,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"NJ","name":"East Windsor Solar 1 LLC (Solar Photovoltaic, 1.4 MW)","type":"generation","voltage_kv":null,"location_ref":"East Windsor Solar 1 LLC, Mercer County, NJ","lat":40.274397,"lng":-74.50169,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 733. Plant 70029 East Windsor Solar 1 LLC (Dimension Energy LLC), Mercer County, NJ; balancing authority PJM. Planned operation 2027-03.\nGenerator EWIN1: 1.4 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1484,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"NY","name":"Avon CSG 2 LLC (Solar Photovoltaic, 4.1 MW)","type":"generation","voltage_kv":null,"location_ref":"Avon CSG 2 LLC, Livingston County, NY","lat":42.885817,"lng":-77.71431,"route":null,"cost_usd":null,"start_date":"2026-08-01","end_date":"2026-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 5. Plant 69834 Avon CSG 2 LLC (Dimension Energy LLC), Livingston County, NY; balancing authority NYIS. Planned operation 2026-08.\nGenerator AVON2: 4.1 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1501,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"NY","name":"Cortland CSG 2 LLC (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Cortland CSG 2 LLC, Cortland County, NY","lat":42.54409,"lng":-75.99276,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 301. Plant 70027 Cortland CSG 2 LLC (Dimension Energy LLC), Cortland County, NY; balancing authority NYIS. Planned operation 2026-10.\nGenerator CORT2: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1510,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"NY","name":"Fabius CSG LLC (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Fabius CSG LLC, Onondaga County, NY","lat":42.830007,"lng":-76.06217,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 415. Plant 70030 Fabius CSG LLC (Dimension Energy LLC), Onondaga County, NY; balancing authority NYIS. Planned operation 2026-11.\nGenerator FABIU: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1530,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"NY","name":"Leatherleaf (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Leatherleaf, Genesee County, NY","lat":43.048657,"lng":-78.03491,"route":null,"cost_usd":null,"start_date":"2027-02-01","end_date":"2027-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 652. Plant 67639 Leatherleaf (Dimension Energy LLC), Genesee County, NY; balancing authority NYIS. Planned operation 2027-02.\nGenerator LLEAF: 5 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1539,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"NY","name":"Macedon CSG LLC (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Macedon CSG LLC, Wayne County, NY","lat":43.083573,"lng":-77.26768,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 154. Plant 70002 Macedon CSG LLC (Dimension Energy LLC), Wayne County, NY; balancing authority NYIS. Planned operation 2026-09.\nGenerator MACED: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1543,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"NY","name":"Mexico PV, LLC (Solar Photovoltaic, 4.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Mexico PV, LLC, Oswego County, NY","lat":43.429675,"lng":-76.16547,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 143. Plant 69828 Mexico PV, LLC (Dimension Energy LLC), Oswego County, NY; balancing authority NYIS. Planned operation 2026-09.\nGenerator MEXIC: 4.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1560,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"NY","name":"Pomfret PV, LLC (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Pomfret PV, LLC, Chautauqua County, NY","lat":42.447083,"lng":-79.35516,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 288. Plant 69855 Pomfret PV, LLC (Dimension Energy LLC), Chautauqua County, NY; balancing authority NYIS. Planned operation 2026-10.\nGenerator POMFR: 3 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1590,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"NY","name":"TJA-NY-1806 Perth Rd Galway, LLC (Solar Photovoltaic, 3.3 MW)","type":"generation","voltage_kv":null,"location_ref":"TJA-NY-1806 Perth Rd Galway, LLC, Saratoga County, NY","lat":43.017403,"lng":-74.05131,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 147. Plant 69854 TJA-NY-1806 Perth Rd Galway, LLC (Dimension Energy LLC), Saratoga County, NY; balancing authority NYIS. Planned operation 2026-09.\nGenerator GLWAY: 3.3 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1674,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"PA","name":"Beaver Gross Road Solar LLC (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Beaver Gross Road Solar LLC, Snyder County, PA","lat":40.747397,"lng":-77.18922,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1487. Plant 70024 Beaver Gross Road Solar LLC (Dimension Energy LLC), Snyder County, PA; balancing authority PJM. Planned operation 2028-03.\nGenerator BEAVE: 3 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1688,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"PA","name":"Delaware Conrath Road Solar LLC (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Delaware Conrath Road Solar LLC, Northumberland County, PA","lat":41.113012,"lng":-76.85038,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1488. Plant 70028 Delaware Conrath Road Solar LLC (Dimension Energy LLC), Northumberland County, PA; balancing authority PJM. Planned operation 2028-03.\nGenerator CONRR: 3 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1696,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"PA","name":"Franklin White Church Road Solar LLC (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Franklin White Church Road Solar LLC, Snyder County, PA","lat":40.780457,"lng":-77.08402,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 729. Plant 69998 Franklin White Church Road Solar LLC (Dimension Energy LLC), Snyder County, PA; balancing authority PJM. Planned operation 2027-03.\nGenerator WHTCH: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1699,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"PA","name":"Greenwood Bottom Road Solar LLC (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Greenwood Bottom Road Solar LLC, Columbia County, PA","lat":41.117527,"lng":-76.48308,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 730. Plant 69999 Greenwood Bottom Road Solar LLC (Dimension Energy LLC), Columbia County, PA; balancing authority PJM. Planned operation 2027-03.\nGenerator GREEB: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1700,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"PA","name":"Greenwood Route 254 Solar LLC (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Greenwood Route 254 Solar LLC, Columbia County, PA","lat":41.130477,"lng":-76.51152,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 731. Plant 70000 Greenwood Route 254 Solar LLC (Dimension Energy LLC), Columbia County, PA; balancing authority PJM. Planned operation 2027-03.\nGenerator GREER: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1712,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"PA","name":"Liberty Keefer Mill Road Solar LLC (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Liberty Keefer Mill Road Solar LLC, Montour County, PA","lat":41.030468,"lng":-76.68827,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1576. Plant 70032 Liberty Keefer Mill Road Solar LLC (Dimension Energy LLC), Montour County, PA; balancing authority PJM. Planned operation 2028-06.\nGenerator KEEFE: 3 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1715,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"PA","name":"Madison Taylor Road Solar LLC (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Madison Taylor Road Solar LLC, Columbia County, PA","lat":41.112516,"lng":-76.538,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 732. Plant 70003 Madison Taylor Road Solar LLC (Dimension Energy LLC), Columbia County, PA; balancing authority PJM. Planned operation 2027-03.\nGenerator TAYLR: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1726,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"PA","name":"Monroe Route 35 Solar LLC (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Monroe Route 35 Solar LLC, Juniata County, PA","lat":40.685584,"lng":-77.13704,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 585. Plant 70004 Monroe Route 35 Solar LLC (Dimension Energy LLC), Juniata County, PA; balancing authority PJM. Planned operation 2026-12.\nGenerator MONRO: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1730,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"PA","name":"Montour Tower Drive Solar LLC (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Montour Tower Drive Solar LLC, Columbia County, PA","lat":40.981975,"lng":-76.52315,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1058. Plant 69994 Montour Tower Drive Solar LLC (Dimension Energy LLC), Columbia County, PA; balancing authority PJM. Planned operation 2027-09.\nGenerator MONTR: 3 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1733,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"PA","name":"Muncy Creek Lime Bluff Road Solar (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Muncy Creek Lime Bluff Road Solar, Lycoming County, PA","lat":41.22184,"lng":-76.75467,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1149. Plant 69995 Muncy Creek Lime Bluff Road Solar (Dimension Energy LLC), Lycoming County, PA; balancing authority PJM. Planned operation 2027-11.\nGenerator MUNCL: 3 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1738,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"PA","name":"Penn Hemlock Solar LLC (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Penn Hemlock Solar LLC, Snyder County, PA","lat":40.693001,"lng":-77.10099,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 582. Plant 69996 Penn Hemlock Solar LLC (Dimension Energy LLC), Snyder County, PA; balancing authority PJM. Planned operation 2026-12.\nGenerator HEMLK: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1739,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"PA","name":"Penn Shoofly Solar LLC (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Penn Shoofly Solar LLC, Columbia County, PA","lat":41.115059,"lng":-76.4738,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 835. Plant 70005 Penn Shoofly Solar LLC (Dimension Energy LLC), Columbia County, PA; balancing authority PJM. Planned operation 2027-05.\nGenerator SHOOF: 3 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1740,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"PA","name":"Perry Route 104 Solar LLC (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Perry Route 104 Solar LLC, Snyder County, PA","lat":40.740172,"lng":-77.01011,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 586. Plant 70006 Perry Route 104 Solar LLC (Dimension Energy LLC), Snyder County, PA; balancing authority PJM. Planned operation 2026-12.\nGenerator PERRR: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1749,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"PA","name":"West Perry Planing Mill Road Solar LLC (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"West Perry Planing Mill Road Solar LLC, Snyder County, PA","lat":40.689203,"lng":-77.14223,"route":null,"cost_usd":null,"start_date":"2027-02-01","end_date":"2027-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 671. Plant 70008 West Perry Planing Mill Road Solar LLC (Dimension Energy LLC), Snyder County, PA; balancing authority PJM. Planned operation 2027-02.\nGenerator WPERR: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2188,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dimension Energy","state":"VA","name":"Richmond Road Solar LLC (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Richmond Road Solar LLC, James City County, VA","lat":37.39976,"lng":-76.82053,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 892. Plant 70007 Richmond Road Solar LLC (Dimension Energy LLC), James City County, VA; balancing authority PJM. Planned operation 2027-06.\nGenerator RICHR: 5 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1431,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Distributed Solar Development","state":"NJ","name":"Harrah's Atlantic City - POI 1 (Meeting (Solar Photovoltaic, 2.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Harrah's Atlantic City - POI 1 (Meeting, Atlantic County, NJ","lat":39.384389,"lng":-74.42627,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 469. Plant 66830 Harrah's Atlantic City - POI 1 (Meeting (Distributed Solar Development, LLC), Atlantic County, NJ; balancing authority PJM. Planned operation 2026-12.\nGenerator P5376: 2.3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1293,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dodge County Wind","state":"MN","name":"Dodge County Wind (Onshore Wind Turbine, 228 MW)","type":"generation","voltage_kv":null,"location_ref":"Dodge County Wind, Dodge County, MN","lat":44.005633,"lng":-92.95039,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1209. Plant 62437 Dodge County Wind (Dodge County Wind, LLC), Dodge County, MN; balancing authority MISO. Planned operation 2027-12.\nGenerator WT: 228 MW Onshore Wind Turbine; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1192,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dolet Hills Solar","state":"LA","name":"Dolet Hills Solar (Solar Photovoltaic, 240 MW)","type":"generation","voltage_kv":null,"location_ref":"Dolet Hills Solar, DeSoto County, LA","lat":31.95595,"lng":-93.62641,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 508. Plant 68785 Dolet Hills Solar (Dolet Hills Solar), DeSoto County, LA; balancing authority MISO. Planned operation 2026-12.\nGenerator DHS1: 240 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2165,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dominion Energy","state":"VA","name":"Clover Creek Solar (Solar Photovoltaic, 77.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Clover Creek Solar, Halifax County, VA","lat":36.816641,"lng":-78.69262,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 856. Plant 66315 Clover Creek Solar (Dominion Energy Inc.), Halifax County, VA; balancing authority PJM. Planned operation 2027-06.\nGenerator CCSO: 77.2 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2166,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dominion Energy","state":"VA","name":"Coastal Virginia Offshore Wind (CVOW) Commercial Project (Offshore Wind Turbine, 2640 MW)","type":"generation","voltage_kv":null,"location_ref":"Coastal Virginia Offshore Wind (CVOW) Commercial Project, VA","lat":36.907956,"lng":-75.34907,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 615. Plant 64550 Coastal Virginia Offshore Wind (CVOW) Commercial Project (Dominion Energy Inc.),  County, VA; balancing authority PJM. Planned operation 2027-01.\nGenerator CVOWC: 2640 MW Offshore Wind Turbine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2167,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dominion Energy","state":"VA","name":"Courthouse Solar (Solar Photovoltaic, 167 MW)","type":"generation","voltage_kv":null,"location_ref":"Courthouse Solar, Charlotte County, VA","lat":37.04,"lng":-78.58,"route":null,"cost_usd":null,"start_date":"2030-10-01","end_date":"2030-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2087. Plant 66312 Courthouse Solar (Dominion Energy Inc.), Charlotte County, VA; balancing authority PJM. Planned operation 2030-10.\nGenerator CHSL: 167 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2169,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dominion Energy","state":"VA","name":"Dulles Solar and Storage (Batteries, Solar Photovoltaic, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Dulles Solar and Storage, Loudoun County, VA","lat":38.95,"lng":-77.5,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 28, 29. Plant 65043 Dulles Solar and Storage (Dominion Energy Inc.), Loudoun County, VA; balancing authority PJM. Planned operation 2026-09.\nGenerator DUSO: 100 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete\nGenerator DUST: 50 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2180,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dominion Energy","state":"VA","name":"Moon Corner Solar (Solar Photovoltaic, 60 MW)","type":"generation","voltage_kv":null,"location_ref":"Moon Corner Solar, Richmond County, VA","lat":37.89,"lng":-76.54,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 38. Plant 66313 Moon Corner Solar (Dominion Energy Inc.), Richmond County, VA; balancing authority PJM. Planned operation 2026-09.\nGenerator MOCO: 60 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":3304,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Queensboro - Ft Johnson 115 kV & Queensboro-Bayfront 115kV (Queensboro-James Island Sect)","type":"transmission line","voltage_kv":115,"location_ref":"Queensboro - Ft Johnson","lat":32.723,"lng":-79.967,"route":null,"cost_usd":5404301,"start_date":"2023-12-31","end_date":"2023-12-31","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":1,"raw_excerpt":"Queensboro - Ft Johnson 115 kV & Queensboro-Bayfront 115kV (Queensboro-James Island Sect)\nProject ID: 6807 B\nDescription: Replace the Queensboro – Ft Johnson 115 kV Line and structures as they have reached the end of life.\nNeed: This project is required due to address end of life issues.\nStatus: In Progress\nPlanned In-Service Date: 12/31/23\nEstimated cost (Previous, 2024-2028, Total): $4,604,301, $800,000, $0, $0, $0, $0, $5,404,301\nLocated: Queensboro = OSM substation 'Queensboro Substation' (SC)","reviewed":false,"approximate":true,"requires_review":false},{"id":3305,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Union Pier 115-13.8 kV Sub: Tap","type":"transmission line","voltage_kv":115,"location_ref":"Union Pier","lat":32.8,"lng":-79.942,"route":null,"cost_usd":5300000,"start_date":"2027-12-31","end_date":"2027-12-31","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":2,"raw_excerpt":"Union Pier 115-13.8 kV Sub: Tap\nProject ID: 0167C-D\nDescription: Installing a 115 kV Tap to feed the future Union Pier 115 kV Sub.\nNeed: This project is needed to for load growth in the Charleston area.\nStatus: Planned\nPlanned In-Service Date: 12/31/27\nEstimated cost (Previous, 2024-2028, Total): $0, $0, $100,000, $100,000, $5,100,000, $0, $5,300,000\nLocated: Union Pier = Charleston County, SC (county centre, curated)","reviewed":false,"approximate":true,"requires_review":false},{"id":3306,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Okatie 230-115kV Substation, Jasper – Yemassee 230kV #1 Fold-in","type":"transmission line","voltage_kv":230,"location_ref":"Okatie","lat":32.334,"lng":-81.032,"route":null,"cost_usd":11116933,"start_date":"2024-12-31","end_date":"2024-12-31","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":3,"raw_excerpt":"Okatie 230-115kV Substation, Jasper – Yemassee 230kV #1 Fold-in\nProject ID: 0139 M,N\nDescription: Expand existing Okatie Transmission sub, add a 230-115 autobank and fold the Jasper – Yemassee 230 kV #1 line into the 230 kV side. Construct two additional 115 kV bus tie lines.\nNeed: This project is needed to improve system performance and to meet NERC TPL and internal DESC Planning Criteria for reliability.\nStatus: In Progress\nPlanned In-Service Date: 12/31/2024\nEstimated cost (Previous, 2024-2028, Total): $2,717,933, $6,631,000, $1,181,000, $0, $0, $0, $11,116,933\nLocated: Okatie = OSM substation 'Okatie Substation' (SC)","reviewed":false,"approximate":false,"requires_review":false},{"id":3307,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Cainhoy - Hamlin 115kV: Rebuild Line and Cainhoy – Hamlin 115 kV #2: Construct New 115 kV Line","type":"transmission line","voltage_kv":115,"location_ref":"Cainhoy - Hamlin","lat":32.901,"lng":-79.815,"route":[[32.941,-79.842],[32.86,-79.788]],"cost_usd":19890850,"start_date":"2025-12-01","end_date":"2025-12-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":4,"raw_excerpt":"Cainhoy - Hamlin 115kV: Rebuild Line and Cainhoy – Hamlin 115 kV #2: Construct New 115 kV Line\nProject ID: 6341 A-F\nDescription: Upgrade the 954 ACSR portion of the Cainhoy – Hamlin 115 kV line to B795 ACSR conductor, construct a new Cainhoy – Hamlin 115 kV #2 line, add terminals to Cainhoy and Hamlin sub to accommodate upgrades.\nNeed: This project is required due to load growth in the Mount Pleasant area and to meet NERC TPL and internal DESC Planning criteria.\nStatus: In Progress\nPlanned In-Service Date: 12/01/25\nEstimated cost (Previous, 2024-2028, Total): $1,189,020, $6,601,830, $11,800,000, $300,000, $0, $0, $19,890,850\nLocated: Cainhoy = OSM substation 'Cainhoy Substation' (SC); Hamlin = OSM substation 'Hamlin Substation' (SC) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3308,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Eastover - Square D 115kV: Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Eastover - Square D","lat":34.029,"lng":-80.898,"route":null,"cost_usd":11700000,"start_date":"2024-06-01","end_date":"2024-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":5,"raw_excerpt":"Eastover - Square D 115kV: Rebuild\nProject ID: 6808 J\nDescription: Replace wooden H-Frame structures with Self Supporting Steel Structures and restring with 1272 ACSR conductor.\nNeed: This project is required to address end of life and reliability issues on these lines.\nStatus: In Progress\nPlanned In-Service Date: 06/01/24\nEstimated cost (Previous, 2024-2028, Total): $9,900,000, $1,800,000, $0, $0, $0, $0, $11,700,000\nLocated: Eastover ~ Richland County, SC (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":3309,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Burton-St Helena 115kV: Rebuild Burton-Frogmore Transmission Section","type":"transmission line","voltage_kv":115,"location_ref":"Burton - St Helena","lat":32.436,"lng":-80.721,"route":null,"cost_usd":8580000,"start_date":"2024-12-31","end_date":"2024-12-31","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":6,"raw_excerpt":"Burton-St Helena 115kV: Rebuild Burton-Frogmore Transmission Section\nProject ID: 6808 K\nDescription: Replace wooden structures with Self Supporting Steel Structures and restring with 1272 ACSR conductor for the Burton – Frogmore Transmission section.\nNeed: This project is required to address end of life and reliability issues on these lines.\nStatus: In Progress\nPlanned In-Service Date: 12/31/24\nEstimated cost (Previous, 2024-2028, Total): $4,330,000, $4,250,000, $0, $0, $0, $0, $8,580,000\nLocated: Burton = OSM substation 'Burton Substation' (SC)","reviewed":false,"approximate":true,"requires_review":false},{"id":3310,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Burton-St Helena 115kV: Frogmore Distribution - St Helena","type":"transmission line","voltage_kv":115,"location_ref":"Burton - St Helena","lat":32.436,"lng":-80.721,"route":null,"cost_usd":6925000,"start_date":"2025-12-31","end_date":"2025-12-31","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":7,"raw_excerpt":"Burton-St Helena 115kV: Frogmore Distribution - St Helena\nProject ID: 6808 L\nDescription: Replace wooden structures with Self Supporting Steel Structures and upgrade to 795 ACSR for the Frogmore Distribution Tap – St. Helena section.\nNeed: This project is required to address end of life and reliability issues on these lines.\nStatus: In Progress\nPlanned In-Service Date: 12/31/25\nEstimated cost (Previous, 2024-2028, Total): $50,000, $50,000, $6,825,000, $0, $0, $0, $6,925,000\nLocated: Burton = OSM substation 'Burton Substation' (SC)","reviewed":false,"approximate":true,"requires_review":false},{"id":3311,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"VCS1-Denny Terrace 230kV & VCS1-Pineland 230kV: Rebuild Single Circuit Sections","type":"transmission line","voltage_kv":230,"location_ref":"VCS1 - Denny Terrace","lat":34.058,"lng":-81.062,"route":null,"cost_usd":4912096,"start_date":"2026-12-31","end_date":"2026-12-31","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":8,"raw_excerpt":"VCS1-Denny Terrace 230kV & VCS1-Pineland 230kV: Rebuild Single Circuit Sections\nProject ID: 6808 N,O\nDescription: Replace wooden H-Frame structures with Self Supporting Steel Structures and restring with standard 1272 ACSR conductor.\nNeed: This project is required to address end of life and reliability issues on these lines.\nStatus: In Progress\nPlanned In-Service Date: 12/31/26\nEstimated cost (Previous, 2024-2028, Total): $332,096, $80,000, $100,000, $4,400,000, $0, $0, $4,912,096\nLocated: Denny Terrace = OSM substation 'Denny Terrace Substation' (SC)","reviewed":false,"approximate":true,"requires_review":false},{"id":3312,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Wateree-Killian 230kV: Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Wateree - Killian","lat":33.928,"lng":-80.761,"route":null,"cost_usd":48224719,"start_date":"2028-12-31","end_date":"2028-12-31","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":9,"raw_excerpt":"Wateree-Killian 230kV: Rebuild\nProject ID: 6808 R\nDescription: Replace wooden H-Frame structures with Self Supporting Steel Structures.\nNeed: This project is required to address end of life and reliability issues on these lines.\nStatus: In Progress\nPlanned In-Service Date: 12/31/28\nEstimated cost (Previous, 2024-2028, Total): $174,719, $0, $100,000, $450,000, $25,000,000, $22,500,000, $48,224,719\nLocated: Wateree = curated point (OSM 'Wateree Substation' beside DESC's Wateree Station, Richland County); Killian = Richland County, SC (county centre, curated) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3313,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Okatie-Bluffton 115kV: Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Okatie - Bluffton","lat":32.284,"lng":-80.943,"route":[[32.33376,-81.03249],[32.235,-80.853]],"cost_usd":40660000,"start_date":"2025-06-01","end_date":"2025-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":10,"raw_excerpt":"Okatie-Bluffton 115kV: Rebuild\nProject ID: 6808 S\nDescription: Replace wooden H-Frame structures with Self Supporting Steel Structures and upgrade conductor to standard 1272 ACSR.\nNeed: This project is required to address end of life and reliability issues on these lines.\nStatus: In Progress\nPlanned In-Service Date: 06/01/2025\nEstimated cost (Previous, 2024-2028, Total): $6,660,000, $26,800,000, $7,200,000, $0, $0, $0, $40,660,000\nLocated: Okatie = OSM substation 'Okatie Substation' (SC); Bluffton = OSM substation 'Bluffton Substation' (SC) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3314,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Hopkins-CIP 230kV: Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Hopkins - CIP","lat":34.029,"lng":-80.898,"route":null,"cost_usd":2600000,"start_date":"2025-12-31","end_date":"2025-12-31","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":11,"raw_excerpt":"Hopkins-CIP 230kV: Rebuild\nProject ID: 6808 U\nDescription: Replace wooden H-Frame structures with Self Supporting Steel Structures.\nNeed: This project is required to address end of life and reliability issues on these lines.\nStatus: Planned\nPlanned In-Service Date: 12/31/25\nEstimated cost (Previous, 2024-2028, Total): $0, $1,000,000, $1,600,000, $0, $0, $0, $2,600,000\nLocated: Hopkins ~ Richland County, SC (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":3315,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Faber Place-Bayfront 115kV: Rebuild North Bridge Terrace to Bayfront Section","type":"transmission line","voltage_kv":115,"location_ref":"Faber Place - Bayfront","lat":32.825,"lng":-79.979,"route":null,"cost_usd":10200000,"start_date":"2028-12-31","end_date":"2028-12-31","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":12,"raw_excerpt":"Faber Place-Bayfront 115kV: Rebuild North Bridge Terrace to Bayfront Section\nProject ID: 6808 V\nDescription: Replace wooden structures with Self Supporting Steel Structures and upgrade conductor to standard 1272 ACSR.\nNeed: This project is required to address end of life and reliability issues on these lines.\nStatus: Planned\nPlanned In-Service Date: 12/31/28\nEstimated cost (Previous, 2024-2028, Total): $0, $0, $0, $200,000, $5,000,000, $5,000,000, $10,200,000\nLocated: Faber Place = OSM substation 'Faber Place Substation' (SC); Bayfront ~ Charleston County, SC (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3316,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Square D - Hopkins 115kV: Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Square D - Hopkins","lat":34.029,"lng":-80.898,"route":null,"cost_usd":4300000,"start_date":"2024-09-30","end_date":"2024-09-30","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":13,"raw_excerpt":"Square D - Hopkins 115kV: Rebuild\nProject ID: 6808 W\nDescription: Replace wooden H-Frame structures with Self Supporting Steel Structures and restring with 1272 ACSR conductor.\nNeed: This project is required to address end of life and reliability issues on these lines.\nStatus: In Progress\nPlanned In-Service Date: 9/30/2024\nEstimated cost (Previous, 2024-2028, Total): $1,300,000, $3,000,000, $0, $0, $0, $0, $4,300,000\nLocated: Hopkins ~ Richland County, SC (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":3317,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Stevens Creek - Hooks 115kV/LR Plumb Branch 46kV Rebuilds","type":"transmission line","voltage_kv":115,"location_ref":"Stevens Creek - Hooks","lat":33.562,"lng":-82.053,"route":null,"cost_usd":11745543,"start_date":"2024-12-31","end_date":"2024-12-31","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":14,"raw_excerpt":"Stevens Creek - Hooks 115kV/LR Plumb Branch 46kV Rebuilds\nProject ID: 6809 E\nDescription: 9.5 miles. Scope includes rebuilding the 115 and 46 kV lines in this corridor SPDC.\nNeed: This project is required to address end of life and reliability issues on these lines.\nStatus: In Progress\nPlanned In-Service Date: 12/31/24\nEstimated cost (Previous, 2024-2028, Total): $8,195,543, $3,550,000, $0, $0, $0, $0, $11,745,543\nLocated: Stevens Creek = OSM substation 'Stevens Creek Dam Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":3318,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Stevens Creek - Hooks 115kV/LR Plumb Branch 46kV","type":"transmission line","voltage_kv":115,"location_ref":"Stevens Creek - Hooks","lat":33.562,"lng":-82.053,"route":null,"cost_usd":7800000,"start_date":"2025-12-31","end_date":"2025-12-31","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":15,"raw_excerpt":"Stevens Creek - Hooks 115kV/LR Plumb Branch 46kV\nProject ID: 6809 G\nDescription: Upgrade 6.5 miles of aging conductor with 1272 ACSR and rebuild with SPDC.\nNeed: This project is required to address end of life and reliability issues on these lines.\nStatus: Planned\nPlanned In-Service Date: 12/31/25\nEstimated cost (Previous, 2024-2028, Total): $0, $50,000, $200,000, $7,550,000, $0, $0, $7,800,000\nLocated: Stevens Creek = OSM substation 'Stevens Creek Dam Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":3319,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Edenwood Sub: #1 & #2 230-115kV Autobanks, Replace with 336MVA","type":"substation","voltage_kv":230,"location_ref":"Edenwood","lat":33.892,"lng":-81.273,"route":null,"cost_usd":10833462,"start_date":"2024-12-25","end_date":"2024-12-25","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":16,"raw_excerpt":"Edenwood Sub: #1 & #2 230-115kV Autobanks, Replace with 336MVA\nProject ID: 6805 G\nDescription: Replace Autobank 1 and 2 at Edenwood Substation.\nNeed: This project is required to address end of life and maintenance issues on these transformers.\nStatus: In Progress\nPlanned In-Service Date: 12/25/24\nEstimated cost (Previous, 2024-2028, Total): $3,300,432, $7,533,030, $0, $0, $0, $0, $10,833,462\nLocated: Edenwood = Lexington County, SC (county centre, curated)","reviewed":false,"approximate":true,"requires_review":false},{"id":3320,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Williams St Sub: Replace Sw House & Relays, AM Williams Sub: Replace Sw House, and McMeekin Sub: Add Sw House","type":"substation","voltage_kv":null,"location_ref":"Williams St","lat":null,"lng":null,"route":null,"cost_usd":9898924,"start_date":"2028-12-31","end_date":"2028-12-31","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":17,"raw_excerpt":"Williams St Sub: Replace Sw House & Relays, AM Williams Sub: Replace Sw House, and McMeekin Sub: Add Sw House\nProject ID: 1060A, I, L\nDescription: Replace switch house, switch house equipment, and relay panels at Williams Street substation. Replace the switch house at AM Williams substation. Add Switching House at McMeekin Substation to move relays from plant relay room.\nNeed: This project is required to address end of life and maintenance issues on these transformers.\nStatus: In Progress\nPlanned In-Service Date: 12/31/28\nEstimated cost (Previous, 2024-2028, Total): $709,124, $1,689,800, $1,200,000, $2,300,000, $1,400,000, $2,600,000, $9,898,924\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3321,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Harleyville 115KV Transmission Tap – Construct (1.4 miles)","type":"transmission line","voltage_kv":115,"location_ref":"Harleyville","lat":33.21,"lng":-80.451,"route":null,"cost_usd":2750000,"start_date":"2027-03-31","end_date":"2027-03-31","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":18,"raw_excerpt":"Harleyville 115KV Transmission Tap – Construct (1.4 miles)\nProject ID: 06005 B\nDescription: Extend the 115 kV line from the Blue Circle tap to the Harleyville substation to provide 115 kV service.\nNeed: Load growth.\nStatus: Planned\nPlanned In-Service Date: 3/31/2027\nEstimated cost (Previous, 2024-2028, Total): $0, $0, $250,000, $1,500,000, $1,000,000, $0, $2,750,000\nLocated: Harleyville = OSM substation 'Harleyville Substation' (SC)","reviewed":false,"approximate":false,"requires_review":false},{"id":3322,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Summerville: Replace and Spare 230-115kV 336MVA Auto Bank","type":"substation","voltage_kv":230,"location_ref":"Summerville","lat":33.082,"lng":-80.405,"route":null,"cost_usd":3982052,"start_date":"2024-12-31","end_date":"2024-12-31","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":19,"raw_excerpt":"Summerville: Replace and Spare 230-115kV 336MVA Auto Bank\nProject ID: 05004 P\nDescription: Purchase a spare 230/115kV, 336MVA Autobank for the Southern Region to be stored at Summerville 230kV Sub. Include a pad, AC for heaters, and possibly a pit for oil containment.\nNeed: Spare equipment needs.\nStatus: In Progress\nPlanned In-Service Date: 12/31/2024\nEstimated cost (Previous, 2024-2028, Total): $782,052, $3,200,000, $0, $0, $0, $0, $3,982,052\nLocated: Summerville = Dorchester County, SC (county centre, curated)","reviewed":false,"approximate":true,"requires_review":false},{"id":3323,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Canadys-Ritter 115KV-Rebld SPDC 230/115KV 1272 (Approx 18 Miles)","type":"transmission line","voltage_kv":230,"location_ref":"Canadys - Ritter","lat":32.957,"lng":-80.639,"route":null,"cost_usd":40000000,"start_date":"2026-06-01","end_date":"2026-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":20,"raw_excerpt":"Canadys-Ritter 115KV-Rebld SPDC 230/115KV 1272 (Approx 18 Miles)\nProject ID: 06076A\nDescription: Rebuild Canadys-Ritter 115 kV line as SPDC with 230 kV on one side and 115 kV on the other side.\nNeed: This project is needed to improve system performance and to meet NERC TPL and internal DESC Planning Criteria for reliability.\nStatus: In Progress\nPlanned In-Service Date: 6/1/2026\nEstimated cost (Previous, 2024-2028, Total): $100,000, $400,000, $19,500,000, $20,000,000, $0, $0, $40,000,000\nLocated: Canadys = OSM substation 'Canadys Substation' (SC); Ritter ~ Colleton County, SC (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3324,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Yemassee– Ritter 230kV #1 & #2: Construct SPDC with B-1272","type":"transmission line","voltage_kv":230,"location_ref":"Yemassee - Ritter","lat":32.773,"lng":-80.76,"route":null,"cost_usd":40611419,"start_date":"2026-06-01","end_date":"2026-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":21,"raw_excerpt":"Yemassee– Ritter 230kV #1 & #2: Construct SPDC with B-1272\nProject ID: 6359\nDescription: Construct Ritter – Yemassee 230kV #1 and #2 SPDC with B1272 ACSR on both sides. Convert the existing Ritter – Yemassee 230 kV to 115 kV operation. Convert and add terminals at Ritter and Yemassee. Add 230 kV bus tie at Ritter and upgrade the Yemassee 230 kV bus tie.\nNeed: This project is needed to improve system performance and to meet NERC TPL and internal DESC Planning Criteria for reliability.\nStatus: Planned\nPlanned In-Service Date: 6/1/2026\nEstimated cost (Previous, 2024-2028, Total): $100,000, $1,300,000, $18,700,000, $20,511,419, $0, $0, $40,611,419\nLocated: Yemassee = OSM substation 'Yemassee Substation' (SC); Ritter ~ Colleton County, SC (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3325,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Riverport Tap: Construct Tap","type":"transmission line","voltage_kv":null,"location_ref":"Riverport","lat":32.334,"lng":-81.032,"route":null,"cost_usd":34877427,"start_date":"2025-12-31","end_date":"2025-12-31","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":22,"raw_excerpt":"Riverport Tap: Construct Tap\nProject ID: 06367 A - C, H\nDescription: Construct Okatie – Riverport 230 kV to feed new Distribution substation.\nNeed: Load growth.\nStatus: In Progress\nPlanned In-Service Date: 12/31/25\nEstimated cost (Previous, 2024-2028, Total): $4,337,401, $1,900,181, $11,489,845, $50,000, $0, $0, $34,877,427\nLocated: Okatie = OSM substation 'Okatie Substation' (SC) (endpoints from the project description)","reviewed":false,"approximate":true,"requires_review":false},{"id":3326,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Jasper – Okatie 230 kV #2: Construct","type":"transmission line","voltage_kv":230,"location_ref":"Jasper - Okatie","lat":32.347,"lng":-81.078,"route":[[32.361,-81.124],[32.33376,-81.03249]],"cost_usd":23787423,"start_date":"2025-12-31","end_date":"2025-12-31","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":23,"raw_excerpt":"Jasper – Okatie 230 kV #2: Construct\nProject ID: 06367 D - G\nDescription: Construct a 230 kV line with B1272 ACSR from Jasper to Okatie 230/115kV Substation. The line is estimated to be 6.5 miles long. This makes Jasper a Medium Impact substation and will require a new CIP Hut.\nNeed: This project is needed to improve system performance and to meet NERC TPL and internal DESC Planning Criteria for reliability.\nStatus: In Progress\nPlanned In-Service Date: 12/31/25\nEstimated cost (Previous, 2024-2028, Total): $9,591,713, $5,087,710, $9,108,000, $0, $0, $0, $23,787,423\nLocated: Jasper = OSM substation 'Jasper Substation' (SC); Okatie = OSM substation 'Okatie Substation' (SC) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3327,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Wagener 115kV Tap: Construct Tap","type":"transmission line","voltage_kv":115,"location_ref":"Wagener","lat":33.65,"lng":-81.361,"route":null,"cost_usd":6005000,"start_date":"2025-12-31","end_date":"2025-12-31","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":24,"raw_excerpt":"Wagener 115kV Tap: Construct Tap\nProject ID: 06371 D\nDescription: Constructing a 115 kV Tap off the Edmund Switching Station- Owens Corning 115 kV Line to feed new Wagener Distribution substation.\nNeed: Load growth.\nStatus: Planned\nPlanned In-Service Date: 12/31/25\nEstimated cost (Previous, 2024-2028, Total): $5,000, $2,800,000, $3,200,000, $0, $0, $0, $6,005,000\nLocated: Wagener = OSM substation 'Wagener Substation' (SC)","reviewed":false,"approximate":false,"requires_review":false},{"id":3328,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Church Creek - Ritter 230kV - Replace 38 Large Angles and Dead Ends","type":"transmission line","voltage_kv":230,"location_ref":"Church Creek - Ritter","lat":32.84,"lng":-80.363,"route":null,"cost_usd":10850000,"start_date":"2024-06-01","end_date":"2024-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":25,"raw_excerpt":"Church Creek - Ritter 230kV - Replace 38 Large Angles and Dead Ends\nProject ID: 06372 A\nDescription: Replace 6.5 miles of aging conductor.\nNeed: Replacing approximately 38 guyed wooden structures due to recent failures in the fiberglass strain insulators along this line. Structures to be changed out are dead ends/large angles.\nStatus: In Progress\nPlanned In-Service Date: 6/1/2024\nEstimated cost (Previous, 2024-2028, Total): $3,850,000, $7,000,000, $0, $0, $0, $0, $10,850,000\nLocated: Church Creek = OSM substation 'Church Creek Substation' (SC); Ritter ~ Colleton County, SC (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3329,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"VCS2-Ward 230kV: Rebuild Line","type":"transmission line","voltage_kv":230,"location_ref":"VCS2 - Ward","lat":33.872,"lng":-81.698,"route":null,"cost_usd":30000000,"start_date":"2029-12-31","end_date":"2029-12-31","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":26,"raw_excerpt":"VCS2-Ward 230kV: Rebuild Line\nProject ID: 06810 F\nDescription: Rebuild 40 miles of 230 kV line.\nNeed: This project is required to address end of life and maintenance issues.\nStatus: Planned\nPlanned In-Service Date: 12/31/29\nEstimated cost (Previous, 2024-2028, Total): $0, $0, $0, $500,000, $9,500,000, $10,000,000, $30,000,000\nLocated: Ward = OSM substation 'Ward Substation' (SC)","reviewed":false,"approximate":true,"requires_review":false},{"id":3330,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Goose Creek Reservoir: Rebuild Transmission Line Crossings","type":"transmission line","voltage_kv":null,"location_ref":"Goose Creek Reservoir","lat":32.934,"lng":-79.974,"route":null,"cost_usd":9655669,"start_date":"2024-12-31","end_date":"2024-12-31","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":27,"raw_excerpt":"Goose Creek Reservoir: Rebuild Transmission Line Crossings\nProject ID: 06810 G\nDescription: Rebuilding the Williams Goose Creek 230 and 115 kV lines and the Williams - Faber Place 230 kV line across the Goose Creek Reservoir.\nNeed: This project is required to address end of life and maintenance issues.\nStatus: In Progress\nPlanned In-Service Date: 12/31/24\nEstimated cost (Previous, 2024-2028, Total): $255,669, $9,400,000, $0, $0, $0, $0, $9,655,669\nLocated: Williams = OSM substation 'Williams Substation' (SC); Faber Place = OSM substation 'Faber Place Substation' (SC) (midpoint) (endpoints from the project description)","reviewed":false,"approximate":true,"requires_review":false},{"id":3331,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Summerville 115kV Loop: Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Summerville","lat":33.082,"lng":-80.405,"route":null,"cost_usd":12475000,"start_date":"2024-12-31","end_date":"2024-12-31","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":28,"raw_excerpt":"Summerville 115kV Loop: Rebuild\nProject ID: 06810 H\nDescription: Replacing several wood pole sections on the Summerville 115 kV Loop that have reached the end of life.\nNeed: This project is required to address end of life and maintenance issues.\nStatus: In Progress\nPlanned In-Service Date: 12/31/24\nEstimated cost (Previous, 2024-2028, Total): $2,475,000, $6,000,000, $4,000,000, $0, $0, $0, $12,475,000\nLocated: Summerville = Dorchester County, SC (county centre, curated)","reviewed":false,"approximate":true,"requires_review":false},{"id":3332,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"St George - Sumter 230kV Tie: Rebuild Line from Santee Substation - Duke/Progress Energy Tie","type":"transmission line","voltage_kv":230,"location_ref":"St George - Sumter","lat":33.549,"lng":-80.458,"route":[[33.199,-80.592],[33.898,-80.324]],"cost_usd":4000000,"start_date":"2025-12-31","end_date":"2025-12-31","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":29,"raw_excerpt":"St George - Sumter 230kV Tie: Rebuild Line from Santee Substation - Duke/Progress Energy Tie\nProject ID: 6809 M\nDescription: Rebuild Line from Santee Substation - Duke/Progress Energy Tie.\nNeed: Grid hardening.\nStatus: Planned\nPlanned In-Service Date: 12/31/2025\nEstimated cost (Previous, 2024-2028, Total): $0, $300,000, $3,700,000, $0, $0, $0, $4,000,000\nLocated: St George = OSM substation 'Saint George Switching Station' (SC); Sumter = OSM substation 'Sumter Substation' (SC) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3333,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Coit – Gills Creek 115kV: Construct","type":"transmission line","voltage_kv":115,"location_ref":"Coit - Gills Creek","lat":34.029,"lng":-80.898,"route":null,"cost_usd":2509602,"start_date":"2024-12-31","end_date":"2024-12-31","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":30,"raw_excerpt":"Coit – Gills Creek 115kV: Construct\nProject ID: 5392 A-C\nDescription: Convert the existing Coit - Gills Creek 33 kV Line to 115 kV. Approximately 1.25 miles. Construct Gills Creek Terminal at Coit Bus #1.\nNeed: Load growth.\nStatus: In Progress\nPlanned In-Service Date: 12/31/2024\nEstimated cost (Previous, 2024-2028, Total): $330,954, $2,178,648, $0, $0, $0, $0, $2,509,602\nLocated: Coit = Richland County, SC (county centre, curated); Gills Creek = Richland County, SC (county centre, curated) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3334,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Hooks - Thurmond 115kV Tie: Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Hooks - Thurmond","lat":33.66,"lng":-82.196,"route":null,"cost_usd":2200080,"start_date":"2024-12-31","end_date":"2024-12-31","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":31,"raw_excerpt":"Hooks - Thurmond 115kV Tie: Rebuild\nProject ID: 6810 A\nDescription: Rebuilding section of line between Hooks and Thurmond. Approximately 2.3 miles. The line will be rebuilt on existing R/W using steel poles, 115 kV insulation, and 1272 ACSR conductor.\nNeed: This project is required to address end of life and reliability issues on these lines.\nStatus: In Progress\nPlanned In-Service Date: 12/31/2024\nEstimated cost (Previous, 2024-2028, Total): $50,080, $2,150,000, $0, $0, $0, $0, $2,200,080\nLocated: Thurmond = OSM substation 'Thurmond Substation' (SC)","reviewed":false,"approximate":true,"requires_review":false},{"id":3335,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Batesburg - Saluda County 115kV: Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Batesburg - Saluda County","lat":33.959,"lng":-81.646,"route":null,"cost_usd":8750000,"start_date":"2025-12-31","end_date":"2025-12-31","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":32,"raw_excerpt":"Batesburg - Saluda County 115kV: Rebuild\nProject ID: 6809 N\nDescription: Rebuild 13.5 miles of conductor.\nNeed: Grid hardening.\nStatus: In Progress\nPlanned In-Service Date: 12/31/2025\nEstimated cost (Previous, 2024-2028, Total): $50,000, $200,000, $8,500,000, $0, $0, $0, $8,750,000\nLocated: Batesburg = OSM substation 'Batesburg Substation' (SC); Saluda County ~ Saluda County, SC (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3336,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Scout 230 kV Sub and Fold-in: Construct","type":"transmission line","voltage_kv":230,"location_ref":"Scout","lat":null,"lng":null,"route":null,"cost_usd":23685000,"start_date":"2026-03-31","end_date":"2026-03-31","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":33,"raw_excerpt":"Scout 230 kV Sub and Fold-in: Construct\nProject ID: 6853 B-F\nDescription: Construct 230kV Transmission Line for Scout Customer Substation and modify VCS1 and Killian terminals.\nNeed: Load growth.\nStatus: In Progress\nPlanned In-Service Date: 3/31/2026\nEstimated cost (Previous, 2024-2028, Total): $65,000, $360,000, $22,975,000, $285,000, $0, $0, $23,685,000\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3337,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Dawson 230kV Sub and Fold-in: Construct and Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Dawson","lat":32.957,"lng":-80.318,"route":null,"cost_usd":93538207,"start_date":"2025-10-01","end_date":"2026-10-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":34,"raw_excerpt":"Dawson 230kV Sub and Fold-in: Construct and Rebuild\nProject ID: 6859\nDescription: Construct Dawson 230kV substation. Fold in the existing Canadys – Church Creek and Canadys – Faber Place 230kV lines at the Dawson 230kV substation (phase 1). Rebuild Canadys – Dawson 230kV #1 and #2 with B1272 ACSR (phase 2).\nNeed: Load growth.\nStatus: In Progress\nPlanned In-Service Date: 10/1/2025 (phase 1) and 10/1/2026 (phase 2)\nEstimated cost (Previous, 2024-2028, Total): $284,366, $8,014,000, $45,475,000, $39,764,841, $0, $0, $93,538,207\nLocated: Canadys = OSM substation 'Canadys Substation' (SC); Faber Place = OSM substation 'Faber Place Substation' (SC) (midpoint) (endpoints from the project description)","reviewed":false,"approximate":true,"requires_review":false},{"id":3338,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Urquhart – Toolebeck 115kV line: Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Urquhart - Toolebeck","lat":33.484,"lng":-81.79,"route":[[33.433,-81.911],[33.535,-81.669]],"cost_usd":17520000,"start_date":"2026-08-12","end_date":"2026-08-12","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":35,"raw_excerpt":"Urquhart – Toolebeck 115kV line: Rebuild\nProject ID: 6852\nDescription: Upgrade the 477 ACSR portions of the Urquhart – Toolebeck 115 kV line to 1272 ACSR. Replace existing structures with Single Pole Double Circuit Structures. Approximately 12.5 miles.\nNeed: This project is needed to improve system performance and to meet NERC TPL and internal DESC Planning Criteria for reliability.\nStatus: In Progress\nPlanned In-Service Date: 8/12/2026\nEstimated cost (Previous, 2024-2028, Total): $100,000, $100,000, $8,660,000, $8,660,000, $0, $0, $17,520,000\nLocated: Urquhart = OSM substation 'Urquhart Substation' (SC); Toolebeck = OSM substation 'Toolebeck Substation' (SC) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3339,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Williams-Summerville 230kV: Upgrade to SPDC B1272 ACSR","type":"transmission line","voltage_kv":230,"location_ref":"Williams - Summerville","lat":33.05,"lng":-80.168,"route":null,"cost_usd":19300000,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":36,"raw_excerpt":"Williams-Summerville 230kV: Upgrade to SPDC B1272 ACSR\nProject ID: 6388 A\nDescription: Rebuild the section of the Williams - Summerville 230 kV line from Ladson Jct to Williams. Line to upgraded to B-1272 and designed for a future second circuit. Approximately 10 miles.\nNeed: This project is needed to improve system performance and to meet NERC TPL and internal DESC Planning Criteria for reliability.\nStatus: Planned\nPlanned In-Service Date: 5/1/2027\nEstimated cost (Previous, 2024-2028, Total): $0, $50,000, $250,000, $9,000,000, $10,000,000, $0, $19,300,000\nLocated: Williams = OSM substation 'Williams Substation' (SC); Summerville = Dorchester County, SC (county centre, curated) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3340,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Cainhoy 115 kV Tap: Construct","type":"transmission line","voltage_kv":115,"location_ref":"Cainhoy","lat":32.941,"lng":-79.842,"route":null,"cost_usd":21850000,"start_date":"2027-12-31","end_date":"2027-12-31","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":37,"raw_excerpt":"Cainhoy 115 kV Tap: Construct\nProject ID: 0147 C, K\nDescription: Construct a 115 kV tap from Cainhoy to Clements Ferry. Approximately 2.8 miles. Construct terminal at Cainhoy.\nNeed: Load growth.\nStatus: Planned\nPlanned In-Service Date: 12/31/2027\nEstimated cost (Previous, 2024-2028, Total): $0, $50,000, $900,000, $10,250,000, $10,650,000, $0, $21,850,000\nLocated: Cainhoy = OSM substation 'Cainhoy Substation' (SC)","reviewed":false,"approximate":false,"requires_review":false},{"id":3341,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Jack Primus 115 kV Tap: Construct","type":"transmission line","voltage_kv":115,"location_ref":"Jack Primus","lat":32.919,"lng":-79.904,"route":null,"cost_usd":18000000,"start_date":"2027-12-31","end_date":"2027-12-31","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":38,"raw_excerpt":"Jack Primus 115 kV Tap: Construct\nProject ID: 0147 B, J\nDescription: Construct a 115 kV tap from Jack Primus to Clements Ferry. Approximately 2.2 miles. Construct terminals at Jack Primus.\nNeed: Load growth.\nStatus: Planned\nPlanned In-Service Date: 12/31/2027\nEstimated cost (Previous, 2024-2028, Total): $0, $50,000, $550,000, $8,500,000, $8,900,000, $0, $18,000,000\nLocated: Jack Primus = OSM substation 'Jack Primus Substation' (SC)","reviewed":false,"approximate":false,"requires_review":false},{"id":3342,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Church Creek – Faber Place – Charleston Transmission: Add 230kV Line","type":"transmission line","voltage_kv":230,"location_ref":"Church Creek - Faber Place - Charleston","lat":32.84,"lng":-80.042,"route":[[32.83,-80.07],[32.85,-80.015]],"cost_usd":34174682,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":39,"raw_excerpt":"Church Creek – Faber Place – Charleston Transmission: Add 230kV Line\nProject ID: 6847 A-B, D-H\nDescription: Construct a 230 kV transmission line from Church Creek to Charleston Transmission. The Church Creek – Faber Place 230kV and 115kV lines will be rebuilt, and a 230kV line will be added between Faber Place and Charleston Transmission. Add 230/115kV transformer at Charleston Transmission. Add/upgrade terminals and bus work at impacted substations.\nNeed: This project is needed to improve system performance and to meet NERC TPL and internal DESC Planning Criteria for reliability.\nStatus: In Progress\nPlanned In-Service Date: 05/01/2027\nEstimated cost (Previous, 2024-2028, Total): $1,772,338, $975,000, $4,250,000, $21,063,338, $6,114,006, $0, $34,174,682\nLocated: Church Creek = OSM substation 'Church Creek Substation' (SC); Faber Place = OSM substation 'Faber Place Substation' (SC) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3343,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Eastover – Sumter 115kV DEP Tie: Rebuild with 1272 ACSR","type":"transmission line","voltage_kv":115,"location_ref":"Eastover - Sumter","lat":33.964,"lng":-80.611,"route":null,"cost_usd":1100000,"start_date":"2026-05-31","end_date":"2026-05-31","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":40,"raw_excerpt":"Eastover – Sumter 115kV DEP Tie: Rebuild with 1272 ACSR\nProject ID: 6846 A\nDescription: Upgrade the DESC section (approx. 1 mile) of the tie line from 397.5 ACSR Ibis to 1272 ACSR.\nNeed: This project is needed to improve system performance and to meet NERC TPL and internal DESC Planning Criteria for reliability.\nStatus: Planned\nPlanned In-Service Date: 05/31/2026\nEstimated cost (Previous, 2024-2028, Total): $0, $75,000, $175,000, $850,000, $0, $0, $1,100,000\nLocated: Sumter = OSM substation 'Sumter Substation' (SC); Eastover ~ Richland County, SC (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3344,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Cameron Jct – Elloree 46 kV Rebuild","type":"transmission line","voltage_kv":46,"location_ref":"Cameron Jct - Elloree","lat":33.548,"lng":-80.644,"route":[[33.564,-80.709],[33.532,-80.58]],"cost_usd":4500000,"start_date":"2026-12-31","end_date":"2026-12-31","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":41,"raw_excerpt":"Cameron Jct – Elloree 46 kV Rebuild\nProject ID: 6810 U\nDescription: Rebuilding the Cameron Jct – Elloree 46 kV Line. 7.3 miles.\nNeed: System hardening\nStatus: Planned\nPlanned In-Service Date: 12/31/2026\nEstimated cost (Previous, 2024-2028, Total): $0, $0, $200,000, $4,300,000, $0, $0, $4,500,000\nLocated: Cameron Jct = OSM substation 'Cameron Substation' (SC); Elloree = OSM substation 'Elloree Substation' (SC) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3345,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Elloree – Santee City 46 kV: Rebuild","type":"transmission line","voltage_kv":46,"location_ref":"Elloree - Santee City","lat":33.532,"lng":-80.58,"route":null,"cost_usd":4500000,"start_date":"2027-12-31","end_date":"2027-12-31","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":42,"raw_excerpt":"Elloree – Santee City 46 kV: Rebuild\nProject ID: 6810 J\nDescription: Rebuilding the 46 kV line between Elloree and Santee City. 7 miles.\nNeed: System hardening\nStatus: Planned\nPlanned In-Service Date: 12/31/2027\nEstimated cost (Previous, 2024-2028, Total): $0, $0, $0, $0, $4,500,000, $0, $4,500,000\nLocated: Elloree = OSM substation 'Elloree Substation' (SC)","reviewed":false,"approximate":true,"requires_review":false},{"id":3346,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Urquhart – Aiken PSA 46 kV: Rebuild","type":"transmission line","voltage_kv":46,"location_ref":"Urquhart - Aiken PSA","lat":33.433,"lng":-81.911,"route":null,"cost_usd":3000000,"start_date":"2027-12-31","end_date":"2027-12-31","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":43,"raw_excerpt":"Urquhart – Aiken PSA 46 kV: Rebuild\nProject ID: 6810 O\nDescription: Rebuilding the section of 46 kV line from Urquhart to the Aiken PSA tap point. TBD if the scope of this project includes rebuilding the actual tap Aiken PSA. 4.5 miles.\nNeed: System hardening\nStatus: Planned\nPlanned In-Service Date: 12/31/2027\nEstimated cost (Previous, 2024-2028, Total): $0, $0, $0, $0, $3,000,000, $0, $3,000,000\nLocated: Urquhart = OSM substation 'Urquhart Substation' (SC)","reviewed":false,"approximate":true,"requires_review":false},{"id":3347,"plan_id":"c509a004-1a84-471c-9057-6250760c98f2","utility":"Dominion Energy South Carolina","state":"SC","name":"Cameron Jct – Cameron – St Matthews 46 kV Rebuild","type":"transmission line","voltage_kv":46,"location_ref":"Cameron Jct - Cameron - St Matthews","lat":33.564,"lng":-80.709,"route":[[33.564,-80.709],[33.564,-80.709]],"cost_usd":5900000,"start_date":"2028-12-31","end_date":"2028-12-31","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://www.scrtp.com/assets/pdfs/home/2024-2028-2million-and-above-project-descriptions.pdf","source_page":44,"raw_excerpt":"Cameron Jct – Cameron – St Matthews 46 kV Rebuild\nProject ID: 6810 T\nDescription: Rebuilding the 46 kV line between Cameron Jct and St Matthews. 9.8 miles.\nNeed: System hardening.\nStatus: Planned\nPlanned In-Service Date: 12/31/2028\nEstimated cost (Previous, 2024-2028, Total): $0, $0, $0, $0, $0, $5,900,000, $5,900,000\nLocated: Cameron Jct = OSM substation 'Cameron Substation' (SC); Cameron = OSM substation 'Cameron Substation' (SC) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2152,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dominion Renewable Energy","state":"VA","name":"Alberta Solar (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Alberta Solar, Brunswick County, VA","lat":36.841728,"lng":-77.91051,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 67. Plant 68070 Alberta Solar (Dominion Renewable Energy), Brunswick County, VA; balancing authority PJM. Planned operation 2026-09.\nGenerator ALBER: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2155,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dominion Renewable Energy","state":"VA","name":"Bellflower Solar (VA) (Solar Photovoltaic, 600 MW)","type":"generation","voltage_kv":null,"location_ref":"Bellflower Solar (VA), Brunswick County, VA","lat":37.0,"lng":-78.0,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2046. Plant 68071 Bellflower Solar (VA) (Dominion Renewable Energy), Brunswick County, VA; balancing authority PJM. Planned operation 2030-01.\nGenerator BELLF: 600 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2157,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dominion Renewable Energy","state":"VA","name":"Blue Ridge Solar (Solar Photovoltaic, 95 MW)","type":"generation","voltage_kv":null,"location_ref":"Blue Ridge Solar, Pittsylvania County, VA","lat":36.790101,"lng":-79.42875,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 704. Plant 68073 Blue Ridge Solar (Dominion Renewable Energy), Pittsylvania County, VA; balancing authority PJM. Planned operation 2027-03.\nGenerator BLUER: 95 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2158,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dominion Renewable Energy","state":"VA","name":"Bridleton Solar (Solar Photovoltaic, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"Bridleton Solar, Henrico County, VA","lat":37.46,"lng":-77.27,"route":null,"cost_usd":null,"start_date":"2028-10-01","end_date":"2028-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1695. Plant 68072 Bridleton Solar (Dominion Renewable Energy), Henrico County, VA; balancing authority PJM. Planned operation 2028-10.\nGenerator BRIDL: 20 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2162,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dominion Renewable Energy","state":"VA","name":"Cerulean Solar (Solar Photovoltaic, 62 MW)","type":"generation","voltage_kv":null,"location_ref":"Cerulean Solar, Richmond County, VA","lat":37.867194,"lng":-76.58987,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 68. Plant 68074 Cerulean Solar (Dominion Renewable Energy), Richmond County, VA; balancing authority PJM. Planned operation 2026-09.\nGenerator CERUL: 62 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2183,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dominion Renewable Energy","state":"VA","name":"Pineside Solar (Solar Photovoltaic, 74.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Pineside Solar, Buckingham County, VA","lat":37.5,"lng":-78.5,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2047. Plant 68075 Pineside Solar (Dominion Renewable Energy), Buckingham County, VA; balancing authority PJM. Planned operation 2030-01.\nGenerator PINES: 74.9 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2186,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dominion Renewable Energy","state":"VA","name":"Redbud Run Solar (Solar Photovoltaic, 30 MW)","type":"generation","voltage_kv":null,"location_ref":"Redbud Run Solar, Frederick County, VA","lat":39.21157,"lng":-78.08417,"route":null,"cost_usd":null,"start_date":"2028-10-01","end_date":"2028-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1686. Plant 65930 Redbud Run Solar (Dominion Renewable Energy), Frederick County, VA; balancing authority PJM. Planned operation 2028-10.\nGenerator 10: 30 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2191,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dominion Renewable Energy","state":"VA","name":"Rocky Run Solar (Solar Photovoltaic, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Rocky Run Solar, Brunswick County, VA","lat":37.0,"lng":-78.0,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1428. Plant 68076 Rocky Run Solar (Dominion Renewable Energy), Brunswick County, VA; balancing authority PJM. Planned operation 2028-01.\nGenerator ROCKY: 300 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2196,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dominion Renewable Energy","state":"VA","name":"Sweet Sue Solar (Solar Photovoltaic, 74.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Sweet Sue Solar, King William County, VA","lat":37.762,"lng":-77.191,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1028. Plant 69474 Sweet Sue Solar (Dominion Renewable Energy), King William County, VA; balancing authority PJM. Planned operation 2027-09.\nGenerator SWTSU: 74.8 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1689,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dover Solar (pa)","state":"PA","name":"Dover Solar (PA) (Solar Photovoltaic, 75 MW)","type":"generation","voltage_kv":null,"location_ref":"Dover Solar (PA), York County, PA","lat":40.01169,"lng":-76.8234,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1146. Plant 68995 Dover Solar (PA) (Dover Solar, LLC (PA)), York County, PA; balancing authority PJM. Planned operation 2027-11.\nGenerator ENX38: 75 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1019,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dragon's Breath Solar Pv","state":"IL","name":"Dragon's Breath Solar LLC PV (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Dragon's Breath Solar LLC PV, Tazewell County, IL","lat":40.428093,"lng":-89.37261,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 178. Plant 70446 Dragon's Breath Solar LLC PV (Dragon's Breath Solar LLC PV), Tazewell County, IL; balancing authority MISO. Planned operation 2026-09.\nGenerator 33699: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":940,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Drawhorn Solar","state":"GA","name":"Drawhorn Solar (Solar Photovoltaic, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"Drawhorn Solar, Hancock County, GA","lat":33.214449,"lng":-83.04206,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1139. Plant 67989 Drawhorn Solar (Drawhorn Solar, LLC), Hancock County, GA; balancing authority SOCO. Planned operation 2027-11.\nGenerator PGR28: 80 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":849,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Drennan Energy Storage","state":"CO","name":"Drennan Energy Storage (Batteries, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Drennan Energy Storage, El Paso County, CO","lat":38.772896,"lng":-104.6671,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1489. Plant 70050 Drennan Energy Storage (Drennan Energy Storage LLC), El Paso County, CO; balancing authority SWPP. Planned operation 2028-03.\nGenerator DRENN: 100 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":732,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dry Creek Energy Storage","state":"CA","name":"Dry Creek Energy Storage, LLC (Batteries, 160 MW)","type":"generation","voltage_kv":null,"location_ref":"Dry Creek Energy Storage, LLC, Sacramento County, CA","lat":38.347139,"lng":-121.1209,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1165. Plant 70256 Dry Creek Energy Storage, LLC (Dry Creek Energy Storage, LLC), Sacramento County, CA; balancing authority BANC. Planned operation 2027-11.\nGenerator DCES: 160 MW Batteries; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1466,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dry Lake East Energy Center","state":"NV","name":"Dry Lake East Energy Center (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Dry Lake East Energy Center, Clark County, NV","lat":36.401094,"lng":-114.8652,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 547. Plant 69549 Dry Lake East Energy Center (Dry Lake East Energy Center), Clark County, NV; balancing authority NEVP. Planned operation 2026-12.\nGenerator DLE1: 200 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":850,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dry Land Prairie Energy Storage","state":"CO","name":"Dry Land Prairie Energy Storage (Batteries, 250 MW)","type":"generation","voltage_kv":null,"location_ref":"Dry Land Prairie Energy Storage, Cheyenne County, CO","lat":38.99974,"lng":-102.4943,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 589. Plant 70137 Dry Land Prairie Energy Storage (Dry Land Prairie Energy Storage, LLC), Cheyenne County, CO; balancing authority PSCO. Planned operation 2026-12.\nGenerator DL250: 250 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1255,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dte Electric","state":"MI","name":"Au Gres Solar Park (Solar Photovoltaic, 175 MW)","type":"generation","voltage_kv":null,"location_ref":"Au Gres Solar Park, Arenac County, MI","lat":44.118,"lng":-83.794,"route":null,"cost_usd":null,"start_date":"2028-08-01","end_date":"2028-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1643. Plant 69462 Au Gres Solar Park (DTE Electric Company), Arenac County, MI; balancing authority MISO. Planned operation 2028-08.\nGenerator AUGSP: 175 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1256,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dte Electric","state":"MI","name":"Beecher Solar Park (Solar Photovoltaic, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"Beecher Solar Park, Lenawee County, MI","lat":41.923,"lng":-83.917,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 883. Plant 69463 Beecher Solar Park (DTE Electric Company), Lenawee County, MI; balancing authority MISO. Planned operation 2027-06.\nGenerator BCRSP: 80 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1257,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dte Electric","state":"MI","name":"Cedar Field Solar Park (Solar Photovoltaic, 145 MW)","type":"generation","voltage_kv":null,"location_ref":"Cedar Field Solar Park, Gladwin County, MI","lat":43.95,"lng":-84.55,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 943. Plant 69464 Cedar Field Solar Park (DTE Electric Company), Gladwin County, MI; balancing authority MISO. Planned operation 2027-07.\nGenerator CDFSP: 145 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1258,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dte Electric","state":"MI","name":"City of Detroit Castle Solar (Solar Photovoltaic, 10 MW)","type":"generation","voltage_kv":null,"location_ref":"City of Detroit Castle Solar, Wayne County, MI","lat":42.411333,"lng":-83.01867,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 268. Plant 69465 City of Detroit Castle Solar (DTE Electric Company), Wayne County, MI; balancing authority MISO. Planned operation 2026-10.\nGenerator CSTSP: 10 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1259,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dte Electric","state":"MI","name":"City of Detroit Greenfield (Solar Photovoltaic, 7 MW)","type":"generation","voltage_kv":null,"location_ref":"City of Detroit Greenfield, Wayne County, MI","lat":42.420589,"lng":-83.09909,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1027. Plant 69466 City of Detroit Greenfield (DTE Electric Company), Wayne County, MI; balancing authority MISO. Planned operation 2027-09.\nGenerator GRESP: 7 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1260,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dte Electric","state":"MI","name":"Cold Creek Solar Park (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Cold Creek Solar Park, Branch County, MI","lat":41.938,"lng":-85.003,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 126. Plant 69471 Cold Creek Solar Park (DTE Electric Company), Branch County, MI; balancing authority MISO. Planned operation 2026-09.\nGenerator CLCSP: 100 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1261,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dte Electric","state":"MI","name":"Deckerville Solar Park (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Deckerville Solar Park, Sanilac County, MI","lat":44.5521,"lng":-82.7649,"route":null,"cost_usd":null,"start_date":"2028-11-01","end_date":"2028-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1730. Plant 69776 Deckerville Solar Park (DTE Electric Company), Sanilac County, MI; balancing authority MISO. Planned operation 2028-11.\nGenerator DKVSP: 200 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1267,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dte Electric","state":"MI","name":"Gratiot Solar Park (Solar Photovoltaic, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"Gratiot Solar Park, Gratiot County, MI","lat":43.436999,"lng":-84.49845,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 240. Plant 68850 Gratiot Solar Park (DTE Electric Company), Gratiot County, MI; balancing authority MISO. Planned operation 2026-10.\nGenerator GRTSP: 50 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1273,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dte Electric","state":"MI","name":"Little Trout Solar (Solar Photovoltaic, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Little Trout Solar, Presque Isle County, MI","lat":45.334045,"lng":-83.75117,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 477. Plant 67755 Little Trout Solar (DTE Electric Company), Presque Isle County, MI; balancing authority MISO. Planned operation 2026-12.\nGenerator LTRSP: 150 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1277,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dte Electric","state":"MI","name":"Peatville Solar Park (Solar Photovoltaic, 185 MW)","type":"generation","voltage_kv":null,"location_ref":"Peatville Solar Park, Sanilac County, MI","lat":43.64,"lng":-82.8,"route":null,"cost_usd":null,"start_date":"2028-07-01","end_date":"2028-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1622. Plant 69467 Peatville Solar Park (DTE Electric Company), Sanilac County, MI; balancing authority MISO. Planned operation 2028-07.\nGenerator PETSP: 185 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1278,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dte Electric","state":"MI","name":"Poseyville Solar Park (Solar Photovoltaic, 206.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Poseyville Solar Park, Midland County, MI","lat":43.5178,"lng":-84.2254,"route":null,"cost_usd":null,"start_date":"2028-04-01","end_date":"2028-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1509. Plant 69468 Poseyville Solar Park (DTE Electric Company), Midland County, MI; balancing authority MISO. Planned operation 2028-04.\nGenerator PSVSP: 206.4 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1279,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dte Electric","state":"MI","name":"Silver Creek Solar Park (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Silver Creek Solar Park, Huron County, MI","lat":43.837206,"lng":-83.05481,"route":null,"cost_usd":null,"start_date":"2028-08-01","end_date":"2028-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1644. Plant 69470 Silver Creek Solar Park (DTE Electric Company), Huron County, MI; balancing authority MISO. Planned operation 2028-08.\nGenerator SVCSP: 200 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1281,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dte Electric","state":"MI","name":"Strasburg Solar Park (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Strasburg Solar Park, Monroe County, MI","lat":41.971933,"lng":-83.45975,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1827. Plant 69775 Strasburg Solar Park (DTE Electric Company), Monroe County, MI; balancing authority MISO. Planned operation 2028-12.\nGenerator STBSP: 100 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1285,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dte Electric","state":"MI","name":"Trenton Channel Energy Center (Batteries, 220 MW)","type":"generation","voltage_kv":null,"location_ref":"Trenton Channel Energy Center, Wayne County, MI","lat":42.124423,"lng":-83.18571,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 478. Plant 67759 Trenton Channel Energy Center (DTE Electric Company), Wayne County, MI; balancing authority MISO. Planned operation 2026-12.\nGenerator TCHEC: 220 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1132,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Duff Solar Park","state":"IN","name":"Duff Solar Park (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Duff Solar Park, Dubois County, IN","lat":38.31341,"lng":-87.02063,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 248. Plant 69156 Duff Solar Park (Duff Solar Park LLC), Dubois County, IN; balancing authority MISO. Planned operation 2026-10.\nGenerator GEN01: 100 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1894,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Duffy Energy Storage","state":"TX","name":"Duffy BESS (Batteries, 235.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Duffy BESS, Matagorda County, TX","lat":28.854592,"lng":-96.08606,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 529. Plant 69295 Duffy BESS (Duffy Energy Storage LLC), Matagorda County, TX; balancing authority ERCO. Planned operation 2026-12.\nGenerator DFBSS: 235.9 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1361,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Duke Energy Carolinas","state":"NC","name":"Allen 2 BESS (Batteries, 167 MW)","type":"generation","voltage_kv":null,"location_ref":"Allen 2 BESS, Gaston County, NC","lat":35.192096,"lng":-81.01013,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 941. Plant 69148 Allen 2 BESS (Duke Energy Carolinas, LLC), Gaston County, NC; balancing authority DUK. Planned operation 2027-07.\nGenerator BESS1: 167 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1364,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Duke Energy Carolinas","state":"NC","name":"Baxter Creek Solar (Solar Photovoltaic, 30 MW)","type":"generation","voltage_kv":null,"location_ref":"Baxter Creek Solar, Davie County, NC","lat":35.865502,"lng":-80.55309,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 16. Plant 60434 Baxter Creek Solar (Duke Energy Carolinas, LLC), Davie County, NC; balancing authority DUK. Planned operation 2026-09.\nGenerator PV1: 30 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1365,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Duke Energy Carolinas","state":"NC","name":"Baxter Creek Solar (Solar Photovoltaic, 30 MW)","type":"generation","voltage_kv":null,"location_ref":"Baxter Creek Solar, Davie County, NC","lat":35.865502,"lng":-80.55309,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 106. Plant 69144 Baxter Creek Solar (Duke Energy Carolinas, LLC), Davie County, NC; balancing authority CPLE. Planned operation 2026-09.\nGenerator PV1: 30 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1369,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Duke Energy Carolinas","state":"NC","name":"Clark Creek Solar Plant (Batteries, Solar Photovoltaic, 54 MW)","type":"generation","voltage_kv":null,"location_ref":"Clark Creek Solar Plant, Lincoln County, NC","lat":35.532689,"lng":-81.24866,"route":null,"cost_usd":null,"start_date":"2028-02-01","end_date":"2028-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1443, 1444. Plant 69771 Clark Creek Solar Plant (Duke Energy Carolinas, LLC), Lincoln County, NC; balancing authority CPLW. Planned operation 2028-02.\nGenerator CCBS1: 14 MW Batteries; (L) Regulatory approvals pending. Not under construction\nGenerator CCSP1: 40 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1370,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Duke Energy Carolinas","state":"NC","name":"Craggy Energy Storage (Batteries, 30.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Craggy Energy Storage, Buncombe County, NC","lat":35.641793,"lng":-82.60868,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 120. Plant 69404 Craggy Energy Storage (Duke Energy Carolinas, LLC), Buncombe County, NC; balancing authority CPLW. Planned operation 2026-09.\nGenerator CRAGB: 30.5 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1379,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Duke Energy Carolinas","state":"NC","name":"Maiden Creek Battery (Batteries, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"Maiden Creek Battery, Catawba County, NC","lat":35.613673,"lng":-81.18707,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 942. Plant 69194 Maiden Creek Battery (Duke Energy Carolinas, LLC), Catawba County, NC; balancing authority DUK. Planned operation 2027-07.\nGenerator MCBA: 50 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1383,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Duke Energy Carolinas","state":"NC","name":"Nebo Energy Storage (Batteries, 2.7 MW)","type":"generation","voltage_kv":null,"location_ref":"Nebo Energy Storage, Burke County, NC","lat":35.791718,"lng":-81.85104,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 253. Plant 69196 Nebo Energy Storage (Duke Energy Carolinas, LLC), Burke County, NC; balancing authority DUK. Planned operation 2026-10.\nGenerator NEBOB: 2.7 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1757,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Duke Energy Carolinas","state":"SC","name":"Bush River Solar Plant (Solar Photovoltaic, 45 MW)","type":"generation","voltage_kv":null,"location_ref":"Bush River Solar Plant, Laurens County, SC","lat":34.3861,"lng":-81.7944,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1429. Plant 69772 Bush River Solar Plant (Duke Energy Carolinas, LLC), Laurens County, SC; balancing authority CPLW. Planned operation 2028-01.\nGenerator BRSP1: 45 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1764,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Duke Energy Carolinas","state":"SC","name":"Hudson Place Solar Plant (Solar Photovoltaic, 70.7 MW)","type":"generation","voltage_kv":null,"location_ref":"Hudson Place Solar Plant, Newberry County, SC","lat":34.2391,"lng":-81.6922,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1432. Plant 70221 Hudson Place Solar Plant (Duke Energy Carolinas, LLC), Newberry County, SC; balancing authority DUK. Planned operation 2028-01.\nGenerator HPSP1: 70.7 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1768,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Duke Energy Carolinas","state":"SC","name":"Longtown Energy Storage (Batteries, 4.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Longtown Energy Storage, Fairfield County, SC","lat":34.416433,"lng":-80.86814,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 109. Plant 69195 Longtown Energy Storage (Duke Energy Carolinas, LLC), Fairfield County, SC; balancing authority DUK. Planned operation 2026-09.\nGenerator LONTB: 4.5 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1774,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Duke Energy Carolinas","state":"SC","name":"Robinson Solar Plant (Solar Photovoltaic, 76 MW)","type":"generation","voltage_kv":null,"location_ref":"Robinson Solar Plant, Chesterfield County, SC","lat":34.4168,"lng":-80.1918,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1406. Plant 70220 Robinson Solar Plant (Duke Energy Carolinas, LLC), Chesterfield County, SC; balancing authority CPLE. Planned operation 2027-12.\nGenerator RSP1: 76 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2699,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Bush River Tie 115/100 Kv Autotransformers, Replace","type":"substation","voltage_kv":115,"location_ref":"Bush River Tie (NC/SC)","lat":34.29,"lng":-81.6,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":2,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 2.\nIn-Service Year: 2027\nProject Name: BUSH RIVER TIE 115/100 KV AUTOTRANSFORMERS, REPLACE\nDescription: Replace existing 115/100 kV autotransformers 7 and 8 with new transformers. Project is part of Red Zone 2.0.\nSupporting Statement: Various generator interconnection studies have shown the need to upgrade this line. This upgrade is needed to enable generation consistent with the approved IRP.\nLocated: BUSH RIVER TIE ~ Newberry County, SC (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2700,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Lakewood Tie - Woodlawn Tie 100 Kv Transmission Lines, Rebuild","type":"transmission line","voltage_kv":100,"location_ref":"Lakewood Tie - Woodlawn Tie (NC/SC)","lat":35.212,"lng":-80.88,"route":[[35.25,-80.876],[35.175,-80.884]],"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":2,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 2.\nIn-Service Year: 2027\nProject Name: LAKEWOOD TIE - WOODLAWN TIE 100 KV TRANSMISSION LINES, REBUILD\nDescription: Rebuild 2 miles (Lakewood Tie - Remount Rd Retail) of the Lakewood Tie - Woodlawn Tie 100 kV transmission lines with 795 ACSS/TW at 200°C.\nSupporting Statement: The Lakewood Tie - Woodlawn Tie 100 kV transmission lines can overload under contingency.\nLocated: LAKEWOOD TIE = OSM substation 'Lakewood Substation' (NC); WOODLAWN TIE = OSM substation 'Woodlawn Substation' (NC) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2701,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Lancaster Main - Monroe Main 100 Kv Transmission Line, Rebuild","type":"transmission line","voltage_kv":100,"location_ref":"Lancaster Main - Monroe Main (NC/SC)","lat":34.839,"lng":-80.617,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":2,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 2.\nIn-Service Year: 2027\nProject Name: LANCASTER MAIN - MONROE MAIN 100 KV TRANSMISSION LINE, REBUILD\nDescription: Rebuild 23.8 miles of Lancaster Main - Monroe Main 100 kV double circuit transmission line with 1158 ACSS/TW at 200°C. ACSS/TW conductor used is considered an alternative transmission technology.\nSupporting Statement: Lancaster Main - Monroe Main 100 kV transmission line can overload under contingency.\nLocated: LANCASTER MAIN ~ Lancaster County, SC (county centre); MONROE MAIN ~ Union County, NC (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2702,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Lawsons Fork Tie - West Spartanburg Tie 100 Kv Transmission Lines, Install Ras","type":"transmission line","voltage_kv":100,"location_ref":"Lawsons Fork Tie - West Spartanburg Tie (NC/SC)","lat":34.932,"lng":-81.992,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":2,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 2.\nIn-Service Year: 2027\nProject Name: LAWSONS FORK TIE - WEST SPARTANBURG TIE 100 KV TRANSMISSION LINES, INSTALL RAS\nDescription: Install a remedial action scheme on the Lawsons Fork Tie - West Spartanburg Tie 100 kV transmission lines.\nSupporting Statement: The Lawsons Fork Tie - West Spartanburg Tie 100 kV transmission lines can overload under contingency\nLocated: LAWSONS FORK TIE ~ Spartanburg County, SC (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2703,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Lee Cc - Belton Tie 100 Kv Transmission Line, Rebuild","type":"transmission line","voltage_kv":100,"location_ref":"Lee Cc - Belton Tie (NC/SC)","lat":34.531,"lng":-82.491,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":3,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 3.\nIn-Service Year: 2027\nProject Name: LEE CC - BELTON TIE 100 KV TRANSMISSION LINE, REBUILD\nDescription: Rebuild the entire Lee CC - Belton Tie 100 kV transmission line (6.4 miles) with 1533 ACSS/TW at 200°C. Project is part of Red Zone 2.0. ACSS/TW\nSupporting Statement: Various generator interconnection studies have shown the need to upgrade this line. This upgrade is needed to enable generation consistent with the approved IRP.\nLocated: BELTON TIE = OSM substation 'Belton Tie Substation' (SC)","reviewed":false,"approximate":true,"requires_review":false},{"id":2704,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Oakboro Tie - Lilesville Tie (Dep) 230 Kv Transmission Line, Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Oakboro Tie - Lilesville Tie (Dep) (NC/SC)","lat":35.097,"lng":-80.224,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":3,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 3.\nIn-Service Year: 2027\nProject Name: OAKBORO TIE - LILESVILLE TIE (DEP) 230 KV TRANSMISSION LINE, REBUILD\nDescription: Rebuild 5.13 miles (Oakboro to DEP change of ownership) of the Oakboro Tie - Lilesville Tie (DEP) 230 kV transmission line with bundled 1272 ACSR at 120°C. Project is part of Red Zone 2.0.\nSupporting Statement: Various generator interconnection studies have shown the need to upgrade this line. This upgrade is needed to enable generation consistent with the approved IRP.\nLocated: OAKBORO TIE = OSM substation 'Oakboro Tie Substation' (NC); LILESVILLE TIE (DEP) ~ Anson County, NC (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2705,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Oakvale Tie - East Greenville Tie 100 Kv Transmission Line, Rebuild","type":"transmission line","voltage_kv":100,"location_ref":"Oakvale Tie - East Greenville Tie (NC/SC)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":3,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 3.\nIn-Service Year: 2027\nProject Name: OAKVALE TIE - EAST GREENVILLE TIE 100 KV TRANSMISSION LINE, REBUILD\nDescription: Rebuild 4.5 miles (East Greenville - Verdae Retail) of the Oakvale Tie - East Greenville Tie 100 kV double circuit transmission line with 795 ACSS/TW at 200°C. ACSS/TW\nSupporting Statement: The Oakvale Tie - East Greenville Tie 100 kV transmission line can overload under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2706,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Oakvale Tie - Shady Grove 100 Kv Transmisison Lines, Upgrade","type":"transmission line","voltage_kv":100,"location_ref":"Oakvale Tie - Shady Grove (NC/SC)","lat":34.794,"lng":-82.475,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":3,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 3.\nIn-Service Year: 2027\nProject Name: OAKVALE TIE - SHADY GROVE 100 KV TRANSMISISON LINES, UPGRADE\nDescription: Replace switches on the Oakvale Tie - Shady Grove 100 kV Transmission LInes in order to increase the rating of the line to the conductor rating\nSupporting Statement: The Oakvale Tie - Shady Grove Tie 100 kV Transmission Lines can overload under contingency\nLocated: SHADY GROVE ~ centre of 2 nearby same-named OSM substations","reviewed":false,"approximate":true,"requires_review":false},{"id":2707,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Stonewater Tie - Westfork Switching Station 100 Kv Transmission Lines, Rebuild","type":"transmission line","voltage_kv":100,"location_ref":"Stonewater Tie - Westfork (NC/SC)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":4,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 4.\nIn-Service Year: 2027\nProject Name: STONEWATER TIE - WESTFORK SWITCHING STATION 100 KV TRANSMISSION LINES, REBUILD\nDescription: Rebuild 3 miles (Wildcat Tie - Westfork Switching Station) of the Stonewater Tie - Westford Switching Station 100 kV transmission line with 1272 ACSR at 120°C.\nSupporting Statement: The Stonewater Tie - Westfork Switching Station 100 kV transmission line can overload under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2708,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Ashe St Switching Station - Parkwood Tie 100 Kv Transmission Line, Reconductor","type":"transmission line","voltage_kv":100,"location_ref":"Ashe St (NC/SC)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":4,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 4.\nIn-Service Year: 2028\nProject Name: ASHE ST SWITCHING STATION - PARKWOOD TIE 100 KV TRANSMISSION LINE, RECONDUCTOR\nDescription: Reconductor 2.6 miles (Research Triangle Retail - Ellis Rd Retail) of the Ashe St Switching Station - Parkwood Tie 100 kV transmission line with 795 ACSS/TW at 200°C. ACSS/TW\nSupporting Statement: The Ashe St Switching Station - Parkwood Tie 100 kV transmission lines can overload under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2709,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Bush River Tie - Creto Tie 100 Kv Transmission Line, Rebuild","type":"transmission line","voltage_kv":100,"location_ref":"Bush River Tie - Creto Tie (NC/SC)","lat":34.29,"lng":-81.6,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":4,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 4.\nIn-Service Year: 2028\nProject Name: BUSH RIVER TIE - CRETO TIE 100 KV TRANSMISSION LINE, REBUILD\nDescription: Rebuild 8 miles (Bush River Tie - Newberry PV) of the Bush River Tie - Buzzard Roost 100 kV transmission line with 1158 ACSS/TW at 200°C. Project is part of Red Zone 2.0. ACSS/TW\nSupporting Statement: Various generator interconnection studies have shown the need to upgrade this line. This upgrade is needed to enable generation consistent with the approved IRP.\nLocated: BUSH RIVER TIE ~ Newberry County, SC (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2710,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Cliffside Steam - Shelby Tie 100 Kv Transmission Lines, Rebuild","type":"transmission line","voltage_kv":100,"location_ref":"Cliffside Steam - Shelby Tie (NC/SC)","lat":35.239,"lng":-81.655,"route":[[35.22,-81.767],[35.258,-81.544]],"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":5,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 5.\nIn-Service Year: 2028\nProject Name: CLIFFSIDE STEAM - SHELBY TIE 100 KV TRANSMISSION LINES, REBUILD\nDescription: Rebuild 5.4 miles (Shelby Tie - Customer Tap Station) of the Cliffside Steam - Shelby Tie 100 kV transmission lines with 1272 ACSR at 120°C.\nSupporting Statement: The Cliffside Steam - Shelby Tie 100 kV transmission lines can overload under contingencies.\nLocated: CLIFFSIDE STEAM = OSM substation 'Cliffside Substation' (NC); SHELBY TIE = OSM substation 'Shelby Tie Substation' (NC) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2711,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Durham Main - Ashe St Switching Station 100 Kv Transmission Line, Rebuild","type":"transmission line","voltage_kv":100,"location_ref":"Durham Main - Ashe St (NC/SC)","lat":36.034,"lng":-78.878,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":5,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 5.\nIn-Service Year: 2028\nProject Name: DURHAM MAIN - ASHE ST SWITCHING STATION 100 KV TRANSMISSION LINE, REBUILD\nDescription: Rebuild the entire circuit of the Durham Main - Ashe St Switching Station 100 kV transmission line with 1272 ACSR at 120°C.\nSupporting Statement: The Durham Main - Ashe St Switching Station 100 kV transmission line can overload under contingencies.\nLocated: DURHAM MAIN ~ Durham County, NC (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2712,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Harrisburg Tie - Concord Main 100 Kv Transmission Lines, Rebuild","type":"transmission line","voltage_kv":100,"location_ref":"Harrisburg Tie - Concord Main (NC/SC)","lat":35.361,"lng":-80.644,"route":[[35.313,-80.692],[35.409,-80.596]],"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":5,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 5.\nIn-Service Year: 2028\nProject Name: HARRISBURG TIE - CONCORD MAIN 100 KV TRANSMISSION LINES, REBUILD\nDescription: Rebuild 5.6 miles (Concord Main to Customer) of the Harrisburg Tie - Concord Main 100 kV double circuit transmission line with 1272 ACSR at 120°C.\nSupporting Statement: The Harrisburg Tie - Concord Main 100 kV transmission lines can overload under contingency.\nLocated: HARRISBURG TIE = OSM substation 'Harrisburg Substation' (NC); CONCORD MAIN = OSM substation 'Concord Main Substation' (NC) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2713,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Harrisburg Tie 230/100/44 Kv Autotransformer, Replace","type":"substation","voltage_kv":100,"location_ref":"Harrisburg Tie 230/100/44 Kv Autotransformer (NC/SC)","lat":35.388,"lng":-80.553,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":5,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 5.\nIn-Service Year: 2028\nProject Name: HARRISBURG TIE 230/100/44 KV AUTOTRANSFORMER, REPLACE\nDescription: Replace existing 230/100/44 kV autotransformer 3 with new larger autotransformer.\nSupporting Statement: Harrisburg Tie 230/100/44 kV autotransformer 3 can overload under contingency.\nLocated: HARRISBURG TIE 230/100/44 KV AUTOTRANSFORMER ~ Cabarrus County, NC (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2714,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Lawsons Fork Tie - West Spartanburg Tie 100 Kv Transmission Line, Rebuild","type":"transmission line","voltage_kv":100,"location_ref":"Lawsons Fork Tie - West Spartanburg Tie (NC/SC)","lat":34.932,"lng":-81.992,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":6,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 6.\nIn-Service Year: 2028\nProject Name: LAWSONS FORK TIE - WEST SPARTANBURG TIE 100 KV TRANSMISSION LINE, REBUILD\nDescription: Rebuild 4 miles (Lawsons Fork Tie - Una Retail) of the Lawsons Fork Tie - West Spartanburg Tie 100 kV transmission line with 1272 ACSR at 120°C.\nSupporting Statement: The Lawsons Fork Tie - West Spartanburg Tie 100 kV transmission line can overload under contingency.\nLocated: LAWSONS FORK TIE ~ Spartanburg County, SC (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2715,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"N Greenville Tie Autotransformer 230/100/44 Kv, Replace","type":"substation","voltage_kv":100,"location_ref":"N Greenville Tie Autotransformer 230/100/44 Kv (NC/SC)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":6,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 6.\nIn-Service Year: 2028\nProject Name: N GREENVILLE TIE AUTOTRANSFORMER 230/100/44 KV, REPLACE\nDescription: Replace existing bank 1 with new larger 230/100/44 kV autobank. Replace existing 230 kV and 44 kV oil breakers with gas breakers.\nSupporting Statement: Existing N Greenville 230/100/44 kV tie bank 1 can overload under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2716,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"North Greensboro Tie - Greensboro Main 100 Kv Transmission Lines, Rebuild","type":"transmission line","voltage_kv":100,"location_ref":"North Greensboro Tie - Greensboro Main (NC/SC)","lat":36.079,"lng":-79.789,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":6,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 6.\nIn-Service Year: 2028\nProject Name: NORTH GREENSBORO TIE - GREENSBORO MAIN 100 KV TRANSMISSION LINES, REBUILD\nDescription: Rebuild both of the North Greensboro Tie - Greensboro Main 100 kV transmission lines with 1158 ACSS/TW at 200°C. ACSS/TW conductor used is considered an alternative transmission technology.\nSupporting Statement: The North Greensboro - Greensboro Main 100 kV transmission line can overload under contingency.\nLocated: NORTH GREENSBORO TIE ~ Guilford County, NC (county centre); GREENSBORO MAIN ~ Guilford County, NC (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2717,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"North Greenville Tie - Pisgah Tie 100 Kv Transmission Line, Rebuild","type":"transmission line","voltage_kv":100,"location_ref":"North Greenville Tie - Pisgah Tie (NC/SC)","lat":35.075,"lng":-82.561,"route":[[34.89,-82.438],[35.259,-82.683]],"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":6,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 6.\nIn-Service Year: 2028\nProject Name: NORTH GREENVILLE TIE - PISGAH TIE 100 KV TRANSMISSION LINE, REBUILD\nDescription: Rebuild 11.5 miles (North Greenville Tie to Marietta Tie) of the North Greenville Tie - Pisgah Tie 100 kV transmission line with 1272 ACSR at 120°C.\nSupporting Statement: The North Greenville Tie - Pisgah Tie 100 kV transmission line can overload under contingencies.\nLocated: NORTH GREENVILLE TIE = OSM substation 'North Greenville Tie Substation' (SC); PISGAH TIE = OSM substation 'Pisgah Tie Substation' (NC) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2718,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Shelby Tie 230/100/44 Kv Autotransformer, Replace","type":"substation","voltage_kv":100,"location_ref":"Shelby Tie 230/100/44 Kv Autotransformer (NC/SC)","lat":35.335,"lng":-81.557,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":7,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 7.\nIn-Service Year: 2028\nProject Name: SHELBY TIE 230/100/44 KV AUTOTRANSFORMER, REPLACE\nDescription: Replace existing 230/100/44 kV autotransformer 3 with new larger autotransformer.\nSupporting Statement: Shelby Tie 230/100/44 kV autotransformer 3 can overload under contingency.\nLocated: SHELBY TIE 230/100/44 KV AUTOTRANSFORMER ~ Cleveland County, NC (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2719,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Tiger Tie Autotransformer, Replace","type":"substation","voltage_kv":null,"location_ref":"Tiger Tie Autotransformer (NC/SC)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":7,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 7.\nIn-Service Year: 2028\nProject Name: TIGER TIE AUTOTRANSFORMER, REPLACE\nDescription: Replace existing autotransformer 5 with new larger autotransformer.\nSupporting Statement: Tiger Tie autotransformer 5 can overload under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2720,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Winecoff Tie - Concord Main 100 Kv Transmission Line, Reconductor","type":"transmission line","voltage_kv":100,"location_ref":"Winecoff Tie - Concord Main (NC/SC)","lat":35.399,"lng":-80.574,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":7,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 7.\nIn-Service Year: 2028\nProject Name: WINECOFF TIE - CONCORD MAIN 100 KV TRANSMISSION LINE, RECONDUCTOR\nDescription: Reconductor the entire Winecoff Tie - Concord Main 100 kV transmission line (3.5 miles) with bundled 336 ACSR at 120°C.\nSupporting Statement: The Winecoff Tie - Concord Main 100 kV transmission lines can overload under contingency.\nLocated: CONCORD MAIN = OSM substation 'Concord Main Substation' (NC); WINECOFF TIE ~ Cabarrus County, NC (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2721,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Winecoff Tie - Conley Switching Station 100 Kv Transmission Lines, Rebuild","type":"transmission line","voltage_kv":100,"location_ref":"Winecoff Tie - Conley (NC/SC)","lat":35.388,"lng":-80.553,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":7,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 7.\nIn-Service Year: 2028\nProject Name: WINECOFF TIE - CONLEY SWITCHING STATION 100 KV TRANSMISSION LINES, REBUILD\nDescription: Rebuild 7.9 miles (Winecoff - Eastfield Retail) of the Winecoff Tie - Conley Switching Station 100 kV transmission lines with 1272 ACSR at 120°C. P\nSupporting Statement: The Winecoff Tie - Conley Switching Station 100 kV transmission lines can overload under contingency.\nLocated: WINECOFF TIE ~ Cabarrus County, NC (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2722,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Hodges Tie Switchyard 230Kv, Expansion","type":"substation","voltage_kv":230,"location_ref":"Hodges Tie Switchyard (NC/SC)","lat":34.156,"lng":-82.128,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":8,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 8.\nIn-Service Year: 2029\nProject Name: HODGES TIE SWITCHYARD 230KV, EXPANSION\nDescription: Expand the 230 kV switchyard at Hodges Tie to a full breaker and a half layout. Install an additional autotransformer.\nSupporting Statement: The Hodges Tie - Belton Tie 100 kV transmission lines can overload under contingencies.\nLocated: HODGES TIE SWITCHYARD ~ Greenwood County, SC (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2723,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Lee Cc - Lee Steam 100 Kv Transmission Line, Construct","type":"transmission line","voltage_kv":100,"location_ref":"Lee Cc - Lee Steam (NC/SC)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":8,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 8.\nIn-Service Year: 2029\nProject Name: LEE CC - LEE STEAM 100 KV TRANSMISSION LINE, CONSTRUCT\nDescription: Construct a new 100 kV busline between Lee CC and Lee Steam with 1158 ACSS/TW at 200°C. ACSS/TW conductor used is considered an alternative transmission technology.\nSupporting Statement: The Lee CC - Lee Steam Station 100 kV transmission lines can overload under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2724,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Parkwood Tie - Customer Station 100 Kv Transmission Line","type":"transmission line","voltage_kv":100,"location_ref":"Parkwood Tie - Customer Station (NC/SC)","lat":35.871,"lng":-78.931,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":8,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 8.\nIn-Service Year: 2029\nProject Name: PARKWOOD TIE - CUSTOMER STATION 100 KV TRANSMISSION LINE\nDescription: Extend the Parkwood Tie - Customer Station 100 kV (14.4 miles) and network with East Durham Tie 100 kV. Conductor for the extension will be 1272 ACSR conductor at 120°C.\nSupporting Statement: To help address thermal loading issues throughout the region around Parkwood Tie, the Parkwood Tie - Customer Station 100 kV will be extended and networked with East Durham Tie 100 kV.\nLocated: PARKWOOD TIE = OSM substation 'Parkwood Substation' (NC)","reviewed":false,"approximate":true,"requires_review":false},{"id":2725,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"East Durham Tie 100 Kv, Expansion","type":"substation","voltage_kv":100,"location_ref":"East Durham Tie (NC/SC)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":8,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 8.\nIn-Service Year: 2030\nProject Name: EAST DURHAM TIE 100 KV, EXPANSION\nDescription: Expand East Durham Tie and establish two new 100 kV terminals for the future East Durham - Parkwood Tie 100 kV transmission line.\nSupporting Statement: The East Durham Tie - Ashe St Switching Station 100 kV transmission line can overload during contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2726,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Morning Star Tie 230 Kv, Expansion","type":"substation","voltage_kv":230,"location_ref":"Morning Star Tie (NC/SC)","lat":35.559,"lng":-82.981,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":9,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 9.\nIn-Service Year: 2030\nProject Name: MORNING STAR TIE 230 KV, EXPANSION\nDescription: Expand the 230 kV switchyard at Morning Star Tie to a full breaker and a half configuration and replace all three existing autobanks with new 230/100/44 kV transformers.\nSupporting Statement: The existing banks at Morning Star can overload for the loss of one or more of the parallel banks. The second Newport - Morning Star 230 kV Lines needs an expanded Morning Star Tie\nLocated: MORNING STAR TIE ~ Haywood County, NC (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2727,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Statesville Tie - Mooresville Tie 44 Kv Transmission Line, Rebuild","type":"transmission line","voltage_kv":44,"location_ref":"Statesville Tie - Mooresville Tie (NC/SC)","lat":35.786,"lng":-80.884,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":9,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 9.\nIn-Service Year: 2030\nProject Name: STATESVILLE TIE - MOORESVILLE TIE 44 KV TRANSMISSION LINE, REBUILD\nDescription: Rebuild 7.9 miles (Statesville Tie - Perth Rd Retail Tap) of the Statesville Tie - Mooresville Tie 44 kV transmission line with 954 ACSR at 120°C as double circuit\nSupporting Statement: The existing Statesville Tie - Mooresville Tie 44 kV transmission line can overload.\nLocated: STATESVILLE TIE = OSM substation 'Statesville Substation' (NC); MOORESVILLE TIE ~ Iredell County, NC (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2728,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Central Tie 230 Kv, Install","type":"substation","voltage_kv":230,"location_ref":"Central Tie (NC/SC)","lat":34.714,"lng":-82.792,"route":null,"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":9,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 9.\nIn-Service Year: 2031\nProject Name: CENTRAL TIE 230 KV, INSTALL\nDescription: Install a 230 kV series bus junction breaker at Central Tie 230 kV.\nSupporting Statement: Contingencies involving the single bus junction breaker at Central Tie 230 kV can cause a number of 100 kV overloads throughout the region.\nLocated: CENTRAL TIE = OSM substation 'Central Tie Substation' (SC)","reviewed":false,"approximate":false,"requires_review":false},{"id":2729,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Cliffside Tie, Add Transformer","type":"substation","voltage_kv":500,"location_ref":"Cliffside Tie (NC/SC)","lat":35.22,"lng":-81.767,"route":null,"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":9,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 9.\nIn-Service Year: 2031\nProject Name: CLIFFSIDE TIE, ADD TRANSFORMER\nDescription: Add a 500/230 kV Autobank at Cliffside Tie, construct bus line between Cliffside Tie and Cliffside 5, and install 3% reactors on the Cliffside 5 230/100/44 kV autobanks\nSupporting Statement: The Newport Tie 500/230 kV Autobank can overload under contingency\nLocated: CLIFFSIDE TIE = OSM substation 'Cliffside Substation' (NC)","reviewed":false,"approximate":false,"requires_review":false},{"id":2730,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Eno Tie - Crest Street Switching Station 100 Kv","type":"substation","voltage_kv":100,"location_ref":"Eno Tie - Crest Street (NC/SC)","lat":36.039,"lng":-78.948,"route":null,"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":10,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 10.\nIn-Service Year: 2031\nProject Name: ENO TIE - CREST STREET SWITCHING STATION 100 KV\nDescription: Correct clearance issues on the Eno Tie - Crest Street Switching Station 100 kV to improve ratings of the existing bundled 477 ACSR conductor to 120°C.\nSupporting Statement: The Eno Tie - Crest Street Switching Station 100 kV transmission lines can overload under contingency.\nLocated: ENO TIE = OSM substation 'Eno Substation' (NC); CREST STREET ~ Durham County, NC (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2731,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Orchard Tie - Hickory Tie 100 Kv Transmission Lines, Rebuild","type":"transmission line","voltage_kv":100,"location_ref":"Orchard Tie - Hickory Tie (NC/SC)","lat":35.657,"lng":-81.309,"route":[[35.598,-81.276],[35.715,-81.342]],"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":10,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 10.\nIn-Service Year: 2031\nProject Name: ORCHARD TIE - HICKORY TIE 100 KV TRANSMISSION LINES, REBUILD\nDescription: Rebuild 4.2 miles (Orchard Tie - Newton Tie Tap) of the Orchard Tie - Hickory Tie 100 kV transmission line with 1272 ACSR conductor at 120°C.\nSupporting Statement: The Orchard Tie - Hickory Tie 100 kV transmission lines can overload under contingency.\nLocated: ORCHARD TIE = OSM substation 'Orchard Tie Substation' (NC); HICKORY TIE = OSM substation 'Hickory Tie Substation' (NC) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2732,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Harrisburg Tie - Mine Shaft Retail 100 Kv Transmission Line, Conversion","type":"transmission line","voltage_kv":100,"location_ref":"Harrisburg Tie - Mine Shaft Retail (NC/SC)","lat":35.313,"lng":-80.692,"route":null,"cost_usd":null,"start_date":"2032-01-01","end_date":"2032-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":10,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 10.\nIn-Service Year: 2032\nProject Name: HARRISBURG TIE - MINE SHAFT RETAIL 100 KV TRANSMISSION LINE, CONVERSION\nDescription: Convert the existing Harrisburg Tie - Univ of N C Charlotte 44 kV transmission line to 100 kV to establish a second 100 kV circuit of the Harrisburg Tie - Mine Shaft Retail 100 kV transmission line.\nSupporting Statement: The Harrisburg Tie - Concord Main 100 kV transmission lines can overload under contingency.\nLocated: HARRISBURG TIE = OSM substation 'Harrisburg Substation' (NC)","reviewed":false,"approximate":true,"requires_review":false},{"id":2733,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Pleasant Garden Tie - Mebane Tie 100 Kv Transmission Line, Rebuild","type":"transmission line","voltage_kv":100,"location_ref":"Pleasant Garden Tie - Mebane Tie (NC/SC)","lat":35.992,"lng":-79.577,"route":null,"cost_usd":null,"start_date":"2032-01-01","end_date":"2032-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":10,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 10.\nIn-Service Year: 2032\nProject Name: PLEASANT GARDEN TIE - MEBANE TIE 100 KV TRANSMISSION LINE, REBUILD\nDescription: Rebuild 1.73 miles (Mebane Tie - Trollingwood Retail) of the Pleasant Garden - Mebane Tie 100 kV transmission line with 1272 ACSR at 120°C.\nSupporting Statement: The Pleasant Garden Tie - Mebane Tie 100 kV transmission lines can overload under contingency.\nLocated: PLEASANT GARDEN TIE = OSM substation 'Pleasant Garden Tie Substation' (NC); MEBANE TIE ~ Alamance County, NC (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2734,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Dan River Steam - North Greensboro Tie 100 Kv Transmission Lines, Rebuild","type":"transmission line","voltage_kv":100,"location_ref":"Dan River Steam - North Greensboro Tie (NC/SC)","lat":36.283,"lng":-79.754,"route":null,"cost_usd":null,"start_date":"2033-01-01","end_date":"2033-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":11,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 11.\nIn-Service Year: 2033\nProject Name: DAN RIVER STEAM - NORTH GREENSBORO TIE 100 KV TRANSMISSION LINES, REBUILD\nDescription: Rebuild the entire Dan River Steam - North Greensboro 100 kV transmission lines (25.9 miles) with 1272 ACSR at 120°C.\nSupporting Statement: The Dan River Steam - North Greensboro Tie 100 kV transmission lines can overload under contingency.\nLocated: DAN RIVER STEAM = OSM substation 'Dan River Steam Station Substation' (NC); NORTH GREENSBORO TIE ~ Guilford County, NC (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2735,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Dan River Steam - Sadler Tie 100 Kv Transmission Lines, Rebuild","type":"transmission line","voltage_kv":100,"location_ref":"Dan River Steam - Sadler Tie (NC/SC)","lat":36.439,"lng":-79.678,"route":[[36.487,-79.72],[36.39,-79.635]],"cost_usd":null,"start_date":"2033-01-01","end_date":"2033-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":11,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 11.\nIn-Service Year: 2033\nProject Name: DAN RIVER STEAM - SADLER TIE 100 KV TRANSMISSION LINES, REBUILD\nDescription: Rebuild the entire Dan River Steam - Sadler Tie 100 kV transmission lines (8.1 miles of Reidsville Circuits and 8.2 miles of Wolf Creek Circuits) with 1272 ACSR at 120°C.\nSupporting Statement: The Dan River Steam - Sadler Tie 100 kV transmission lines can overload under contingency.\nLocated: DAN RIVER STEAM = OSM substation 'Dan River Steam Station Substation' (NC); SADLER TIE = OSM substation 'Sadler Tie Substation' (NC) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2736,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Dixon School Rd - Customer Delivery 230 Kv Transmission Line, Construct","type":"transmission line","voltage_kv":230,"location_ref":"Dixon School Rd - Customer Delivery (NC/SC)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2033-01-01","end_date":"2033-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":11,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 11.\nIn-Service Year: 2033\nProject Name: DIXON SCHOOL RD - CUSTOMER DELIVERY 230 KV TRANSMISSION LINE, CONSTRUCT\nDescription: Construct a new 1.3 mile 230 kV transmission line from Dixon School Rd to a customer delivery station with 954 ACSR at 120°C.\nSupporting Statement: To support additional customer growth in the region.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2737,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Harrisburg Tie - Amity Switching Station 100 Kv Transmission Line, Rebuild","type":"transmission line","voltage_kv":100,"location_ref":"Harrisburg Tie - Amity (NC/SC)","lat":35.313,"lng":-80.692,"route":null,"cost_usd":null,"start_date":"2033-01-01","end_date":"2033-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":11,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 11.\nIn-Service Year: 2033\nProject Name: HARRISBURG TIE - AMITY SWITCHING STATION 100 KV TRANSMISSION LINE, REBUILD\nDescription: Rebuild 6.45 miles (Harrisburg Tie to Structure 52.0) of the Harrisburg Tie - Amity Switching Station 100 kV transmission line with 1272 ACSR at 120°C.\nSupporting Statement: The Harrisburg Tie - Amity Switching Station 100 kV transmission lines can overload under contingency.\nLocated: HARRISBURG TIE = OSM substation 'Harrisburg Substation' (NC)","reviewed":false,"approximate":true,"requires_review":false},{"id":2738,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Marshall Steam - Beckerdite Tie 230 Kv Transmission Line, Uprate","type":"transmission line","voltage_kv":230,"location_ref":"Marshall Steam - Beckerdite Tie (NC/SC)","lat":35.804,"lng":-80.594,"route":[[35.597,-80.967],[36.011,-80.222]],"cost_usd":null,"start_date":"2033-01-01","end_date":"2033-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":12,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 12.\nIn-Service Year: 2033\nProject Name: MARSHALL STEAM - BECKERDITE TIE 230 KV TRANSMISSION LINE, UPRATE\nDescription: Correct clearance issues on the Marshall Steam - Beckerdite Tie 230 kV transmission line to improve ratings of the existing 954 ACSR conductor to 120°C.\nSupporting Statement: The Marshall Steam - Beckerdite Tie 230 kV transmission line ratings can limit the operational flexibility of Belews Steam Station. Improving line ratings will remove that limitation.\nLocated: MARSHALL STEAM = OSM substation 'Marshall Steam Substation' (NC); BECKERDITE TIE = OSM substation 'Beckerdite Tie Substation' (NC) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2739,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Marshall Steam Station - Boyd Switching Station 230 Kv Transmission Line, Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Marshall Steam Station - Boyd (NC/SC)","lat":35.597,"lng":-80.967,"route":null,"cost_usd":null,"start_date":"2033-01-01","end_date":"2033-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":12,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 12.\nIn-Service Year: 2033\nProject Name: MARSHALL STEAM STATION - BOYD SWITCHING STATION 230 KV TRANSMISSION LINE, REBUILD\nDescription: Rebuild the entire 15 miles of the Marshall Steam - Boyd Switching Station 230 kV transmission line with bundled 1272 ACSR conductor at 120°C.\nSupporting Statement: The Marshall Steam - Boyd Switching Station 230 kV transmission lines can overload under contingency.\nLocated: MARSHALL STEAM STATION = OSM substation 'Marshall Steam Substation' (NC)","reviewed":false,"approximate":true,"requires_review":false},{"id":2740,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Mcguire Nuclear Station - Marshall Steam Station 230 Kv Transmission Lines, Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Mcguire Nuclear Station - Marshall Steam Station (NC/SC)","lat":35.514,"lng":-80.957,"route":[[35.432,-80.947],[35.597,-80.967]],"cost_usd":null,"start_date":"2033-01-01","end_date":"2033-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":12,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 12.\nIn-Service Year: 2033\nProject Name: MCGUIRE NUCLEAR STATION - MARSHALL STEAM STATION 230 KV TRANSMISSION LINES, REBUILD\nDescription: Rebuild the entire McGuire Nuclear Station - Marshall Steam Station 230 kV transmission lines with 1533 ACSS/TW at 200°C.\nSupporting Statement: The McGuire Nuclear Station - Marshall Steam Station 230 kV transmission lines can overload under contingency.\nLocated: MCGUIRE NUCLEAR STATION = OSM plant 'McGuire Nuclear Station' (NC); MARSHALL STEAM STATION = OSM substation 'Marshall Steam Substation' (NC) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2741,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Newport Tie - Morning Star Tie 230 Kv Transmission Line","type":"transmission line","voltage_kv":230,"location_ref":"Newport Tie - Morning Star Tie (NC/SC)","lat":34.998,"lng":-81.121,"route":null,"cost_usd":null,"start_date":"2033-01-01","end_date":"2033-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":13,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 13.\nIn-Service Year: 2033\nProject Name: NEWPORT TIE - MORNING STAR TIE 230 KV TRANSMISSION LINE\nDescription: Add a second circuit to the Newport Tie - Morning Star Tie 230 kV transmission line with 954 ACSR rated at 120°C.\nSupporting Statement: Existing Newport Tie - Morning Star Tie 230 kV transmission line can overload under contingencies.\nLocated: NEWPORT TIE = OSM substation 'Newport Tie Substation' (SC)","reviewed":false,"approximate":true,"requires_review":false},{"id":2742,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Oak Hollow Switching Station 100 Kv, Construct","type":"substation","voltage_kv":100,"location_ref":"Oak Hollow (NC/SC)","lat":34.893,"lng":-82.372,"route":null,"cost_usd":null,"start_date":"2033-01-01","end_date":"2033-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":13,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 13.\nIn-Service Year: 2033\nProject Name: OAK HOLLOW SWITCHING STATION 100 KV, CONSTRUCT\nDescription: Construct a new switching station on the Beckerdite Tie - Greensboro Main 100 kV transmission lines Project listed as conceptual in the local transmission plan. Need date may shift in future.\nSupporting Statement: The Beckerdite Tie - Greensboro Main 100 kV transmission lines can overload under contingencies.\nLocated: OAK HOLLOW ~ Greenville County, SC (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2743,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Shelby Tie 230/100/44 Kv Autotransformer, Replace","type":"substation","voltage_kv":100,"location_ref":"Shelby Tie 230/100/44 Kv Autotransformer (NC/SC)","lat":35.335,"lng":-81.557,"route":null,"cost_usd":null,"start_date":"2033-01-01","end_date":"2033-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":13,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 13.\nIn-Service Year: 2033\nProject Name: SHELBY TIE 230/100/44 KV AUTOTRANSFORMER, REPLACE\nDescription: Replace existing 230/100/44 kV autotransformer 4 with new larger autotransformer.\nSupporting Statement: Shelby Tie 230/100/44 kV autotransformer 4 can overload under contingency.\nLocated: SHELBY TIE 230/100/44 KV AUTOTRANSFORMER ~ Cleveland County, NC (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2744,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Stamey Tie - Statesville Tie 100 Kv Transmission Line, Rebuild","type":"transmission line","voltage_kv":100,"location_ref":"Stamey Tie - Statesville Tie (NC/SC)","lat":35.773,"lng":-80.942,"route":[[35.78,-80.989],[35.765,-80.894]],"cost_usd":null,"start_date":"2033-01-01","end_date":"2033-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":13,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 13.\nIn-Service Year: 2033\nProject Name: STAMEY TIE - STATESVILLE TIE 100 KV TRANSMISSION LINE, REBUILD\nDescription: Rebuild the entire 6 miles of the Stamey Tie - Statesville Tie 100 kV transmission line with 1272 ACSR conductor at 120°C.\nSupporting Statement: The Stamey Tie - Statesville Tie 100 kV transmission lines can overload under contingency.\nLocated: STAMEY TIE = OSM substation 'Stamey Substation' (NC); STATESVILLE TIE = OSM substation 'Statesville Substation' (NC) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2745,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Dan River Cc - Dan River Steam 100 Kv Transmission Lines, Rebuild","type":"transmission line","voltage_kv":100,"location_ref":"Dan River Cc - Dan River Steam (NC/SC)","lat":36.487,"lng":-79.72,"route":[[36.487,-79.72],[36.487,-79.72]],"cost_usd":null,"start_date":"2034-01-01","end_date":"2034-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":14,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 14.\nIn-Service Year: 2034\nProject Name: DAN RIVER CC - DAN RIVER STEAM 100 KV TRANSMISSION LINES, REBUILD\nDescription: Rebuild the entire Dan River CC - Dan River Steam 100 kV transmission lines (0.5 miles) with bundled 1158 ACSS/TW at 200°C.\nSupporting Statement: The Dan River CC - Dan River Steam 100 kV transmission lines can overload under contingency.\nLocated: DAN RIVER CC = OSM substation 'Dan River Steam Station Substation' (NC); DAN RIVER STEAM = OSM substation 'Dan River Steam Station Substation' (NC) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2746,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Madison Tie 100/44 Kv, Install Transformer","type":"substation","voltage_kv":100,"location_ref":"Madison Tie (NC/SC)","lat":36.406,"lng":-79.953,"route":null,"cost_usd":null,"start_date":"2034-01-01","end_date":"2034-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":14,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 14.\nIn-Service Year: 2034\nProject Name: MADISON TIE 100/44 KV, INSTALL TRANSFORMER\nDescription: Add a second 100/44 kV autotransformer to Madison Tie. Project listed as conceptual in the local transmission plan. Need date may shift in future.\nSupporting Statement: The single 100/44 kV autotransformer at Madison Tie cannot support future load growth.\nLocated: MADISON TIE = OSM substation 'Madison Tie Substation' (NC)","reviewed":false,"approximate":false,"requires_review":false},{"id":2747,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Rural Hall Tie- Shattalon Switching Station 100 Kv Transmission Lines, Rebuild","type":"transmission line","voltage_kv":100,"location_ref":"Rural Hall Tie- Shattalon (NC/SC)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2034-01-01","end_date":"2034-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":14,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 14.\nIn-Service Year: 2034\nProject Name: RURAL HALL TIE- SHATTALON SWITCHING STATION 100 KV TRANSMISSION LINES, REBUILD\nDescription: Rebuild both of the Rural Hall Tie - Shattalon Switching Station 100 kV transmission lines with 795 ACSS/TW at 200°C.\nSupporting Statement: Both of the Rural Hall Tie - Shattalon Switching Station 100 kV transmission lines can overload under contingencies.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2748,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Lookout Tie - Marshall Steam 44 Kv Transmission Line, Rebuild","type":"transmission line","voltage_kv":44,"location_ref":"Lookout Tie - Marshall Steam (NC/SC)","lat":35.597,"lng":-80.967,"route":null,"cost_usd":null,"start_date":"2035-01-01","end_date":"2035-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":14,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 14.\nIn-Service Year: 2035\nProject Name: LOOKOUT TIE - MARSHALL STEAM 44 KV TRANSMISSION LINE, REBUILD\nDescription: Rebuild the Lookout Tie - Marshall Steam 44 kV transmission line as double circuit with 954 ACSR at 120°C. Establish a 100 kV circuit served out of Lookout Tie.\nSupporting Statement: The Lookout Tie - Marshall Steam 44 kV transmission line can experience thermal and voltage issues under periods of extreme loading.\nLocated: MARSHALL STEAM = OSM substation 'Marshall Steam Substation' (NC)","reviewed":false,"approximate":true,"requires_review":false},{"id":2749,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Harrisburg Tie - Morning Star Tie 100 Kv Transmission Lines, Upgrade","type":"transmission line","voltage_kv":100,"location_ref":"Harrisburg Tie - Morning Star Tie (NC/SC)","lat":35.313,"lng":-80.692,"route":null,"cost_usd":null,"start_date":"2036-01-01","end_date":"2036-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":15,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 15.\nIn-Service Year: 2036\nProject Name: HARRISBURG TIE - MORNING STAR TIE 100 KV TRANSMISSION LINES, UPGRADE\nDescription: Improve clearances along the Harrisburg Tie - Morning Star Tie 100 kV Transmission Lines to improve the line rating to 120°F\nSupporting Statement: The Harrisburg Tie - Morning Star Tie 100 kV Transmission Lines can overload due to contingency\nLocated: HARRISBURG TIE = OSM substation 'Harrisburg Substation' (NC)","reviewed":false,"approximate":true,"requires_review":false},{"id":2750,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Hendersonville - Campobello Tie And Campobello Tie - Tiger Tie 100 Kv Lines","type":"transmission line","voltage_kv":100,"location_ref":"Hendersonville - Campobello Tie - Tiger Tie (NC/SC)","lat":35.196,"lng":-82.285,"route":[[35.27,-82.407],[35.121,-82.163]],"cost_usd":null,"start_date":"2036-01-01","end_date":"2036-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":15,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 15.\nIn-Service Year: 2036\nProject Name: HENDERSONVILLE - CAMPOBELLO TIE AND CAMPOBELLO TIE - TIGER TIE 100 KV LINES\nDescription: Rebuild the Hendersonville Tie - Campobello Tie 100 kV Lines and the Campobello Tie - Tiger Tie 100 kV Lines with 1158 ACSS/TW rated at 200°C. Total miles rebuilt is 29.64 Miles.\nSupporting Statement: The Hendersonvill Tie - Campobello Tie and Campobello Tie - Tiger Tie 100 kV Transmission Lines can overload under contingency\nLocated: HENDERSONVILLE = OSM substation 'Hendersonville Tie Substation' (NC); CAMPOBELLO TIE = OSM substation 'Campobello Substation' (SC) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2751,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Longview Tie - Lyle Creek Switching Station 100 Kv Transmission Line, Rebuild","type":"transmission line","voltage_kv":100,"location_ref":"Longview Tie - Lyle Creek (NC/SC)","lat":35.721,"lng":-81.41,"route":null,"cost_usd":null,"start_date":"2036-01-01","end_date":"2036-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":15,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 15.\nIn-Service Year: 2036\nProject Name: LONGVIEW TIE - LYLE CREEK SWITCHING STATION 100 KV TRANSMISSION LINE, REBUILD\nDescription: Rebuild 3 miles (Longview Tie - North Lakes Retail) of the Longview Tie - Lyle Creek Switching Station 100 kV transmission line with 477 ACSS/TW at 200°C and network lines\nSupporting Statement: The Hickory Tie - Lyle Creek 100 kV, Lyle Creek - Lookout Tie 100 kV, and the Stamey Tie - Lookout Tie 100 kV transmission lines can overload under contingencies.\nLocated: LONGVIEW TIE = OSM substation 'Longview Substation' (NC)","reviewed":false,"approximate":true,"requires_review":false},{"id":2752,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Stamey Tie - Lookout Tie 100 Kv Transmission Line, Rebuild","type":"transmission line","voltage_kv":100,"location_ref":"Stamey Tie - Lookout Tie (NC/SC)","lat":35.78,"lng":-80.989,"route":null,"cost_usd":null,"start_date":"2036-01-01","end_date":"2036-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":16,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 16.\nIn-Service Year: 2036\nProject Name: STAMEY TIE - LOOKOUT TIE 100 KV TRANSMISSION LINE, REBUILD\nDescription: Rebuild 5.5 miles (Lookout Tie - Customer Delivery) of the Stamey Tie - Lookout Tie 100 kV transmission line with bundled 1272 ACSR at 120°C.\nSupporting Statement: The Stamey Tie - Lookout Tie 100 kV transmission lines can overload under contingency.\nLocated: STAMEY TIE = OSM substation 'Stamey Substation' (NC)","reviewed":false,"approximate":true,"requires_review":false},{"id":2753,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Tiger Tie - Campobello Tie 100 Kv Transmission Line, Rebuild","type":"transmission line","voltage_kv":100,"location_ref":"Tiger Tie - Campobello Tie (NC/SC)","lat":35.037,"lng":-82.159,"route":[[34.953,-82.155],[35.121,-82.163]],"cost_usd":null,"start_date":"2036-01-01","end_date":"2036-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":16,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 16.\nIn-Service Year: 2036\nProject Name: TIGER TIE - CAMPOBELLO TIE 100 KV TRANSMISSION LINE, REBUILD\nDescription: Rebuild the entire 11.8 miles of the Tiger Tie - Campobello Tie 100 kV transmission line with 1272 ACSR conductor at 120°C.\nSupporting Statement: The Tiger Tie - Campobello Tie 100 kV transmission lines can overload under contingency.\nLocated: TIGER TIE = OSM substation 'Tiger Tie Substation' (SC); CAMPOBELLO TIE = OSM substation 'Campobello Substation' (SC) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2754,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Carolinas","state":null,"name":"Woodruff Tie - Pacolet Tie 100 Kv Transmission Lines, Upgrade","type":"transmission line","voltage_kv":100,"location_ref":"Woodruff Tie - Pacolet Tie (NC/SC)","lat":34.815,"lng":-81.901,"route":[[34.734,-82.052],[34.896,-81.75]],"cost_usd":null,"start_date":"2036-01-01","end_date":"2036-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":16,"raw_excerpt":"SERTP DUKE CAROLINAS Balancing Authority Area, page 16.\nIn-Service Year: 2036\nProject Name: WOODRUFF TIE - PACOLET TIE 100 KV TRANSMISSION LINES, UPGRADE\nDescription: Upgrade anciliory equipment on the Woodruff Tie - Pacolet Tie 100 kV Transmission Lines to improve the line rating to 110°F\nSupporting Statement: The Woodruff Tie - Pacolet Tie 100 kV Transmission Lines can overload due to contingency\nLocated: WOODRUFF TIE = OSM substation 'Woodruff Tie Substation' (SC); PACOLET TIE = OSM substation 'Pacolet Tie Substation' (SC) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":909,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Duke Energy Florida","state":"FL","name":"Bailey Mill Solar (Solar Photovoltaic, 74.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Bailey Mill Solar, Jefferson County, FL","lat":30.409127,"lng":-83.93336,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 65. Plant 68052 Bailey Mill Solar (Duke Energy Florida, LLC), Jefferson County, FL; balancing authority FPC. Planned operation 2026-09.\nGenerator PV1: 74.9 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":923,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Duke Energy Florida","state":"FL","name":"Lonesome Camp Solar Plant (Solar Photovoltaic, 74.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Lonesome Camp Solar Plant, Osceola County, FL","lat":28.079121,"lng":-81.24029,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 788. Plant 70222 Lonesome Camp Solar Plant (Duke Energy Florida, LLC), Osceola County, FL; balancing authority FPC. Planned operation 2027-04.\nGenerator LCSP1: 74.9 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":930,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Duke Energy Florida","state":"FL","name":"Powerline Energy Storage (Batteries, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Powerline Energy Storage, Citrus County, FL","lat":28.96684,"lng":-82.61751,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 722. Plant 69356 Powerline Energy Storage (Duke Energy Florida, LLC), Citrus County, FL; balancing authority FPC. Planned operation 2027-03.\nGenerator PWLNB: 100 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":935,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Duke Energy Florida","state":"FL","name":"Turnpike Solar Plant (Solar Photovoltaic, 74.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Turnpike Solar Plant, Osceola County, FL","lat":28.063296,"lng":-81.22305,"route":null,"cost_usd":null,"start_date":"2027-02-01","end_date":"2027-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 676. Plant 70223 Turnpike Solar Plant (Duke Energy Florida, LLC), Osceola County, FL; balancing authority FPC. Planned operation 2027-02.\nGenerator TPSP1: 74.9 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1362,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Duke Energy Progress","state":"NC","name":"Asheville BESS (Batteries, 17.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Asheville BESS, Buncombe County, NC","lat":35.472139,"lng":-82.54163,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 123. Plant 69429 Asheville BESS (Duke Energy Progress - (NC)), Buncombe County, NC; balancing authority CPLW. Planned operation 2026-09.\nGenerator AVLB1: 17.3 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1363,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Duke Energy Progress","state":"NC","name":"Asheville Solar (Solar Photovoltaic, 9.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Asheville Solar, Buncombe County, NC","lat":35.470591,"lng":-82.54223,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 532. Plant 69357 Asheville Solar (Duke Energy Progress - (NC)), Buncombe County, NC; balancing authority CPLW. Planned operation 2026-12.\nGenerator PV1: 9.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1373,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Duke Energy Progress","state":"NC","name":"Elm City BESS (Batteries, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"Elm City BESS, Wilson County, NC","lat":35.789717,"lng":-77.85501,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 124. Plant 69444 Elm City BESS (Duke Energy Progress - (NC)), Wilson County, NC; balancing authority CPLE. Planned operation 2026-09.\nGenerator ECB1: 20 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1384,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Duke Energy Progress","state":"NC","name":"New Hill 1 Battery (Batteries, 56 MW)","type":"generation","voltage_kv":null,"location_ref":"New Hill 1 Battery, Wake County, NC","lat":35.659692,"lng":-78.94412,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1024. Plant 69119 New Hill 1 Battery (Duke Energy Progress - (NC)), Wake County, NC; balancing authority CPLE. Planned operation 2027-09.\nGenerator NHBA1: 56 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1398,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Duke Energy Progress","state":"NC","name":"Warsaw 2 Energy Storage (Batteries, 11 MW)","type":"generation","voltage_kv":null,"location_ref":"Warsaw 2 Energy Storage, Duplin County, NC","lat":35.003702,"lng":-78.1165,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 153. Plant 69988 Warsaw 2 Energy Storage (Duke Energy Progress - (NC)), Duplin County, NC; balancing authority CPLE. Planned operation 2026-09.\nGenerator WBA2: 11 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2755,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Progress","state":null,"name":"Clayton Industrial - Selma 115 Kv Transmission Line, Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Clayton Industrial - Selma (NC/SC)","lat":35.513,"lng":-78.367,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":17,"raw_excerpt":"SERTP DUKE PROGRESS EAST Balancing Authority Area, page 17.\nIn-Service Year: 2027\nProject Name: CLAYTON INDUSTRIAL - SELMA 115 KV TRANSMISSION LINE, REBUILD\nDescription: Rebuild 9.4 miles of entire Clayton Industrial - Selma 115 kV transmission line to 795 ACSS/TW at 365°F.\nSupporting Statement: Various generator interconnection studies have shown the need to upgrade this line. This upgrade is needed to enable generation consistent with the approved IRP.\nLocated: SELMA ~ Johnston County, NC (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2756,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Progress","state":null,"name":"Robinson Plant - Rockingham 115 Kv Transmission Line, Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Robinson Plant - Rockingham (NC/SC)","lat":34.653,"lng":-79.959,"route":[[34.402,-80.158],[34.904,-79.759]],"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":17,"raw_excerpt":"SERTP DUKE PROGRESS EAST Balancing Authority Area, page 17.\nIn-Service Year: 2027\nProject Name: ROBINSON PLANT - ROCKINGHAM 115 KV TRANSMISSION LINE, REBUILD\nDescription: Rebuild the Sneedsboro Solar - Cordova - Rockingham portions of the Robinson - Rockingham 115 kV transmission line using 795 ACSS/TW conductor at 365°F or equivalent (~17 miles).\nSupporting Statement: Various solar studies have shown the need for this upgrade. This upgrade is needed for future solar generation proposed for compliance with the Carbon Plan goals.\nLocated: ROBINSON PLANT = OSM substation 'Robinson Substation' (SC); ROCKINGHAM = OSM substation 'Rockingham Substation' (NC) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2757,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Progress","state":null,"name":"Sumter - Desc Eastover 115 Kv Transmission Line (Sumter Gold Kist Tap - Sumter Kings Hwy Section), Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Sumter - Desc Eastover (NC/SC)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":17,"raw_excerpt":"SERTP DUKE PROGRESS EAST Balancing Authority Area, page 17.\nIn-Service Year: 2027\nProject Name: SUMTER - DESC EASTOVER 115 KV TRANSMISSION LINE (SUMTER GOLD KIST TAP - SUMTER KINGS HWY SECTION), REBUILD\nDescription: Rebuild the 5.82 mile 397.5 ACSR portion (Sumter Gold Kist Tap - Sumter Kings Hwy section) of the Sumter - DESC Eastover 115 kV transmission line with 3-1272 MCM 45/7 ACSR 212°F conductor.\nSupporting Statement: Multiple contingencies cause the Sumter Gold Kist Tap - Sumter Kings Hwy section of Sumter - Eastover 115 kV transmission line to overload.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2758,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Progress","state":null,"name":"Weatherspoon - Lof 115 Kv Transmission Line (Maxton - Pembroke), Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Weatherspoon - Lof (NC/SC)","lat":34.589,"lng":-78.974,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":18,"raw_excerpt":"SERTP DUKE PROGRESS EAST Balancing Authority Area, page 18.\nIn-Service Year: 2027\nProject Name: WEATHERSPOON - LOF 115 KV TRANSMISSION LINE (MAXTON - PEMBROKE), REBUILD\nDescription: Rebuild 9 miles (near Pembroke to near Maxton) with 3-795 MCM ACSS/TW 365°F. Install two new switches.\nSupporting Statement: The Maxton - Pembroke section of the Weatherspoon-LOF 115 kV transmission line overloads under contingency.\nLocated: WEATHERSPOON = OSM substation 'Weatherspoon Plant Substation' (NC)","reviewed":false,"approximate":true,"requires_review":false},{"id":2759,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Progress","state":null,"name":"Barnard Creek – Castle Hayne 230 Kv East Line, Upgrade Switches 38A-1, 38A-2 To 3000 A And 41B-3 To 2000 A","type":"transmission line","voltage_kv":230,"location_ref":"Barnard Creek - Castle Hayne (NC/SC)","lat":34.169,"lng":-77.902,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":18,"raw_excerpt":"SERTP DUKE PROGRESS EAST Balancing Authority Area, page 18.\nIn-Service Year: 2028\nProject Name: BARNARD CREEK – CASTLE HAYNE 230 KV EAST LINE, UPGRADE SWITCHES 38A-1, 38A-2 TO 3000 A AND 41B-3 TO 2000 A\nDescription: Upgrade switches on the Barnard Creek – Castle Hayne 230 kV East line.\nSupporting Statement: The Barnard Creek – Castle Hayne 230 kV East line overloads for various contingencies.\nLocated: BARNARD CREEK = OSM substation 'Barnard Creek Substation' (NC); CASTLE HAYNE ~ New Hanover County, NC (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2760,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Progress","state":null,"name":"Brunswick 1 - Barnard Creek 230Kv Line, Upgrade Oos Relays, Ct Ratios, Line Trap, And Line Switches To Allow Us Of 2806 A Line Conductor 32°F Cw Rating","type":"transmission line","voltage_kv":230,"location_ref":"Brunswick 1 - Barnard Creek (NC/SC)","lat":34.096,"lng":-78.083,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":18,"raw_excerpt":"SERTP DUKE PROGRESS EAST Balancing Authority Area, page 18.\nIn-Service Year: 2028\nProject Name: BRUNSWICK 1 - BARNARD CREEK 230KV LINE, UPGRADE OOS RELAYS, CT RATIOS, LINE TRAP, AND LINE SWITCHES TO ALLOW US OF 2806 A LINE CONDUCTOR 32°F CW RATING\nDescription: Upgrade Brunswick Plant equipment including OOS relay to 3000 A for the Castle Hayne 230 East line.\nSupporting Statement: Mutiple contingencies cause the Brunswick 1-Brunswick EMC Daws Creek POD section of the Brunswick 1-Castle Hayne 230 kV East line to overload.\nLocated: BARNARD CREEK = OSM substation 'Barnard Creek Substation' (NC); BRUNSWICK 1 ~ Brunswick County, NC (county centre) (nearest of 2) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2761,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Progress","state":null,"name":"Lilesville - Oakboro 230 Kv Black And White Lines, Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Lilesville - Oakboro (NC/SC)","lat":34.975,"lng":-80.11,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":18,"raw_excerpt":"SERTP DUKE PROGRESS EAST Balancing Authority Area, page 18.\nIn-Service Year: 2028\nProject Name: LILESVILLE - OAKBORO 230 KV BLACK AND WHITE LINES, REBUILD\nDescription: Rebuild the entire DEP portion of Lilesville - Oakboro 230 kV Black and White lines to 6- 1272 ACSR 212°F conductor.\nSupporting Statement: Various generator interconnection studies have shown the need to upgrade this line. This upgrade is needed to enable generation consistent with the approved IRP.\nLocated: LILESVILLE ~ Anson County, NC (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2762,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Progress","state":null,"name":"Method-Dpc East Durham 230 Kv Line Upgrade Line Switches And Terminal Equipment At Both Ends To Allow Full Line Conductor 2546 A Cold Winter Rating","type":"transmission line","voltage_kv":230,"location_ref":"Method - Dpc East Durham (NC/SC)","lat":35.79,"lng":-78.651,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":19,"raw_excerpt":"SERTP DUKE PROGRESS EAST Balancing Authority Area, page 19.\nIn-Service Year: 2028\nProject Name: METHOD-DPC EAST DURHAM 230 KV LINE UPGRADE LINE SWITCHES AND TERMINAL EQUIPMENT AT BOTH ENDS TO ALLOW FULL LINE CONDUCTOR 2546 A COLD WINTER RATING\nDescription: Method - DPC East Durham 230 kV line, Upgrade relay settings and equipment at both ends of the line to get full cold winter rating.\nSupporting Statement: Various outages overload the Method – DPC East Durham 230 kV line.\nLocated: METHOD ~ Wake County, NC (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2763,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Progress","state":null,"name":"Wake-Zebulon 230Kv Line, Upgrade Ct Ratios And Relay Settings At Wake, Upgrade Line Switch 42-1, And Upgrade Ct Ratios And Relay Settings At Zebulon 230, All To 3000 A","type":"transmission line","voltage_kv":230,"location_ref":"Wake - Zebulon (NC/SC)","lat":35.786,"lng":-78.552,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":19,"raw_excerpt":"SERTP DUKE PROGRESS EAST Balancing Authority Area, page 19.\nIn-Service Year: 2028\nProject Name: WAKE-ZEBULON 230KV LINE, UPGRADE CT RATIOS AND RELAY SETTINGS AT WAKE, UPGRADE LINE SWITCH 42-1, AND UPGRADE CT RATIOS AND RELAY SETTINGS AT ZEBULON 230, ALL TO 3000 A\nDescription: Wake 230 kV, Upgrade CT ratios and relay settings, and line switch. Uprate CT ratios and relay settings at Zebulon 230 kV.\nSupporting Statement: Multiple contingencies cause the the Wake – Zebulon 230 kV line to overload.\nLocated: WAKE = OSM substation 'Wake Substation' (NC); ZEBULON ~ Wake County, NC (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2764,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Progress","state":null,"name":"Brunswick 2 - Town Creek 230Kv Line, Upgrade Oos Relay To At Least 2000 A, Preferably 3000 A","type":"transmission line","voltage_kv":230,"location_ref":"Brunswick 2 - Town Creek (NC/SC)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":19,"raw_excerpt":"SERTP DUKE PROGRESS EAST Balancing Authority Area, page 19.\nIn-Service Year: 2029\nProject Name: BRUNSWICK 2 - TOWN CREEK 230KV LINE, UPGRADE OOS RELAY TO AT LEAST 2000 A, PREFERABLY 3000 A\nDescription: Upgrade OOS relay on Brunswick 2 - Town Creek 230 kV line to at least 2000 A, preferably 3000 A.\nSupporting Statement: The Brunswick 2 – Town Creek 230 kV line overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2765,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Progress","state":null,"name":"Henderson – Dvp Kerr Dam 115 Kv Line, Upgrade The Wave Trap, Ct Ratio, And Relay Settings At Henderson 230 To At Least 1294 A","type":"transmission line","voltage_kv":115,"location_ref":"Henderson - Dvp Kerr Dam (NC/SC)","lat":36.365,"lng":-78.405,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":20,"raw_excerpt":"SERTP DUKE PROGRESS EAST Balancing Authority Area, page 20.\nIn-Service Year: 2029\nProject Name: HENDERSON – DVP KERR DAM 115 KV LINE, UPGRADE THE WAVE TRAP, CT RATIO, AND RELAY SETTINGS AT HENDERSON 230 TO AT LEAST 1294 A\nDescription: Henderson - DVP Kerr Dam 115 kV Line, uprate terminal equipment at Henderson 230 kV Sub\nSupporting Statement: The Henderson – DVP Kerr Dam 115 kV line overloads for various contingencies.\nLocated: HENDERSON ~ Vance County, NC (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2766,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Progress","state":null,"name":"Brunswick 1 - Delco 230 Kv East Line (Brunswick 1 - Southport Tap), Upgrade Switch; Rebuild Brunswick 1-Southport Tap Section","type":"transmission line","voltage_kv":230,"location_ref":"Brunswick 1 - Delco (NC/SC)","lat":34.182,"lng":-78.227,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":20,"raw_excerpt":"SERTP DUKE PROGRESS EAST Balancing Authority Area, page 20.\nIn-Service Year: 2030\nProject Name: BRUNSWICK 1 - DELCO 230 KV EAST LINE (BRUNSWICK 1 - SOUTHPORT TAP), UPGRADE SWITCH; REBUILD BRUNSWICK 1-SOUTHPORT TAP SECTION\nDescription: Rebuild the Brunswick 1 - Southport Tap section (0.09 miles) of Brunswick 1 - Delco 230 kV East transmission line with 6-1590 MCM ACSR 212°F conductor.\nSupporting Statement: Various contingencies cause the Brunswick 1 - Southport Tap section of Brunswick 1 - Delco 230 kV East line to overload.\nLocated: DELCO = OSM substation 'Delco Substation' (NC); BRUNSWICK 1 ~ Brunswick County, NC (county centre) (nearest of 2) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2767,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Progress","state":null,"name":"Lee - Milburnie 230 Kv Transmission Line, Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Lee - Milburnie (NC/SC)","lat":35.583,"lng":-78.373,"route":null,"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":20,"raw_excerpt":"SERTP DUKE PROGRESS EAST Balancing Authority Area, page 20.\nIn-Service Year: 2031\nProject Name: LEE - MILBURNIE 230 KV TRANSMISSION LINE, REBUILD\nDescription: Rebuild the entire Lee - Milburnie 230 kV transmission line with 954 MCM HS285 ACSS/TW conductor (40.19 miles) and upgrade terminal equipment.\nSupporting Statement: Various generator interconnection studies have shown the need to upgrade this line. This upgrade is needed to enable generation consistent with the approved IRP.\nLocated: LEE = OSM substation 'Lee Substation' (NC); MILBURNIE ~ Wake County, NC (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2768,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Progress","state":null,"name":"Holly Ridge North 115 Kv Switching Station, Construct","type":"substation","voltage_kv":115,"location_ref":"Holly Ridge North (NC/SC)","lat":34.763,"lng":-77.499,"route":null,"cost_usd":null,"start_date":"2033-01-01","end_date":"2033-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":21,"raw_excerpt":"SERTP DUKE PROGRESS EAST Balancing Authority Area, page 21.\nIn-Service Year: 2033\nProject Name: HOLLY RIDGE NORTH 115 KV SWITCHING STATION, CONSTRUCT\nDescription: Construct a new 115 kV switching station northeast of Holly Ridge, NC where the Castle Hayne - Folkstone 115 kV and Folkstone - Jacksonville City 115 kV transmission lines come together. Construct a new 115 kV feeder from the new switching station to JOEMC Folkstone POD.\nSupporting Statement: Multiple contingencies result in low voltages on the Castle Hayne - Folkstone 115 kV transmission line.\nLocated: HOLLY RIDGE NORTH ~ Onslow County, NC (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2769,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Progress","state":null,"name":"Durham - Rtp 230 Kv Transmission Line (Durham - Brier Creek), Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Durham - Rtp (NC/SC)","lat":35.951,"lng":-78.75,"route":null,"cost_usd":null,"start_date":"2036-01-01","end_date":"2036-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":21,"raw_excerpt":"SERTP DUKE PROGRESS EAST Balancing Authority Area, page 21.\nIn-Service Year: 2036\nProject Name: DURHAM - RTP 230 KV TRANSMISSION LINE (DURHAM - BRIER CREEK), REBUILD\nDescription: Rebuild 4.6 miles (Durham - Brier Creek) of the Durham - RTP 230 kV transmission line with 6-1590 MCM ACSR 212°F conductor. This project is listed as conceptual in the local transmission plan.\nSupporting Statement: This upgrade is needed to serve a new industrial customer load.\nLocated: DURHAM = OSM substation 'Durham Substation' (NC)","reviewed":false,"approximate":true,"requires_review":false},{"id":2770,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Progress","state":null,"name":"Falls - Franklinton (Franklinton - Franklinton Novo 115 Kv Feeder), Construct","type":"transmission line","voltage_kv":115,"location_ref":"Falls - Franklinton (Franklinton - Franklinton Novo (NC/SC)","lat":35.394,"lng":-80.075,"route":null,"cost_usd":null,"start_date":"2036-01-01","end_date":"2036-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":21,"raw_excerpt":"SERTP DUKE PROGRESS EAST Balancing Authority Area, page 21.\nIn-Service Year: 2036\nProject Name: FALLS - FRANKLINTON (FRANKLINTON - FRANKLINTON NOVO 115 KV FEEDER), CONSTRUCT\nDescription: Construct new Franklinton - Franklinton Novo 115 kV Feeder line. This project is listed as conceptual in the local transmission plan. Need date may shift in future.\nSupporting Statement: Multiple contingencies cause low voltages at buses on the Franklinton - Spring Hope SS 115 kV transmission line.\nLocated: FALLS = OSM plant 'Falls Hydro' (NC)","reviewed":false,"approximate":true,"requires_review":false},{"id":2771,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Progress","state":null,"name":"Rocky Mount - Wilson 115 Kv Transmission Line, Upgrade Terminal Equipment","type":"transmission line","voltage_kv":115,"location_ref":"Rocky Mount - Wilson (NC/SC)","lat":35.826,"lng":-77.877,"route":null,"cost_usd":null,"start_date":"2036-01-01","end_date":"2036-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":22,"raw_excerpt":"SERTP DUKE PROGRESS EAST Balancing Authority Area, page 22.\nIn-Service Year: 2036\nProject Name: ROCKY MOUNT - WILSON 115 KV TRANSMISSION LINE, UPGRADE TERMINAL EQUIPMENT\nDescription: Upgrade terminal equipment at both ends of the Rocky Mt - Wilson 115 kV transmission line. This project is listed as conceptual in the local transmission plan.\nSupporting Statement: Various contingencies cause the Wilson - Elm City Solar Tap section of the Rocky - Mount Wilson 115 kV transmission line to overload.\nLocated: ROCKY MOUNT = OSM substation 'Rocky Mount Substation' (NC); WILSON ~ Wilson County, NC (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2772,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Duke Energy Progress","state":"NC","name":"Vanderbilt –- West Asheville 115 Kv Line, 115 Kv Cb And Switches, Upgrade","type":"transmission line","voltage_kv":115,"location_ref":"Vanderbilt –- West Asheville (NC)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":23,"raw_excerpt":"SERTP DUKE PROGRESS WEST Balancing Authority Area, page 23.\nIn-Service Year: 2027\nProject Name: VANDERBILT –- WEST ASHEVILLE 115 KV LINE, 115 KV CB AND SWITCHES, UPGRADE\nDescription: Replace the following equipment at Vanderbilt 115kV Substation: 1-115kV Breaker, 2 sets of 115kV disconnects, and 1-115kV switch. Also uprate CT ratios at Vanderbilt and West Asheville substations.\nSupporting Statement: Outage of the Craggy-West Asheville 115kV Line can cause the Vanderbilt-West Asheville 115kV Line to overload.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2265,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dutc Bn","state":"WY","name":"Dutchman Solar generation and BESS (Batteries, Solar Photovoltaic, 998 MW)","type":"generation","voltage_kv":null,"location_ref":"Dutchman Solar generation and BESS, Converse County, WY","lat":42.871644,"lng":-105.8176,"route":null,"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1914, 1915. Plant 68317 Dutchman Solar generation and BESS (DUTC bn, LLC), Converse County, WY; balancing authority WACM. Planned operation 2029-06.\nGenerator DUTC1: 499 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction\nGenerator DUTC2: 499 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":734,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Dynegy Oakland","state":"CA","name":"Dynegy Oakland Power Plant (Batteries, 43.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Dynegy Oakland Power Plant, Alameda County, CA","lat":37.79675,"lng":-122.2819,"route":null,"cost_usd":null,"start_date":"2028-05-01","end_date":"2028-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1513. Plant 6211 Dynegy Oakland Power Plant (Dynegy Oakland, LLC), Alameda County, CA; balancing authority CISO. Planned operation 2028-05.\nGenerator GEN4: 43.3 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1171,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"DYSP","state":"KY","name":"Dyers Spring Solar (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Dyers Spring Solar, Breckinridge County, KY","lat":37.688411,"lng":-86.26927,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2027. Plant 68290 Dyers Spring Solar (DYSP, LLC), Breckinridge County, KY; balancing authority LGEE. Planned operation 2029-12.\nGenerator DYSP: 200 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":674,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Eagl Bn","state":"AZ","name":"Eagle Eye Solar and Storage (Batteries, Solar Photovoltaic, 800 MW)","type":"generation","voltage_kv":null,"location_ref":"Eagle Eye Solar and Storage, La Paz County, AZ","lat":33.727,"lng":-112.881,"route":null,"cost_usd":null,"start_date":"2028-05-01","end_date":"2028-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1526, 1527. Plant 68287 Eagle Eye Solar and Storage (EAGL bn, LLC), La Paz County, AZ; balancing authority WALC. Planned operation 2028-05.\nGenerator EAGL1: 400 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction\nGenerator EAGL2: 400 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1262,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Eagle Creek Solar Park","state":"MI","name":"Eagle Creek Solar Park LLC (Solar Photovoltaic, 120 MW)","type":"generation","voltage_kv":null,"location_ref":"Eagle Creek Solar Park LLC, Saginaw County, MI","lat":43.308523,"lng":-84.21895,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 719. Plant 68898 Eagle Creek Solar Park LLC (Eagle Creek Solar Park LLC), Saginaw County, MI; balancing authority MISO. Planned operation 2027-03.\nGenerator ECS1: 120 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":793,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"East Avenue Q Solar Project 2022","state":"CA","name":"Palmdale Water District HQ (Solar Photovoltaic, 1.7 MW)","type":"generation","voltage_kv":null,"location_ref":"Palmdale Water District HQ, Los Angeles County, CA","lat":34.587916,"lng":-118.0931,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 235. Plant 68541 Palmdale Water District HQ (East Avenue Q Solar Project 2022, LLC), Los Angeles County, CA; balancing authority CISO. Planned operation 2026-10.\nGenerator 7169: 1.7 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":792,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"East Avenue South Solar Project 2022","state":"CA","name":"Palmdale Water District 6MG Tank (Batteries, Solar Photovoltaic, 1.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Palmdale Water District 6MG Tank, Los Angeles County, CA","lat":34.558047,"lng":-118.1187,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 361, 362. Plant 68542 Palmdale Water District 6MG Tank (East Avenue South Solar Project 2022, LLC), Los Angeles County, CA; balancing authority CISO. Planned operation 2026-11.\nGenerator 7170B: 0.3 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator 7170G: 1 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1897,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"East Bernard","state":"TX","name":"East Bernard (Batteries, 9.5 MW)","type":"generation","voltage_kv":null,"location_ref":"East Bernard, Wharton County, TX","lat":29.52854,"lng":-96.07052,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 408. Plant 69903 East Bernard (East Bernard LLC), Wharton County, TX; balancing authority ERCO. Planned operation 2026-11.\nGenerator EBERN: 9.5 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1169,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"East Kentucky Power Coop","state":"KY","name":"Cooperative Solar Three-Marion (Solar Photovoltaic, 96 MW)","type":"generation","voltage_kv":null,"location_ref":"Cooperative Solar Three-Marion, Marion County, KY","lat":37.605113,"lng":-85.24824,"route":null,"cost_usd":null,"start_date":"2027-08-01","end_date":"2027-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 982. Plant 69742 Cooperative Solar Three-Marion (East Kentucky Power Coop, Inc), Marion County, KY; balancing authority PJM. Planned operation 2027-08.\nGenerator PV3: 96 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1170,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"East Kentucky Power Coop","state":"KY","name":"Cooperative Solar Two-Fayette (Solar Photovoltaic, 40 MW)","type":"generation","voltage_kv":null,"location_ref":"Cooperative Solar Two-Fayette, Fayette County, KY","lat":38.035403,"lng":-84.31579,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1147. Plant 69741 Cooperative Solar Two-Fayette (East Kentucky Power Coop, Inc), Fayette County, KY; balancing authority PJM. Planned operation 2027-11.\nGenerator PV2: 40 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1180,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"East Kentucky Power Coop","state":"KY","name":"Liberty Station (Natural Gas Internal Combustion Engine, 217.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Liberty Station, Casey County, KY","lat":37.369331,"lng":-84.95767,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1815, 1816, 1817, 1818, 1819, 1820, 1821, 1822, 1823, 1824, 1825, 1826. Plant 69726 Liberty Station (East Kentucky Power Coop, Inc), Casey County, KY; balancing authority PJM. Planned operation 2028-12.\nGenerator L1: 18.1 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator L10: 18.1 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator L11: 18.1 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator L12: 18.1 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator L2: 18.1 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator L3: 18.1 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator L4: 18.1 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator L5: 18.1 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator L6: 18.1 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator L7: 18.1 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator L8: 18.1 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator L9: 18.1 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2156,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"East Point Energy","state":"VA","name":"Bethlehem Energy Center, LLC - (VA) (Batteries, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"Bethlehem Energy Center, LLC - (VA), Prince William County, VA","lat":38.781889,"lng":-77.5426,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 307. Plant 70231 Bethlehem Energy Center, LLC - (VA) (East Point Energy, LLC), Prince William County, VA; balancing authority PJM. Planned operation 2026-10.\nGenerator BETHL: 20 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2171,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"East Point Energy","state":"VA","name":"Evergreen Energy Center, LLC (Batteries, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"Evergreen Energy Center, LLC, Loudoun County, VA","lat":39.044885,"lng":-77.58191,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 170. Plant 70232 Evergreen Energy Center, LLC (East Point Energy, LLC), Loudoun County, VA; balancing authority PJM. Planned operation 2026-09.\nGenerator EVERG: 20 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2185,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"East Point Energy","state":"VA","name":"Railroad Energy Center, LLC (Batteries, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"Railroad Energy Center, LLC, Prince William County, VA","lat":38.781689,"lng":-77.54202,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 308. Plant 70233 Railroad Energy Center, LLC (East Point Energy, LLC), Prince William County, VA; balancing authority PJM. Planned operation 2026-10.\nGenerator RAILR: 20 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2187,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"East Point Energy","state":"VA","name":"Reid Energy Center, LLC (Batteries, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"Reid Energy Center, LLC, Prince William County, VA","lat":38.729874,"lng":-77.59242,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 591. Plant 70234 Reid Energy Center, LLC (East Point Energy, LLC), Prince William County, VA; balancing authority PJM. Planned operation 2026-12.\nGenerator REID: 20 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2151,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ecg Utah Solar1","state":"UT","name":"Utah Solar 1 (Solar Photovoltaic, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Utah Solar 1, Millard County, UT","lat":39.504761,"lng":-112.5077,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1254. Plant 66426 Utah Solar 1 (ECG Utah Solar1, LLC), Millard County, UT; balancing authority LDWP. Planned operation 2027-12.\nGenerator 1EUS: 300 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1899,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Echols Grove","state":"TX","name":"Echols Grove Solar (Solar Photovoltaic, 201 MW)","type":"generation","voltage_kv":null,"location_ref":"Echols Grove Solar, Lamar County, TX","lat":33.616471,"lng":-95.45837,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1345. Plant 68902 Echols Grove Solar (Echols Grove LLC), Lamar County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator ECHPV: 201 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1401,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ecoplexus","state":"NC","name":"Westminister NC (Solar Photovoltaic, 60 MW)","type":"generation","voltage_kv":null,"location_ref":"Westminister NC, Rutherford County, NC","lat":35.452,"lng":-81.919,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1743. Plant 63567 Westminister NC (Ecoplexus, Inc), Rutherford County, NC; balancing authority DUK. Planned operation 2028-12.\nGenerator WSMTR: 60 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2204,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ecos Energy","state":"VT","name":"Apple Hill Solar (Solar Photovoltaic, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"Apple Hill Solar, Bennington County, VT","lat":42.9077,"lng":-73.2041,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 441. Plant 61037 Apple Hill Solar (Ecos Energy LLC), Bennington County, VT; balancing authority ISNE. Planned operation 2026-12.\nGenerator APPL: 2 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":689,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Edf Renewables Development","state":"AZ","name":"Sawtooth Solar (Batteries, Solar Photovoltaic, 500 MW)","type":"generation","voltage_kv":null,"location_ref":"Sawtooth Solar, Pinal County, AZ","lat":32.728,"lng":-111.629,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1574, 1575. Plant 68883 Sawtooth Solar (EDF Renewables Development, Inc.), Pinal County, AZ; balancing authority AZPS. Planned operation 2028-06.\nGenerator STBA: 250 MW Batteries; (L) Regulatory approvals pending. Not under construction\nGenerator STPV: 250 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":776,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Edf Renewables Development","state":"CA","name":"Lycan Solar Project (Solar Photovoltaic, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"Lycan Solar Project, Riverside County, CA","lat":33.621326,"lng":-115.0959,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1261. Plant 66805 Lycan Solar Project (EDF Renewables Development, Inc.), Riverside County, CA; balancing authority CISO. Planned operation 2027-12.\nGenerator LYCAN: 400 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":777,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Edf Renewables Development","state":"CA","name":"Lycan Solar Project (Batteries, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"Lycan Solar Project, Riverside County, CA","lat":33.621326,"lng":-115.0959,"route":null,"cost_usd":null,"start_date":"2030-04-01","end_date":"2030-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2058. Plant 66805 Lycan Solar Project (EDF Renewables Development, Inc.), Riverside County, CA; balancing authority CISO. Planned operation 2030-04.\nGenerator LYCN2: 400 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":945,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Edf Renewables Development","state":"GA","name":"Rock House Solar (Solar Photovoltaic, 250 MW)","type":"generation","voltage_kv":null,"location_ref":"Rock House Solar, McDuffie County, GA","lat":33.4481,"lng":-82.4039,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1135. Plant 67226 Rock House Solar (EDF Renewables Development, Inc.), McDuffie County, GA; balancing authority SOCO. Planned operation 2027-11.\nGenerator ROCKH: 250 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1463,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Edf Renewables Development","state":"NV","name":"Bonanza Solar and Storage Project (Batteries, Solar Photovoltaic, 495 MW)","type":"generation","voltage_kv":null,"location_ref":"Bonanza Solar and Storage Project, Clark County, NV","lat":36.558,"lng":-115.799,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1269, 1270. Plant 66908 Bonanza Solar and Storage Project (EDF Renewables Development, Inc.), Clark County, NV; balancing authority CISO. Planned operation 2027-12.\nGenerator BZES: 195 MW Batteries; (L) Regulatory approvals pending. Not under construction\nGenerator BZPV: 300 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1522,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Edf Renewables Development","state":"NY","name":"Homer Solar Energy Center (Solar Photovoltaic, 90 MW)","type":"generation","voltage_kv":null,"location_ref":"Homer Solar Energy Center, Cortland County, NY","lat":42.658652,"lng":-76.09993,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1131. Plant 65052 Homer Solar Energy Center (EDF Renewables Development, Inc.), Cortland County, NY; balancing authority NYIS. Planned operation 2027-11.\nGenerator HSEC: 90 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1591,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Edf Renewables Development","state":"NY","name":"Tracy Solar Energy Center (Solar Photovoltaic, 119 MW)","type":"generation","voltage_kv":null,"location_ref":"Tracy Solar Energy Center, Jefferson County, NY","lat":44.175939,"lng":-75.98513,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1130. Plant 65051 Tracy Solar Energy Center (EDF Renewables Development, Inc.), Jefferson County, NY; balancing authority NYIS. Planned operation 2027-11.\nGenerator TSEC: 119 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1609,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Edf Renewables Development","state":"OH","name":"Eastern Cottontail Solar (Solar Photovoltaic, 220 MW)","type":"generation","voltage_kv":null,"location_ref":"Eastern Cottontail Solar, Fairfield County, OH","lat":39.844172,"lng":-82.49453,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1799. Plant 69108 Eastern Cottontail Solar (EDF Renewables Development, Inc.), Fairfield County, OH; balancing authority PJM. Planned operation 2028-12.\nGenerator COT01: 220 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2006,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Edinburg Ess Assets","state":"TX","name":"North Edinburg BESS 1 (Batteries, 10 MW)","type":"generation","voltage_kv":null,"location_ref":"North Edinburg BESS 1, Hidalgo County, TX","lat":26.347194,"lng":-98.18844,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 383. Plant 69253 North Edinburg BESS 1 (Edinburg ESS Assets LLC), Hidalgo County, TX; balancing authority ERCO. Planned operation 2026-11.\nGenerator NEBA1: 10 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":735,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Edpr Ca Solar Park Vi","state":"CA","name":"EDPR CA Solar Park VI LLC (CA) Hybrid (Batteries, Solar Photovoltaic, 241 MW)","type":"generation","voltage_kv":null,"location_ref":"EDPR CA Solar Park VI LLC (CA) Hybrid, Fresno County, CA","lat":36.62543,"lng":-120.3789,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 193, 194. Plant 62892 EDPR CA Solar Park VI LLC (CA) Hybrid (EDPR CA Solar Park VI LLC), Fresno County, CA; balancing authority CISO. Planned operation 2026-10.\nGenerator SONR2: 40 MW Batteries; (TS) Construction complete, but not yet in commercial operation\nGenerator SONRI: 201 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2221,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Edp Renewables North America","state":"WA","name":"Saddle Mountain East Wind Farm (Onshore Wind Turbine, 126 MW)","type":"generation","voltage_kv":null,"location_ref":"Saddle Mountain East Wind Farm, Adams County, WA","lat":46.789,"lng":-119.346,"route":null,"cost_usd":null,"start_date":"2029-10-01","end_date":"2029-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1980. Plant 62263 Saddle Mountain East Wind Farm (EDP Renewables North America LLC), Adams County, WA; balancing authority AVA. Planned operation 2029-10.\nGenerator GEN1: 126 MW Onshore Wind Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":736,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Edpr Scarlet Iii","state":"CA","name":"EDPR Scarlet III (Batteries, 70 MW)","type":"generation","voltage_kv":null,"location_ref":"EDPR Scarlet III, Fresno County, CA","lat":36.608742,"lng":-120.3511,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 577. Plant 69947 EDPR Scarlet III (EDPR Scarlet III LLC), Fresno County, CA; balancing authority CISO. Planned operation 2026-12.\nGenerator GEN05: 70 MW Batteries; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1902,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Eldora Energy","state":"TX","name":"Eldora Energy LLC (Batteries, Solar Photovoltaic, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"Eldora Energy LLC, Matagorda County, TX","lat":28.865989,"lng":-96.12169,"route":null,"cost_usd":null,"start_date":"2028-07-01","end_date":"2028-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1592, 1593. Plant 65847 Eldora Energy LLC (Eldora Energy LLC), Matagorda County, TX; balancing authority ERCO. Planned operation 2028-07.\nGenerator ELDBS: 200 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator ELDPV: 200 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1903,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Elio Energy","state":"TX","name":"Elio Energy LLC (Batteries, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Elio Energy LLC, Brazoria County, TX","lat":29.247678,"lng":-95.68546,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1241. Plant 65850 Elio Energy LLC (Elio Energy LLC), Brazoria County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator ELIBS: 300 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1133,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Elliot Solar","state":"IN","name":"Elliot Solar LLC (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Elliot Solar LLC, Gibson County, IN","lat":38.316297,"lng":-87.42793,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2008. Plant 64904 Elliot Solar LLC (Elliot Solar LLC), Gibson County, IN; balancing authority MISO. Planned operation 2029-12.\nGenerator 1: 200 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1939,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ellomay Usa","state":"TX","name":"Hillsboro Solar Project (Solar Photovoltaic, 10 MW)","type":"generation","voltage_kv":null,"location_ref":"Hillsboro Solar Project, Hill County, TX","lat":32.029636,"lng":-97.14555,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 114, 115. Plant 69262 Hillsboro Solar Project (Ellomay USA Inc), Hill County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator HILL1: 5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete\nGenerator HILL2: 5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1024,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ember Sun Pv","state":"IL","name":"Ember Sun LLC PV (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Ember Sun LLC PV, McDonough County, IL","lat":40.489341,"lng":-90.69128,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 179. Plant 70447 Ember Sun LLC PV (Ember Sun LLC PV), McDonough County, IL; balancing authority MISO. Planned operation 2026-09.\nGenerator 45629: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2229,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Emerald Bluffs Solar Park","state":"WI","name":"Emerald Bluffs Solar Park (Solar Photovoltaic, 225 MW)","type":"generation","voltage_kv":null,"location_ref":"Emerald Bluffs Solar Park, Juneau County, WI","lat":43.764276,"lng":-90.01398,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1806. Plant 69450 Emerald Bluffs Solar Park (Emerald Bluffs Solar Park LLC), Juneau County, WI; balancing authority MISO. Planned operation 2028-12.\nGenerator GEN01: 225 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":751,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Emeren Us","state":"CA","name":"Gibson Solar Project - Hybrid (Batteries, Solar Photovoltaic, 26 MW)","type":"generation","voltage_kv":null,"location_ref":"Gibson Solar Project - Hybrid, Yolo County, CA","lat":38.678386,"lng":-121.9876,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1284, 1285. Plant 67836 Gibson Solar Project - Hybrid (Emeren US, LLC), Yolo County, CA; balancing authority CISO. Planned operation 2027-12.\nGenerator GSP1: 13 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction\nGenerator GSP2: 13 MW Batteries; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1505,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Emerson Solar","state":"NY","name":"Emerson NY (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Emerson NY, Columbia County, NY","lat":42.275414,"lng":-73.73512,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1342. Plant 68862 Emerson NY (Emerson Solar, LLC), Columbia County, NY; balancing authority NYIS. Planned operation 2027-12.\nGenerator PV1: 5 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1243,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Emery Meadow Solar Station","state":"ME","name":"Emery Meadow Solar Station (Solar Photovoltaic, 16.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Emery Meadow Solar Station, York County, ME","lat":43.643433,"lng":-70.55837,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1235. Plant 65366 Emery Meadow Solar Station (Emery Meadow Solar Station, LLC), York County, ME; balancing authority ISNE. Planned operation 2027-12.\nGenerator EMSS: 16.4 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1406,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Emmons-logan Energy Storage","state":"ND","name":"Emmons-Logan Energy Storage (Batteries, 140 MW)","type":"generation","voltage_kv":null,"location_ref":"Emmons-Logan Energy Storage, Emmons County, ND","lat":46.372883,"lng":-99.9784,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 564. Plant 69878 Emmons-Logan Energy Storage (Emmons-Logan Energy Storage, LLC), Emmons County, ND; balancing authority MISO. Planned operation 2026-12.\nGenerator 5869: 140 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1162,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Empire District Electric","state":"KS","name":"Riverton (Natural Gas Fired Combustion Turbine, 27 MW)","type":"generation","voltage_kv":null,"location_ref":"Riverton, Cherokee County, KS","lat":37.072616,"lng":-94.6987,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 13, 14. Plant 1239 Riverton (Empire District Electric Co), Cherokee County, KS; balancing authority SWPP. Planned operation 2026-09.\nGenerator 13: 13.5 MW Natural Gas Fired Combustion Turbine; (TS) Construction complete, but not yet in commercial operation\nGenerator 14: 13.5 MW Natural Gas Fired Combustion Turbine; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1507,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Empire Offshore Wind","state":"NY","name":"Empire Wind 1 (Offshore Wind Turbine, 810 MW)","type":"generation","voltage_kv":null,"location_ref":"Empire Wind 1, Kings County, NY","lat":40.32,"lng":-73.42,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1017. Plant 68443 Empire Wind 1 (Empire Offshore Wind LLC), Kings County, NY; balancing authority NYIS. Planned operation 2027-09.\nGenerator EMP01: 810 MW Offshore Wind Turbine; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1906,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Enbridge Solar (sequoia Ii)","state":"TX","name":"Enbridge Solar (Sequoia II) (Solar Photovoltaic, 415 MW)","type":"generation","voltage_kv":null,"location_ref":"Enbridge Solar (Sequoia II), Callahan County, TX","lat":32.341078,"lng":-99.17308,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 527. Plant 69272 Enbridge Solar (Sequoia II) (Enbridge Solar (Sequoia II), LLC), Callahan County, TX; balancing authority ERCO. Planned operation 2026-12.\nGenerator SEQII: 415 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1898,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Enbridge Wind (easter)","state":"TX","name":"Easter (Onshore Wind Turbine, 152 MW)","type":"generation","voltage_kv":null,"location_ref":"Easter, Castro County, TX","lat":34.668882,"lng":-102.3517,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 683. Plant 59971 Easter (Enbridge Wind (Easter), LLC), Castro County, TX; balancing authority ERCO. Planned operation 2027-03.\nGenerator ESTR1: 152 MW Onshore Wind Turbine; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1508,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Endicott Ny Solar Farm","state":"NY","name":"Endicott (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Endicott, Broome County, NY","lat":42.139575,"lng":-76.09664,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1339. Plant 68859 Endicott (Endicott NY Solar Farm, LLC), Broome County, NY; balancing authority NYIS. Planned operation 2027-12.\nGenerator PV1: 5 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2065,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Enel Green Power Roseland Solar","state":"TX","name":"Roseland Solar Project, LLC (Solar Photovoltaic, 500 MW)","type":"generation","voltage_kv":null,"location_ref":"Roseland Solar Project, LLC, Falls County, TX","lat":31.461242,"lng":-96.82493,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 27. Plant 65028 Roseland Solar Project, LLC (Enel Green Power Roseland Solar, LLC), Falls County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator ROSES: 500 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1218,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Energizar Storage","state":"MA","name":"Energizar BESS (Batteries, 250 MW)","type":"generation","voltage_kv":null,"location_ref":"Energizar BESS, Suffolk County, MA","lat":42.39556,"lng":-71.02218,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1031. Plant 69721 Energizar BESS (Energizar Storage LLC), Suffolk County, MA; balancing authority ISNE. Planned operation 2027-09.\nGenerator BESS1: 250 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":742,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Enersmart Storage","state":"CA","name":"EnerSmart Mesa Heights Sub Station (Batteries, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"EnerSmart Mesa Heights Sub Station, San Diego County, CA","lat":32.82412,"lng":-117.1513,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 466. Plant 66552 EnerSmart Mesa Heights Sub Station (EnerSmart Storage), San Diego County, CA; balancing authority CISO. Planned operation 2026-12.\nGenerator MH162: 3 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":857,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Engie Distributed Renewables Development","state":"CO","name":"Keenesburg (Solar Photovoltaic, 7.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Keenesburg, Weld County, CO","lat":40.187364,"lng":-104.5061,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 424. Plant 70333 Keenesburg (ENGIE Distributed Renewables Development LLC), Weld County, CO; balancing authority PSCO. Planned operation 2026-11.\nGenerator KBPV1: 7.2 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":896,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Engie Distributed Renewables Development","state":"CT","name":"Windsor Locks (Solar Photovoltaic, 1.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Windsor Locks, Hartford County, CT","lat":41.928086,"lng":-72.68693,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 403. Plant 69807 Windsor Locks (ENGIE Distributed Renewables Development LLC), Hartford County, CT; balancing authority ISNE. Planned operation 2026-11.\nGenerator WNSRL: 1.8 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1059,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Engie Distributed Renewables Development","state":"IL","name":"Menard 1 (Solar Photovoltaic, 2.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Menard 1, Menard County, IL","lat":40.089,"lng":-89.723,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1052. Plant 69804 Menard 1 (ENGIE Distributed Renewables Development LLC), Menard County, IL; balancing authority MISO. Planned operation 2027-09.\nGenerator MEPV1: 2.8 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1087,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Engie Distributed Renewables Development","state":"IL","name":"Rockford Plant 7 (Solar Photovoltaic, 1.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Rockford Plant 7, Winnebago County, IL","lat":42.232527,"lng":-89.02408,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 728. Plant 69805 Rockford Plant 7 (ENGIE Distributed Renewables Development LLC), Winnebago County, IL; balancing authority PJM. Planned operation 2027-03.\nGenerator RFRD7: 1.5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1630,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Engie Distributed Renewables Development","state":"OH","name":"Trenton Solar - (OH) (Solar Photovoltaic, 9.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Trenton Solar - (OH), Butler County, OH","lat":39.455321,"lng":-84.46788,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 832. Plant 69819 Trenton Solar - (OH) (ENGIE Distributed Renewables Development LLC), Butler County, OH; balancing authority PJM. Planned operation 2027-05.\nGenerator TRNTN: 9.5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1716,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Engie Distributed Renewables Development","state":"PA","name":"Maple Ridge A (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Maple Ridge A, Franklin County, PA","lat":39.901992,"lng":-77.578,"route":null,"cost_usd":null,"start_date":"2028-04-01","end_date":"2028-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1511. Plant 69970 Maple Ridge A (ENGIE Distributed Renewables Development LLC), Franklin County, PA; balancing authority PJM. Planned operation 2028-04.\nGenerator MPLRA: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1717,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Engie Distributed Renewables Development","state":"PA","name":"Maple Ridge B (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Maple Ridge B, Franklin County, PA","lat":39.901992,"lng":-77.578,"route":null,"cost_usd":null,"start_date":"2028-04-01","end_date":"2028-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1512. Plant 69971 Maple Ridge B (ENGIE Distributed Renewables Development LLC), Franklin County, PA; balancing authority PJM. Planned operation 2028-04.\nGenerator MPLRB: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":787,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Engie North America","state":"CA","name":"Noosa Energy Storage LLC (Batteries, 99 MW)","type":"generation","voltage_kv":null,"location_ref":"Noosa Energy Storage LLC, San Joaquin County, CA","lat":37.756292,"lng":-121.1481,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 24. Plant 64531 Noosa Energy Storage LLC (Engie North America), San Joaquin County, CA; balancing authority CISO. Planned operation 2026-09.\nGenerator KOV4A: 99 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1856,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Engie North America","state":"TX","name":"Castor (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Castor, Brazoria County, TX","lat":29.150279,"lng":-95.65118,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 32. Plant 65870 Castor (Engie North America), Brazoria County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator CASTR: 200 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2013,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Engie North America","state":"TX","name":"Octans (Batteries, 125 MW)","type":"generation","voltage_kv":null,"location_ref":"Octans, Pecos County, TX","lat":31.000575,"lng":-102.6799,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1756. Plant 65590 Octans (Engie North America), Pecos County, TX; balancing authority ERCO. Planned operation 2028-12.\nGenerator OCTNS: 125 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2137,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Engie North America","state":"TX","name":"Zeya (Batteries, 250 MW)","type":"generation","voltage_kv":null,"location_ref":"Zeya, Galveston County, TX","lat":29.388758,"lng":-94.94793,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 33. Plant 65880 Zeya (Engie North America), Galveston County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator ZEYA: 250 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":902,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Engie Solidago Solar","state":"DE","name":"ENGIE Solidago Solar Project - Hybrid (Batteries, 12.5 MW)","type":"generation","voltage_kv":null,"location_ref":"ENGIE Solidago Solar Project - Hybrid, New Castle County, DE","lat":39.395187,"lng":-75.7535,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 852. Plant 65304 ENGIE Solidago Solar Project - Hybrid (ENGIE Solidago Solar LLC), New Castle County, DE; balancing authority PJM. Planned operation 2027-06.\nGenerator BESS: 12.5 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":637,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Entergy Arkansas","state":"AR","name":"Arkansas Cypress Solar Station (Batteries, Solar Photovoltaic, 950 MW)","type":"generation","voltage_kv":null,"location_ref":"Arkansas Cypress Solar Station, Jefferson County, AR","lat":34.42,"lng":-92.08,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1845, 1846. Plant 69989 Arkansas Cypress Solar Station (Entergy Arkansas LLC), Jefferson County, AR; balancing authority MISO. Planned operation 2029-01.\nGenerator PB1: 600 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated\nGenerator PB2: 350 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":644,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Entergy Arkansas","state":"AR","name":"Ironwood Power Station (Natural Gas Fired Combustion Turbine, 467.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Ironwood Power Station, Hot Spring County, AR","lat":34.433826,"lng":-92.9042,"route":null,"cost_usd":null,"start_date":"2028-07-01","end_date":"2028-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1623. Plant 69750 Ironwood Power Station (Entergy Arkansas LLC), Hot Spring County, AR; balancing authority MISO. Planned operation 2028-07.\nGenerator 1A: 467.3 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":645,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Entergy Arkansas","state":"AR","name":"Jefferson Power Station (Natural Gas Fired Combined Cycle, 820 MW)","type":"generation","voltage_kv":null,"location_ref":"Jefferson Power Station, Jefferson County, AR","lat":34.427527,"lng":-92.13996,"route":null,"cost_usd":null,"start_date":"2029-11-01","end_date":"2029-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1997, 1998. Plant 69185 Jefferson Power Station (Entergy Arkansas LLC), Jefferson County, AR; balancing authority MISO. Planned operation 2029-11.\nGenerator JPS1: 342 MW Natural Gas Fired Combined Cycle; (L) Regulatory approvals pending. Not under construction\nGenerator JPSCT: 478 MW Natural Gas Fired Combined Cycle; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1188,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Entergy Louisiana","state":"LA","name":"Bogalusa West Solar Station (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Bogalusa West Solar Station, Washington County, LA","lat":30.84,"lng":-89.86,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1830. Plant 69990 Bogalusa West Solar Station (Entergy Louisiana LLC), Washington County, LA; balancing authority MISO. Planned operation 2028-12.\nGenerator BW1: 200 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1189,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Entergy Louisiana","state":"LA","name":"Cypress Harvest Solar Station (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Cypress Harvest Solar Station, Iberville County, LA","lat":30.237835,"lng":-91.26486,"route":null,"cost_usd":null,"start_date":"2028-08-01","end_date":"2028-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1650. Plant 69952 Cypress Harvest Solar Station (Entergy Louisiana LLC), Iberville County, LA; balancing authority MISO. Planned operation 2028-08.\nGenerator CH1: 200 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1190,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Entergy Louisiana","state":"LA","name":"Cypress Harvest Solar Station (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Cypress Harvest Solar Station, Iberville County, LA","lat":30.237835,"lng":-91.26486,"route":null,"cost_usd":null,"start_date":"2029-09-01","end_date":"2029-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1979. Plant 69952 Cypress Harvest Solar Station (Entergy Louisiana LLC), Iberville County, LA; balancing authority MISO. Planned operation 2029-09.\nGenerator CH2: 200 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1193,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Entergy Louisiana","state":"LA","name":"Franklin Farms 1&2 (Natural Gas Fired Combined Cycle, 1560.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Franklin Farms 1&2, Richland County, LA","lat":32.53246,"lng":-91.62767,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1781, 1782, 1783, 1784. Plant 68214 Franklin Farms 1&2 (Entergy Louisiana LLC), Richland County, LA; balancing authority MISO. Planned operation 2028-12.\nGenerator 1A: 469.3 MW Natural Gas Fired Combined Cycle; (L) Regulatory approvals pending. Not under construction\nGenerator 1B: 311 MW Natural Gas Fired Combined Cycle; (L) Regulatory approvals pending. Not under construction\nGenerator 2A: 469.3 MW Natural Gas Fired Combined Cycle; (L) Regulatory approvals pending. Not under construction\nGenerator 2B: 311 MW Natural Gas Fired Combined Cycle; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1199,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Entergy Louisiana","state":"LA","name":"Pointe Coupee Power Station (Natural Gas Fired Combined Cycle, 780.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Pointe Coupee Power Station, Pointe Coupee County, LA","lat":30.739,"lng":-91.377,"route":null,"cost_usd":null,"start_date":"2031-10-01","end_date":"2031-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2288, 2289. Plant 69944 Pointe Coupee Power Station (Entergy Louisiana LLC), Pointe Coupee County, LA; balancing authority MISO. Planned operation 2031-10.\nGenerator PC1A: 469.3 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator PC1B: 311 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1200,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Entergy Louisiana","state":"LA","name":"Pointe Coupee Power Station (Natural Gas Fired Combined Cycle, 780.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Pointe Coupee Power Station, Pointe Coupee County, LA","lat":30.739,"lng":-91.377,"route":null,"cost_usd":null,"start_date":"2031-11-01","end_date":"2031-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2293, 2294. Plant 69944 Pointe Coupee Power Station (Entergy Louisiana LLC), Pointe Coupee County, LA; balancing authority MISO. Planned operation 2031-11.\nGenerator PC2A: 469.3 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator PC2B: 311 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1201,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Entergy Louisiana","state":"LA","name":"Pointe Coupee Power Station (Natural Gas Fired Combined Cycle, 780.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Pointe Coupee Power Station, Pointe Coupee County, LA","lat":30.739,"lng":-91.377,"route":null,"cost_usd":null,"start_date":"2031-12-01","end_date":"2031-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2303, 2304. Plant 69944 Pointe Coupee Power Station (Entergy Louisiana LLC), Pointe Coupee County, LA; balancing authority MISO. Planned operation 2031-12.\nGenerator PC3A: 469.3 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator PC3B: 311 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1202,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Entergy Louisiana","state":"LA","name":"Richland Parish Power Station 1&2 (Natural Gas Fired Combined Cycle, 1560.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Richland Parish Power Station 1&2, Richland County, LA","lat":32.468339,"lng":-91.68038,"route":null,"cost_usd":null,"start_date":"2030-03-01","end_date":"2030-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2054, 2055, 2056, 2057. Plant 69449 Richland Parish Power Station 1&2 (Entergy Louisiana LLC), Richland County, LA; balancing authority MISO. Planned operation 2030-03.\nGenerator 1A: 469.3 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator 1B: 311 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator 2A: 469.3 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator 2B: 311 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1203,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Entergy Louisiana","state":"LA","name":"Richland Parish Power Station 3 (Natural Gas Fired Combined Cycle, 780.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Richland Parish Power Station 3, Richland County, LA","lat":32.496716,"lng":-91.69867,"route":null,"cost_usd":null,"start_date":"2030-10-01","end_date":"2030-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2091, 2092. Plant 69649 Richland Parish Power Station 3 (Entergy Louisiana LLC), Richland County, LA; balancing authority MISO. Planned operation 2030-10.\nGenerator 3A: 469.3 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator 3B: 311 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1204,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Entergy Louisiana","state":"LA","name":"Richland Parish Power Station 4 (Natural Gas Fired Combined Cycle, 780.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Richland Parish Power Station 4, Richland County, LA","lat":32.497782,"lng":-91.6997,"route":null,"cost_usd":null,"start_date":"2030-10-01","end_date":"2030-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2093, 2094. Plant 69650 Richland Parish Power Station 4 (Entergy Louisiana LLC), Richland County, LA; balancing authority MISO. Planned operation 2030-10.\nGenerator 4A: 469.3 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator 4B: 311 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1210,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Entergy Louisiana","state":"LA","name":"Waterford 5 (Natural Gas Fired Combined Cycle, 820 MW)","type":"generation","voltage_kv":null,"location_ref":"Waterford 5, St Charles County, LA","lat":29.988583,"lng":-90.48565,"route":null,"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1919, 1920. Plant 69184 Waterford 5 (Entergy Louisiana LLC), St Charles County, LA; balancing authority MISO. Planned operation 2029-06.\nGenerator WF5CT: 478 MW Natural Gas Fired Combined Cycle; (T) Regulatory approvals received. Not under construction\nGenerator WF5ST: 342 MW Natural Gas Fired Combined Cycle; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1211,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Entergy Louisiana","state":"LA","name":"Waterford 6 (Natural Gas Fired Combined Cycle, 820 MW)","type":"generation","voltage_kv":null,"location_ref":"Waterford 6, St Charles County, LA","lat":29.988583,"lng":-90.48565,"route":null,"cost_usd":null,"start_date":"2030-06-01","end_date":"2030-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2070, 2071. Plant 69445 Waterford 6 (Entergy Louisiana LLC), St Charles County, LA; balancing authority MISO. Planned operation 2030-06.\nGenerator CT1: 478 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator ST1: 342 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1212,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Entergy Louisiana","state":"LA","name":"Westlake Power Station (Natural Gas Fired Combined Cycle, 819.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Westlake Power Station, Calcasieu County, LA","lat":30.281105,"lng":-93.30189,"route":null,"cost_usd":null,"start_date":"2030-10-01","end_date":"2030-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2089, 2090. Plant 69426 Westlake Power Station (Entergy Louisiana LLC), Calcasieu County, LA; balancing authority MISO. Planned operation 2030-10.\nGenerator CA1: 341.7 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator CT1: 477.7 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2076,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Entergy Louisiana","state":"TX","name":"Segno Solar Station (Solar Photovoltaic, 170 MW)","type":"generation","voltage_kv":null,"location_ref":"Segno Solar Station, Polk County, TX","lat":30.577,"lng":-94.686,"route":null,"cost_usd":null,"start_date":"2029-03-01","end_date":"2029-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1872. Plant 69991 Segno Solar Station (Entergy Louisiana LLC), Polk County, TX; balancing authority MISO. Planned operation 2029-03.\nGenerator SN1: 170 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2120,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Entergy Louisiana","state":"TX","name":"Votaw Solar Station (Solar Photovoltaic, 141 MW)","type":"generation","voltage_kv":null,"location_ref":"Votaw Solar Station, Hardin County, TX","lat":30.4355,"lng":-94.673,"route":null,"cost_usd":null,"start_date":"2029-05-01","end_date":"2029-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1897. Plant 69993 Votaw Solar Station (Entergy Louisiana LLC), Hardin County, TX; balancing authority MISO. Planned operation 2029-05.\nGenerator VT1: 141 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1191,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Entergy Mississippi","state":"LA","name":"Delta Solar Plant (Solar Photovoltaic, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"Delta Solar Plant, Bolivar County, LA","lat":33.794007,"lng":-90.71392,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1140. Plant 68028 Delta Solar Plant (Entergy Mississippi LLC), Bolivar County, LA; balancing authority MISO. Planned operation 2027-11.\nGenerator DSP: 80 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1333,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Entergy Mississippi","state":"MS","name":"Delta Blues Advanced Power Station (Natural Gas Fired Combined Cycle, 818.7 MW)","type":"generation","voltage_kv":null,"location_ref":"Delta Blues Advanced Power Station, Washington County, MS","lat":33.330476,"lng":-91.13058,"route":null,"cost_usd":null,"start_date":"2028-05-01","end_date":"2028-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1523, 1524. Plant 67914 Delta Blues Advanced Power Station (Entergy Mississippi LLC), Washington County, MS; balancing authority MISO. Planned operation 2028-05.\nGenerator 1A: 477 MW Natural Gas Fired Combined Cycle; (L) Regulatory approvals pending. Not under construction\nGenerator 1C: 341.7 MW Natural Gas Fired Combined Cycle; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1346,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Entergy Mississippi","state":"MS","name":"Penton Solar Plant (Solar Photovoltaic, 190 MW)","type":"generation","voltage_kv":null,"location_ref":"Penton Solar Plant, DeSoto County, MS","lat":34.861567,"lng":-90.263,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1469. Plant 68029 Penton Solar Plant (Entergy Mississippi LLC), DeSoto County, MS; balancing authority MISO. Planned operation 2028-03.\nGenerator PSP: 190 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1353,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Entergy Mississippi","state":"MS","name":"Traceview Advanced Power Station (Natural Gas Fired Combined Cycle, 819.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Traceview Advanced Power Station, Madison County, MS","lat":32.405646,"lng":-90.22114,"route":null,"cost_usd":null,"start_date":"2028-08-01","end_date":"2028-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1651, 1652. Plant 70187 Traceview Advanced Power Station (Entergy Mississippi LLC), Madison County, MS; balancing authority MISO. Planned operation 2028-08.\nGenerator CT1: 477.7 MW Natural Gas Fired Combined Cycle; (U) Under construction, less than or equal to 50 percent complete\nGenerator ST1: 341.7 MW Natural Gas Fired Combined Cycle; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1354,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Entergy Mississippi","state":"MS","name":"Vicksburg Advanced Power Station (Natural Gas Fired Combined Cycle, 819.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Vicksburg Advanced Power Station, Warren County, MS","lat":32.28526,"lng":-90.92568,"route":null,"cost_usd":null,"start_date":"2028-08-01","end_date":"2028-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1641, 1642. Plant 69223 Vicksburg Advanced Power Station (Entergy Mississippi LLC), Warren County, MS; balancing authority MISO. Planned operation 2028-08.\nGenerator GT1: 477.7 MW Natural Gas Fired Combined Cycle; (U) Under construction, less than or equal to 50 percent complete\nGenerator ST1: 341.7 MW Natural Gas Fired Combined Cycle; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1208,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Entergy New Orleans","state":"LA","name":"Sherwood Forest BESS (Batteries, 7.7 MW)","type":"generation","voltage_kv":null,"location_ref":"Sherwood Forest BESS, Orleans County, LA","lat":30.01266,"lng":-89.94403,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 959. Plant 69992 Sherwood Forest BESS (Entergy New Orleans, LLC), Orleans County, LA; balancing authority MISO. Planned operation 2027-07.\nGenerator BA1: 7.7 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1970,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Entergy Texas","state":"TX","name":"Legend Power Station (Natural Gas Fired Combined Cycle, 754 MW)","type":"generation","voltage_kv":null,"location_ref":"Legend Power Station, Jefferson County, TX","lat":29.880219,"lng":-93.99573,"route":null,"cost_usd":null,"start_date":"2028-07-01","end_date":"2028-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1605. Plant 68053 Legend Power Station (Entergy Texas Inc.), Jefferson County, TX; balancing authority ERCO. Planned operation 2028-07.\nGenerator LEG: 754 MW Natural Gas Fired Combined Cycle; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1974,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Entergy Texas","state":"TX","name":"Lone Star Power Station (Natural Gas Fired Combustion Turbine, 467.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Lone Star Power Station, San Jacinto County, TX","lat":30.414158,"lng":-95.01671,"route":null,"cost_usd":null,"start_date":"2028-07-01","end_date":"2028-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1621. Plant 69077 Lone Star Power Station (Entergy Texas Inc.), San Jacinto County, TX; balancing authority MISO. Planned operation 2028-07.\nGenerator 1A: 467.3 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2014,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Entergy Texas","state":"TX","name":"Orange County Advanced Power Station (Natural Gas Fired Combined Cycle, 1306 MW)","type":"generation","voltage_kv":null,"location_ref":"Orange County Advanced Power Station, Orange County, TX","lat":30.025251,"lng":-93.87134,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 44, 45, 46. Plant 66621 Orange County Advanced Power Station (Entergy Texas Inc.), Orange County, TX; balancing authority MISO. Planned operation 2026-09.\nGenerator 1A: 453 MW Natural Gas Fired Combined Cycle; (TS) Construction complete, but not yet in commercial operation\nGenerator 1B: 453 MW Natural Gas Fired Combined Cycle; (TS) Construction complete, but not yet in commercial operation\nGenerator 1C: 400 MW Natural Gas Fired Combined Cycle; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":744,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Enterprise Bess","state":"CA","name":"Enterprise BESS (Batteries, 54.1 MW)","type":"generation","voltage_kv":null,"location_ref":"Enterprise BESS, San Diego County, CA","lat":33.12181,"lng":-117.1174,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1347. Plant 68923 Enterprise BESS (Enterprise BESS LLC), San Diego County, CA; balancing authority CISO. Planned operation 2027-12.\nGenerator ENTB: 54.1 MW Batteries; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":680,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Enviromission","state":"AZ","name":"La Paz Solar Tower (Solar Thermal without Energy Storage, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"La Paz Solar Tower, La Paz County, AZ","lat":33.917222,"lng":-114.2675,"route":null,"cost_usd":null,"start_date":"2030-06-01","end_date":"2030-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2064. Plant 58652 La Paz Solar Tower (Enviromission, Inc), La Paz County, AZ; balancing authority WALC. Planned operation 2030-06.\nGenerator 1: 200 MW Solar Thermal without Energy Storage; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1907,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Erath County Solar","state":"TX","name":"Erath County Solar (Solar Photovoltaic, 204 MW)","type":"generation","voltage_kv":null,"location_ref":"Erath County Solar, Erath County, TX","lat":32.089488,"lng":-98.17853,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1766. Plant 67353 Erath County Solar (Erath County Solar LLC), Erath County, TX; balancing authority ERCO. Planned operation 2028-12.\nGenerator 4666: 204 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1336,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ergon Refining","state":"MS","name":"Ergon Refining Vicksburg (Natural Gas Fired Combustion Turbine, 15.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Ergon Refining Vicksburg, Warren County, MS","lat":32.388271,"lng":-90.90834,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 997, 998. Plant 54918 Ergon Refining Vicksburg (Ergon Refining Inc), Warren County, MS; balancing authority MISO. Planned operation 2027-09.\nGenerator TM02: 7.9 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete\nGenerator TM03: 7.9 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1908,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Erin Solar","state":"TX","name":"Erin (Solar Photovoltaic, 202 MW)","type":"generation","voltage_kv":null,"location_ref":"Erin, Wharton County, TX","lat":29.163,"lng":-96.013,"route":null,"cost_usd":null,"start_date":"2029-10-01","end_date":"2029-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1983. Plant 68275 Erin (Erin Solar LLC), Wharton County, TX; balancing authority ERCO. Planned operation 2029-10.\nGenerator 1: 202 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2205,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Essex Vt Bess 1","state":"VT","name":"Essex VT BESS 1 (Batteries, 16 MW)","type":"generation","voltage_kv":null,"location_ref":"Essex VT BESS 1, Chittenden County, VT","lat":44.483701,"lng":-73.10717,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 553. Plant 69602 Essex VT BESS 1 (Essex VT BESS 1 LLC), Chittenden County, VT; balancing authority ISNE. Planned operation 2026-12.\nGenerator 90918: 16 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1158,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Evergy Kansas Central","state":"KS","name":"McNew Generating Station (Natural Gas Fired Combined Cycle, 765 MW)","type":"generation","voltage_kv":null,"location_ref":"McNew Generating Station, Reno County, KS","lat":38.00595,"lng":-97.92166,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2048. Plant 68295 McNew Generating Station (Evergy Kansas Central, Inc), Reno County, KS; balancing authority SWPP. Planned operation 2030-01.\nGenerator MCN1: 765 MW Natural Gas Fired Combined Cycle; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1164,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Evergy Kansas Central","state":"KS","name":"Viola Generating Station (Natural Gas Fired Combined Cycle, 765 MW)","type":"generation","voltage_kv":null,"location_ref":"Viola Generating Station, Sumner County, KS","lat":37.331481,"lng":-97.67,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1841. Plant 68294 Viola Generating Station (Evergy Kansas Central, Inc), Sumner County, KS; balancing authority SWPP. Planned operation 2029-01.\nGenerator VIO1: 765 MW Natural Gas Fired Combined Cycle; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1163,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Evergy Missouri West","state":"KS","name":"Sunflower Sky Energy Center (Solar Photovoltaic, 65 MW)","type":"generation","voltage_kv":null,"location_ref":"Sunflower Sky Energy Center, Wilson County, KS","lat":37.502223,"lng":-95.64868,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 829. Plant 69631 Sunflower Sky Energy Center (Evergy Missouri West), Wilson County, KS; balancing authority SWPP. Planned operation 2027-05.\nGenerator SFS01: 65 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1317,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Evergy Missouri West","state":"MO","name":"Foxtrot Solar Energy LLC (Solar Photovoltaic, 108.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Foxtrot Solar Energy LLC, Jasper County, MO","lat":37.352,"lng":-94.606,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 636. Plant 69481 Foxtrot Solar Energy LLC (Evergy Missouri West), Jasper County, MO; balancing authority SWPP. Planned operation 2027-01.\nGenerator FXTRT: 108.9 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1325,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Evergy Missouri West","state":"MO","name":"Mullin Creek #1 Generating Station (Natural Gas Fired Combustion Turbine, 489.7 MW)","type":"generation","voltage_kv":null,"location_ref":"Mullin Creek #1 Generating Station, Nodaway County, MO","lat":38.00595,"lng":-97.92166,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2049. Plant 68296 Mullin Creek #1 Generating Station (Evergy Missouri West), Nodaway County, MO; balancing authority SWPP. Planned operation 2030-01.\nGenerator MC1: 489.7 MW Natural Gas Fired Combustion Turbine; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1909,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Evlou Solar","state":"TX","name":"Evlou Solar, LLC (Batteries, Solar Photovoltaic, 500 MW)","type":"generation","voltage_kv":null,"location_ref":"Evlou Solar, LLC, El Paso County, TX","lat":31.507744,"lng":-106.0534,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1430, 1431. Plant 70034 Evlou Solar, LLC (Evlou Solar, LLC), El Paso County, TX; balancing authority EPE. Planned operation 2028-01.\nGenerator ES: 250 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete\nGenerator ESS: 250 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1509,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Excelsior Energy Center","state":"NY","name":"Excelsior Energy Center (Solar Photovoltaic, 280 MW)","type":"generation","voltage_kv":null,"location_ref":"Excelsior Energy Center, Genesee County, NY","lat":43.064852,"lng":-78.07681,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 360. Plant 68507 Excelsior Energy Center (Excelsior Energy Center, LLC), Genesee County, NY; balancing authority NYIS. Planned operation 2026-11.\nGenerator EEC: 280 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2033,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Fermi America","state":"TX","name":"Project Matador Gas Plant (PMG) (Natural Gas Fired Combustion Turbine, 120 MW)","type":"generation","voltage_kv":null,"location_ref":"Project Matador Gas Plant (PMG), Carson County, TX","lat":35.283762,"lng":-101.569,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 886, 887, 888. Plant 69799 Project Matador Gas Plant (PMG) (Fermi America), Carson County, TX; balancing authority ERCO. Planned operation 2027-06.\nGenerator G6B01: 40 MW Natural Gas Fired Combustion Turbine; (T) Regulatory approvals received. Not under construction\nGenerator G6B02: 40 MW Natural Gas Fired Combustion Turbine; (T) Regulatory approvals received. Not under construction\nGenerator G6B03: 40 MW Natural Gas Fired Combustion Turbine; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2034,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Fermi America","state":"TX","name":"Project Matador Gas Plant (PMG) (Natural Gas Fired Combined Cycle, Natural Gas Fired Combustion Turbine, 1692.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Project Matador Gas Plant (PMG), Carson County, TX","lat":35.283762,"lng":-101.569,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1039, 1040, 1041, 1042, 1043, 1044, 1045, 1046, 1047, 1048, 1049, 1050, 1051. Plant 69799 Project Matador Gas Plant (PMG) (Fermi America), Carson County, TX; balancing authority ERCO. Planned operation 2027-09.\nGenerator F1G01: 260 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator F1G02: 260 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator F1G03: 260 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator F2G01: 260 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator F2G02: 260 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator F2G03: 260 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator TM001: 18.9 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator TM002: 18.9 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator TM003: 18.9 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator TM004: 18.9 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator TM005: 18.9 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator TM006: 18.9 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator TM007: 18.9 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2035,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Fermi America","state":"TX","name":"Project Matador Gas Plant (PMG) (Natural Gas Fired Combined Cycle, 1035 MW)","type":"generation","voltage_kv":null,"location_ref":"Project Matador Gas Plant (PMG), Carson County, TX","lat":35.283762,"lng":-101.569,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1366, 1367, 1368, 1369, 1370, 1371, 1372, 1373, 1374, 1375, 1376, 1377, 1378. Plant 69799 Project Matador Gas Plant (PMG) (Fermi America), Carson County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator F1S01: 105 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator F1S02: 105 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator F1S03: 105 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator F2S01: 105 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator F2S02: 105 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator F2S03: 105 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator FBG01: 50 MW Natural Gas Fired Combined Cycle; (U) Under construction, less than or equal to 50 percent complete\nGenerator FBG02: 50 MW Natural Gas Fired Combined Cycle; (U) Under construction, less than or equal to 50 percent complete\nGenerator FBG03: 50 MW Natural Gas Fired Combined Cycle; (U) Under construction, less than or equal to 50 percent complete\nGenerator FBG04: 50 MW Natural Gas Fired Combined Cycle; (U) Under construction, less than or equal to 50 percent complete\nGenerator FBG05: 50 MW Natural Gas Fired Combined Cycle; (U) Under construction, less than or equal to 50 percent complete\nGenerator FBG06: 50 MW Natural Gas Fired Combined Cycle; (U) Under construction, less than or equal to 50 percent complete\nGenerator FBS01: 105 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2036,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Fermi America","state":"TX","name":"Project Matador Gas Plant (PMG) (Natural Gas Fired Combined Cycle, 8832 MW)","type":"generation","voltage_kv":null,"location_ref":"Project Matador Gas Plant (PMG), Carson County, TX","lat":35.283762,"lng":-101.569,"route":null,"cost_usd":null,"start_date":"2030-12-01","end_date":"2030-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2136, 2137, 2138, 2139, 2140, 2141, 2142, 2143, 2144, 2145, 2146, 2147, 2148, 2149, 2150, 2151, 2152, 2153, 2154, 2155, 2156, 2157, 2158, 2159, 2160, 2161, 2162, 2163, 2164, 2165, 2166, 2167, 2168, 2169, 2170, 2171, 2172, 2173, 2174, 2175, 2176, 2177, 2178, 2179, 2180, 2181, 2182, 2183, 2184, 2185, 2186, 2187, 2188, 2189, 2190, 2191, 2192, 2193, 2194, 2195, 2196, 2197, 2198, 2199, 2200, 2201, 2202, 2203, 2204, 2205, 2206, 2207, 2208, 2209, 2210, 2211, 2212, 2213, 2214, 2215, 2216, 2217, 2218, 2219, 2220, 2221, 2222, 2223, 2224, 2225, 2226, 2227, 2228, 2229, 2230, 2231, 2232, 2233, 2234, 2235, 2236, 2237, 2238, 2239, 2240, 2241, 2242, 2243, 2244, 2245, 2246, 2247, 2248, 2249, 2250, 2251, 2252, 2253, 2254, 2255, 2256, 2257, 2258, 2259, 2260, 2261, 2262, 2263. Plant 69799 Project Matador Gas Plant (PMG) (Fermi America), Carson County, TX; balancing authority ERCO. Planned operation 2030-12.\nGenerator EG001: 57 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator EG002: 57 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator EG003: 57 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator EG004: 57 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator EG005: 57 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator EG006: 57 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator EG007: 57 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator EG008: 57 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator EG009: 57 MW Natural Gas Fired Combined Cycle; (P)","reviewed":false,"approximate":false,"requires_review":false},{"id":2037,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Fermi Nuclear","state":"TX","name":"Project Matador Nuclear (Nuclear, 2234 MW)","type":"generation","voltage_kv":null,"location_ref":"Project Matador Nuclear, Carson County, TX","lat":35.283762,"lng":-101.569,"route":null,"cost_usd":null,"start_date":"2031-12-01","end_date":"2031-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2301, 2302. Plant 69798 Project Matador Nuclear (Fermi Nuclear), Carson County, TX; balancing authority ERCO. Planned operation 2031-12.\nGenerator PMN1: 1117 MW Nuclear; (P) Planned for installation, but regulatory approvals not initiated\nGenerator PMN3: 1117 MW Nuclear; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2038,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Fermi Nuclear","state":"TX","name":"Project Matador Nuclear (Nuclear, 2234 MW)","type":"generation","voltage_kv":null,"location_ref":"Project Matador Nuclear, Carson County, TX","lat":35.283762,"lng":-101.569,"route":null,"cost_usd":null,"start_date":"2032-12-01","end_date":"2032-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2306, 2307. Plant 69798 Project Matador Nuclear (Fermi Nuclear), Carson County, TX; balancing authority ERCO. Planned operation 2032-12.\nGenerator PMN2: 1117 MW Nuclear; (P) Planned for installation, but regulatory approvals not initiated\nGenerator PMN4: 1117 MW Nuclear; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1232,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Fe Taft","state":"MA","name":"Taft BESS (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Taft BESS, Worcester County, MA","lat":42.03383,"lng":-71.60374,"route":null,"cost_usd":null,"start_date":"2027-02-01","end_date":"2027-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 661. Plant 69723 Taft BESS (FE Taft LLC), Worcester County, MA; balancing authority ISNE. Planned operation 2027-02.\nGenerator BESS1: 200 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1919,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Fge Goodnight Ii","state":"TX","name":"Goodnight Wind II (Onshore Wind Turbine, 265.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Goodnight Wind II, Armstrong County, TX","lat":34.937162,"lng":-101.4339,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 825. Plant 69403 Goodnight Wind II (FGE Goodnight II, LLC), Armstrong County, TX; balancing authority ERCO. Planned operation 2027-05.\nGenerator GOOD2: 265.5 MW Onshore Wind Turbine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1610,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Firelands Wind","state":"OH","name":"Firelands Wind (Onshore Wind Turbine, 297 MW)","type":"generation","voltage_kv":null,"location_ref":"Firelands Wind, Huron County, OH","lat":41.210325,"lng":-82.77908,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 817. Plant 68186 Firelands Wind (Firelands Wind, LLC), Huron County, OH; balancing authority PJM. Planned operation 2027-05.\nGenerator FIRE: 297 MW Onshore Wind Turbine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1467,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Fish Lake Geothermal","state":"NV","name":"Fish Lake Geothermal (Geothermal, 26.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Fish Lake Geothermal, Esmeralda County, NV","lat":37.860925,"lng":-118.0341,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1001, 1002, 1003, 1004, 1005. Plant 66618 Fish Lake Geothermal (Fish Lake Geothermal LLC), Esmeralda County, NV; balancing authority NEVP. Planned operation 2027-09.\nGenerator FL1: 3.3 MW Geothermal; (P) Planned for installation, but regulatory approvals not initiated\nGenerator FL2: 3.3 MW Geothermal; (P) Planned for installation, but regulatory approvals not initiated\nGenerator FL3: 4.7 MW Geothermal; (P) Planned for installation, but regulatory approvals not initiated\nGenerator FL4: 6.2 MW Geothermal; (P) Planned for installation, but regulatory approvals not initiated\nGenerator FL5: 9 MW Geothermal; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1912,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Flatland Solar Energy","state":"TX","name":"Flatland Solar (Solar Photovoltaic, 180 MW)","type":"generation","voltage_kv":null,"location_ref":"Flatland Solar, Scurry County, TX","lat":32.618367,"lng":-100.9789,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1161. Plant 70183 Flatland Solar (Flatland Solar Energy, LLC), Scurry County, TX; balancing authority ERCO. Planned operation 2027-11.\nGenerator FSPV: 180 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1611,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Flint","state":"OH","name":"Flint (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Flint, Franklin County, OH","lat":40.09639,"lng":-82.73361,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 940. Plant 68911 Flint (Flint), Franklin County, OH; balancing authority PJM. Planned operation 2027-07.\nGenerator 27288: 200 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1511,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Flint Mine Solar","state":"NY","name":"Flint Mine Solar (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Flint Mine Solar, Greene County, NY","lat":42.313611,"lng":-73.84556,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1459. Plant 67090 Flint Mine Solar (Flint Mine Solar, LLC), Greene County, NY; balancing authority NYIS. Planned operation 2028-03.\nGenerator FMS: 100 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1027,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Flora Solar","state":"IL","name":"Flora Solar (Solar Photovoltaic, 125 MW)","type":"generation","voltage_kv":null,"location_ref":"Flora Solar, Clay County, IL","lat":38.648852,"lng":-88.51444,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1287. Plant 67937 Flora Solar (Flora Solar, LLC), Clay County, IL; balancing authority PJM. Planned operation 2027-12.\nGenerator FLOSO: 125 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":908,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Florida Power & Light","state":"FL","name":"Ambersweet (Solar Photovoltaic, 74.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Ambersweet, Indian River County, FL","lat":27.567468,"lng":-80.62782,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 769. Plant 68829 Ambersweet (Florida Power & Light Co), Indian River County, FL; balancing authority FPL. Planned operation 2027-04.\nGenerator 1: 74.5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":911,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Florida Power & Light","state":"FL","name":"Catfish (Solar Photovoltaic, 74.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Catfish, Okeechobee County, FL","lat":27.277731,"lng":-80.78854,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 934. Plant 68830 Catfish (Florida Power & Light Co), Okeechobee County, FL; balancing authority FPL. Planned operation 2027-07.\nGenerator 1: 74.5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":913,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Florida Power & Light","state":"FL","name":"Cocoplum (Solar Photovoltaic, 74.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Cocoplum, Hendry County, FL","lat":26.762027,"lng":-81.1907,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 935. Plant 68831 Cocoplum (Florida Power & Light Co), Hendry County, FL; balancing authority FPL. Planned operation 2027-07.\nGenerator 1: 74.5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":914,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Florida Power & Light","state":"FL","name":"County Line (Solar Photovoltaic, 74.5 MW)","type":"generation","voltage_kv":null,"location_ref":"County Line, DeSoto County, FL","lat":27.110556,"lng":-81.80083,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 770. Plant 68832 County Line (Florida Power & Light Co), DeSoto County, FL; balancing authority FPL. Planned operation 2027-04.\nGenerator 1: 74.5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":917,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Florida Power & Light","state":"FL","name":"Hardwood Hammock (Solar Photovoltaic, 74.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Hardwood Hammock, Walton County, FL","lat":27.282662,"lng":-81.77522,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 936. Plant 68833 Hardwood Hammock (Florida Power & Light Co), Walton County, FL; balancing authority FPL. Planned operation 2027-07.\nGenerator 1: 74.5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":918,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Florida Power & Light","state":"FL","name":"Hendry (Solar Photovoltaic, 74.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Hendry, Hendry County, FL","lat":26.410345,"lng":-81.03189,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 629. Plant 68834 Hendry (Florida Power & Light Co), Hendry County, FL; balancing authority FPL. Planned operation 2027-01.\nGenerator 1: 74.5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":921,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Florida Power & Light","state":"FL","name":"Joshua Creek (Solar Photovoltaic, 74.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Joshua Creek, DeSoto County, FL","lat":27.282662,"lng":-81.77522,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1100. Plant 68835 Joshua Creek (Florida Power & Light Co), DeSoto County, FL; balancing authority FPL. Planned operation 2027-10.\nGenerator 1: 74.5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":924,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Florida Power & Light","state":"FL","name":"Maple Trail (Solar Photovoltaic, 74.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Maple Trail, Baker County, FL","lat":30.314392,"lng":-82.18501,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 937. Plant 68836 Maple Trail (Florida Power & Light Co), Baker County, FL; balancing authority FPL. Planned operation 2027-07.\nGenerator 1: 74.5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":926,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Florida Power & Light","state":"FL","name":"Middle Lake (Solar Photovoltaic, 74.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Middle Lake, Madison County, FL","lat":30.380511,"lng":-83.34074,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 768. Plant 68824 Middle Lake (Florida Power & Light Co), Madison County, FL; balancing authority FPL. Planned operation 2027-04.\nGenerator 1: 74.5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":929,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Florida Power & Light","state":"FL","name":"Pinecone (Solar Photovoltaic, 74.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Pinecone, Calhoun County, FL","lat":30.439415,"lng":-85.25499,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1097. Plant 68825 Pinecone (Florida Power & Light Co), Calhoun County, FL; balancing authority FPL. Planned operation 2027-10.\nGenerator 1: 74.5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":931,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Florida Power & Light","state":"FL","name":"Saddle (Solar Photovoltaic, 74.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Saddle, Calhoun County, FL","lat":30.439415,"lng":-85.25499,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1098. Plant 68826 Saddle (Florida Power & Light Co), Calhoun County, FL; balancing authority FPL. Planned operation 2027-10.\nGenerator 1: 74.5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":933,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Florida Power & Light","state":"FL","name":"Spanish Moss (Solar Photovoltaic, 74.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Spanish Moss, St Lucie County, FL","lat":27.509782,"lng":-80.56447,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1099. Plant 68827 Spanish Moss (Florida Power & Light Co), St Lucie County, FL; balancing authority FPL. Planned operation 2027-10.\nGenerator 1: 74.5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":934,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Florida Power & Light","state":"FL","name":"Tangelo (Solar Photovoltaic, 74.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Tangelo, Okeechobee County, FL","lat":27.507993,"lng":-80.73651,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 628. Plant 68828 Tangelo (Florida Power & Light Co), Okeechobee County, FL; balancing authority FPL. Planned operation 2027-01.\nGenerator 1: 74.5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":626,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Foley Solar","state":"AL","name":"Foley Solar, LLC (Solar Photovoltaic, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"Foley Solar, LLC, Baldwin County, AL","lat":30.377488,"lng":-87.72751,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 217. Plant 68002 Foley Solar, LLC (Foley Solar, LLC), Baldwin County, AL; balancing authority SOCO. Planned operation 2026-10.\nGenerator FOLEY: 80 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":739,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Form Energy","state":"CA","name":"East Road Storage Project (Batteries, 1 MW)","type":"generation","voltage_kv":null,"location_ref":"East Road Storage Project, Mendocino County, CA","lat":39.25,"lng":-123.196,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 860. Plant 67565 East Road Storage Project (Form Energy Inc.), Mendocino County, CA; balancing authority CISO. Planned operation 2027-06.\nGenerator CEC01: 1 MW Batteries; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":854,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Fortress Solar 1","state":"CO","name":"Fortress 1 (Batteries, Solar Photovoltaic, 398.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Fortress 1, Morgan County, CO","lat":40.26,"lng":-103.57,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1474, 1475, 1476. Plant 69278 Fortress 1 (Fortress Solar 1 LLC), Morgan County, CO; balancing authority PSCO. Planned operation 2028-03.\nGenerator 1: 199 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction\nGenerator 2: 150 MW Batteries; (L) Regulatory approvals pending. Not under construction\nGenerator 3: 49.9 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1440,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Four Mile Mesa Solar","state":"NM","name":"Four Mile Mesa Solar, LLC (Batteries, Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Four Mile Mesa Solar, LLC, San Juan County, NM","lat":36.8685,"lng":-108.277,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 957, 958. Plant 69966 Four Mile Mesa Solar, LLC (Four Mile Mesa Solar, LLC), San Juan County, NM; balancing authority PNM. Planned operation 2027-07.\nGenerator FMM: 100 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete\nGenerator FMMS: 100 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1441,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Foxtail Flats Solar","state":"NM","name":"Foxtail Flats Solar, LLC (Batteries, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"Foxtail Flats Solar, LLC, San Juan County, NM","lat":36.8685,"lng":-108.277,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 834. Plant 69967 Foxtail Flats Solar, LLC (Foxtail Flats Solar, LLC), San Juan County, NM; balancing authority PNM. Planned operation 2027-05.\nGenerator FTB: 80 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1442,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Foxtail Flats Solar","state":"NM","name":"Foxtail Flats Solar, LLC (Solar Photovoltaic, 170 MW)","type":"generation","voltage_kv":null,"location_ref":"Foxtail Flats Solar, LLC, San Juan County, NM","lat":36.8685,"lng":-108.277,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 891. Plant 69967 Foxtail Flats Solar, LLC (Foxtail Flats Solar, LLC), San Juan County, NM; balancing authority PNM. Planned operation 2027-06.\nGenerator FTS: 170 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":898,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Fps Cedar Creek Solar","state":"DE","name":"Cedar Creek Solar (Solar Photovoltaic, 114 MW)","type":"generation","voltage_kv":null,"location_ref":"Cedar Creek Solar, New Castle County, DE","lat":39.37259,"lng":-75.56455,"route":null,"cost_usd":null,"start_date":"2028-07-01","end_date":"2028-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1590. Plant 64543 Cedar Creek Solar (FPS Cedar Creek Solar LLC), New Castle County, DE; balancing authority PJM. Planned operation 2028-07.\nGenerator 1: 114 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1561,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Fps Potic Solar","state":"NY","name":"Potic Solar (Solar Photovoltaic, 4.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Potic Solar, Greene County, NY","lat":42.29559,"lng":-73.9012,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 922. Plant 64541 Potic Solar (FPS Potic Solar LLC), Greene County, NY; balancing authority NYIS. Planned operation 2027-07.\nGenerator 1: 4.9 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1295,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Franklin Heating Station","state":"MN","name":"Franklin Heating Station (Natural Gas Fired Combined Cycle, Petroleum Liquids, 24.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Franklin Heating Station, Olmsted County, MN","lat":44.020576,"lng":-92.4656,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 795, 796, 797, 798, 799, 800. Plant 54224 Franklin Heating Station (Franklin Heating Station), Olmsted County, MN; balancing authority MISO. Planned operation 2027-05.\nGenerator CTG1: 7.5 MW Natural Gas Fired Combined Cycle; (U) Under construction, less than or equal to 50 percent complete\nGenerator EG11: 3.4 MW Petroleum Liquids; (U) Under construction, less than or equal to 50 percent complete\nGenerator EG12: 3.4 MW Petroleum Liquids; (U) Under construction, less than or equal to 50 percent complete\nGenerator EG13: 3.4 MW Petroleum Liquids; (U) Under construction, less than or equal to 50 percent complete\nGenerator EG14: 3.4 MW Petroleum Liquids; (U) Under construction, less than or equal to 50 percent complete\nGenerator EG15: 3.4 MW Petroleum Liquids; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1296,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Franklin Heating Station","state":"MN","name":"Franklin Heating Station (Petroleum Liquids, 3.1 MW)","type":"generation","voltage_kv":null,"location_ref":"Franklin Heating Station, Olmsted County, MN","lat":44.020576,"lng":-92.4656,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1419. Plant 54224 Franklin Heating Station (Franklin Heating Station), Olmsted County, MN; balancing authority MISO. Planned operation 2028-01.\nGenerator DG9: 3.1 MW Petroleum Liquids; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1245,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Freedom Pine Solar","state":"ME","name":"Freedom Pine Solar (Solar Photovoltaic, 250 MW)","type":"generation","voltage_kv":null,"location_ref":"Freedom Pine Solar, York County, ME","lat":43.34779,"lng":-70.8974,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1842. Plant 68491 Freedom Pine Solar (Freedom Pine Solar, LLC), York County, ME; balancing authority ISNE. Planned operation 2029-01.\nGenerator FPS: 250 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":905,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Freepoint Commodities","state":"DE","name":"Raceway Solar (Solar Photovoltaic, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"Raceway Solar, Kent County, DE","lat":38.909956,"lng":-75.58819,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 918. Plant 63846 Raceway Solar (Freepoint Commodities LLC), Kent County, DE; balancing authority PJM. Planned operation 2027-07.\nGenerator RACE: 50 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2206,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Freepoint Commodities","state":"VT","name":"Fair Haven Solar (Solar Photovoltaic, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"Fair Haven Solar, Rutland County, VT","lat":43.636,"lng":-73.279,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1485. Plant 69667 Fair Haven Solar (Freepoint Commodities LLC), Rutland County, VT; balancing authority ISNE. Planned operation 2028-03.\nGenerator FHS1: 20 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2208,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Freepoint Commodities","state":"VT","name":"Shaftsbury Solar (Solar Photovoltaic, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"Shaftsbury Solar, Bennington County, VT","lat":42.96463,"lng":-73.16841,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1744. Plant 64064 Shaftsbury Solar (Freepoint Commodities LLC), Bennington County, VT; balancing authority ISNE. Planned operation 2028-12.\nGenerator SHAFT: 20 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2109,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Freestone Solar","state":"TX","name":"Timber Cove Solar (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Timber Cove Solar, Freestone County, TX","lat":31.870589,"lng":-96.15247,"route":null,"cost_usd":null,"start_date":"2028-05-01","end_date":"2028-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1518. Plant 66922 Timber Cove Solar (Freestone Solar LLC), Freestone County, TX; balancing authority ERCO. Planned operation 2028-05.\nGenerator 59957: 100 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2142,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Fremont Solar","state":"UT","name":"Fremont Solar (Batteries, Solar Photovoltaic, 297 MW)","type":"generation","voltage_kv":null,"location_ref":"Fremont Solar, Iron County, UT","lat":37.9789,"lng":-112.7761,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1300, 1301. Plant 68153 Fremont Solar (Fremont Solar, LLC), Iron County, UT; balancing authority PACE. Planned operation 2027-12.\nGenerator BA1: 198 MW Batteries; (U) Under construction, less than or equal to 50 percent complete\nGenerator PV1: 99 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1264,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Freshwater Solar","state":"MI","name":"Freshwater Solar, LLC (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Freshwater Solar, LLC, Montcalm County, MI","lat":43.338197,"lng":-85.04013,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 881. Plant 69169 Freshwater Solar, LLC (Freshwater Solar LLC), Montcalm County, MI; balancing authority MISO. Planned operation 2027-06.\nGenerator FWS: 200 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1263,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Freshwater Solar Ii","state":"MI","name":"Freshwater Solar II, LLC (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Freshwater Solar II, LLC, Montcalm County, MI","lat":43.310581,"lng":-85.05159,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1352. Plant 69170 Freshwater Solar II, LLC (Freshwater Solar II, LLC), Montcalm County, MI; balancing authority MISO. Planned operation 2027-12.\nGenerator FW2: 100 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1174,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Fron Bn","state":"KY","name":"Frontier Solar (Solar Photovoltaic, 120 MW)","type":"generation","voltage_kv":null,"location_ref":"Frontier Solar, Washington County, KY","lat":37.605063,"lng":-85.24822,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1093. Plant 68293 Frontier Solar (FRON bn, LLC), Washington County, KY; balancing authority LGEE. Planned operation 2027-10.\nGenerator FRON: 120 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":915,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Frp Forest Trail Solar","state":"FL","name":"FRP Forest Trail Solar (Solar Photovoltaic, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"FRP Forest Trail Solar, Duval County, FL","lat":30.440764,"lng":-81.83423,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 546. Plant 69548 FRP Forest Trail Solar (FRP Forest Trail Solar LLC), Duval County, FL; balancing authority JEA. Planned operation 2026-12.\nGenerator SFE: 50 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":916,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Frp Miller Solar","state":"FL","name":"FRP Miller Solar (Batteries, Solar Photovoltaic, 124.5 MW)","type":"generation","voltage_kv":null,"location_ref":"FRP Miller Solar, Duval County, FL","lat":30.320634,"lng":-81.91274,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 555, 556. Plant 69626 FRP Miller Solar (FRP Miller Solar LLC), Duval County, FL; balancing authority JEA. Planned operation 2026-12.\nGenerator BMF: 50 MW Batteries; (U) Under construction, less than or equal to 50 percent complete\nGenerator SMF: 74.5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1913,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Funston Solar","state":"TX","name":"Funston Solar (Solar Photovoltaic, 350 MW)","type":"generation","voltage_kv":null,"location_ref":"Funston Solar, Jones County, TX","lat":32.783669,"lng":-99.72019,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 475. Plant 67359 Funston Solar (Funston Solar, LLC), Jones County, TX; balancing authority ERCO. Planned operation 2026-12.\nGenerator 4666: 350 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1443,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gallegos Wind Farm","state":"NM","name":"Gallegos Wind Farm, Phase 1 (Onshore Wind Turbine, 190 MW)","type":"generation","voltage_kv":null,"location_ref":"Gallegos Wind Farm, Phase 1, Union County, NM","lat":36.580281,"lng":-103.849,"route":null,"cost_usd":null,"start_date":"2028-11-01","end_date":"2028-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1703. Plant 59047 Gallegos Wind Farm, Phase 1 (Gallegos Wind Farm LLC), Union County, NM; balancing authority PNM. Planned operation 2028-11.\nGenerator GEN 1: 190 MW Onshore Wind Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1917,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gatsby Energy Storage","state":"TX","name":"Gatsby Energy Storage Project (Batteries, 103.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Gatsby Energy Storage Project, Pecos County, TX","lat":30.664176,"lng":-101.7801,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 717. Plant 68428 Gatsby Energy Storage Project (Gatsby Energy Storage LLC), Pecos County, TX; balancing authority ERCO. Planned operation 2027-03.\nGenerator GTSBY: 103.4 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1762,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Geb Solar","state":"SC","name":"GEB Solar (Solar Photovoltaic, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"GEB Solar, Darlington County, SC","lat":34.412367,"lng":-80.04192,"route":null,"cost_usd":null,"start_date":"2028-11-01","end_date":"2028-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1707. Plant 62217 GEB Solar (GEB Solar), Darlington County, SC; balancing authority CPLE. Planned operation 2028-11.\nGenerator 40: 50 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":988,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Generate Capital","state":"IL","name":"Arlington 1 (Solar Photovoltaic, 4.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Arlington 1, Bureau County, IL","lat":41.454037,"lng":-89.29509,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 249. Plant 69174 Arlington 1 (Generate Capital), Bureau County, IL; balancing authority MISO. Planned operation 2026-10.\nGenerator 11238: 4.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":989,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Generate Capital","state":"IL","name":"Arlington 2 (Solar Photovoltaic, 4.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Arlington 2, Bureau County, IL","lat":41.454503,"lng":-89.29475,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 250. Plant 69175 Arlington 2 (Generate Capital), Bureau County, IL; balancing authority MISO. Planned operation 2026-10.\nGenerator 11239: 4.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1003,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Generate Capital","state":"IL","name":"Bonacci 1 (Solar Photovoltaic, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Bonacci 1, Champaign County, IL","lat":40.083997,"lng":-88.16215,"route":null,"cost_usd":null,"start_date":"2027-02-01","end_date":"2027-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 656. Plant 69176 Bonacci 1 (Generate Capital), Champaign County, IL; balancing authority MISO. Planned operation 2027-02.\nGenerator 11218: 2.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1004,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Generate Capital","state":"IL","name":"Bonacci 2 (Solar Photovoltaic, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Bonacci 2, Champaign County, IL","lat":40.083997,"lng":-88.16215,"route":null,"cost_usd":null,"start_date":"2027-02-01","end_date":"2027-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 657. Plant 69177 Bonacci 2 (Generate Capital), Champaign County, IL; balancing authority MISO. Planned operation 2027-02.\nGenerator 11218: 2.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1009,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Generate Capital","state":"IL","name":"Cherry Solar 1 (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Cherry Solar 1, Bureau County, IL","lat":41.450314,"lng":-89.22483,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 251. Plant 69178 Cherry Solar 1 (Generate Capital), Bureau County, IL; balancing authority MISO. Planned operation 2026-10.\nGenerator 11237: 5 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1017,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Generate Capital","state":"IL","name":"Cottonwood - IL (Solar Photovoltaic, 4.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Cottonwood - IL, Woodford County, IL","lat":40.684739,"lng":-89.00338,"route":null,"cost_usd":null,"start_date":"2026-08-01","end_date":"2026-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 10. Plant 70444 Cottonwood - IL (Generate Capital), Woodford County, IL; balancing authority MISO. Planned operation 2026-08.\nGenerator 11131: 4.9 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1045,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Generate Capital","state":"IL","name":"KA 340 (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"KA 340, Kankakee County, IL","lat":41.245,"lng":-87.753,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 376. Plant 69182 KA 340 (Generate Capital), Kankakee County, IL; balancing authority PJM. Planned operation 2026-11.\nGenerator 11225: 5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1046,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Generate Capital","state":"IL","name":"KN216 (Solar Photovoltaic, 4.9 MW)","type":"generation","voltage_kv":null,"location_ref":"KN216, Kane County, IL","lat":41.852991,"lng":-88.43975,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 431. Plant 70442 KN216 (Generate Capital), Kane County, IL; balancing authority MISO. Planned operation 2026-11.\nGenerator 11224: 4.9 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1050,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Generate Capital","state":"IL","name":"Little Creek (Solar Photovoltaic, 4 MW)","type":"generation","voltage_kv":null,"location_ref":"Little Creek, McDonough County, IL","lat":40.564286,"lng":-90.88035,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 254. Plant 69204 Little Creek (Generate Capital), McDonough County, IL; balancing authority MISO. Planned operation 2026-10.\nGenerator 11241: 4 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1073,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Generate Capital","state":"IL","name":"Osman Trust (Solar Photovoltaic, 4.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Osman Trust, McHenry County, IL","lat":42.267124,"lng":-88.45245,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 255. Plant 69207 Osman Trust (Generate Capital), McHenry County, IL; balancing authority PJM. Planned operation 2026-10.\nGenerator 11215: 4.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1110,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Generate Capital","state":"IL","name":"Sommer (Solar Photovoltaic, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"Sommer, Massac County, IL","lat":37.205915,"lng":-88.8179,"route":null,"cost_usd":null,"start_date":"2027-02-01","end_date":"2027-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 658. Plant 69215 Sommer (Generate Capital), Massac County, IL; balancing authority MISO. Planned operation 2027-02.\nGenerator 11216: 2 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1499,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Generate Capital","state":"NY","name":"Cold Springs (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Cold Springs, Onondaga County, NY","lat":43.137912,"lng":-76.27779,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 252. Plant 69180 Cold Springs (Generate Capital), Onondaga County, NY; balancing authority NYIS. Planned operation 2026-10.\nGenerator 11254: 5 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1520,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Generate Capital","state":"NY","name":"Hillview (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Hillview, Warren County, NY","lat":43.29864,"lng":-73.56023,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 521. Plant 69181 Hillview (Generate Capital), Warren County, NY; balancing authority NYIS. Planned operation 2026-12.\nGenerator 11150: 5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1536,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Generate Capital","state":"NY","name":"Lodi I (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Lodi I, Schuyler County, NY","lat":42.588337,"lng":-76.84425,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 377. Plant 69205 Lodi I (Generate Capital), Schuyler County, NY; balancing authority NYIS. Planned operation 2026-11.\nGenerator 11249: 5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1537,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Generate Capital","state":"NY","name":"Lodi II (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Lodi II, Schuyler County, NY","lat":42.586527,"lng":-76.84413,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 378. Plant 69206 Lodi II (Generate Capital), Schuyler County, NY; balancing authority NYIS. Planned operation 2026-11.\nGenerator 11250: 5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1594,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Generate Capital","state":"NY","name":"Vienna (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Vienna, Oneida County, NY","lat":43.23835,"lng":-75.69039,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 379. Plant 69218 Vienna (Generate Capital), Oneida County, NY; balancing authority NYIS. Planned operation 2026-11.\nGenerator 11247: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1600,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Generate Capital","state":"NY","name":"West Genesee (Solar Photovoltaic, 2.9 MW)","type":"generation","voltage_kv":null,"location_ref":"West Genesee, Onondaga County, NY","lat":43.165134,"lng":-76.41876,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 111. Plant 69220 West Genesee (Generate Capital), Onondaga County, NY; balancing authority NYIS. Planned operation 2026-09.\nGenerator 11253: 2.9 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":941,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Georgia Power","state":"GA","name":"Hammond (Batteries, 57.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Hammond, Floyd County, GA","lat":34.2528,"lng":-85.3456,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 12. Plant 708 Hammond (Georgia Power Co), Floyd County, GA; balancing authority SOCO. Planned operation 2026-09.\nGenerator 5: 57.5 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":956,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Georgia Power","state":"GA","name":"Yates (Natural Gas Fired Combustion Turbine, 482.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Yates, Coweta County, GA","lat":33.4622,"lng":-84.8986,"route":null,"cost_usd":null,"start_date":"2027-02-01","end_date":"2027-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 648. Plant 728 Yates (Georgia Power Co), Coweta County, GA; balancing authority SOCO. Planned operation 2027-02.\nGenerator 8: 482.8 MW Natural Gas Fired Combustion Turbine; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":957,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Georgia Power","state":"GA","name":"Yates (Natural Gas Fired Combustion Turbine, 965.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Yates, Coweta County, GA","lat":33.4622,"lng":-84.8986,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1166, 1167. Plant 728 Yates (Georgia Power Co), Coweta County, GA; balancing authority SOCO. Planned operation 2027-12.\nGenerator 10: 482.8 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator 9: 482.8 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":3348,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Cc - Hyundai Motors Savannah Aka. Project Ea","type":"substation","voltage_kv":null,"location_ref":"Hyundai Motors Savannah Aka. Project Ea","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2025-01-01","end_date":"2025-01-01","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":177,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 219, TEAMS 19523): SAV: CC - HYUNDAI MOTORS SAVANNAH AKA. PROJECT EA; need date 01/01/2025; sponsor SAV. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3349,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Mitchell - North Tifton 230Kv Reconductor","type":"transmission line","voltage_kv":230,"location_ref":"Mitchell - North Tifton","lat":31.459,"lng":-83.84,"route":[[31.444,-84.135],[31.475,-83.545]],"cost_usd":null,"start_date":"2025-05-01","end_date":"2025-05-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":177,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 216, TEAMS 18492): MITCHELL - NORTH TIFTON 230KV RECONDUCTOR; need date 05/01/2025; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: MITCHELL = OSM substation 'Mitchell Substation (115kV)' (GA); NORTH TIFTON = OSM substation 'North Tifton Substation (115kV)' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3350,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Adamsville - Jack Mcdonough 230Kv Line Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Adamsville - Jack Mcdonough","lat":33.792,"lng":-84.488,"route":null,"cost_usd":null,"start_date":"2025-06-01","end_date":"2025-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":177,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 206, TEAMS 19676): ADAMSVILLE - JACK MCDONOUGH 230KV LINE REBUILD; need date 06/01/2025; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: JACK MCDONOUGH = curated point (OSM power plant 'Plant McDonough-Atkinson', Smyrna, Cobb County); ADAMSVILLE = curated point (Adamsville quarter of Atlanta, Fulton County (OSM/Nominatim)) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3351,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Echeconnee-Wellston 115Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Echeconnee - Wellston","lat":32.458,"lng":-83.662,"route":null,"cost_usd":null,"start_date":"2025-06-01","end_date":"2025-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":177,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 214, TEAMS 18800): ECHECONNEE-WELLSTON 115KV REBUILD; need date 06/01/2025; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: WELLSTON ~ Houston County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":3352,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Grid - Bremen - Crooked Creek (Apc) 115 Kv Project","type":"transmission line","voltage_kv":115,"location_ref":"Grid - Bremen - Crooked Creek (Apc)","lat":33.709,"lng":-85.143,"route":null,"cost_usd":null,"start_date":"2025-06-01","end_date":"2025-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":177,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 211, TEAMS 19187): GRID - BREMEN - CROOKED CREEK (APC) 115 KV PROJECT; need date 06/01/2025; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: BREMEN = OSM substation 'Bremen Primary Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":3353,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Jesup - Ludowici Primary 115Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Jesup - Ludowici Primary","lat":31.663,"lng":-81.834,"route":[[31.603,-81.925],[31.722,-81.744]],"cost_usd":null,"start_date":"2025-06-01","end_date":"2025-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":177,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 218, TEAMS 11821): JESUP - LUDOWICI PRIMARY 115KV REBUILD; need date 06/01/2025; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: JESUP = OSM substation 'Jesup Substation' (GA); LUDOWICI PRIMARY = OSM substation 'Ludowici Primary Substation' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3354,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Norcross 230Kv Bus 1-3 Series Bus Tie Breaker Installation","type":"substation","voltage_kv":230,"location_ref":"Norcross","lat":33.933,"lng":-84.213,"route":null,"cost_usd":null,"start_date":"2025-06-01","end_date":"2025-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":177,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 202, TEAMS 20464): NORCROSS 230KV BUS 1-3 SERIES BUS TIE BREAKER INSTALLATION; need date 06/01/2025; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: NORCROSS = OSM substation 'Norcross Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":3355,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Pine Grove Primary 115 Kv Dual Stage Capacitor Bank","type":"substation","voltage_kv":115,"location_ref":"Pine Grove Primary","lat":30.882,"lng":-83.228,"route":null,"cost_usd":null,"start_date":"2025-06-01","end_date":"2025-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":178,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 216, TEAMS 19631): PINE GROVE PRIMARY 115 KV DUAL STAGE CAPACITOR BANK; need date 06/01/2025; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: PINE GROVE PRIMARY = OSM substation 'Pine Grove Primary Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":3356,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Deptford - Magnolia 115Kv Reconductor","type":"transmission line","voltage_kv":115,"location_ref":"Deptford - Magnolia","lat":32.045,"lng":-81.067,"route":[[32.067,-81.048],[32.023,-81.086]],"cost_usd":null,"start_date":"2025-06-01","end_date":"2025-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":178,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 219, TEAMS 20067): SAV: DEPTFORD - MAGNOLIA 115KV RECONDUCTOR; need date 06/01/2025; sponsor SAV. Cost columns are redacted in the public filing.\nLocated: DEPTFORD = OSM substation 'Deptford Substation' (GA); MAGNOLIA = OSM substation 'Magnolia Substation' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3357,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Smart Valve Installation","type":"substation","voltage_kv":null,"location_ref":"Smart Valve Installation","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2025-06-01","end_date":"2025-06-01","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":178,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 214, TEAMS 20466): SMART VALVE INSTALLATION; need date 06/01/2025; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3358,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Thalmann And Colerain 23O Kv Line Relay Panel Upgrades","type":"transmission line","voltage_kv":null,"location_ref":"Thalmann - Colerain 23O Kv","lat":31.103,"lng":-81.662,"route":null,"cost_usd":null,"start_date":"2025-06-01","end_date":"2025-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":178,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 218, TEAMS 21046): THALMANN AND COLERAIN 23O KV LINE RELAY PANEL UPGRADES; need date 06/01/2025; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: THALMANN = OSM substation 'Thalmann Substation' (GA); COLERAIN 23O KV ~ Camden County, GA (county centre) (nearest of 2) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3359,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Villa Rica Low Side Breaker","type":"substation","voltage_kv":null,"location_ref":"Villa Rica Low Side","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2025-06-01","end_date":"2025-06-01","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":178,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 211, TEAMS 20431): VILLA RICA LOW SIDE BREAKER; need date 06/01/2025; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3360,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Camden Industrial Park (Gpc)","type":"substation","voltage_kv":null,"location_ref":"Camden Industrial Park (Gpc)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2025-06-01","end_date":"2025-06-01","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":178,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 218, TEAMS 20684): CAMDEN INDUSTRIAL PARK (GPC); need date 06/01/2025; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3361,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Jefferson Street#3 - Northwest (White) 115 Kv Reconductor","type":"transmission line","voltage_kv":115,"location_ref":"Jefferson Street#3 - Northwest (White)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2025-12-01","end_date":"2025-12-01","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":178,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 206, TEAMS 18889): JEFFERSON STREET#3 - NORTHWEST (WHITE) 115 KV RECONDUCTOR; need date 12/01/2025; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3362,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Anthony Shoals Statcom System","type":"substation","voltage_kv":null,"location_ref":"Anthony Shoals","lat":34.002,"lng":-82.636,"route":null,"cost_usd":null,"start_date":"2025-12-31","end_date":"2025-12-31","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":178,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 212, TEAMS 20326): ANTHONY SHOALS STATCOM SYSTEM; need date 12/31/2025; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: ANTHONY SHOALS = OSM substation 'Anthony Shoals Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":3363,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Cc - Cass Pine - Hill View 230 Kv Line - Cc Improvements","type":"transmission line","voltage_kv":230,"location_ref":"Cass Pine - Hill View","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2025-12-31","end_date":"2025-12-31","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":178,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 211, TEAMS 20152): CC - CASS PINE - HILL VIEW 230 KV LINE - CC IMPROVEMENTS; need date 12/31/2025; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3364,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Cc - Project Chronos - Sk/Hyundai","type":"transmission line","voltage_kv":null,"location_ref":"Project Chronos - Sk/Hyundai","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2025-12-31","end_date":"2025-12-31","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":178,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 211, TEAMS 20175): CC - PROJECT CHRONOS - SK/HYUNDAI; need date 12/31/2025; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3365,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Little Ogeechee 230 - 115Kv: Relay Modernization","type":"substation","voltage_kv":115,"location_ref":"Little Ogeechee 230","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2025-12-31","end_date":"2025-12-31","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":178,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 219, TEAMS 17075): SAV: LITTLE OGEECHEE 230 - 115KV: RELAY MODERNIZATION; need date 12/31/2025; sponsor SAV. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3366,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Cc - Qts Fayetteville Transmission Needs","type":"substation","voltage_kv":null,"location_ref":"Qts Fayetteville","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2026-04-01","end_date":"2026-04-01","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":178,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 208, TEAMS 20018): CC - QTS FAYETTEVILLE TRANSMISSION NEEDS; need date 04/01/2026; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3367,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Adamsville - Buzzard Roost 230Kv Rebuild And Jumper Upgrade","type":"transmission line","voltage_kv":230,"location_ref":"Adamsville - Buzzard Roost","lat":33.759,"lng":-84.505,"route":null,"cost_usd":null,"start_date":"2026-06-01","end_date":"2026-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":179,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 208, TEAMS 19597): ADAMSVILLE - BUZZARD ROOST 230KV REBUILD AND JUMPER UPGRADE; need date 06/01/2026; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: ADAMSVILLE = curated point (Adamsville quarter of Atlanta, Fulton County (OSM/Nominatim))","reviewed":false,"approximate":true,"requires_review":false},{"id":3368,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Blankets Creek – Woodstock 115Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Blankets Creek - Woodstock","lat":34.136,"lng":-84.511,"route":[[34.186,-84.508],[34.085,-84.513]],"cost_usd":null,"start_date":"2026-06-01","end_date":"2026-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":179,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 201, TEAMS 18960): BLANKETS CREEK – WOODSTOCK 115KV LINE REBUILD; need date 06/01/2026; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: BLANKETS CREEK = OSM substation 'Blankets Creek Substation' (GA); WOODSTOCK = OSM substation 'Woodstock Substation' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3369,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Cc - Garrett Road Switching Station - Trae Lane","type":"substation","voltage_kv":null,"location_ref":"Garrett Road","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2026-06-01","end_date":"2026-06-01","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":179,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 201, TEAMS 20243): CC - GARRETT ROAD SWITCHING STATION - TRAE LANE; need date 06/01/2026; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3370,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Cc - Stonewall Tell Road (Ta Realty)","type":"substation","voltage_kv":null,"location_ref":"Stonewall Tell Road (Ta Realty)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2026-06-01","end_date":"2026-06-01","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":179,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 208, TEAMS 20216): CC - STONEWALL TELL ROAD (TA REALTY); need date 06/01/2026; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3371,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"East Point Relay Modernization","type":"substation","voltage_kv":null,"location_ref":"East Point","lat":33.676,"lng":-84.463,"route":null,"cost_usd":null,"start_date":"2026-06-01","end_date":"2026-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":179,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 208, TEAMS 20491): EAST POINT RELAY MODERNIZATION; need date 06/01/2026; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: EAST POINT = OSM substation 'East Point Primary Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":3372,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Fenwick Street - Sand Bar Ferry 115Kv (Reconductor/Rebuild)","type":"transmission line","voltage_kv":115,"location_ref":"Fenwick Street - Sand Bar Ferry","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2026-06-01","end_date":"2026-06-01","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":179,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 215, TEAMS 16007): FENWICK STREET - SAND BAR FERRY 115KV (RECONDUCTOR/REBUILD); need date 06/01/2026; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3373,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Goat Rock 230Kv Switch, Jumper, & Line Trap Replacement","type":"transmission line","voltage_kv":230,"location_ref":"Goat Rock","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2026-06-01","end_date":"2026-06-01","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":179,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 213, TEAMS 20516): GOAT ROCK 230KV SWITCH, JUMPER, & LINE TRAP REPLACEMENT; need date 06/01/2026; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3374,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Gordon-N Dublin 115Kv (Gordon-Engl Mci J) Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Gordon - N Dublin","lat":32.882,"lng":-83.317,"route":null,"cost_usd":null,"start_date":"2026-06-01","end_date":"2026-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":179,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 214, TEAMS 19618): GORDON-N DUBLIN 115KV (GORDON-ENGL MCI J) REBUILD; need date 06/01/2026; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: GORDON = OSM substation 'Gordon Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":3375,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Grady - Morrow (White) 115Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Grady - Morrow (White)","lat":33.698,"lng":-84.401,"route":null,"cost_usd":null,"start_date":"2026-06-01","end_date":"2026-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":179,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 206, TEAMS 21139): GRADY - MORROW (WHITE) 115KV REBUILD; need date 06/01/2026; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: MORROW (WHITE) = OSM substation 'Morrow Substation' (GA); GRADY = Fulton County, GA (county centre, curated) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3376,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Grady 230/115Kv Relay Modernization","type":"substation","voltage_kv":230,"location_ref":"Grady","lat":33.79,"lng":-84.468,"route":null,"cost_usd":null,"start_date":"2026-06-01","end_date":"2026-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":179,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 206, TEAMS 20474): GRADY 230/115KV RELAY MODERNIZATION; need date 06/01/2026; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: GRADY = Fulton County, GA (county centre, curated)","reviewed":false,"approximate":true,"requires_review":false},{"id":3377,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Grid - Gainesville #2 Equipment Replacement","type":"transmission line","voltage_kv":null,"location_ref":"Grid - Gainesville #2","lat":34.302,"lng":-83.825,"route":null,"cost_usd":null,"start_date":"2026-06-01","end_date":"2026-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":179,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 212, TEAMS 19706): GRID - GAINESVILLE #2 EQUIPMENT REPLACEMENT; need date 06/01/2026; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: GAINESVILLE #2 ~ centre of 2 nearby same-named OSM substations","reviewed":false,"approximate":true,"requires_review":false},{"id":3378,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Hammond - Weiss Dam 115Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Hammond - Weiss Dam","lat":34.264,"lng":-85.214,"route":null,"cost_usd":null,"start_date":"2026-06-01","end_date":"2026-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":180,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 211, TEAMS 19636): HAMMOND - WEISS DAM 115KV LINE REBUILD; need date 06/01/2026; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: HAMMOND = Floyd County, GA (county centre, curated)","reviewed":false,"approximate":true,"requires_review":false},{"id":3379,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Kathleen Area Improvements","type":"substation","voltage_kv":null,"location_ref":"Kathleen","lat":32.458,"lng":-83.662,"route":null,"cost_usd":null,"start_date":"2026-06-01","end_date":"2026-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":180,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 214, TEAMS 20512): KATHLEEN AREA IMPROVEMENTS; need date 06/01/2026; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: KATHLEEN ~ Houston County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":3380,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Klondike Relay Modernization","type":"substation","voltage_kv":null,"location_ref":"Klondike","lat":33.637,"lng":-84.124,"route":null,"cost_usd":null,"start_date":"2026-06-01","end_date":"2026-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":180,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 206, TEAMS 20490): KLONDIKE RELAY MODERNIZATION; need date 06/01/2026; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: KLONDIKE = OSM substation 'Klondike Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":3381,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Morrow 115Kv Relay Upgrade","type":"substation","voltage_kv":115,"location_ref":"Morrow","lat":33.606,"lng":-84.333,"route":null,"cost_usd":null,"start_date":"2026-06-01","end_date":"2026-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":180,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 208, TEAMS 20300): MORROW 115KV RELAY UPGRADE; need date 06/01/2026; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: MORROW = OSM substation 'Morrow Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":3382,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Palmyra Reactor Removal","type":"substation","voltage_kv":null,"location_ref":"Palmyra","lat":31.818,"lng":-84.147,"route":null,"cost_usd":null,"start_date":"2026-06-01","end_date":"2026-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":180,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 216, TEAMS 18690): PALMYRA REACTOR REMOVAL; need date 06/01/2026; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: PALMYRA ~ Lee County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":3383,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Boulevard - Deptford 115Kv Reconductor","type":"transmission line","voltage_kv":115,"location_ref":"Boulevard - Deptford","lat":32.054,"lng":-81.096,"route":[[32.041,-81.144],[32.067,-81.048]],"cost_usd":null,"start_date":"2026-06-01","end_date":"2026-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":180,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 219, TEAMS 20066): SAV: BOULEVARD - DEPTFORD 115KV RECONDUCTOR; need date 06/01/2026; sponsor SAV. Cost columns are redacted in the public filing.\nLocated: BOULEVARD = OSM substation 'Boulevard Substation' (GA); DEPTFORD = OSM substation 'Deptford Substation' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3384,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Cc - Big Ogeechee 500/230Kv (Cc Network Improvements)","type":"substation","voltage_kv":500,"location_ref":"Big Ogeechee","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2026-06-01","end_date":"2026-06-01","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":180,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 219, TEAMS 19966): SAV: CC - BIG OGEECHEE 500/230KV (CC NETWORK IMPROVEMENTS); need date 06/01/2026; sponsor SAV. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3385,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Mcintosh - Purrysburg 230Kv Reactors","type":"substation","voltage_kv":230,"location_ref":"Mcintosh - Purrysburg","lat":32.352,"lng":-81.175,"route":null,"cost_usd":null,"start_date":"2026-06-01","end_date":"2026-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":180,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 219, TEAMS 20277): SAV: MCINTOSH - PURRYSBURG 230KV REACTORS; need date 06/01/2026; sponsor SAV. Cost columns are redacted in the public filing.\nLocated: MCINTOSH = OSM substation 'McIntosh Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":3386,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Scottdale Relay Modernization","type":"substation","voltage_kv":null,"location_ref":"Scottdale","lat":33.771,"lng":-84.226,"route":null,"cost_usd":null,"start_date":"2026-06-01","end_date":"2026-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":180,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 206, TEAMS 20489): SCOTTDALE RELAY MODERNIZATION; need date 06/01/2026; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: SCOTTDALE ~ DeKalb County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":3387,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Union City - Yates 230 Kv White Line Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Union City - Yates","lat":33.626,"lng":-84.683,"route":null,"cost_usd":null,"start_date":"2026-04-01","end_date":"2026-04-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":180,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 208, TEAMS 17900): UNION CITY - YATES 230 KV WHITE LINE REBUILD; need date 04/01/2026; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: YATES = OSM substation 'Yates Switchyard' (GA); UNION CITY ~ Fulton County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3388,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Union City - Yates 230Kv (White) Switch And Trap Replacement","type":"transmission line","voltage_kv":230,"location_ref":"Union City - Yates","lat":33.626,"lng":-84.683,"route":null,"cost_usd":null,"start_date":"2026-06-01","end_date":"2026-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":181,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 208, TEAMS 20691): UNION CITY - YATES 230KV (WHITE) SWITCH AND TRAP REPLACEMENT; need date 06/01/2026; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: YATES = OSM substation 'Yates Switchyard' (GA); UNION CITY ~ Fulton County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3389,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Cc - Project Payton Bainbridge","type":"substation","voltage_kv":null,"location_ref":"Project Payton Bainbridge","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2026-06-30","end_date":"2026-06-30","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":181,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 216, TEAMS 20223): CC - PROJECT PAYTON BAINBRIDGE; need date 06/30/2026; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3390,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Ohara Breaker Replacement","type":"substation","voltage_kv":null,"location_ref":"Ohara","lat":33.482,"lng":-84.367,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":181,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 208, TEAMS 21022): OHARA BREAKER REPLACEMENT; need date 10/01/2026; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: OHARA = OSM substation 'O'Hara Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":3391,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Dresden Line Protective Relaying","type":"transmission line","voltage_kv":null,"location_ref":"Dresden","lat":33.351,"lng":-84.906,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":181,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 208, TEAMS 20668): DRESDEN LINE PROTECTIVE RELAYING; need date 12/01/2026; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: DRESDEN = OSM substation 'Dresden Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":3392,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Cc - Cass Pine 230/25 New Sub - Qcells - Cc Improvements","type":"substation","voltage_kv":null,"location_ref":"Cass Pine 230/25","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2026-12-31","end_date":"2026-12-31","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":181,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 211, TEAMS 20151): CC - CASS PINE 230/25 NEW SUB - QCELLS - CC IMPROVEMENTS; need date 12/31/2026; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3393,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Grady-West End 115Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Grady - West End","lat":33.79,"lng":-84.468,"route":null,"cost_usd":null,"start_date":"2026-12-31","end_date":"2026-12-31","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":181,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 206, TEAMS 19287): GRADY-WEST END 115KV REBUILD; need date 12/31/2026; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: GRADY = Fulton County, GA (county centre, curated)","reviewed":false,"approximate":true,"requires_review":false},{"id":3394,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Morrow - Mountain View 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Morrow - Mountain View","lat":33.579,"lng":-84.373,"route":null,"cost_usd":null,"start_date":"2026-12-31","end_date":"2026-12-31","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":181,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 208, TEAMS 19363): MORROW - MOUNTAIN VIEW 115 KV REBUILD; need date 12/31/2026; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: MORROW = OSM substation 'Morrow Substation' (GA); MOUNTAIN VIEW ~ Clayton County, GA (county centre) (nearest of 2) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3395,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Cc - Emblem Riverside Customer Sub (Flexential)","type":"substation","voltage_kv":null,"location_ref":"Emblem Riverside Customer","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":181,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 201, TEAMS 20509): CC - EMBLEM RIVERSIDE CUSTOMER SUB (FLEXENTIAL); need date 03/01/2027; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3396,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Morrow - Yates Common 115Kv Line Upgrade","type":"transmission line","voltage_kv":115,"location_ref":"Morrow - Yates Common","lat":33.534,"lng":-84.618,"route":[[33.606,-84.333],[33.462,-84.904]],"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":181,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 208, TEAMS 19601): MORROW - YATES COMMON 115KV LINE UPGRADE; need date 05/01/2027; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: MORROW = OSM substation 'Morrow Substation' (GA); YATES COMMON = OSM substation 'Yates Common Substation' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3397,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Possum Branch - Yates Common 115Kv Rebuild (Yates To Clem)","type":"transmission line","voltage_kv":115,"location_ref":"Possum Branch - Yates Common","lat":33.462,"lng":-84.904,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":181,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 211, TEAMS 15879): POSSUM BRANCH - YATES COMMON 115KV REBUILD (YATES TO CLEM); need date 05/01/2027; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: YATES COMMON = OSM substation 'Yates Common Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":3398,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Cc - Gullatt Road Transmission Improvements","type":"substation","voltage_kv":null,"location_ref":"Gullatt Road","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":182,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 208, TEAMS 20771): CC - GULLATT ROAD TRANSMISSION IMPROVEMENTS; need date 06/01/2027; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3399,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Cc - Microsoft - Shugart (Cco06)","type":"transmission line","voltage_kv":null,"location_ref":"Microsoft - Shugart (Cco06)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":182,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 208, TEAMS 18736): CC - MICROSOFT - SHUGART (CCO06); need date 06/01/2027; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3400,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Cc - Summer Lake - Villa Rica 230Kv Rebuild (Cc Improvmnt)","type":"transmission line","voltage_kv":230,"location_ref":"Summer Lake - Villa Rica","lat":33.741,"lng":-84.855,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":182,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 201, TEAMS 20781): CC - SUMMER LAKE - VILLA RICA 230KV REBUILD (CC IMPROVMNT); need date 06/01/2027; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: VILLA RICA = OSM substation 'Villa Rica Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":3401,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Cc - Ta Realty Ellenwood Network Improvements","type":"substation","voltage_kv":null,"location_ref":"Ta Realty Ellenwood","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":182,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 208, TEAMS 20736): CC - TA REALTY ELLENWOOD NETWORK IMPROVEMENTS; need date 06/01/2027; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3402,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Doyle - Lg&E Monroe 230Kv - Jacks Creek Loop In","type":"transmission line","voltage_kv":230,"location_ref":"Doyle - E Monroe","lat":33.838,"lng":-83.699,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":182,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 212, TEAMS 20234): DOYLE - LG&E MONROE 230KV - JACKS CREEK LOOP IN; need date 06/01/2027; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: DOYLE = OSM substation 'Doyle Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":3403,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Jesup - Offerman 115Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Jesup - Offerman","lat":31.513,"lng":-82.035,"route":[[31.603,-81.925],[31.423,-82.144]],"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":182,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 218, TEAMS 18668): JESUP - OFFERMAN 115KV REBUILD; need date 06/01/2027; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: JESUP = OSM substation 'Jesup Substation' (GA); OFFERMAN = OSM substation 'Offerman Substation' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3404,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Lawrenceville - Winder 115Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Lawrenceville - Winder","lat":33.979,"lng":-83.873,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":183,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 202, TEAMS 10143): LAWRENCEVILLE - WINDER 115KV LINE REBUILD; need date 06/01/2027; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: WINDER = OSM 'Winder Primary Substation' (GA); LAWRENCEVILLE ~ centre of 3 nearby same-named OSM substations (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3405,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Lawrenceville - Winder Primary 230Kv Line Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Lawrenceville - Winder Primary","lat":33.979,"lng":-83.873,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":183,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 202, TEAMS 10481): LAWRENCEVILLE - WINDER PRIMARY 230KV LINE REBUILD; need date 06/01/2027; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: WINDER PRIMARY = OSM 'Winder Primary Substation' (GA); LAWRENCEVILLE ~ centre of 3 nearby same-named OSM substations (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3406,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Sandersville #1 - Wadley Pri. 115Kv Rebuild/Reconductor","type":"transmission line","voltage_kv":115,"location_ref":"Sandersville #1 - Wadley Pri.","lat":32.998,"lng":-82.802,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":183,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 214, TEAMS 19248): SANDERSVILLE #1 - WADLEY PRI. 115KV REBUILD/RECONDUCTOR; need date 06/01/2027; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: SANDERSVILLE #1 = OSM substation 'Sandersville Substation #1' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":3407,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Goshen (Sav) - Kraft 115Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Goshen (Sav) - Kraft","lat":32.199,"lng":-81.178,"route":[[32.148,-81.146],[32.249,-81.209]],"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":183,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 219, TEAMS 20785): SAV: GOSHEN (SAV) - KRAFT 115KV LINE REBUILD; need date 06/01/2027; sponsor SAV. Cost columns are redacted in the public filing.\nLocated: KRAFT = OSM substation 'Kraft Substation' (GA); GOSHEN (SAV) = OSM substation 'Goshen Substation' (GA), nearest of 2 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3408,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Goshen (Sav) - Mcintosh 115Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Goshen (Sav) - Mcintosh","lat":32.3,"lng":-81.192,"route":[[32.352,-81.175],[32.249,-81.209]],"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":183,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 219, TEAMS 20065): SAV: GOSHEN (SAV) - MCINTOSH 115KV LINE REBUILD; need date 06/01/2027; sponsor SAV. Cost columns are redacted in the public filing.\nLocated: MCINTOSH = OSM substation 'McIntosh Substation' (GA); GOSHEN (SAV) = OSM substation 'Goshen Substation' (GA), nearest of 2 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3409,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Cc - Tomochichi 500/230Kv Solution (Cc Network Improvements)","type":"substation","voltage_kv":500,"location_ref":"Tomochichi","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-07-15","end_date":"2027-07-15","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":183,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 208, TEAMS 20717): CC - TOMOCHICHI 500/230KV SOLUTION (CC NETWORK IMPROVEMENTS); need date 07/15/2027; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3410,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Grid - Arkwright - Lloyd Shoals 115Kv","type":"transmission line","voltage_kv":115,"location_ref":"Grid - Arkwright - Lloyd Shoals","lat":33.065,"lng":-83.768,"route":null,"cost_usd":null,"start_date":"2027-07-30","end_date":"2027-07-30","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":183,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 214, TEAMS 18573): GRID - ARKWRIGHT - LLOYD SHOALS 115KV; need date 07/30/2027; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: LLOYD SHOALS = OSM plant 'Lloyd Shoals Dam' (GA); ARKWRIGHT ~ Bibb County, GA (county centre) (nearest of 2) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3411,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Athena - East Watkinsville 115 Kv (Rebuild)","type":"transmission line","voltage_kv":115,"location_ref":"Athena - East Watkinsville","lat":33.918,"lng":-83.365,"route":[[33.976,-83.346],[33.861,-83.385]],"cost_usd":null,"start_date":"2027-12-31","end_date":"2027-12-31","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":183,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 212, TEAMS 17977): ATHENA - EAST WATKINSVILLE 115 KV (REBUILD); need date 12/31/2027; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: ATHENA = OSM substation 'Athena Substation' (GA); EAST WATKINSVILLE = OSM substation 'East Watkinsville Substation' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3412,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Cc - Hill View & Grassy Hollow Sub - Cc Improvements","type":"substation","voltage_kv":null,"location_ref":"Hill View - Grassy Hollow","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-12-31","end_date":"2027-12-31","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":183,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 211, TEAMS 20150): CC - HILL VIEW & GRASSY HOLLOW SUB - CC IMPROVEMENTS; need date 12/31/2027; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3413,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Dyer Road - East Roanoke 115Kv (Rebuild)","type":"transmission line","voltage_kv":115,"location_ref":"Dyer Road - East Roanoke","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-12-31","end_date":"2027-12-31","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":183,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 211, TEAMS 20024): DYER ROAD - EAST ROANOKE 115KV (REBUILD); need date 12/31/2027; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3414,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Aultman Road-Perry 115Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Aultman Road - Perry","lat":32.455,"lng":-83.702,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":183,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 214, TEAMS 19997): AULTMAN ROAD-PERRY 115KV LINE REBUILD; need date 06/01/2028; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: PERRY = OSM substation 'Perry Primary Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":3415,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Cc - East Villa Rica Area Switching Station (Cc Improvement)","type":"substation","voltage_kv":null,"location_ref":"East Villa Rica","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":183,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 201, TEAMS 20797): CC - EAST VILLA RICA AREA SWITCHING STATION (CC IMPROVEMENT); need date 06/01/2028; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3416,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Cc - Villa Rica Upgrades (Cc Network Improvements)","type":"substation","voltage_kv":null,"location_ref":"Villa Rica","lat":33.741,"lng":-84.855,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":183,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 211, TEAMS 20774): CC - VILLA RICA UPGRADES (CC NETWORK IMPROVEMENTS); need date 06/01/2028; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: VILLA RICA = OSM substation 'Villa Rica Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":3417,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Fitzgerald - Pitts 115 Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Fitzgerald - Pitts","lat":31.846,"lng":-83.365,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":184,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 214, TEAMS 21048): FITZGERALD - PITTS 115 KV LINE REBUILD; need date 06/01/2028; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: FITZGERALD = OSM substation 'Fitzgerald Substation' (GA); PITTS ~ Wilcox County, GA (county centre) (nearest of 2) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3418,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Jack Mcdonough - Northwest (Black) 230Kv Reconductor","type":"transmission line","voltage_kv":230,"location_ref":"Jack Mcdonough - Northwest (Black)","lat":33.825,"lng":-84.471,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":184,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 206, TEAMS 20777): JACK MCDONOUGH - NORTHWEST (BLACK) 230KV RECONDUCTOR; need date 06/01/2028; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: JACK MCDONOUGH = curated point (OSM power plant 'Plant McDonough-Atkinson', Smyrna, Cobb County)","reviewed":false,"approximate":true,"requires_review":false},{"id":3419,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Pittman Road - West Point Dam (Usa) 115Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Pittman Road - West Point Dam (Usa)","lat":32.901,"lng":-85.178,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":184,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 213, TEAMS 20482): PITTMAN ROAD - WEST POINT DAM (USA) 115KV REBUILD; need date 06/01/2028; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: WEST POINT DAM (USA) ~ centre of 2 nearby same-named OSM substations","reviewed":false,"approximate":true,"requires_review":false},{"id":3420,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Plant Yates Breaker And Half Station","type":"substation","voltage_kv":null,"location_ref":"Plant Yates","lat":33.461,"lng":-84.897,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":184,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 208, TEAMS 20656): PLANT YATES BREAKER AND HALF STATION; need date 06/01/2028; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: PLANT YATES = OSM substation 'Yates Switchyard' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":3421,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Coleman - Dean Forest 115Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Coleman - Dean Forest","lat":32.096,"lng":-81.208,"route":[[32.084,-81.189],[32.108,-81.227]],"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":184,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 219, TEAMS 20783): SAV: COLEMAN - DEAN FOREST 115KV LINE REBUILD; need date 06/01/2028; sponsor SAV. Cost columns are redacted in the public filing.\nLocated: DEAN FOREST = OSM substation 'Dean Forest Substation' (GA); COLEMAN = OSM substation 'Coleman Substation' (GA), nearest of 2 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3422,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Magnolia - Truman Parkway 115Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Magnolia - Truman Parkway","lat":32.023,"lng":-81.086,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":184,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 219, TEAMS 20407): SAV: MAGNOLIA - TRUMAN PARKWAY 115KV REBUILD; need date 06/01/2028; sponsor SAV. Cost columns are redacted in the public filing.\nLocated: MAGNOLIA = OSM substation 'Magnolia Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":3423,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Smart Valves At East Villa Rica Switching Station","type":"substation","voltage_kv":null,"location_ref":"Smart Valves At East Villa Rica","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":184,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 201, TEAMS 21069): SMART VALVES AT EAST VILLA RICA SWITCHING STATION; need date 06/01/2028; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3424,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"South Macon 115Kv Buses 1 & 2 Replacement","type":"substation","voltage_kv":115,"location_ref":"South Macon","lat":32.82,"lng":-83.626,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":184,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 214, TEAMS 20768): SOUTH MACON 115KV BUSES 1 & 2 REPLACEMENT; need date 06/01/2028; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: SOUTH MACON = OSM substation 'South Macon Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":3425,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Union City - Yates 230Kv (Black) Line Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Union City - Yates","lat":33.626,"lng":-84.683,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":184,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 208, TEAMS 20274): UNION CITY - YATES 230KV (BLACK) LINE REBUILD; need date 06/01/2028; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: YATES = OSM substation 'Yates Switchyard' (GA); UNION CITY ~ Fulton County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3426,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"First Avenue - North Columbus 115Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"First Avenue - North Columbus","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":184,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 213, TEAMS 13166): FIRST AVENUE - NORTH COLUMBUS 115KV LINE REBUILD; need date 12/01/2028; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3427,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Ashley Park-Wansley 500Kv","type":"transmission line","voltage_kv":500,"location_ref":"Ashley Park - Wansley","lat":33.412,"lng":-84.762,"route":null,"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":185,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 208, TEAMS 21062): ASHLEY PARK-WANSLEY 500KV; need date 06/01/2029; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: WANSLEY = OSM substation 'Wansley Substation' (GA); ASHLEY PARK ~ Fayette County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3428,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Blakely Primary - Huckleberry 115Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Blakely Primary - Huckleberry","lat":31.383,"lng":-84.918,"route":null,"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":185,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 216, TEAMS 10222): BLAKELY PRIMARY - HUCKLEBERRY 115KV REBUILD; need date 06/01/2029; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: BLAKELY PRIMARY ~ centre of 2 nearby same-named OSM substations","reviewed":false,"approximate":true,"requires_review":false},{"id":3429,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Broadway - Echeconnee 115 Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Broadway - Echeconnee","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":185,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 214, TEAMS 21047): BROADWAY - ECHECONNEE 115 KV LINE REBUILD; need date 06/01/2029; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3430,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Butler - Thomaston 230Kv Line Conversion","type":"transmission line","voltage_kv":230,"location_ref":"Butler - Thomaston","lat":32.736,"lng":-84.302,"route":[[32.571,-84.29],[32.9,-84.313]],"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":185,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 213, TEAMS 16887): BUTLER - THOMASTON 230KV LINE CONVERSION; need date 06/01/2029; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: BUTLER = OSM substation 'Butler Primary Substation' (GA); THOMASTON = OSM substation 'Thomaston Primary Substation' (GA), nearest of 2 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3431,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Buzzard Roost - Factory Shoals 230Kv New Line","type":"transmission line","voltage_kv":230,"location_ref":"Buzzard Roost - Factory Shoals","lat":33.769,"lng":-84.591,"route":null,"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":185,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 201, TEAMS 21036): BUZZARD ROOST - FACTORY SHOALS 230KV NEW LINE; need date 06/01/2029; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: FACTORY SHOALS = curated point (Factory Shoals Road SW, Mableton, on the Cobb/Douglas County line west of Atlant)","reviewed":false,"approximate":true,"requires_review":false},{"id":3432,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Conyers - Klondike 230 Kv Second Line","type":"transmission line","voltage_kv":230,"location_ref":"Conyers - Klondike","lat":33.645,"lng":-84.075,"route":null,"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":185,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 206, TEAMS 21142): CONYERS - KLONDIKE 230 KV SECOND LINE; need date 06/01/2029; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: KLONDIKE = OSM substation 'Klondike Substation' (GA); CONYERS ~ Rockdale County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3433,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Glenwood Springs - Porterdale Primary 230Kv Line Switch Repl","type":"transmission line","voltage_kv":230,"location_ref":"Glenwood Springs - Porterdale Primary","lat":33.553,"lng":-83.851,"route":null,"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":185,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 206, TEAMS 21138): GLENWOOD SPRINGS - PORTERDALE PRIMARY 230KV LINE SWITCH REPL; need date 06/01/2029; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: PORTERDALE PRIMARY ~ Newton County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":3434,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Lloyd Shoals - Porterdale Primary 115Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Lloyd Shoals - Porterdale Primary","lat":33.437,"lng":-83.846,"route":null,"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":185,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 206, TEAMS 21141): LLOYD SHOALS - PORTERDALE PRIMARY 115KV REBUILD; need date 06/01/2029; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: LLOYD SHOALS = OSM plant 'Lloyd Shoals Dam' (GA); PORTERDALE PRIMARY ~ Newton County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3435,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Lower River - Webb (Apc) 115Kv Reconductor","type":"transmission line","voltage_kv":115,"location_ref":"Lower River - Webb (Apc)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":185,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 216, TEAMS 20285): LOWER RIVER - WEBB (APC) 115KV RECONDUCTOR; need date 06/01/2029; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3436,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Mcever Road - Shoal Creek 115Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Mcever Road - Shoal Creek","lat":34.273,"lng":-83.874,"route":null,"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":186,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 212, TEAMS 19621): MCEVER ROAD - SHOAL CREEK 115KV REBUILD; need date 06/01/2029; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: MCEVER ROAD = OSM substation 'McEver Road Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":3437,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Mcmanus - West Brunswick 115Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Mcmanus - West Brunswick","lat":31.247,"lng":-81.552,"route":[[31.213,-81.545],[31.28,-81.559]],"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":186,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 218, TEAMS 20346): MCMANUS - WEST BRUNSWICK 115KV REBUILD; need date 06/01/2029; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: MCMANUS = OSM substation 'McManus Switchyard' (GA); WEST BRUNSWICK = OSM substation 'West Brunswick Substation' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3438,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Norcross - North Druid Hills 115Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Norcross - North Druid Hills","lat":33.852,"lng":-84.22,"route":null,"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":186,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 202, TEAMS 20757): NORCROSS - NORTH DRUID HILLS 115KV REBUILD; need date 06/01/2029; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: NORCROSS = OSM substation 'Norcross Substation' (GA); NORTH DRUID HILLS ~ DeKalb County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3439,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Boulevard - Magnolia 115 Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Boulevard - Magnolia","lat":32.032,"lng":-81.115,"route":[[32.041,-81.144],[32.023,-81.086]],"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":186,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 219, TEAMS 21006): SAV: BOULEVARD - MAGNOLIA 115 KV LINE REBUILD; need date 06/01/2029; sponsor SAV. Cost columns are redacted in the public filing.\nLocated: BOULEVARD = OSM substation 'Boulevard Substation' (GA); MAGNOLIA = OSM substation 'Magnolia Substation' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3440,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Dean Forest - Little Ogeechee 230 Kv Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Dean Forest - Little Ogeechee","lat":32.046,"lng":-81.221,"route":[[32.084,-81.189],[32.007,-81.253]],"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":186,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 219, TEAMS 21023): SAV: DEAN FOREST - LITTLE OGEECHEE 230 KV REBUILD; need date 06/01/2029; sponsor SAV. Cost columns are redacted in the public filing.\nLocated: DEAN FOREST = OSM substation 'Dean Forest Substation' (GA); LITTLE OGEECHEE = OSM substation 'Little Ogeechee Substation' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3441,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Rice Hope New Auto Transformer","type":"substation","voltage_kv":null,"location_ref":"Rice Hope","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":186,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 219, TEAMS 20989): SAV: RICE HOPE NEW AUTO TRANSFORMER; need date 06/01/2029; sponsor SAV. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3442,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"South Bainbridge - Sinai (Fpl) 115Kv Line Reconductor","type":"transmission line","voltage_kv":115,"location_ref":"South Bainbridge - Sinai (Fpl)","lat":30.84,"lng":-84.489,"route":null,"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":186,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 216, TEAMS 13628): SOUTH BAINBRIDGE - SINAI (FPL) 115KV LINE RECONDUCTOR; need date 06/01/2029; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: SOUTH BAINBRIDGE = OSM substation 'South Bainbridge Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":3443,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Bay Creek - Conyers 230Kv Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Bay Creek - Conyers","lat":33.76,"lng":-83.954,"route":null,"cost_usd":null,"start_date":"2029-12-31","end_date":"2029-12-31","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":186,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 202, TEAMS 20248): BAY CREEK - CONYERS 230KV REBUILD; need date 12/31/2029; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: BAY CREEK = OSM substation 'Bay Creek Substation' (GA); CONYERS ~ Rockdale County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3444,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Anniston - Hammond 230Kv Line","type":"transmission line","voltage_kv":230,"location_ref":"Anniston - Hammond","lat":34.264,"lng":-85.214,"route":null,"cost_usd":null,"start_date":"2030-06-01","end_date":"2030-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":186,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 211, TEAMS 21129): ANNISTON - HAMMOND 230KV LINE; need date 06/01/2030; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: HAMMOND = Floyd County, GA (county centre, curated)","reviewed":false,"approximate":true,"requires_review":false},{"id":3445,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Atkinson - Northside Drive 115Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Atkinson - Northside Drive","lat":33.825,"lng":-84.471,"route":null,"cost_usd":null,"start_date":"2030-06-01","end_date":"2030-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":186,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 201, TEAMS 20764): ATKINSON - NORTHSIDE DRIVE 115KV REBUILD; need date 06/01/2030; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: ATKINSON = curated point (Plant Atkinson shares the Plant McDonough-Atkinson site in Cobb County (OSM))","reviewed":false,"approximate":true,"requires_review":false},{"id":3446,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Atkinson - Northwest 115Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Atkinson - Northwest","lat":33.825,"lng":-84.471,"route":null,"cost_usd":null,"start_date":"2030-06-01","end_date":"2030-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":186,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 201, TEAMS 20761): ATKINSON - NORTHWEST 115KV REBUILD; need date 06/01/2030; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: ATKINSON = curated point (Plant Atkinson shares the Plant McDonough-Atkinson site in Cobb County (OSM))","reviewed":false,"approximate":true,"requires_review":false},{"id":3447,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Cc - North Georgia Data Network Upgrades","type":"substation","voltage_kv":null,"location_ref":"North Georgia Data","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2030-06-01","end_date":"2030-06-01","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":186,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 212, TEAMS 21130): CC - NORTH GEORGIA DATA NETWORK UPGRADES; need date 06/01/2030; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3448,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Cornelia - Tallulah Lodge 115Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Cornelia - Tallulah Lodge","lat":34.634,"lng":-83.526,"route":null,"cost_usd":null,"start_date":"2030-06-01","end_date":"2030-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":186,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 212, TEAMS 10478): CORNELIA - TALLULAH LODGE 115KV REBUILD; need date 06/01/2030; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: CORNELIA ~ Habersham County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":3449,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"East Point - Tributary 230Kv Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"East Point - Tributary","lat":33.689,"lng":-84.615,"route":null,"cost_usd":null,"start_date":"2030-06-01","end_date":"2030-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":186,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 201, TEAMS 21097): EAST POINT - TRIBUTARY 230KV REBUILD; need date 06/01/2030; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: EAST POINT = OSM substation 'East Point Primary Substation' (GA); TRIBUTARY ~ Douglas County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3450,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"East Point - Union City 230Kv Black Line Reconductor","type":"transmission line","voltage_kv":230,"location_ref":"East Point - Union City","lat":33.733,"lng":-84.466,"route":null,"cost_usd":null,"start_date":"2030-06-01","end_date":"2030-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":187,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 208, TEAMS 20480): EAST POINT - UNION CITY 230KV BLACK LINE RECONDUCTOR; need date 06/01/2030; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: EAST POINT = OSM substation 'East Point Primary Substation' (GA); UNION CITY ~ Fulton County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3451,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Echeconnee-Wellston 115Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Echeconnee - Wellston","lat":32.458,"lng":-83.662,"route":null,"cost_usd":null,"start_date":"2030-06-01","end_date":"2030-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":187,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 214, TEAMS 19627): ECHECONNEE-WELLSTON 115KV LINE REBUILD; need date 06/01/2030; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: WELLSTON ~ Houston County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":3452,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Farley (Apc)-Tazewell 500Kv","type":"substation","voltage_kv":500,"location_ref":"Farley (Apc)-Tazewell","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2030-06-01","end_date":"2030-06-01","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":187,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 216, TEAMS 21063): FARLEY (APC)-TAZEWELL 500KV; need date 06/01/2030; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3453,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Gainesville #2 - Mcever Road 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Gainesville #2 - Mcever Road","lat":34.268,"lng":-83.842,"route":[[34.273,-83.874],[34.263,-83.81]],"cost_usd":null,"start_date":"2030-06-01","end_date":"2030-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":187,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 212, TEAMS 12120): GAINESVILLE #2 - MCEVER ROAD 115 KV REBUILD; need date 06/01/2030; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: MCEVER ROAD = OSM substation 'McEver Road Substation' (GA); GAINESVILLE #2 = OSM substation 'Gainesville Substation #2' (GA), nearest of 2 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3454,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Glenwood Springs - Lake Oconee 115Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Glenwood Springs - Lake Oconee","lat":33.46,"lng":-83.247,"route":null,"cost_usd":null,"start_date":"2030-06-01","end_date":"2030-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":187,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 214, TEAMS 20298): GLENWOOD SPRINGS - LAKE OCONEE 115KV LINE REBUILD; need date 06/01/2030; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: LAKE OCONEE = OSM substation 'Lake Oconee Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":3455,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Goat Rock Reactors Installation","type":"substation","voltage_kv":null,"location_ref":"Goat Rock Reactors Installation","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2030-06-01","end_date":"2030-06-01","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":187,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 213, TEAMS 21128): GOAT ROCK REACTORS INSTALLATION; need date 06/01/2030; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3456,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Goldens Creek - Warrenton Primary 230Kv Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Goldens Creek - Warrenton Primary","lat":33.394,"lng":-82.679,"route":null,"cost_usd":null,"start_date":"2030-06-01","end_date":"2030-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":187,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 215, TEAMS 19996): GOLDENS CREEK - WARRENTON PRIMARY 230KV REBUILD; need date 06/01/2030; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: WARRENTON PRIMARY ~ centre of 2 nearby same-named OSM substations","reviewed":false,"approximate":true,"requires_review":false},{"id":3457,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Gordon-Sandersville #1 115Kv Line Rebuild (Deepstep-Sand #6)","type":"transmission line","voltage_kv":115,"location_ref":"Gordon - Sandersville #1","lat":32.94,"lng":-83.059,"route":[[32.882,-83.317],[32.998,-82.802]],"cost_usd":null,"start_date":"2030-06-01","end_date":"2030-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":187,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 214, TEAMS 20428): GORDON-SANDERSVILLE #1 115KV LINE REBUILD (DEEPSTEP-SAND #6); need date 06/01/2030; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: GORDON = OSM substation 'Gordon Substation' (GA); SANDERSVILLE #1 = OSM substation 'Sandersville Substation #1' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3458,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Goshen Area Strategic Solution","type":"substation","voltage_kv":null,"location_ref":"Goshen","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2030-06-01","end_date":"2030-06-01","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":187,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 215, TEAMS 21116): GOSHEN AREA STRATEGIC SOLUTION; need date 06/01/2030; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3459,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Jefferson Road - Winder Primary 115Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Jefferson Road - Winder Primary","lat":33.986,"lng":-83.666,"route":[[33.978,-83.579],[33.995,-83.753]],"cost_usd":null,"start_date":"2030-06-01","end_date":"2030-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":188,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 212, TEAMS 20789): JEFFERSON ROAD - WINDER PRIMARY 115KV REBUILD; need date 06/01/2030; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: JEFFERSON ROAD = OSM substation 'Jefferson Rd Substation' (GA); WINDER PRIMARY = OSM substation 'Winder Primary Substation' (GA), nearest of 2 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3460,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Kettle Creek Primary - Pine Grove Primary 115Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Kettle Creek Primary - Pine Grove Primary","lat":30.882,"lng":-83.228,"route":null,"cost_usd":null,"start_date":"2030-06-01","end_date":"2030-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":188,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 216, TEAMS 20284): KETTLE CREEK PRIMARY - PINE GROVE PRIMARY 115KV REBUILD; need date 06/01/2030; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: PINE GROVE PRIMARY = OSM substation 'Pine Grove Primary Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":3461,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"New Cavender Drive - Tributary 230Kv Line","type":"transmission line","voltage_kv":230,"location_ref":"New Cavender Drive - Tributary","lat":33.701,"lng":-84.767,"route":null,"cost_usd":null,"start_date":"2030-06-01","end_date":"2030-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":188,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 201, TEAMS 20857): NEW CAVENDER DRIVE - TRIBUTARY 230KV LINE; need date 06/01/2030; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: TRIBUTARY ~ Douglas County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":3462,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"North Spa 230Kv Strategic Project","type":"substation","voltage_kv":230,"location_ref":"North Spa","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2030-06-01","end_date":"2030-06-01","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":188,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 214, TEAMS 21093): NORTH SPA 230KV STRATEGIC PROJECT; need date 06/01/2030; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3463,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Tallulah Lodge - Toccoa 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Tallulah Lodge - Toccoa","lat":34.581,"lng":-83.353,"route":null,"cost_usd":null,"start_date":"2030-06-01","end_date":"2030-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":188,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 212, TEAMS 19995): TALLULAH LODGE - TOCCOA 115 KV REBUILD; need date 06/01/2030; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: TOCCOA = OSM substation 'Toccoa Primary Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":3464,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Tributary - Thornton Rd 230Kv Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Tributary - Thornton Rd","lat":33.701,"lng":-84.767,"route":null,"cost_usd":null,"start_date":"2030-06-01","end_date":"2030-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":188,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 201, TEAMS 21098): TRIBUTARY - THORNTON RD 230KV REBUILD; need date 06/01/2030; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: TRIBUTARY ~ Douglas County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":3465,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Thomaston 230 New Build Sub","type":"substation","voltage_kv":null,"location_ref":"Thomaston 230","lat":32.882,"lng":-84.292,"route":null,"cost_usd":null,"start_date":"2030-11-01","end_date":"2030-11-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":188,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 213, TEAMS 20160): THOMASTON 230 NEW BUILD SUB; need date 11/01/2030; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: THOMASTON 230 ~ Upson County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":3466,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Bainbridge Transmission: East River Road, East Bainbridge","type":"substation","voltage_kv":null,"location_ref":"Bainbridge","lat":30.913,"lng":-84.567,"route":null,"cost_usd":null,"start_date":"2030-12-31","end_date":"2030-12-31","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":188,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 216, TEAMS 18848): BAINBRIDGE TRANSMISSION: EAST RIVER ROAD, EAST BAINBRIDGE; need date 12/31/2030; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: BAINBRIDGE = OSM substation 'Bainbridge Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":3467,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Glenwood Springs 115Kv Cap Bank","type":"substation","voltage_kv":115,"location_ref":"Glenwood Springs","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2030-12-31","end_date":"2030-12-31","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":188,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 214, TEAMS 19626): GLENWOOD SPRINGS 115KV CAP BANK; need date 12/31/2030; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3468,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"East Point - Union City (White) 230Kv Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"East Point - Union City (White)","lat":33.733,"lng":-84.466,"route":null,"cost_usd":null,"start_date":"2031-05-01","end_date":"2031-05-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":188,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 208, TEAMS 20690): EAST POINT - UNION CITY (WHITE) 230KV REBUILD; need date 05/01/2031; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: EAST POINT = OSM substation 'East Point Primary Substation' (GA); UNION CITY (WHITE) ~ Fulton County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3469,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Avery - Hopewell 115Kv Reconductor","type":"transmission line","voltage_kv":115,"location_ref":"Avery - Hopewell","lat":34.195,"lng":-84.334,"route":[[34.217,-84.386],[34.174,-84.283]],"cost_usd":null,"start_date":"2031-06-01","end_date":"2031-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":188,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 202, TEAMS 19632): AVERY - HOPEWELL 115KV RECONDUCTOR; need date 06/01/2031; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: AVERY = OSM substation 'Avery Substation' (GA); HOPEWELL = OSM substation 'Hopewell Substation' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3470,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Bowen #10 500/230Kv Autobank Replacement","type":"substation","voltage_kv":500,"location_ref":"Bowen #10","lat":34.122,"lng":-84.922,"route":null,"cost_usd":null,"start_date":"2031-06-01","end_date":"2031-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":188,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 211, TEAMS 10811): BOWEN #10 500/230KV AUTOBANK REPLACEMENT; need date 06/01/2031; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: BOWEN #10 = OSM substation 'Bowen Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":3471,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Hatch - Wadley 500 Kv Line Strategic Project","type":"transmission line","voltage_kv":500,"location_ref":"Hatch - Wadley","lat":32.847,"lng":-82.406,"route":null,"cost_usd":null,"start_date":"2031-06-01","end_date":"2031-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":188,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 215, TEAMS 20756): HATCH - WADLEY 500 KV LINE STRATEGIC PROJECT; need date 06/01/2031; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: WADLEY ~ centre of 2 nearby same-named OSM substations","reviewed":false,"approximate":true,"requires_review":false},{"id":3472,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Coleman - Meldrim 115Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Coleman - Meldrim","lat":32.132,"lng":-81.297,"route":[[32.155,-81.368],[32.108,-81.227]],"cost_usd":null,"start_date":"2032-06-01","end_date":"2032-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":189,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 219, TEAMS 20784): SAV: COLEMAN - MELDRIM 115KV LINE REBUILD; need date 06/01/2032; sponsor SAV. Cost columns are redacted in the public filing.\nLocated: MELDRIM = OSM substation 'Meldrim Substation' (GA); COLEMAN = OSM substation 'Coleman Substation' (GA), nearest of 2 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3473,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Arkwright Bus And Jumper Replacement","type":"substation","voltage_kv":null,"location_ref":"Arkwright Bus - Jumper Replacement","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2033-06-01","end_date":"2033-06-01","start_precision":"day","end_precision":"day","confidence":0.6000000238418579,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":189,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 214, TEAMS 20767): ARKWRIGHT BUS AND JUMPER REPLACEMENT; need date 06/01/2033; sponsor GPC. Cost columns are redacted in the public filing.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3474,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Bay Creek - Conyers 230Kv Limiting Element Replacement","type":"transmission line","voltage_kv":230,"location_ref":"Bay Creek - Conyers","lat":33.76,"lng":-83.954,"route":null,"cost_usd":null,"start_date":"2033-06-01","end_date":"2033-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":189,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 202, TEAMS 20758): BAY CREEK - CONYERS 230KV LIMITING ELEMENT REPLACEMENT; need date 06/01/2033; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: BAY CREEK = OSM substation 'Bay Creek Substation' (GA); CONYERS ~ Rockdale County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3475,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Evans Primary - Thurmond Dam (Usa) #5 115Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Evans Primary - Thurmond Dam (Usa) #5","lat":33.602,"lng":-82.183,"route":[[33.544,-82.169],[33.66,-82.196]],"cost_usd":null,"start_date":"2033-06-01","end_date":"2033-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":189,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 215, TEAMS 20793): EVANS PRIMARY - THURMOND DAM (USA) #5 115KV REBUILD; need date 06/01/2033; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: EVANS PRIMARY = OSM substation 'Evans Primary Substation' (GA); THURMOND DAM (USA) #5 = OSM substation 'Thurmond Substation' (SC) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3476,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Evans Primary - Thurmond Dam (Usa) #6 115Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Evans Primary - Thurmond Dam (Usa) #6","lat":33.602,"lng":-82.183,"route":[[33.544,-82.169],[33.66,-82.196]],"cost_usd":null,"start_date":"2033-06-01","end_date":"2033-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":189,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 215, TEAMS 20794): EVANS PRIMARY - THURMOND DAM (USA) #6 115KV REBUILD; need date 06/01/2033; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: EVANS PRIMARY = OSM substation 'Evans Primary Substation' (GA); THURMOND DAM (USA) #6 = OSM substation 'Thurmond Substation' (SC) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3477,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Mcever Road - Shoal Creek 115Kv Rebuild Phase Iii","type":"transmission line","voltage_kv":115,"location_ref":"Mcever Road - Shoal Creek","lat":34.273,"lng":-83.874,"route":null,"cost_usd":null,"start_date":"2033-06-01","end_date":"2033-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":189,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 212, TEAMS 21053): MCEVER ROAD - SHOAL CREEK 115KV REBUILD PHASE III; need date 06/01/2033; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: MCEVER ROAD = OSM substation 'McEver Road Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":3478,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Mcgrau Ford - Middle Fork 500Kv Line Project","type":"transmission line","voltage_kv":500,"location_ref":"Mcgrau Ford - Middle Fork","lat":34.326,"lng":-84.337,"route":null,"cost_usd":null,"start_date":"2033-06-01","end_date":"2033-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":189,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 212, TEAMS 09661): MCGRAU FORD - MIDDLE FORK 500KV LINE PROJECT; need date 06/01/2033; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: MCGRAU FORD = OSM substation 'McGrau Ford Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":3479,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Meldrim Bank D Replacement","type":"substation","voltage_kv":null,"location_ref":"Meldrim","lat":32.155,"lng":-81.368,"route":null,"cost_usd":null,"start_date":"2033-06-01","end_date":"2033-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":189,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 219, TEAMS 20796): SAV: MELDRIM BANK D REPLACEMENT; need date 06/01/2033; sponsor SAV. Cost columns are redacted in the public filing.\nLocated: MELDRIM = OSM substation 'Meldrim Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":3480,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Thomson Primary 230/115Kv Second Transformer","type":"substation","voltage_kv":230,"location_ref":"Thomson Primary","lat":33.462,"lng":-82.454,"route":null,"cost_usd":null,"start_date":"2033-06-01","end_date":"2033-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":189,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 215, TEAMS 14222): THOMSON PRIMARY 230/115KV SECOND TRANSFORMER; need date 06/01/2033; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: THOMSON PRIMARY ~ centre of 2 nearby same-named OSM substations","reviewed":false,"approximate":true,"requires_review":false},{"id":3481,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Winder Primary 230Kv Bus 1-2 Parallel Bus-Tie Installation","type":"substation","voltage_kv":230,"location_ref":"Winder Primary","lat":34.01,"lng":-83.755,"route":null,"cost_usd":null,"start_date":"2033-06-01","end_date":"2033-06-01","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":190,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 202, TEAMS 20759): WINDER PRIMARY 230KV BUS 1-2 PARALLEL BUS-TIE INSTALLATION; need date 06/01/2033; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: WINDER PRIMARY ~ centre of 2 nearby same-named OSM substations","reviewed":false,"approximate":true,"requires_review":false},{"id":3482,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Pine Grove Primary - West Valdosta 115 Kv Reconductor","type":"transmission line","voltage_kv":115,"location_ref":"Pine Grove Primary - West Valdosta","lat":30.858,"lng":-83.248,"route":null,"cost_usd":null,"start_date":"2033-12-31","end_date":"2033-12-31","start_precision":"day","end_precision":"day","confidence":0.800000011920929,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":190,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 216, TEAMS 10487): PINE GROVE PRIMARY - WEST VALDOSTA 115 KV RECONDUCTOR; need date 12/31/2033; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: PINE GROVE PRIMARY = OSM substation 'Pine Grove Primary Substation' (GA); WEST VALDOSTA ~ Lowndes County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3483,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Dawson Crossing - Gainesville #1 115 Kv","type":"transmission line","voltage_kv":115,"location_ref":"Dawson Crossing - Gainesville #1","lat":34.359,"lng":-83.987,"route":[[34.378,-84.134],[34.34,-83.84]],"cost_usd":null,"start_date":"2034-06-01","end_date":"2034-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":190,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 212, TEAMS 18700): DAWSON CROSSING - GAINESVILLE #1 115 KV; need date 06/01/2034; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: DAWSON CROSSING = OSM substation 'Dawson Crossing Substation' (GA); GAINESVILLE #1 = OSM substation 'Gainesville Primary Substation (#1)' (GA), nearest of 2 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3484,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Little Ogeechee 230/115Kv Bank Replacement","type":"substation","voltage_kv":230,"location_ref":"Little Ogeechee","lat":32.007,"lng":-81.253,"route":null,"cost_usd":null,"start_date":"2034-06-01","end_date":"2034-06-01","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":190,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 219, TEAMS 20787): SAV: LITTLE OGEECHEE 230/115KV BANK REPLACEMENT; need date 06/01/2034; sponsor SAV. Cost columns are redacted in the public filing.\nLocated: LITTLE OGEECHEE = OSM substation 'Little Ogeechee Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":3485,"plan_id":"16ce1eac-9958-42fe-9573-426883e0f32b","utility":"Georgia Power","state":"GA","name":"Evans Primary - Thomson Primary 115Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Evans Primary - Thomson Primary","lat":33.499,"lng":-82.291,"route":[[33.544,-82.169],[33.454,-82.414]],"cost_usd":null,"start_date":"2034-12-31","end_date":"2034-12-31","start_precision":"day","end_precision":"day","confidence":0.949999988079071,"source_url":"https://psc.ga.gov/search/facts-docket/?docketId=56002","source_page":190,"raw_excerpt":"Georgia ITS 10 Year Plan, Table 2 (zone 215, TEAMS 17993): EVANS PRIMARY - THOMSON PRIMARY 115KV REBUILD; need date 12/31/2034; sponsor GPC. Cost columns are redacted in the public filing.\nLocated: EVANS PRIMARY = OSM substation 'Evans Primary Substation' (GA); THOMSON PRIMARY = OSM substation 'Thomson Primary Substation' (GA), nearest of 2 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2783,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Adamsville - Buzzard Roost 230 Kv Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Adamsville - Buzzard Roost (GA)","lat":33.481,"lng":-82.48,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":27,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 27.\nIn-Service Year: 2027\nProject Name: GTC: ADAMSVILLE - BUZZARD ROOST 230 KV REBUILD\nDescription: Rebuild about 5 miles of the Adamsville - Buzzard Roost 230 kV line with 200°C 1351 ACSS Martin.\nSupporting Statement: The Adamsville - Buzzard Roost 230kV line overloads under contingency.\nLocated: ADAMSVILLE ~ McDuffie County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2784,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Douglasville - Villa Rica 230 Kv Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Douglasville - Villa Rica (GA)","lat":33.721,"lng":-84.811,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":27,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 27.\nIn-Service Year: 2027\nProject Name: GTC: DOUGLASVILLE - VILLA RICA 230 KV REBUILD\nDescription: Rebuild the 2.5 mile section of the Villa Rica - Douglasville 230 kV line with bundled 200°C 1351 ACSS Martin conductor.\nSupporting Statement: The Villa Rica - Douglasville 230 kV line overloads under contingency.\nLocated: VILLA RICA = OSM substation 'Villa Rica Substation' (GA); DOUGLASVILLE ~ Douglas County, GA (county centre) (nearest of 2) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2785,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Doyle - Winder Primary 230 Kv Line Jumper Replacement","type":"transmission line","voltage_kv":230,"location_ref":"Doyle - Winder Primary (GA)","lat":33.916,"lng":-83.726,"route":[[33.838,-83.699],[33.995,-83.753]],"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":27,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 27.\nIn-Service Year: 2027\nProject Name: GTC: DOYLE - WINDER PRIMARY 230 KV LINE JUMPER REPLACEMENT\nDescription: Replace the limiting AAC 1033 jumper with AAC 1590 at Doyle on the Doyle - Winder Primary 230 kV line.\nSupporting Statement: The Doyle - Winder Primary 230kV line overloads under contingency.\nLocated: DOYLE = OSM substation 'Doyle Substation' (GA); WINDER PRIMARY = OSM substation 'Winder Primary Substation' (GA), nearest of 2 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2786,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"East Moultrie - Highway 112 230 Kv Line","type":"transmission line","voltage_kv":230,"location_ref":"East Moultrie - Highway 112 (GA)","lat":31.242,"lng":-83.743,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":27,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 27.\nIn-Service Year: 2027\nProject Name: GTC: EAST MOULTRIE - HIGHWAY 112 230 KV LINE\nDescription: Build approximately 27 miles of new 230 kV line between HWY 112 and East Moultrie substations with 160°C 1351 ACSS conductor.\nSupporting Statement: This project addresses thermal overloads on the Daisy - West Valdosta 230 kV and Mitchell - Raccoon Creek 230 kV lines under contingency.\nLocated: EAST MOULTRIE = OSM substation 'East Moultrie Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":2787,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"East Walton 500/230 Kv Project","type":"substation","voltage_kv":500,"location_ref":"East Walton (GA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":28,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 28.\nIn-Service Year: 2027\nProject Name: GTC: EAST WALTON 500/230 KV PROJECT\nDescription: GTC: - Construct the East Walton 500/230 kV substation. - Construct the Bostwick 230 kV switching station. - Construct the East Walton - Rockville 500 kV line (3 - 100°C 1113 ACSR). - Construct the Bethabara - East Walton 230 kV line (170°C 1351.5 ACSS). - Construct the Bostwick - East Walton 230 kV line (170°C 1351.5 ACSS). - Construct the East Walton - Jack's Creek 230 kV line (170°C 1351.5 ACSS). - At Bethabara, terminate the East Walton 230 kV line. - Loop the East Social Circle - East Watkinsville 230 kV line into Bostwick. - Replace line trap at East Watkinsville on the Bostwick 230 kV line. GPC: - Construct the Rockville 500 kV switching station. - Loop the Scherer - Warthen 500 kV line into Rockville. - Loop the Doyle - LG&E Monroe 230 kV line into Jack's Creek. MEAG: - Construct the Jack's Creek 230 kV switching station.\nSupporting Statement: Contingencies of 230 kV transmission lines in Central area causes several 230 kV transmission lines to overload. The project also addresses increasing loads in Northeast Georgia and the increase of South to North flow from Central region into the Northeast due to solar generation located in South GA.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2788,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Garrett Rd - V. Rica 230 Kv Line Reconductor","type":"transmission line","voltage_kv":230,"location_ref":"Garrett Rd - V. Rica (GA)","lat":33.582,"lng":-85.081,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":28,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 28.\nIn-Service Year: 2027\nProject Name: GTC: GARRETT RD - V. RICA 230 KV LINE RECONDUCTOR\nDescription: Reconductor the section from East Villa Rica Switching station to Garrett Rd with 160°C 1351 ACSS on 11.5 miles of the Garrett Road - Villa Rica 230 kV line. Additionally, the 2.5 mile section from East Villa Rica Switching Station to Villa Rica will be rebuilt with bundled 200°C 1351 ACSS Martin.\nSupporting Statement: The Garrett Road - Villa Rica 230 kV line overloads under contingency.\nLocated: V. RICA ~ Carroll County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2789,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Glenwood Springs - Lick Creek 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Glenwood Springs - Lick Creek (GA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":29,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 29.\nIn-Service Year: 2027\nProject Name: GTC: GLENWOOD SPRINGS - LICK CREEK 115 KV REBUILD\nDescription: Rebuild approximately 7.5 miles of the Glendwood Springs - Lick Creek 115 kV line section with 100°C 795 ACSR conductor.\nSupporting Statement: The Glenwood Springs - Lick Creek 115 kV line conductor and structures are at the end of life and have recent maintenance issues.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2790,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Hickory Level - Villa Rica 230 Kv Line Reconductor","type":"transmission line","voltage_kv":230,"location_ref":"Hickory Level - Villa Rica (GA)","lat":33.741,"lng":-84.855,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":29,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 29.\nIn-Service Year: 2027\nProject Name: GTC: HICKORY LEVEL - VILLA RICA 230 KV LINE RECONDUCTOR\nDescription: Reconductor 8.6 miles of the Hickory Level - Villa Rica 230 kV line with 160°C 1351 ACSS Martin. Replace limiting elements along the line.\nSupporting Statement: The Hickory Level - Villa Rica 230 kV line overloads under contingency.\nLocated: VILLA RICA = OSM substation 'Villa Rica Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":2791,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Jackson 115 Kv Bus And Jumper Upgrades","type":"substation","voltage_kv":115,"location_ref":"Jackson (GA)","lat":33.285,"lng":-83.966,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":29,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 29.\nIn-Service Year: 2027\nProject Name: GTC: JACKSON 115 KV BUS AND JUMPER UPGRADES\nDescription: Upgrade limiting elements at Jackson 115 kV substation to be a higher rating.\nSupporting Statement: Limiting elements exceed their thermal rating under contingency.\nLocated: JACKSON = OSM substation 'Jackson Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":2792,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Morning Hornet 2Nd 230/115 Kv Bank & Stanton Sp 115 Kv","type":"substation","voltage_kv":230,"location_ref":"Morning Hornet 2Nd (GA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":29,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 29.\nIn-Service Year: 2027\nProject Name: GTC: MORNING HORNET 2ND 230/115 KV BANK & STANTON SP 115 KV\nDescription: Add a second 230/115 kV auto transformer at Morning Hornet substation. Also, build a new 115 kV line from Morning Hornet to Thumbs Up, approximately 2.4 miles, with 100°C 1351 ACSR conductor.\nSupporting Statement: The East Social Circle - Stanton Springs 115 kV and Morning Hornet - Thumbs Up 115 kV lines overload under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2793,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Replace 230/115 Kv Auto Transformers At South Hazlehurst","type":"substation","voltage_kv":230,"location_ref":"230/115 Kv Auto Transformers At South Hazlehurst (GA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":30,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 30.\nIn-Service Year: 2027\nProject Name: GTC: REPLACE 230/115 KV AUTO TRANSFORMERS AT SOUTH HAZLEHURST\nDescription: Replace 230/115 kV auto transformers at South Hazlehurst with higher rating transformers.\nSupporting Statement: The 230/115 kV auto transformers at South Hazlehurst overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2794,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Riddleville 115 Kv Bus Replacement","type":"substation","voltage_kv":115,"location_ref":"Riddleville (GA)","lat":32.972,"lng":-82.798,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":30,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 30.\nIn-Service Year: 2027\nProject Name: GTC: RIDDLEVILLE 115 KV BUS REPLACEMENT\nDescription: Replace the main 115 kV bus at the substation with higher rating.\nSupporting Statement: The Sandersville #1 - Wadley 115 kV line overloads under contingency.\nLocated: RIDDLEVILLE ~ Washington County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2795,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Skc 115 Kv Bus And Jumper Replacement","type":"substation","voltage_kv":115,"location_ref":"Skc (GA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":30,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 30.\nIn-Service Year: 2027\nProject Name: GTC: SKC 115 KV BUS AND JUMPER REPLACEMENT\nDescription: Upgrade limiting elements at the SKC substation to a higher rating.\nSupporting Statement: The Covington #2 - SKC 115 kV line exceeds its thermal rating under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2796,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Switch Way - Thornton Road 230 Kv Line Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Switch Way - Thornton Road (GA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":30,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 30.\nIn-Service Year: 2027\nProject Name: GTC: SWITCH WAY - THORNTON ROAD 230 KV LINE REBUILD\nDescription: Rebuild 1.3 miles of Switch Way - Thornton Road 230 kV line with minimum rating of 160°C 1033 ACSS conductor.\nSupporting Statement: The Switch Way - Thornton Road 230 kV line overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2835,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Barneyville - East Moultrie 115Kv New Line","type":"transmission line","voltage_kv":115,"location_ref":"Barneyville - East Moultrie (GA)","lat":31.197,"lng":-83.586,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":41,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 41.\nIn-Service Year: 2028\nProject Name: GTC: BARNEYVILLE - EAST MOULTRIE 115KV NEW LINE\nDescription: Build approximately 20 miles of a new 115 kV line from Barneyville to East Moultrie with 200°C 1351 ACSS .\nSupporting Statement: The Barneyville - Pine Grove Primary 115 kV line and Barneyville - Douglas 115 kV line overload under contingency.\nLocated: EAST MOULTRIE = OSM substation 'East Moultrie Substation' (GA); BARNEYVILLE ~ Cook County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2836,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Bonaire Primary 500/230 Kv Xfmr Replcement & Relay Modification","type":"substation","voltage_kv":500,"location_ref":"Bonaire Primary (GA)","lat":32.565,"lng":-83.6,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":41,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 41.\nIn-Service Year: 2028\nProject Name: GTC: BONAIRE PRIMARY 500/230 KV XFMR REPLCEMENT & RELAY MODIFICATION\nDescription: Replace 500/230 kV, auto transformer C with a new transformer. Replace obsolete relay panels.\nSupporting Statement: Replacement of obsolete relays and major equipment at Bonaire Primary needed due to ongoing maintenance issues.\nLocated: BONAIRE PRIMARY = OSM substation 'Bonaire Primary Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":2837,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Bostwick - East Social Circle 230 Kv Reconductor","type":"transmission line","voltage_kv":230,"location_ref":"Bostwick - East Social Circle (GA)","lat":33.636,"lng":-83.589,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":41,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 41.\nIn-Service Year: 2028\nProject Name: GTC: BOSTWICK - EAST SOCIAL CIRCLE 230 KV RECONDUCTOR\nDescription: Reconductor appoximately 10.8 miles of the East Social Circle - East Watkinsville 230 kV line from 1033 ACSR Curlew conductor to 1033 ACCS 200°C conductor.\nSupporting Statement: The Bostwick - East Social Circle 230 kV line overloads under contingency.\nLocated: EAST SOCIAL CIRCLE = OSM substation 'East Social Circle Substation' (GA); BOSTWICK ~ Morgan County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2838,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Dyer Road - South Coweta 115 Kv Rebuild Phase 1","type":"transmission line","voltage_kv":115,"location_ref":"Dyer Road - South Coweta (GA)","lat":33.326,"lng":-84.534,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":41,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 41.\nIn-Service Year: 2028\nProject Name: GTC: DYER ROAD - SOUTH COWETA 115 KV REBUILD PHASE 1\nDescription: Rebuild the 12.6 miles section of the Dyer Road - South Coweta 115 kV line with 200°C 1351 ACSS Martin.\nSupporting Statement: The Dyer Road - South Coweta 115 kV line overloads under contingency.\nLocated: SOUTH COWETA = OSM substation 'South Coweta Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":2839,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Mcdonough - South Griffin 115 Kv Rebuild - Phase 1","type":"transmission line","voltage_kv":115,"location_ref":"Mcdonough - South Griffin (GA)","lat":33.453,"lng":-84.154,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":42,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 42.\nIn-Service Year: 2028\nProject Name: GTC: MCDONOUGH - SOUTH GRIFFIN 115 KV REBUILD - PHASE 1\nDescription: Rebuild the McDonough - South Griffin 115 kV line with 200°C 1351 ACSS Martin. Replace limiting switches and jumpers with higher rated equpiment.\nSupporting Statement: The McDonough - South Griffin 115 kV line overloads under contingency.\nLocated: MCDONOUGH ~ Henry County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2840,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"New Hampton 230/115 Kv Sub","type":"substation","voltage_kv":230,"location_ref":"New Hampton (GA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":42,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 42.\nIn-Service Year: 2028\nProject Name: GTC: NEW HAMPTON 230/115 KV SUB\nDescription: Construct a new 230/115 kV substation next to the existing Hampton 115 kV substation. The new substation will serve the Henderson Farms load as well as the existing Hampton 115 kV sub.\nSupporting Statement: The project will address multiple thermal overloads that occur under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2841,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"North Dublin 230/115Kv Transformers And Bus-Tie Breaker","type":"substation","voltage_kv":230,"location_ref":"North Dublin (GA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":42,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 42.\nIn-Service Year: 2028\nProject Name: GTC: NORTH DUBLIN 230/115KV TRANSFORMERS AND BUS-TIE BREAKER\nDescription: Replace North Dublin 230/115 kV Banks A & B with (2) new 230/115 kV auto transformers. Replace North Dublin 230 kV bus tie breaker with a new breaker. Replace North Dublin 115 kV bus tie breaker with a new breaker.\nSupporting Statement: Replacement of major equipment needed due to ongoing maintenance issues.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2842,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Remove Limiting Elements On South Coweta 230/115 Kv Bank A","type":"substation","voltage_kv":230,"location_ref":"South Coweta (GA)","lat":33.326,"lng":-84.534,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":42,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 42.\nIn-Service Year: 2028\nProject Name: GTC: REMOVE LIMITING ELEMENTS ON SOUTH COWETA 230/115 KV BANK A\nDescription: Replace limiting elements associated with South Coweta 230/115 kV auto transformer with higher rating.\nSupporting Statement: South Coweta 230/115 kV auto transformer overloads under contingency.\nLocated: SOUTH COWETA = OSM substation 'South Coweta Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":2843,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Rum Creek 500 Kv New Switching Station","type":"substation","voltage_kv":500,"location_ref":"Rum Creek (GA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":43,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 43.\nIn-Service Year: 2028\nProject Name: GTC: RUM CREEK 500 KV NEW SWITCHING STATION\nDescription: Construct the Rum Creek 500 kV breaker and half switching station. Loop in the existing Bonaire Primary - Scherer and Ohara - Scherer 500 kV lines. Terminate the new Big Smarr - Rum Creek 500 kV line. Construct the new line using 100°C (3) 1113 ACSR Bluejay conductor.\nSupporting Statement: The Bonaire Primary 500/230 kV Bank C and Bonaire Primary - Dorsett 230 kV line overload under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2889,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Barnesville - South Griffin 230 Kv Project","type":"transmission line","voltage_kv":230,"location_ref":"Barnesville - South Griffin (GA)","lat":33.044,"lng":-84.177,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":54,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 54.\nIn-Service Year: 2029\nProject Name: GTC: BARNESVILLE - SOUTH GRIFFIN 230 KV PROJECT\nDescription: Construct a new 19 mile, 230 kV line from South Griffin substation - Barnesville Primary substation with 200°C 1351 ACSS conductor.\nSupporting Statement: The Barnesville - South Griffin 115 kV line overloads under contingency.\nLocated: BARNESVILLE ~ centre of 2 nearby same-named OSM substations","reviewed":false,"approximate":true,"requires_review":false},{"id":2890,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Barnesville Primary - Thomaston 230 Kv","type":"transmission line","voltage_kv":230,"location_ref":"Barnesville Primary - Thomaston (GA)","lat":32.995,"lng":-84.221,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":54,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 54.\nIn-Service Year: 2029\nProject Name: GTC: BARNESVILLE PRIMARY - THOMASTON 230 KV\nDescription: Rebuild 13.24 miles of the Barnesville Primary - Thomaston 230 kV line with 200°C 1351 ACSS conductor. Replace line switches and jumpers.\nSupporting Statement: Barnesville Primary - Thomaston 230 kV line overloads under contingency.\nLocated: THOMASTON = OSM 'Thomaston #3 Substation' (GA); BARNESVILLE PRIMARY ~ centre of 2 nearby same-named OSM substations (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2891,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Bay Creek 230/115 Kv Second Auto Transformer","type":"substation","voltage_kv":230,"location_ref":"Bay Creek (GA)","lat":33.868,"lng":-83.882,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":55,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 55.\nIn-Service Year: 2029\nProject Name: GTC: BAY CREEK 230/115 KV SECOND AUTO TRANSFORMER\nDescription: Install a second 230/115 kV auto transformer at the Bay Creek substation.\nSupporting Statement: The Bay Creek - Monroe 115 kV line overloads under contingency.\nLocated: BAY CREEK = OSM substation 'Bay Creek Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":2892,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Buzzard Roost - Thornton Road 230 Kv Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Buzzard Roost - Thornton Road (GA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":55,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 55.\nIn-Service Year: 2029\nProject Name: GTC: BUZZARD ROOST - THORNTON ROAD 230 KV REBUILD\nDescription: Rebuild the Buzzard Roost - Thornton Road 230 kV line, approximately 1 mile, with 200°C 1351 ACSS conductor.\nSupporting Statement: The Buzzard Roost - Thornton Road 230 kV line overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2893,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Clarksboro - Winder Primary 230 Kv Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Clarksboro - Winder Primary (GA)","lat":34.077,"lng":-83.66,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":55,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 55.\nIn-Service Year: 2029\nProject Name: GTC: CLARKSBORO - WINDER PRIMARY 230 KV REBUILD\nDescription: Rebuild approximately 14 miles of the Clarksboro - Winder 230 kV line with 200°C 1351 ACSS conductor.\nSupporting Statement: The Clarksboro - Winder 230 kV line overloads under contingency.\nLocated: WINDER PRIMARY = OSM 'Winder Substation' (GA); CLARKSBORO ~ Jackson County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2894,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Cliftondale - Line Creek 230 Kv Line","type":"transmission line","voltage_kv":230,"location_ref":"Cliftondale (GA)","lat":33.79,"lng":-84.468,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":55,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 55.\nIn-Service Year: 2029\nProject Name: GTC: CLIFTONDALE - LINE CREEK 230 KV LINE\nDescription: Build a new 11.6 mile 230 kV line from Cliftondale to Line Creek with 200°C 1351 ACSS Martin.\nSupporting Statement: The line is being built to resolve thermal issues in Metro West and network Metro South more.\nLocated: CLIFTONDALE ~ Fulton County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2895,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Dawson Crossing - Nelson (Black) Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Dawson Crossing - Nelson (Black) (GA)","lat":34.383,"lng":-84.257,"route":[[34.378,-84.134],[34.387,-84.379]],"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":56,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 56.\nIn-Service Year: 2029\nProject Name: GTC: DAWSON CROSSING - NELSON (BLACK) REBUILD\nDescription: Rebuild approximately 7.5 miles from Nelson to McClain Mountain to Big Canoe on the Dawson Crossing - Nelson (Black) 115 kV line with 200°C 795 ACSS conductor or equivalent.\nSupporting Statement: Dawson Crossing - Nelson (Black) 115 kV line overloads under contingency.\nLocated: DAWSON CROSSING = OSM substation 'Dawson Crossing Substation' (GA); NELSON (BLACK) = OSM substation 'Nelson Substation' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2896,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Dresden - Talbot 500 Kv Line","type":"transmission line","voltage_kv":500,"location_ref":"Dresden - Talbot (GA)","lat":32.969,"lng":-84.799,"route":[[33.351,-84.906],[32.588,-84.692]],"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":56,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 56.\nIn-Service Year: 2029\nProject Name: GTC: DRESDEN - TALBOT 500 KV LINE\nDescription: New 500 kV line will be built from new Talbot substation to Dresden with 100°C 1113 ACSR conductor along with a new 500/230 kV substation.\nSupporting Statement: This strategic project will address multiple thermal overloads that occur under contingency.\nLocated: DRESDEN = OSM substation 'Dresden Substation' (GA); TALBOT = OSM plant 'Talbot Energy Power Plant' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2897,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Dresden 230 Kv Breaker Replacements","type":"substation","voltage_kv":230,"location_ref":"Dresden (GA)","lat":33.351,"lng":-84.906,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":56,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 56.\nIn-Service Year: 2029\nProject Name: GTC: DRESDEN 230 KV BREAKER REPLACEMENTS\nDescription: At Dresden, the breaker duty margin will become negative starting on 06/01/2029 for five 230 kV breakers. Replace them with 230 kV higher rated breakers.\nSupporting Statement: This project is needed to increase breaker duty margins at Dresden substation to comply with NERC TPL-001-05, Section 2.3.\nLocated: DRESDEN = OSM substation 'Dresden Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":2898,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Heard County Breaker Replacements","type":"substation","voltage_kv":500,"location_ref":"Heard County (GA)","lat":33.359,"lng":-84.994,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":56,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 56.\nIn-Service Year: 2029\nProject Name: GTC: HEARD COUNTY BREAKER REPLACEMENTS\nDescription: The breaker duty margin will become negative starting on 10/01/2029 for four 500 kV breakers. Replace them with 500 kV higher rated breakers.\nSupporting Statement: This project is needed to increase breaker duty margins at Heard County substation to comply with NERC TPL-001-05, Section 2.3.\nLocated: HEARD COUNTY = OSM substation 'Heard County Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":2899,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Mcdonough - South Griffin 115 Kv Rebuild - Phase 2","type":"transmission line","voltage_kv":115,"location_ref":"Mcdonough - South Griffin (GA)","lat":33.453,"lng":-84.154,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":57,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 57.\nIn-Service Year: 2029\nProject Name: GTC: MCDONOUGH - SOUTH GRIFFIN 115 KV REBUILD - PHASE 2\nDescription: Rebuild the McDonough - South Griffin 115 kV line with 200°C 1351 ACSS Martin. Replace limiting switches and jumpers with higher rated equpiment.\nSupporting Statement: The McDonough - South Griffin 115 kV line overloads under contingency.\nLocated: MCDONOUGH ~ Henry County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2900,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"New Tenaska - Wansley 500 Kv Line","type":"transmission line","voltage_kv":500,"location_ref":"New Tenaska - Wansley (GA)","lat":33.411,"lng":-85.031,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":57,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 57.\nIn-Service Year: 2029\nProject Name: GTC: NEW TENASKA - WANSLEY 500 KV LINE\nDescription: Construct a 5 mile long 500 kV line between Tenaska and Wansley with (3) 1113 ACSR Bluejay conductor. Make all neccesary accomodations at the substations for the line termination.\nSupporting Statement: This project reduces multiple 500 kV line loadings, and provides additional operational and maintenance flexibility, which increases reliability.\nLocated: WANSLEY = OSM substation 'Wansley Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":2901,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Ohara - South Griffin 230 Kv Line Reconductor","type":"transmission line","voltage_kv":230,"location_ref":"Ohara - South Griffin (GA)","lat":33.482,"lng":-84.367,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":57,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 57.\nIn-Service Year: 2029\nProject Name: GTC: OHARA - SOUTH GRIFFIN 230 KV LINE RECONDUCTOR\nDescription: Reconductor the 23 mile Ohara - South Griffin 230 kV line section using 200°C 1351 ACSS.\nSupporting Statement: The Ohara - South Griffin 230 kV line overloads under contingency.\nLocated: OHARA = OSM substation 'O'Hara Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":2902,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Rum Creek - Tomochichi (Black) 500 Kv Line","type":"transmission line","voltage_kv":500,"location_ref":"Rum Creek - Tomochichi (Black) (GA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":58,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 58.\nIn-Service Year: 2029\nProject Name: GTC: RUM CREEK - TOMOCHICHI (BLACK) 500 KV LINE\nDescription: Construct a second 500 kV line from Rum Creek to Tomochichi (Black) which is approximately 30 miles long with 100°C (3) 1113 ACSR Bluejay conductor. Make the necessary modifications at Rum Creek and Tomochichi to add breakers and terminate the line.\nSupporting Statement: This project addresses multiple thermal overloads that ocurr under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2903,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Talbot #2 - Big Tazewell 500 Kv Line","type":"transmission line","voltage_kv":500,"location_ref":"Talbot #2 - Big Tazewell (GA)","lat":32.588,"lng":-84.692,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":58,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 58.\nIn-Service Year: 2029\nProject Name: GTC: TALBOT #2 - BIG TAZEWELL 500 KV LINE\nDescription: Build a new 500 kV line from Big Tazewell to Talbot #2, approximately 20 miles. Make all necessary accomodations at Big Tazewell and Talbot #2 for the new 500 kV breakers and line termination.\nSupporting Statement: This project addresses multiple thermal overloads that ocurr under contingency.\nLocated: TALBOT #2 = OSM plant 'Talbot Energy Power Plant' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":2904,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Talbot Co #1 230 Kv Breaker Replacements","type":"substation","voltage_kv":230,"location_ref":"Talbot Co #1 (GA)","lat":32.705,"lng":-84.53,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":58,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 58.\nIn-Service Year: 2029\nProject Name: GTC: TALBOT CO #1 230 KV BREAKER REPLACEMENTS\nDescription: The breaker duty margin will become negative starting on 06/01/2029 for six 230 kV breakers. Replace them with 230 kV higher rated breakers.\nSupporting Statement: This project is needed to increase breaker duty margins at Talbot Co. #1 substation to comply with NERC TPL-001-05, Section 2.3.\nLocated: TALBOT CO #1 ~ Talbot County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2905,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Talbot Co #2 230 Kv Breaker Replacements","type":"substation","voltage_kv":230,"location_ref":"Talbot Co #2 (GA)","lat":32.705,"lng":-84.53,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":59,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 59.\nIn-Service Year: 2029\nProject Name: GTC: TALBOT CO #2 230 KV BREAKER REPLACEMENTS\nDescription: The breaker duty margin will become negative starting on 06/01/2029 for four 230 kV breakers. Replace them with 230 kV higher rated breakers.\nSupporting Statement: This project is needed to increase breaker duty margins at Talbot CO #2 substation to comply with NERC TPL-001-05, Section 2.3.\nLocated: TALBOT CO #2 ~ Talbot County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2906,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Union City Primary 230 Kv Breaker Replacements","type":"substation","voltage_kv":230,"location_ref":"Union City Primary (GA)","lat":33.79,"lng":-84.468,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":59,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 59.\nIn-Service Year: 2029\nProject Name: GTC: UNION CITY PRIMARY 230 KV BREAKER REPLACEMENTS\nDescription: At Union City Primary, the breaker duty margin will become negative starting on 04/01/2029 for eleven 230 kV breakers. Replace them with 230 kV higher rated breakers.\nSupporting Statement: This project is needed to increase breaker duty margins at Union City Primary substation to comply with NERC TPL-001-05, Section 2.3.\nLocated: UNION CITY PRIMARY ~ Fulton County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2959,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Bonaire Primary - Eastman Primary 115 Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Bonaire Primary - Eastman Primary (GA)","lat":32.389,"lng":-83.38,"route":[[32.565,-83.6],[32.213,-83.161]],"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":72,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 72.\nIn-Service Year: 2030\nProject Name: GTC: BONAIRE PRIMARY - EASTMAN PRIMARY 115 KV LINE REBUILD\nDescription: Rebuild 41.08 miles of the Bonaire Primary - Eastman Primary 115 kV Line with 200°C 1351 ACSS Martin conductor and upgrade the limiting bus at Roddy substation with a higher rating.\nSupporting Statement: The Bonaire Primary - Eastman Primary 115 kV line overloads under multiple contingencies\nLocated: BONAIRE PRIMARY = OSM substation 'Bonaire Primary Substation' (GA); EASTMAN PRIMARY = OSM substation 'Eastman Primary Substation' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2960,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Buzzard Roost - Rockhouse Rd 230 Kv Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Buzzard Roost - Rockhouse Rd (GA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":73,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 73.\nIn-Service Year: 2030\nProject Name: GTC: BUZZARD ROOST - ROCKHOUSE RD 230 KV REBUILD\nDescription: Rebuild the Buzzard Roost - Rockhouse Rd 230 kV line circuit 2, approximately 0.81 mile, with 200°C 1351 ACSS conductor.\nSupporting Statement: The Buzzard Roost - Rockhouse Rd 230 kV line circuit 2 overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2961,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Cavender Drive 500/230 Kv Auto Transformer","type":"substation","voltage_kv":500,"location_ref":"Cavender Drive (GA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":73,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 73.\nIn-Service Year: 2030\nProject Name: GTC: CAVENDER DRIVE 500/230 KV AUTO TRANSFORMER\nDescription: Cavender Drive will become a 500/230 kV station looping in the Villa Rica - Union City 500 kV line, installing a 500/230 kV auto transformer.\nSupporting Statement: The project will address multiple thermal overloads that occur under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2962,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Douglasville - East Villa Rica Ss 230 Kv Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Douglasville - East Villa Rica Ss (GA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":73,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 73.\nIn-Service Year: 2030\nProject Name: GTC: DOUGLASVILLE - EAST VILLA RICA SS 230 KV REBUILD\nDescription: Rebuild 8.2 miles of the Douglasville - East Villa Rica 230 kV line with 200°C 1351.0 ACSS Martin conductor.\nSupporting Statement: The Douglasville - East Villa Rica 230 kV line overloads under a contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2963,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"East Watkinsville 230 Kv Station Modification","type":"substation","voltage_kv":230,"location_ref":"East Watkinsville (GA)","lat":33.861,"lng":-83.385,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":73,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 73.\nIn-Service Year: 2030\nProject Name: GTC: EAST WATKINSVILLE 230 KV STATION MODIFICATION\nDescription: Replace series reactors at East Watkinsville on the Russell Dam 230 kV line.\nSupporting Statement: Equipment on the East Watkinsville - Russell Dam 230 kV line overloads under contingency.\nLocated: EAST WATKINSVILLE = OSM substation 'East Watkinsville Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":2964,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Hartwell Dam - Hartwell Energy 230 Kv Series Reactors","type":"substation","voltage_kv":230,"location_ref":"Hartwell Dam - Hartwell Energy (GA)","lat":34.341,"lng":-82.821,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":74,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 74.\nIn-Service Year: 2030\nProject Name: GTC: HARTWELL DAM - HARTWELL ENERGY 230 KV SERIES REACTORS\nDescription: Replace the series reactors on the Hartwell Dam - Hartwell Energy 230 kV line with larger size.\nSupporting Statement: The reactors on the Hartwell Dam - Hartwell Energy 230 kV line overload under contingency.\nLocated: HARTWELL DAM = OSM substation 'Hartwell Energy Facility Substation' (GA); HARTWELL ENERGY = OSM substation 'Hartwell Energy Facility Substation' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2965,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Hartwell Energy - Middle Fork 230 Kv Line","type":"transmission line","voltage_kv":230,"location_ref":"Hartwell Energy - Middle Fork (GA)","lat":34.341,"lng":-82.821,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":74,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 74.\nIn-Service Year: 2030\nProject Name: GTC: HARTWELL ENERGY - MIDDLE FORK 230 KV LINE\nDescription: Construct a new 230 kV line, approx. 35 miles, from Hartwell Energy to Middle Fork, using (2) 200°C 1351 ACSS conductor. GTC: Expand Hartwell Energy 230 kV and Middle Fork 230 kV substations for the new line termination.\nSupporting Statement: New 230 kV line addresses multiple constraints that occur under contingency along the eastern interface.\nLocated: HARTWELL ENERGY = OSM substation 'Hartwell Energy Facility Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":2966,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Pond Fork - Midway 115 Kv Line","type":"transmission line","voltage_kv":115,"location_ref":"Pond Fork - Midway (GA)","lat":31.807,"lng":-81.458,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":74,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 74.\nIn-Service Year: 2030\nProject Name: GTC: POND FORK - MIDWAY 115 KV LINE\nDescription: GTC: Construct approximately 6 miles of 115 kV line with minimum 170°C 1351 ACSS conductor utilizing the existing GTC owned portion of the North Jackson - Lawrence Smith 46 kV ROW. Add a second 230/115 kV auto transformer at Pond Fork substation.\nSupporting Statement: The future Banks Crossing - Pond Fork 115 kV line overloads under contingency due to an increase of load in the area.\nLocated: MIDWAY ~ Liberty County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2967,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Rockville - Tiger Creek -Warthen 500 Kv Lines","type":"transmission line","voltage_kv":500,"location_ref":"Rockville - Tiger Creek -Warthen (GA)","lat":33.321,"lng":-83.372,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":75,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 75.\nIn-Service Year: 2030\nProject Name: GTC: ROCKVILLE - TIGER CREEK -WARTHEN 500 KV LINES\nDescription: Build the new 500 kV line from Rockville to Tiger Creek and Tiger Creek to Warthen, approximaely 20 miles and 9 miles long respectively with 100°C (3) 1113 ACSR Bluejay conductor. Build a 500 kV yard at Tiger Creek and install a 500/230 kV auto transformer. Make all necessary accomodations at Warthen and Rockville for the new 500 kV breakers.\nSupporting Statement: This project addresses several thermal constraints that occur under contingency.\nLocated: ROCKVILLE ~ Putnam County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2968,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Thornton Rd - Cavender Drive 230 Kv New Line","type":"transmission line","voltage_kv":230,"location_ref":"Thornton Rd - Cavender Drive (GA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":75,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 75.\nIn-Service Year: 2030\nProject Name: GTC: THORNTON RD - CAVENDER DRIVE 230 KV NEW LINE\nDescription: Build a new 7 mile 230 kV line from Cavender Drive to Buzzard Roost with 200°C 1351 ACSS Martin.\nSupporting Statement: New 230 kV line from Cavender Drive to Buzzard Roost mitigates multiple thermal overloads during a base case scenario.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2969,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Union City Line Trap Replacement","type":"transmission line","voltage_kv":500,"location_ref":"Union City (GA)","lat":33.79,"lng":-84.468,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":75,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 75.\nIn-Service Year: 2030\nProject Name: GTC: UNION CITY LINE TRAP REPLACEMENT\nDescription: Replace limiting line trap at Union City for the Ashley Park 500 kV line with higher rated equipment.\nSupporting Statement: The Union City - Ashley Park 500 kV line overloads under contingency.\nLocated: UNION CITY ~ Fulton County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2970,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Yates - Line Creek 230 Kv (Green) Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Yates (GA)","lat":33.461,"lng":-84.897,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":76,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 76.\nIn-Service Year: 2030\nProject Name: GTC: YATES - LINE CREEK 230 KV (GREEN) REBUILD\nDescription: Rebuild 16.5 miles of the Yates - Line Creek (Green) 230 kV line using 200°C 1351 ACSS Martin.\nSupporting Statement: The Yates - Line Creek 230 kV line overloads under a contingency.\nLocated: YATES = OSM substation 'Yates Switchyard' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":2971,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Yates - Line Creek 230 Kv (Red) Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Yates (GA)","lat":33.461,"lng":-84.897,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":76,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 76.\nIn-Service Year: 2030\nProject Name: GTC: YATES - LINE CREEK 230 KV (RED) REBUILD\nDescription: Rebuild 16.5 miles of the Yates - Line Creek (Red) 230 kV line using 200°C 1351 ACSS Martin.\nSupporting Statement: The Yates - Line Creek 230 kV line overloads under a contingency.\nLocated: YATES = OSM substation 'Yates Switchyard' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":3011,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Achord Road - North Dublin 115 Kv Line","type":"transmission line","voltage_kv":115,"location_ref":"Achord Road - North Dublin (GA)","lat":32.503,"lng":-82.946,"route":null,"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":86,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 86.\nIn-Service Year: 2031\nProject Name: GTC: ACHORD ROAD - NORTH DUBLIN 115 KV LINE\nDescription: Rebuild the Achord Road to North Dublin 115 kV line, approximately 9.84 miles, with 200°C 1351 ACSS conductor.\nSupporting Statement: The Achord Road to North Dublin 115 kV line overloads under contingency.\nLocated: ACHORD ROAD = OSM substation 'Achord Road Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":3012,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Avery - Hopewell 115 Kv Reconductor","type":"transmission line","voltage_kv":115,"location_ref":"Avery - Hopewell (GA)","lat":34.195,"lng":-84.334,"route":[[34.217,-84.386],[34.174,-84.283]],"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":86,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 86.\nIn-Service Year: 2031\nProject Name: GTC: AVERY - HOPEWELL 115 KV RECONDUCTOR\nDescription: Reconductor the Hopewell to Birmingham line section (approximately 3.3 miles) on the Avery - Hopewell 115 kV line with 100°C 1033 ACSR conductor. Replace jumper at Birmingham with 1590 AAC jumper.\nSupporting Statement: The Avery - Hopewell 115 kV line overloads under contingency.\nLocated: AVERY = OSM substation 'Avery Substation' (GA); HOPEWELL = OSM substation 'Hopewell Substation' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3013,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Bonaire Primary - Echeconnee 115 Kv Line","type":"transmission line","voltage_kv":115,"location_ref":"Bonaire Primary - Echeconnee (GA)","lat":32.512,"lng":-83.631,"route":null,"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":86,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 86.\nIn-Service Year: 2031\nProject Name: GTC: BONAIRE PRIMARY - ECHECONNEE 115 KV LINE\nDescription: Rebuild the Bonaire Primary - Echeconnee 115 kV line, approximately 19 miles with 200°C 1351 ACSS conductor.\nSupporting Statement: The Bonaire Primary - Echeconnee 115 kV line overloads under multiple contingencies.\nLocated: BONAIRE PRIMARY = OSM substation 'Bonaire Primary Substation' (GA); ECHECONNEE ~ Houston County, GA (county centre) (nearest of 2) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3014,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Dresden Jumper Replacement","type":"substation","voltage_kv":230,"location_ref":"Dresden Jumper Replacement (GA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":87,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 87.\nIn-Service Year: 2031\nProject Name: GTC: DRESDEN JUMPER REPLACEMENT\nDescription: Replace the Jumpers at Dresden limiting the Dresden - Yates 230 kV line with higher rated jumpers.\nSupporting Statement: The jumpers overload under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3015,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Mcdonough - Ola 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Mcdonough - Ola (GA)","lat":33.467,"lng":-84.092,"route":null,"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":87,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 87.\nIn-Service Year: 2031\nProject Name: GTC: MCDONOUGH - OLA 115 KV REBUILD\nDescription: Rebuild the 3.6 miles section from Mcgarity to Ola on the McDonough - Ola 115 kV line with 200°C 1351 ACSS Martin. Upgrade limiting elements at Ola.\nSupporting Statement: The Mcdonough - Ola 115 kV line overloads under contingency.\nLocated: OLA = OSM substation 'Ola Substation' (GA); MCDONOUGH ~ Henry County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3016,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Ola - Porterdale 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Ola - Porterdale (GA)","lat":33.517,"lng":-83.941,"route":null,"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":87,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 87.\nIn-Service Year: 2031\nProject Name: GTC: OLA - PORTERDALE 115 KV REBUILD\nDescription: Rebuild the Porterdale - Salem Road 115 kV line segment, approximately 2.76 miles, using 200°C 1351 ACSS Martin. Replace the limiting elements on the line.\nSupporting Statement: The Ola - Porterdale 115 kV line overloads under a contingency.\nLocated: OLA = OSM substation 'Ola Substation' (GA); PORTERDALE ~ Newton County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3029,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Dyer Road - South Coweta 115 Kv Rebuild (Phase 2)","type":"transmission line","voltage_kv":115,"location_ref":"Dyer Road - South Coweta (GA)","lat":33.326,"lng":-84.534,"route":null,"cost_usd":null,"start_date":"2032-01-01","end_date":"2032-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":91,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 91.\nIn-Service Year: 2032\nProject Name: GTC: DYER ROAD - SOUTH COWETA 115 KV REBUILD (PHASE 2)\nDescription: Rebuild the 3.2 mile section on the Dyer Road - South Coweta 115 kV line from South Coweta to Mcintosh Trail with 200°C 1351 ACSS Martin and replace limiting elements at South Coweta and Mcintosh Trail.\nSupporting Statement: The Dyer Road - South Coweta 115 kV line overloads under contingency.\nLocated: SOUTH COWETA = OSM substation 'South Coweta Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":3036,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Center Primary - Clarksboro 230 Kv Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Center Primary - Clarksboro (GA)","lat":34.131,"lng":-83.563,"route":null,"cost_usd":null,"start_date":"2033-01-01","end_date":"2033-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":93,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 93.\nIn-Service Year: 2033\nProject Name: GTC: CENTER PRIMARY - CLARKSBORO 230 KV REBUILD\nDescription: Rebuild the Center Primary - Clarksboro Primary 230 kV line (approximate 8.3 miles) with 200°C 1351 ACSS conductor.\nSupporting Statement: The Center Primary - Clarksboro 230 kV line overloads under contingency.\nLocated: CLARKSBORO ~ Jackson County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":3037,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"East Social Circle - Snellville 230 Kv Equipment Upgrade","type":"transmission line","voltage_kv":230,"location_ref":"East Social Circle - Snellville (GA)","lat":33.757,"lng":-83.864,"route":[[33.674,-83.679],[33.839,-84.048]],"cost_usd":null,"start_date":"2033-01-01","end_date":"2033-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":93,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 93.\nIn-Service Year: 2033\nProject Name: GTC: EAST SOCIAL CIRCLE - SNELLVILLE 230 KV EQUIPMENT UPGRADE\nDescription: Replace limiting elements on the East Social Circle - Snellville 230 kV line with higher rating equipement.\nSupporting Statement: Equipment on the East Social Circle - Snellville 230 kV line overloads under contingency.\nLocated: EAST SOCIAL CIRCLE = OSM substation 'East Social Circle Substation' (GA); SNELLVILLE = OSM substation 'Snellville Substation' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3038,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"East Walton - Middle Fork 500 Kv","type":"transmission line","voltage_kv":500,"location_ref":"East Walton - Middle Fork (GA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2033-01-01","end_date":"2033-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":94,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 94.\nIn-Service Year: 2033\nProject Name: GTC: EAST WALTON - MIDDLE FORK 500 KV\nDescription: Construct a new 500 kV line from East Walton to Middle Fork, approximately 45 miles long with (3) 100°C 1113 ACSR conductor. Make all necessary accomodations for new 500 kV breakers at East Walton and Middle Fork substations.\nSupporting Statement: This project addresses thermal overloads in Central and Northeast areas of GA, adds additional capacity, and improves voltage profile.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3039,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Shoal Creek - South Hall 230 Kv Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Shoal Creek - South Hall (GA)","lat":34.219,"lng":-83.803,"route":null,"cost_usd":null,"start_date":"2033-01-01","end_date":"2033-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":94,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 94.\nIn-Service Year: 2033\nProject Name: GTC: SHOAL CREEK - SOUTH HALL 230 KV REBUILD\nDescription: Rebuild approximately 7.9 miles of the Shoal Creek - South Hall 230 kV line. Upgrade limiting elements on the line.\nSupporting Statement: The Shoal Creek - South Hall 230 kV line overloads under contingency.\nLocated: SOUTH HALL = OSM substation 'South Hall Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":3047,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Cumming - Dawson Crossing 115 Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Cumming - Dawson Crossing (GA)","lat":34.289,"lng":-84.132,"route":[[34.2,-84.13],[34.378,-84.134]],"cost_usd":null,"start_date":"2034-01-01","end_date":"2034-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":96,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 96.\nIn-Service Year: 2034\nProject Name: GTC: CUMMING - DAWSON CROSSING 115 KV LINE REBUILD\nDescription: Rebuild approximately 12.7 miles of the Cumming - Dawson Crossing 115 kV line with 200°C 1351 ACSS Martin conductor.\nSupporting Statement: The Cumming - Dawson Crossing 115 kV line overloads under contingency.\nLocated: CUMMING = OSM substation 'Cumming Substation' (GA); DAWSON CROSSING = OSM substation 'Dawson Crossing Substation' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3061,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Georgia Transmission Corp","state":"GA","name":"Avery - Holly Springs 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Avery - Holly Springs (GA)","lat":34.206,"lng":-84.46,"route":[[34.217,-84.386],[34.195,-84.535]],"cost_usd":null,"start_date":"2035-01-01","end_date":"2035-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":100,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 100.\nIn-Service Year: 2035\nProject Name: GTC: AVERY - HOLLY SPRINGS 115 KV REBUILD\nDescription: Rebuild the 2.43 miles from Holly Springs to Newlight Church section of the Avery - Holly Springs 115 kV line with 200°C 1351 ACSS Martin conductor.\nSupporting Statement: The Avery - Holly Springs 115 kV line overloads under contingency.\nLocated: AVERY = OSM substation 'Avery Substation' (GA); HOLLY SPRINGS = OSM substation 'Holly Springs Substation' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":992,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Geronimo Power","state":"IL","name":"Bee Hollow Solar, LLC (Solar Photovoltaic, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Bee Hollow Solar, LLC, St Clair County, IL","lat":38.323,"lng":-89.75,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 407. Plant 69874 Bee Hollow Solar, LLC (Geronimo Power), St Clair County, IL; balancing authority MISO. Planned operation 2026-11.\nGenerator BHSF: 150 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1270,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Geronimo Power","state":"MI","name":"Jackson County Solar, LLC (Solar Photovoltaic, 125 MW)","type":"generation","voltage_kv":null,"location_ref":"Jackson County Solar, LLC, Jackson County, MI","lat":42.281921,"lng":-84.65668,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 135. Plant 69647 Jackson County Solar, LLC (Geronimo Power), Jackson County, MI; balancing authority MISO. Planned operation 2026-09.\nGenerator JCKSN: 125 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1307,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Geronimo Power","state":"MN","name":"Plum Creek (Onshore Wind Turbine, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Plum Creek, Cottonwood County, MN","lat":44.14504,"lng":-95.38272,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1738. Plant 61687 Plum Creek (Geronimo Power), Cottonwood County, MN; balancing authority MISO. Planned operation 2028-12.\nGenerator PLMCK: 200 MW Onshore Wind Turbine; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1784,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Geronimo Power","state":"SD","name":"Grant Solar, LLC (Solar Photovoltaic, 99 MW)","type":"generation","voltage_kv":null,"location_ref":"Grant Solar, LLC, McCook County, SD","lat":43.550003,"lng":-97.26738,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1110. Plant 69981 Grant Solar, LLC (Geronimo Power), McCook County, SD; balancing authority MISO. Planned operation 2027-10.\nGenerator GRNTS: 99 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2237,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Geronimo Power","state":"WI","name":"Portage Solar, LLC (Solar Photovoltaic, 250 MW)","type":"generation","voltage_kv":null,"location_ref":"Portage Solar, LLC, Portage County, WI","lat":44.456358,"lng":-89.54401,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 956. Plant 69887 Portage Solar, LLC (Geronimo Power), Portage County, WI; balancing authority MISO. Planned operation 2027-07.\nGenerator PRTGS: 250 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1175,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"GGSO","state":"KY","name":"Gage Solar (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Gage Solar, McCracken County, KY","lat":37.0967,"lng":-88.7791,"route":null,"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1913. Plant 68292 Gage Solar (GGSO, LLC), McCracken County, KY; balancing authority LGEE. Planned operation 2029-06.\nGenerator GGSO: 200 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1918,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gigawatt Solar","state":"TX","name":"Gigawatt Solar (Solar Photovoltaic, 773 MW)","type":"generation","voltage_kv":null,"location_ref":"Gigawatt Solar, Parker County, TX","lat":32.547389,"lng":-97.59792,"route":null,"cost_usd":null,"start_date":"2028-08-01","end_date":"2028-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1635, 1636. Plant 68305 Gigawatt Solar (Gigawatt Solar LLC), Parker County, TX; balancing authority ERCO. Planned operation 2028-08.\nGenerator GWT1: 429 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated\nGenerator GWT2: 344 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1031,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gilman Solar Pv","state":"IL","name":"Gilman Solar LLC (Solar Photovoltaic, 4.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Gilman Solar LLC, Iroquois County, IL","lat":40.764392,"lng":-87.99916,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1021. Plant 68972 Gilman Solar LLC (Gilman Solar LLC PV), Iroquois County, IL; balancing authority MISO. Planned operation 2027-09.\nGenerator 11253: 4.5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1337,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Girasol Solar Farm","state":"MS","name":"Girasol Solar Farm (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Girasol Solar Farm, Sunflower County, MS","lat":33.676092,"lng":-90.64287,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1790. Plant 68352 Girasol Solar Farm (Girasol Solar Farm LLC), Sunflower County, MS; balancing authority MISO. Planned operation 2028-12.\nGenerator GIPV1: 100 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2172,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gladys Solar","state":"VA","name":"Gladys Solar LLC (Solar Photovoltaic, 60.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Gladys Solar LLC, Campbell County, VA","lat":37.143719,"lng":-79.14207,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1085. Plant 67871 Gladys Solar LLC (Gladys Solar LLC), Campbell County, VA; balancing authority PJM. Planned operation 2027-10.\nGenerator ENX29: 60.4 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":752,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Glenarm Bess","state":"CA","name":"Glenarm BESS Plant (Batteries, 25 MW)","type":"generation","voltage_kv":null,"location_ref":"Glenarm BESS Plant, Los Angeles County, CA","lat":34.12739,"lng":-118.1477,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 879. Plant 69024 Glenarm BESS Plant (Glenarm BESS LLC), Los Angeles County, CA; balancing authority CISO. Planned operation 2027-06.\nGenerator GLNB1: 25 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":807,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Golden Fields Solar Vi","state":"CA","name":"Rosamond South II (Batteries, 140 MW)","type":"generation","voltage_kv":null,"location_ref":"Rosamond South II, Kern County, CA","lat":34.852326,"lng":-118.4312,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 396, 397. Plant 69648 Rosamond South II (Golden Fields Solar VI, LLC), Kern County, CA; balancing authority CISO. Planned operation 2026-11.\nGenerator BSBA2: 48 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator RSBA: 92 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1961,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Goldenmax Energy","state":"TX","name":"Knapp BESS (Batteries, 10 MW)","type":"generation","voltage_kv":null,"location_ref":"Knapp BESS, Scurry County, TX","lat":32.6913,"lng":-101.0515,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 256. Plant 69226 Knapp BESS (GoldenMax Energy Inc), Scurry County, TX; balancing authority ERCO. Planned operation 2026-10.\nGenerator KNBA1: 10 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1904,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Golden Spread Electric Cooperative","state":"TX","name":"Elk Station (Natural Gas Fired Combustion Turbine, 199.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Elk Station, Hale County, TX","lat":33.865,"lng":-101.8433,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 681. Plant 58835 Elk Station (Golden Spread Electric Cooperative, Inc), Hale County, TX; balancing authority SWPP. Planned operation 2027-03.\nGenerator ELK4: 199.8 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":753,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gonzaga Ridge Battery Facility","state":"CA","name":"Gonzaga Ridge Battery Facility (Batteries, 51.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Gonzaga Ridge Battery Facility, Merced County, CA","lat":37.065806,"lng":-121.1929,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 98. Plant 68980 Gonzaga Ridge Battery Facility (Gonzaga Ridge Battery Facility, LLC), Merced County, CA; balancing authority CISO. Planned operation 2026-09.\nGenerator GRBF: 51.8 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":754,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gonzaga Ridge Wind Farm","state":"CA","name":"Gonzaga Ridge Wind Farm (Onshore Wind Turbine, 132.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Gonzaga Ridge Wind Farm, Merced County, CA","lat":37.065806,"lng":-121.1294,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 99, 100, 101. Plant 68981 Gonzaga Ridge Wind Farm (Gonzaga Ridge Wind Farm, LLC), Merced County, CA; balancing authority CISO. Planned operation 2026-09.\nGenerator GRWF1: 40.3 MW Onshore Wind Turbine; (V) Under construction, more than 50 percent complete\nGenerator GRWF2: 34.6 MW Onshore Wind Turbine; (V) Under construction, more than 50 percent complete\nGenerator GRWF3: 57.9 MW Onshore Wind Turbine; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2266,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Goshen Solar","state":"WY","name":"Goshen Solar (Solar Photovoltaic, 163 MW)","type":"generation","voltage_kv":null,"location_ref":"Goshen Solar, Goshen County, WY","lat":41.853445,"lng":-104.5032,"route":null,"cost_usd":null,"start_date":"2030-12-01","end_date":"2030-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2110. Plant 67936 Goshen Solar (Goshen Solar, LLC), Goshen County, WY; balancing authority WACM. Planned operation 2030-12.\nGenerator GS1: 163 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":755,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Grace Orchard Interconnection","state":"CA","name":"Grace Energy Center (Solar Photovoltaic, 500 MW)","type":"generation","voltage_kv":null,"location_ref":"Grace Energy Center, Riverside County, CA","lat":33.653564,"lng":-114.696,"route":null,"cost_usd":null,"start_date":"2027-08-01","end_date":"2027-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 983. Plant 69820 Grace Energy Center (Grace Orchard Interconnection, LLC), Riverside County, CA; balancing authority CISO. Planned operation 2027-08.\nGenerator GRA1: 500 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":756,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Grace Orchard Interconnection","state":"CA","name":"Grace Energy Center (Batteries, 500 MW)","type":"generation","voltage_kv":null,"location_ref":"Grace Energy Center, Riverside County, CA","lat":33.653564,"lng":-114.696,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1105. Plant 69820 Grace Energy Center (Grace Orchard Interconnection, LLC), Riverside County, CA; balancing authority CISO. Planned operation 2027-10.\nGenerator GRA2: 500 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1266,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Grand Basin Energy Storage","state":"MI","name":"Grand Basin Energy Storage (Batteries, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Grand Basin Energy Storage, Jackson County, MI","lat":42.420211,"lng":-84.48752,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 745. Plant 70403 Grand Basin Energy Storage (Grand Basin Energy Storage, LLC), Jackson County, MI; balancing authority MISO. Planned operation 2027-03.\nGenerator GRBS1: 100 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1635,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Grand River Dam Authority","state":"OK","name":"GREC (Natural Gas Fired Combustion Turbine, 594 MW)","type":"generation","voltage_kv":null,"location_ref":"GREC, Mayes County, OK","lat":36.190278,"lng":-95.2894,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 11. Plant 165 GREC (Grand River Dam Authority), Mayes County, OK; balancing authority SWPP. Planned operation 2026-09.\nGenerator 4: 594 MW Natural Gas Fired Combustion Turbine; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2110,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gransolar Texas Eight","state":"TX","name":"Tokio Solar (Solar Photovoltaic, 170.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Tokio Solar, McLennan County, TX","lat":31.427419,"lng":-97.31086,"route":null,"cost_usd":null,"start_date":"2027-08-01","end_date":"2027-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 972. Plant 66397 Tokio Solar (Gransolar Texas Eight, LLC), McLennan County, TX; balancing authority ERCO. Planned operation 2027-08.\nGenerator TOKIO: 170.4 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2119,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gransolar Texas Eleven","state":"TX","name":"Vial BESS (Batteries, 141.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Vial BESS, Hill County, TX","lat":31.953772,"lng":-97.06248,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1013. Plant 67784 Vial BESS (Gransolar Texas Eleven LLC), Hill County, TX; balancing authority ERCO. Planned operation 2027-09.\nGenerator GRS11: 141.4 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2000,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gransolar Texas Fifteen","state":"TX","name":"Naduah Solar (Solar Photovoltaic, 102.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Naduah Solar, Limestone County, TX","lat":31.521467,"lng":-96.67385,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1076. Plant 66396 Naduah Solar (Gransolar Texas Fifteen, LLC), Limestone County, TX; balancing authority ERCO. Planned operation 2027-10.\nGenerator NDUAH: 102.3 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1931,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gransolar Texas Five","state":"TX","name":"Hayrick BESS (Batteries, 113.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Hayrick BESS, Coke County, TX","lat":32.022914,"lng":-100.2926,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1462. Plant 67779 Hayrick BESS (Gransolar Texas Five LLC), Coke County, TX; balancing authority ERCO. Planned operation 2028-03.\nGenerator GRS5: 113.9 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1930,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gransolar Texas Four","state":"TX","name":"Harryoung PV and BESS (Batteries, Solar Photovoltaic, 380 MW)","type":"generation","voltage_kv":null,"location_ref":"Harryoung PV and BESS, Cameron County, TX","lat":26.276027,"lng":-97.63249,"route":null,"cost_usd":null,"start_date":"2028-05-01","end_date":"2028-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1520, 1521. Plant 67777 Harryoung PV and BESS (Gransolar Texas Four LLC), Cameron County, TX; balancing authority ERCO. Planned operation 2028-05.\nGenerator GRS4B: 190 MW Batteries; (L) Regulatory approvals pending. Not under construction\nGenerator GRS4P: 190 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1910,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gransolar Texas Fourteen","state":"TX","name":"Eytcheson Solar (Solar Photovoltaic, 76.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Eytcheson Solar, Navarro County, TX","lat":31.872617,"lng":-96.7,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1423. Plant 66398 Eytcheson Solar (Gransolar Texas Fourteen, LLC), Navarro County, TX; balancing authority ERCO. Planned operation 2028-01.\nGenerator EYTCH: 76.4 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1843,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gransolar Texas Nine","state":"TX","name":"Braswell Solar (Solar Photovoltaic, 44.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Braswell Solar, McLennan County, TX","lat":31.34904,"lng":-97.21786,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1461. Plant 67772 Braswell Solar (Gransolar Texas Nine LLC), McLennan County, TX; balancing authority ERCO. Planned operation 2028-03.\nGenerator GRS9: 44.2 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2125,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gransolar Texas Nineteen","state":"TX","name":"Whistle Solar (Solar Photovoltaic, 56.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Whistle Solar, Navarro County, TX","lat":31.985,"lng":-96.43658,"route":null,"cost_usd":null,"start_date":"2028-05-01","end_date":"2028-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1522. Plant 67785 Whistle Solar (Gransolar Texas Nineteen LLC), Navarro County, TX; balancing authority ERCO. Planned operation 2028-05.\nGenerator GRS19: 56.3 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1965,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gransolar Texas Seven","state":"TX","name":"Lampe Solar (Solar Photovoltaic, 60.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Lampe Solar, Washington County, TX","lat":30.310524,"lng":-96.47887,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1283. Plant 67781 Lampe Solar (Gransolar Texas Seven LLC), Washington County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator GRS7: 60.2 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1911,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gransolar Texas Sixteen","state":"TX","name":"Findley PV and BESS (Batteries, Solar Photovoltaic, 100.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Findley PV and BESS, Limestone County, TX","lat":31.643389,"lng":-96.77961,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1425, 1426. Plant 67778 Findley PV and BESS (Gransolar Texas Sixteen, LLC), Limestone County, TX; balancing authority ERCO. Planned operation 2028-01.\nGenerator GR16B: 50.3 MW Batteries; (L) Regulatory approvals pending. Not under construction\nGenerator GR16P: 50.3 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2021,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gransolar Texas Ten","state":"TX","name":"Payne Battlecreek Solar (Solar Photovoltaic, 85 MW)","type":"generation","voltage_kv":null,"location_ref":"Payne Battlecreek Solar, Hill County, TX","lat":31.852503,"lng":-96.75536,"route":null,"cost_usd":null,"start_date":"2027-08-01","end_date":"2027-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 974. Plant 67788 Payne Battlecreek Solar (Gransolar Texas Ten LLC), Hill County, TX; balancing authority ERCO. Planned operation 2027-08.\nGenerator GRS10: 85 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1888,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gransolar Texas Thirteen","state":"TX","name":"Despain Solar (Solar Photovoltaic, 236.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Despain Solar, Kinney County, TX","lat":29.282259,"lng":-100.2098,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1253. Plant 66421 Despain Solar (Gransolar Texas Thirteen, LLC), Kinney County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator GRS13: 236.2 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2023,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gransolar Texas Three","state":"TX","name":"Pecan BESS (Batteries, 157.1 MW)","type":"generation","voltage_kv":null,"location_ref":"Pecan BESS, Leon County, TX","lat":31.078667,"lng":-96.22328,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1770. Plant 67774 Pecan BESS (Gransolar Texas Three, LLC), Leon County, TX; balancing authority ERCO. Planned operation 2028-12.\nGenerator GRS3: 157.1 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2044,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gransolar Texas Three","state":"TX","name":"Quarter Ranch Solar (Solar Photovoltaic, 154.1 MW)","type":"generation","voltage_kv":null,"location_ref":"Quarter Ranch Solar, Webb County, TX","lat":27.301064,"lng":-99.43041,"route":null,"cost_usd":null,"start_date":"2028-10-01","end_date":"2028-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1689. Plant 67078 Quarter Ranch Solar (Gransolar Texas Three, LLC), Webb County, TX; balancing authority ERCO. Planned operation 2028-10.\nGenerator GRS3: 154.1 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2117,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gransolar Texas Twelve","state":"TX","name":"Ventures BESS (Batteries, 226.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Ventures BESS, Matagorda County, TX","lat":28.974482,"lng":-95.99381,"route":null,"cost_usd":null,"start_date":"2028-09-01","end_date":"2028-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1665. Plant 67783 Ventures BESS (Gransolar Texas Twelve LLC), Matagorda County, TX; balancing authority ERCO. Planned operation 2028-09.\nGenerator GRS12: 226.8 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1878,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gransolar Texas Twenty","state":"TX","name":"Cosper Solar (Solar Photovoltaic, 148.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Cosper Solar, Bell County, TX","lat":30.994225,"lng":-97.79588,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1137. Plant 67773 Cosper Solar (Gransolar Texas Twenty LLC), Bell County, TX; balancing authority ERCO. Planned operation 2027-11.\nGenerator GRS20: 148.2 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2050,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gransolar Texas Twenty Two","state":"TX","name":"RedSun PV and BESS (Batteries, Solar Photovoltaic, 168 MW)","type":"generation","voltage_kv":null,"location_ref":"RedSun PV and BESS, Burnet County, TX","lat":30.784886,"lng":-98.20217,"route":null,"cost_usd":null,"start_date":"2028-07-01","end_date":"2028-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1603, 1604. Plant 67782 RedSun PV and BESS (Gransolar Texas Twenty Two LLC), Burnet County, TX; balancing authority ERCO. Planned operation 2028-07.\nGenerator GS22B: 84 MW Batteries; (L) Regulatory approvals pending. Not under construction\nGenerator GS22P: 84 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1883,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gransolar Texas Two","state":"TX","name":"Cuchillas PV and BESS (Batteries, Solar Photovoltaic, 612.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Cuchillas PV and BESS, Webb County, TX","lat":27.644178,"lng":-99.18445,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1771, 1772. Plant 67776 Cuchillas PV and BESS (Gransolar Texas Two LLC), Webb County, TX; balancing authority ERCO. Planned operation 2028-12.\nGenerator GRS2B: 306.9 MW Batteries; (L) Regulatory approvals pending. Not under construction\nGenerator GRS2P: 305.6 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1915,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Graphic Packaging International - Waco","state":"TX","name":"GPI WACO Power (Natural Gas Fired Combustion Turbine, 43.4 MW)","type":"generation","voltage_kv":null,"location_ref":"GPI WACO Power, McLennan County, TX","lat":31.47682,"lng":-97.18766,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 647. Plant 70343 GPI WACO Power (Graphic Packaging International - WACO), McLennan County, TX; balancing authority ERCO. Planned operation 2027-01.\nGenerator WAGT1: 43.4 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1582,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Grassy Knoll Solar Ny","state":"NY","name":"SunEast Grassy Knoll Solar Project (Solar Photovoltaic, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"SunEast Grassy Knoll Solar Project, Herkimer County, NY","lat":43.065379,"lng":-74.84372,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1074. Plant 63863 SunEast Grassy Knoll Solar Project (Grassy Knoll Solar NY LLC), Herkimer County, NY; balancing authority NYIS. Planned operation 2027-10.\nGenerator Q#885: 20 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":903,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Grears Corner Solar","state":"DE","name":"Grears Corner Solar (Solar Photovoltaic, 4 MW)","type":"generation","voltage_kv":null,"location_ref":"Grears Corner Solar, New Castle County, DE","lat":39.380083,"lng":-75.70611,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 706. Plant 68211 Grears Corner Solar (Grears Corner Solar, LLC), New Castle County, DE; balancing authority PJM. Planned operation 2027-03.\nGenerator GRER: 4 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1914,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Greater Bryant G Solar","state":"TX","name":"GBG SOLAR (Solar Photovoltaic, 22.2 MW)","type":"generation","voltage_kv":null,"location_ref":"GBG SOLAR, Midland County, TX","lat":31.92835,"lng":-102.1617,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 280. Plant 69628 GBG SOLAR (Greater Bryant G Solar, LLC), Midland County, TX; balancing authority ERCO. Planned operation 2026-10.\nGenerator GBPV1: 22.2 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1033,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Great Plains Solar","state":"IL","name":"Great Plains Solar, LLC (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Great Plains Solar, LLC, Perry County, IL","lat":38.177944,"lng":-89.55289,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 549. Plant 69586 Great Plains Solar, LLC (Great Plains Solar, LLC), Perry County, IL; balancing authority MISO. Planned operation 2026-12.\nGenerator GPS: 100 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1290,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Great River Energy","state":"MN","name":"Cambridge CT Hybrid (Batteries, 1 MW)","type":"generation","voltage_kv":null,"location_ref":"Cambridge CT Hybrid, Isanti County, MN","lat":45.601,"lng":-93.2081,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1168. Plant 2038 Cambridge CT Hybrid (Great River Energy), Isanti County, MN; balancing authority MISO. Planned operation 2027-12.\nGenerator BA1: 1 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2214,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gree Bn","state":"WA","name":"Greenwater BESS (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Greenwater BESS, Pierce County, WA","lat":47.236485,"lng":-122.2271,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 498. Plant 68341 Greenwater BESS (GREE bn, LLC), Pierce County, WA; balancing authority PSEI. Planned operation 2026-12.\nGenerator GREE: 200 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1920,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Greenalia Solar Power Blackwelder Ranch","state":"TX","name":"Greenalia Solar Power Blackwelder Ranch (Solar Photovoltaic, 199.7 MW)","type":"generation","voltage_kv":null,"location_ref":"Greenalia Solar Power Blackwelder Ranch, Pecos County, TX","lat":30.81256,"lng":-102.1865,"route":null,"cost_usd":null,"start_date":"2030-06-01","end_date":"2030-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2068. Plant 68767 Greenalia Solar Power Blackwelder Ranch (Greenalia Solar Power Blackwelder Ranch, LLC), Pecos County, TX; balancing authority ERCO. Planned operation 2030-06.\nGenerator BRGSP: 199.7 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1947,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Greenalia Solar Power Hutcherson","state":"TX","name":"Hutcherson Solar (Solar Photovoltaic, 123.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Hutcherson Solar, Wilbarger County, TX","lat":34.02533,"lng":-99.26568,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2050. Plant 68765 Hutcherson Solar (Greenalia Solar Power Hutcherson, LLC), Wilbarger County, TX; balancing authority ERCO. Planned operation 2030-01.\nGenerator HUGSP: 123.3 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1971,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Greenalia Solar Power Leitrim","state":"TX","name":"Leitrim Solar Park (Solar Photovoltaic, 91.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Leitrim Solar Park, Hill County, TX","lat":31.79623,"lng":-97.20278,"route":null,"cost_usd":null,"start_date":"2030-10-01","end_date":"2030-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2088. Plant 67544 Leitrim Solar Park (Greenalia Solar Power Leitrim, LLC), Hill County, TX; balancing authority ERCO. Planned operation 2030-10.\nGenerator LEGSP: 91.2 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2045,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Greenalia Solar Power Ratcliff","state":"TX","name":"Ratcliff Solar Park (Solar Photovoltaic, 78.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Ratcliff Solar Park, Freestone County, TX","lat":30.217058,"lng":-95.81602,"route":null,"cost_usd":null,"start_date":"2029-08-01","end_date":"2029-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1957. Plant 67563 Ratcliff Solar Park (Greenalia Solar Power Ratcliff, LLC), Freestone County, TX; balancing authority ERCO. Planned operation 2029-08.\nGenerator RAGSP: 78.8 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2053,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Greenalia Solar Power Reis","state":"TX","name":"Reis Solar Park (Solar Photovoltaic, 105.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Reis Solar Park, Atascosa County, TX","lat":28.652762,"lng":-98.45369,"route":null,"cost_usd":null,"start_date":"2029-05-01","end_date":"2029-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1894. Plant 67564 Reis Solar Park (Greenalia Solar Power Reis, LLC), Atascosa County, TX; balancing authority ERCO. Planned operation 2029-05.\nGenerator REGSP: 105.5 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2064,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Greenalia Solar Power Roscommon","state":"TX","name":"Roscommon Solar Park (Solar Photovoltaic, 82.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Roscommon Solar Park, Lamar County, TX","lat":33.631719,"lng":-95.69587,"route":null,"cost_usd":null,"start_date":"2029-10-01","end_date":"2029-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1982. Plant 67566 Roscommon Solar Park (Greenalia Solar Power Roscommon, LLC), Lamar County, TX; balancing authority ERCO. Planned operation 2029-10.\nGenerator ROGSP: 82.8 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2124,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Greenalia Solar Power Wensowitch","state":"TX","name":"Wensowitch Solar Park (Solar Photovoltaic, 145.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Wensowitch Solar Park, Navarro County, TX","lat":32.300261,"lng":-96.37123,"route":null,"cost_usd":null,"start_date":"2028-11-01","end_date":"2028-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1722. Plant 67567 Wensowitch Solar Park (Greenalia Solar Power Wensowitch, LLC), Navarro County, TX; balancing authority ERCO. Planned operation 2028-11.\nGenerator WEGSP: 145.6 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2129,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Greenalia Solar Power Wittig","state":"TX","name":"Wittig Solar Park (Solar Photovoltaic, 96 MW)","type":"generation","voltage_kv":null,"location_ref":"Wittig Solar Park, Wharton County, TX","lat":29.245055,"lng":-95.87477,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2018. Plant 67568 Wittig Solar Park (Greenalia Solar Power Wittig, LLC), Wharton County, TX; balancing authority ERCO. Planned operation 2029-12.\nGenerator WIGSP: 96 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1834,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Greenalia Wind Power Blackwelder Ranch","state":"TX","name":"Blackwelder Ranch Wind (Onshore Wind Turbine, 110.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Blackwelder Ranch Wind, Pecos County, TX","lat":30.81256,"lng":-102.1865,"route":null,"cost_usd":null,"start_date":"2030-06-01","end_date":"2030-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2069. Plant 68768 Blackwelder Ranch Wind (Greenalia Wind Power Blackwelder Ranch, LLC), Pecos County, TX; balancing authority ERCO. Planned operation 2030-06.\nGenerator BRGWP: 110.4 MW Onshore Wind Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1835,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Greenalia Wind Power Blue Hills","state":"TX","name":"Blue Hills Wind Project (Onshore Wind Turbine, 276 MW)","type":"generation","voltage_kv":null,"location_ref":"Blue Hills Wind Project, Val Verde County, TX","lat":30.233597,"lng":-101.3636,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2017. Plant 67542 Blue Hills Wind Project (Greenalia Wind Power Blue Hills, LLC), Val Verde County, TX; balancing authority ERCO. Planned operation 2029-12.\nGenerator BHWP: 276 MW Onshore Wind Turbine; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2031,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Greenalia Wind Power Pioneer Field","state":"TX","name":"Pioneer Field Wind Power (Onshore Wind Turbine, 136.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Pioneer Field Wind Power, Tom Green County, TX","lat":31.19494,"lng":-100.2118,"route":null,"cost_usd":null,"start_date":"2030-11-01","end_date":"2030-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2099. Plant 68766 Pioneer Field Wind Power (Greenalia Wind Power Pioneer Field, LLC), Tom Green County, TX; balancing authority ERCO. Planned operation 2030-11.\nGenerator PFGWP: 136.2 MW Onshore Wind Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1010,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Greenbacker Renewable Energy","state":"IL","name":"Cherry Valley (Solar Photovoltaic, 12.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Cherry Valley, Boone County, IL","lat":42.240017,"lng":-88.93076,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1274. Plant 67253 Cherry Valley (Greenbacker Renewable Energy Corporation), Boone County, IL; balancing authority MISO. Planned operation 2027-12.\nGenerator 761: 12.5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1246,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Greenbacker Renewable Energy","state":"ME","name":"Hogs Bay (Solar Photovoltaic, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"Hogs Bay, Hancock County, ME","lat":44.57579,"lng":-68.19965,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 343. Plant 66768 Hogs Bay (Greenbacker Renewable Energy Corporation), Hancock County, ME; balancing authority ISNE. Planned operation 2026-11.\nGenerator 694: 2 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1515,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Greenbacker Renewable Energy","state":"NY","name":"Hecate Energy Cider Solar LLC (Solar Photovoltaic, 557 MW)","type":"generation","voltage_kv":null,"location_ref":"Hecate Energy Cider Solar LLC, Genesee County, NY","lat":43.097336,"lng":-78.23041,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 200. Plant 64163 Hecate Energy Cider Solar LLC (Greenbacker Renewable Energy Corporation), Genesee County, NY; balancing authority NYIS. Planned operation 2026-10.\nGenerator 11111: 557 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1921,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Greenlia Solar Power Misae Iii","state":"TX","name":"Greenalia Solar Power Misae III (Solar Photovoltaic, 169.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Greenalia Solar Power Misae III, Childress County, TX","lat":34.343755,"lng":-100.0668,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1019. Plant 68769 Greenalia Solar Power Misae III (Greenlia Solar Power Misae III, LLC), Childress County, TX; balancing authority ERCO. Planned operation 2027-09.\nGenerator M3GSP: 169.6 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1498,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Green Power Energy","state":"NY","name":"Cody Road Wind Farm (Onshore Wind Turbine, 7.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Cody Road Wind Farm, Madison County, NY","lat":42.967145,"lng":-75.75592,"route":null,"cost_usd":null,"start_date":"2029-07-01","end_date":"2029-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1938, 1939, 1940. Plant 61592 Cody Road Wind Farm (Green Power Energy LLC), Madison County, NY; balancing authority NYIS. Planned operation 2029-07.\nGenerator WT1: 2.4 MW Onshore Wind Turbine; (U) Under construction, less than or equal to 50 percent complete\nGenerator WT2: 2.4 MW Onshore Wind Turbine; (U) Under construction, less than or equal to 50 percent complete\nGenerator WT3: 2.4 MW Onshore Wind Turbine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2174,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Greenwood Solar I","state":"VA","name":"Greenwood Solar I (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Greenwood Solar I, Culpeper County, VA","lat":38.427261,"lng":-77.90787,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1569. Plant 68205 Greenwood Solar I (Greenwood Solar I, LLC), Culpeper County, VA; balancing authority PJM. Planned operation 2028-06.\nGenerator GRNWD: 100 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1338,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Greer Solar","state":"MS","name":"Greer Solar Plant (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Greer Solar Plant, Washington County, MS","lat":33.115544,"lng":-90.83077,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 504. Plant 68515 Greer Solar Plant (Greer Solar, LLC), Washington County, MS; balancing authority MISO. Planned operation 2026-12.\nGenerator GREER: 200 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1923,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Grizzly Ridge Solar","state":"TX","name":"Grizzly Ridge Solar (Batteries, 10 MW)","type":"generation","voltage_kv":null,"location_ref":"Grizzly Ridge Solar, Hamilton County, TX","lat":31.738177,"lng":-98.21374,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 41. Plant 66410 Grizzly Ridge Solar (Grizzly Ridge Solar LLC), Hamilton County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator 596: 10 MW Batteries; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1986,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Grs Bess Texas Eight","state":"TX","name":"Marcos PV and BESS (Batteries, Solar Photovoltaic, 231.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Marcos PV and BESS, Victoria County, TX","lat":28.904979,"lng":-97.71017,"route":null,"cost_usd":null,"start_date":"2029-08-01","end_date":"2029-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1958, 1959. Plant 68080 Marcos PV and BESS (GRS BESS Texas Eight LLC), Victoria County, TX; balancing authority ERCO. Planned operation 2029-08.\nGenerator GRS8B: 115.9 MW Batteries; (L) Regulatory approvals pending. Not under construction\nGenerator GRS8P: 115.9 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2085,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Grs Bess Texas Seven","state":"TX","name":"Steelhead Energy Storage (Batteries, 193.7 MW)","type":"generation","voltage_kv":null,"location_ref":"Steelhead Energy Storage, Fannin County, TX","lat":33.633102,"lng":-96.15789,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1014. Plant 67798 Steelhead Energy Storage (GRS BESS Texas Seven, LLC), Fannin County, TX; balancing authority ERCO. Planned operation 2027-09.\nGenerator GRS7: 193.7 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":855,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Grva Bn","state":"CO","name":"Grand Valley Solar Generation and BESS (Batteries, Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Grand Valley Solar Generation and BESS, Mesa County, CO","lat":39.1987,"lng":-108.782,"route":null,"cost_usd":null,"start_date":"2029-10-01","end_date":"2029-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1984, 1985. Plant 68343 Grand Valley Solar Generation and BESS (GRVA bn, LLC), Mesa County, CO; balancing authority PSCO. Planned operation 2029-10.\nGenerator GRVA1: 100 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction\nGenerator GRVA2: 100 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1924,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gulfstar Power","state":"TX","name":"GulfStar Power, LLC (Solar Photovoltaic, 451.6 MW)","type":"generation","voltage_kv":null,"location_ref":"GulfStar Power, LLC, Wharton County, TX","lat":29.191296,"lng":-95.96752,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 207. Plant 66871 GulfStar Power, LLC (GulfStar Power, LLC), Wharton County, TX; balancing authority ERCO. Planned operation 2026-10.\nGenerator SOLAR: 451.6 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1925,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Gunnar Reliability Project","state":"TX","name":"Gunnar Reliability Project (Batteries, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Gunnar Reliability Project, Hidalgo County, TX","lat":26.315571,"lng":-98.14851,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 528. Plant 69277 Gunnar Reliability Project (Gunnar Reliability Project LLC), Hidalgo County, TX; balancing authority ERCO. Planned operation 2026-12.\nGenerator GR001: 150 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1926,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hackberry Creek Solar","state":"TX","name":"Hackberry Creek Solar (Solar Photovoltaic, 175 MW)","type":"generation","voltage_kv":null,"location_ref":"Hackberry Creek Solar, Mitchell County, TX","lat":32.393074,"lng":-100.8702,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1486. Plant 69984 Hackberry Creek Solar (Hackberry Creek Solar, LLC), Mitchell County, TX; balancing authority ERCO. Planned operation 2028-03.\nGenerator 6059: 175 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":960,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hamakua Energy Lp","state":"HI","name":"Hamakua Energy Plant (Batteries, 7.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Hamakua Energy Plant, Hawaii County, HI","lat":20.0939,"lng":-155.4711,"route":null,"cost_usd":null,"start_date":"2030-11-01","end_date":"2030-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2095. Plant 55369 Hamakua Energy Plant (Hamakua Energy LP), Hawaii County, HI; balancing authority . Planned operation 2030-11.\nGenerator BESS1: 7.5 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1929,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Harlingen Ess Assets","state":"TX","name":"Harlingen #1 BESS 1 (Batteries, 10 MW)","type":"generation","voltage_kv":null,"location_ref":"Harlingen #1 BESS 1, Cameron County, TX","lat":26.206111,"lng":-97.70842,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 382. Plant 69252 Harlingen #1 BESS 1 (Harlingen ESS Assets LLC), Cameron County, TX; balancing authority ERCO. Planned operation 2026-11.\nGenerator HABA1: 10 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1268,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hart Solar Partners","state":"MI","name":"Hart Solar Project (Solar Photovoltaic, 120 MW)","type":"generation","voltage_kv":null,"location_ref":"Hart Solar Project, Oceana County, MI","lat":43.692866,"lng":-86.32097,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 49. Plant 66778 Hart Solar Project (Hart Solar Partners, LLC), Oceana County, MI; balancing authority MISO. Planned operation 2026-09.\nGenerator HS1: 120 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1514,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hatchery Solar","state":"NY","name":"Hatchery Solar (Solar Photovoltaic, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"Hatchery Solar, Livingston County, NY","lat":42.976583,"lng":-77.76974,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1132. Plant 65901 Hatchery Solar (Hatchery Solar, LLC), Livingston County, NY; balancing authority NYIS. Planned operation 2027-11.\nGenerator 6: 20 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":971,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hawkeye Solar","state":"IA","name":"Hawkeye Solar, LLC (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Hawkeye Solar, LLC, Clinton County, IA","lat":41.835204,"lng":-90.69966,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1491. Plant 70257 Hawkeye Solar, LLC (Hawkeye Solar, LLC), Clinton County, IA; balancing authority MISO. Planned operation 2028-03.\nGenerator H1SLR: 200 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":970,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hawkeye Solar Ii","state":"IA","name":"Hawkeye Solar II, LLC (Solar Photovoltaic, 250 MW)","type":"generation","voltage_kv":null,"location_ref":"Hawkeye Solar II, LLC, Clinton County, IA","lat":41.835204,"lng":-90.69966,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1492. Plant 70258 Hawkeye Solar II, LLC (Hawkeye Solar II, LLC), Clinton County, IA; balancing authority MISO. Planned operation 2028-03.\nGenerator H2SLR: 250 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1359,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Haymaker Energy Project","state":"MT","name":"Haymaker Hybrid (Onshore Wind Turbine, 630 MW)","type":"generation","voltage_kv":null,"location_ref":"Haymaker Hybrid, Wheatland County, MT","lat":46.357442,"lng":-110.3958,"route":null,"cost_usd":null,"start_date":"2031-10-01","end_date":"2031-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2280. Plant 63878 Haymaker Hybrid (Haymaker Energy Project LLC), Wheatland County, MT; balancing authority NWMT. Planned operation 2031-10.\nGenerator HAY: 630 MW Onshore Wind Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1374,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Headwater Energy","state":"NC","name":"Gum Swamp Solar, LLC (Solar Photovoltaic, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"Gum Swamp Solar, LLC, Scotland County, NC","lat":34.867,"lng":-79.599,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 837. Plant 70302 Gum Swamp Solar, LLC (Headwater Energy, LLC), Scotland County, NC; balancing authority CPLE. Planned operation 2027-05.\nGenerator 22: 80 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1382,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Headwater Energy","state":"NC","name":"Midfield Solar, LLC (Solar Photovoltaic, 25 MW)","type":"generation","voltage_kv":null,"location_ref":"Midfield Solar, LLC, Columbus County, NC","lat":34.394,"lng":-78.771,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 593. Plant 70303 Midfield Solar, LLC (Headwater Energy, LLC), Columbus County, NC; balancing authority CPLE. Planned operation 2026-12.\nGenerator 20: 25 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1391,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Headwater Energy","state":"NC","name":"Sleepy Creek Solar, LLC (Solar Photovoltaic, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"Sleepy Creek Solar, LLC, Bladen County, NC","lat":34.592,"lng":-78.326,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1113. Plant 70304 Sleepy Creek Solar, LLC (Headwater Energy, LLC), Bladen County, NC; balancing authority CPLE. Planned operation 2027-10.\nGenerator 24: 80 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1396,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Headwater Energy","state":"NC","name":"Tanglewood Solar, LLC (Solar Photovoltaic, 8.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Tanglewood Solar, LLC, Pasquotank County, NC","lat":36.25,"lng":-76.3,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 594. Plant 70305 Tanglewood Solar, LLC (Headwater Energy, LLC), Pasquotank County, NC; balancing authority CPLE. Planned operation 2026-12.\nGenerator 23: 8.4 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1400,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Headwater Energy","state":"NC","name":"Westfield Solar, LLC (Solar Photovoltaic, 40 MW)","type":"generation","voltage_kv":null,"location_ref":"Westfield Solar, LLC, Hoke County, NC","lat":34.943,"lng":-79.242,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 595. Plant 70306 Westfield Solar, LLC (Headwater Energy, LLC), Hoke County, NC; balancing authority CPLE. Planned operation 2026-12.\nGenerator 21: 40 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1932,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hecate Energy Harley Hand Solar","state":"TX","name":"Hecate Energy Harley Hand Solar LLC (Solar Photovoltaic, 514 MW)","type":"generation","voltage_kv":null,"location_ref":"Hecate Energy Harley Hand Solar LLC, Nolan County, TX","lat":32.468537,"lng":-100.2164,"route":null,"cost_usd":null,"start_date":"2028-11-01","end_date":"2028-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1719. Plant 64234 Hecate Energy Harley Hand Solar LLC (Hecate Energy Harley Hand Solar LLC), Nolan County, TX; balancing authority ERCO. Planned operation 2028-11.\nGenerator 19936: 514 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1933,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hecate Energy Ramsey Storage","state":"TX","name":"Hecate Energy Ramsey Storage (Batteries, 500 MW)","type":"generation","voltage_kv":null,"location_ref":"Hecate Energy Ramsey Storage, Wharton County, TX","lat":29.02939,"lng":-96.2362,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1252. Plant 66414 Hecate Energy Ramsey Storage (Hecate Energy Ramsey Storage, LLC), Wharton County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator RMSY: 500 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1934,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hecate Grid East Valley Storage","state":"TX","name":"Hecate Grid East Valley Storage (Batteries, 255 MW)","type":"generation","voltage_kv":null,"location_ref":"Hecate Grid East Valley Storage, Cameron County, TX","lat":25.94113,"lng":-97.53276,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1251. Plant 66411 Hecate Grid East Valley Storage (Hecate Grid East Valley Storage, LLC), Cameron County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator RMSY: 255 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":759,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hecate Grid Gwent Storage 1","state":"CA","name":"Hecate Grid Gwent Storage 1 (Batteries, 135 MW)","type":"generation","voltage_kv":null,"location_ref":"Hecate Grid Gwent Storage 1, Ventura County, CA","lat":34.28093,"lng":-118.903,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1760. Plant 66409 Hecate Grid Gwent Storage 1 (Hecate Grid Gwent Storage 1, LLC), Ventura County, CA; balancing authority CISO. Planned operation 2028-12.\nGenerator GWNT: 135 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":760,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hecate Grid Humidor Storage 1","state":"CA","name":"Humidor Storage I (Batteries, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Humidor Storage I, Los Angeles County, CA","lat":34.29116,"lng":-118.7518,"route":null,"cost_usd":null,"start_date":"2029-09-01","end_date":"2029-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1970. Plant 65703 Humidor Storage I (Hecate Grid Humidor Storage 1 LLC), Los Angeles County, CA; balancing authority CISO. Planned operation 2029-09.\nGenerator HEHUM: 300 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1893,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"He-cottonwood Solar","state":"TX","name":"Donegal Solar Project (Solar Photovoltaic, 204.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Donegal Solar Project, Dickens County, TX","lat":33.796247,"lng":-100.8728,"route":null,"cost_usd":null,"start_date":"2028-10-01","end_date":"2028-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1690. Plant 67543 Donegal Solar Project (HE-Cottonwood Solar, LLC), Dickens County, TX; balancing authority ERCO. Planned operation 2028-10.\nGenerator DOGSP: 204.2 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2008,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hec Renewable Energy America","state":"TX","name":"OCI Hillsboro (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"OCI Hillsboro, Hill County, TX","lat":31.941,"lng":-97.021,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1077. Plant 66401 OCI Hillsboro (HEC Renewable Energy America LLC), Hill County, TX; balancing authority ERCO. Planned operation 2027-10.\nGenerator OHLPV: 200 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2009,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hec Renewable Energy America","state":"TX","name":"OCI Hillsboro (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"OCI Hillsboro, Hill County, TX","lat":31.941,"lng":-97.021,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1250. Plant 66401 OCI Hillsboro (HEC Renewable Energy America LLC), Hill County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator OHLBS: 200 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2218,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Helion Energy","state":"WA","name":"Orion - Helion (All Other, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"Orion - Helion, Chelan County, WA","lat":47.3368,"lng":-120.1043,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1798. Plant 69099 Orion - Helion (Helion Energy, Inc.), Chelan County, WA; balancing authority CHPD. Planned operation 2028-12.\nGenerator HEWA1: 50 MW All Other; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1881,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hen Infrastructure","state":"TX","name":"Coyote Springs (TX) (Petroleum Liquids, 9.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Coyote Springs (TX), Reeves County, TX","lat":31.39471,"lng":-103.6303,"route":null,"cost_usd":null,"start_date":"2027-02-01","end_date":"2027-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 651. Plant 65811 Coyote Springs (TX) (HEN Infrastructure, L.L.C.), Reeves County, TX; balancing authority ERCO. Planned operation 2027-02.\nGenerator CYSTD: 9.9 MW Petroleum Liquids; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2071,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hen Infrastructure","state":"TX","name":"Saddleback BESS2 (All Other, 9.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Saddleback BESS2, Reeves County, TX","lat":31.332883,"lng":-103.4984,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 203. Plant 65834 Saddleback BESS2 (HEN Infrastructure, L.L.C.), Reeves County, TX; balancing authority ERCO. Planned operation 2026-10.\nGenerator SDBTD: 9.9 MW All Other; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2176,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hera Solar","state":"VA","name":"Hera Solar (Solar Photovoltaic, 13.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Hera Solar, Tazewell County, VA","lat":36.167141,"lng":-81.50336,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1578. Plant 70409 Hera Solar (Hera Solar, LLC), Tazewell County, VA; balancing authority PJM. Planned operation 2028-06.\nGenerator ENX41: 13.3 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1901,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Heritage Solar","state":"TX","name":"El Patrimonio (Solar Photovoltaic, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"El Patrimonio, Bexar County, TX","lat":29.240499,"lng":-98.51006,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1030. Plant 69660 El Patrimonio (Heritage Solar LLC), Bexar County, TX; balancing authority ERCO. Planned operation 2027-09.\nGenerator HS: 150 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1516,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Heritage Wind","state":"NY","name":"Heritage Wind (Onshore Wind Turbine, 126 MW)","type":"generation","voltage_kv":null,"location_ref":"Heritage Wind, Orleans County, NY","lat":43.170976,"lng":-78.17454,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1567. Plant 68191 Heritage Wind (Heritage Wind, LLC), Orleans County, NY; balancing authority NYIS. Planned operation 2028-06.\nGenerator HRTG: 126 MW Onshore Wind Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1519,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Highbanks Solar","state":"NY","name":"Highbanks Solar (Solar Photovoltaic, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"Highbanks Solar, Livingston County, NY","lat":42.737227,"lng":-77.91431,"route":null,"cost_usd":null,"start_date":"2029-09-01","end_date":"2029-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1971. Plant 65934 Highbanks Solar (Highbanks Solar, LLC), Livingston County, NY; balancing authority NYIS. Planned operation 2029-09.\nGenerator 7: 20 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1518,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"High Bridge Wind","state":"NY","name":"High Bridge Wind Project (Onshore Wind Turbine, 103.2 MW)","type":"generation","voltage_kv":null,"location_ref":"High Bridge Wind Project, Chenango County, NY","lat":42.437923,"lng":-75.48056,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1211. Plant 62894 High Bridge Wind Project (High Bridge Wind, LLC), Chenango County, NY; balancing authority NYIS. Planned operation 2027-12.\nGenerator WT: 103.2 MW Onshore Wind Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1213,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Highland Ave Solar 1","state":"MA","name":"Borrego - Highland Ave (Batteries, Solar Photovoltaic, 10 MW)","type":"generation","voltage_kv":null,"location_ref":"Borrego - Highland Ave, Bristol County, MA","lat":41.661525,"lng":-71.05998,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 345, 346. Plant 67279 Borrego - Highland Ave (Highland Ave Solar 1, LLC), Bristol County, MA; balancing authority ISNE. Planned operation 2026-11.\nGenerator 6572: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete\nGenerator 6572B: 5 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1636,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"High Spring Solar Energy","state":"OK","name":"High Spring Solar Energy (Solar Photovoltaic, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"High Spring Solar Energy, Muskogee County, OK","lat":35.576674,"lng":-95.65816,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1357. Plant 69239 High Spring Solar Energy (High Spring Solar Energy), Muskogee County, OK; balancing authority SWPP. Planned operation 2027-12.\nGenerator HSS: 400 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1937,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hill Solar 1","state":"TX","name":"Hill Solar 1 (Solar Photovoltaic, 405 MW)","type":"generation","voltage_kv":null,"location_ref":"Hill Solar 1, Hill County, TX","lat":32.139,"lng":-97.06,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 51. Plant 66912 Hill Solar 1 (Hill Solar 1, LLC), Hill County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator HS1: 405 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1938,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hill Solar Ii","state":"TX","name":"Hill Solar II (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Hill Solar II, Hill County, TX","lat":32.115203,"lng":-97.06783,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 232. Plant 68481 Hill Solar II (Hill Solar II, LLC), Hill County, TX; balancing authority ERCO. Planned operation 2026-10.\nGenerator HS2: 200 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1583,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hills Solar Ny","state":"NY","name":"SunEast Hills Solar Project (Solar Photovoltaic, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"SunEast Hills Solar Project, Herkimer County, NY","lat":43.068296,"lng":-74.84923,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1072. Plant 62895 SunEast Hills Solar Project (Hills Solar NY LLC), Herkimer County, NY; balancing authority NYIS. Planned operation 2027-10.\nGenerator Q581: 20 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1341,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hinds Solar","state":"MS","name":"Hinds Solar, LLC (Solar Photovoltaic, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Hinds Solar, LLC, Hinds County, MS","lat":32.416186,"lng":-90.38886,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 927. Plant 67231 Hinds Solar, LLC (Hinds Solar, LLC), Hinds County, MS; balancing authority MISO. Planned operation 2027-07.\nGenerator HS: 150 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1940,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hockley","state":"TX","name":"Hockley (Batteries, 9.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Hockley, Harris County, TX","lat":30.021964,"lng":-95.84826,"route":null,"cost_usd":null,"start_date":"2027-02-01","end_date":"2027-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 669. Plant 69902 Hockley (Hockley LLC), Harris County, TX; balancing authority ERCO. Planned operation 2027-02.\nGenerator HOCKL: 9.9 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1143,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hodson Greendefine Jay Desoto","state":"IN","name":"New Jay PV & BESS (Solar Photovoltaic, 39 MW)","type":"generation","voltage_kv":null,"location_ref":"New Jay PV & BESS, Jay County, IN","lat":40.369376,"lng":-85.18392,"route":null,"cost_usd":null,"start_date":"2028-09-01","end_date":"2028-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1668. Plant 67966 New Jay PV & BESS (Hodson Greendefine Jay Desoto LLC), Jay County, IN; balancing authority PJM. Planned operation 2028-09.\nGenerator NEWJ1: 39 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2177,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ho-fel Solar","state":"VA","name":"Ho-Fel Solar (Solar Photovoltaic, 50.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Ho-Fel Solar, Isle of Wight County, VA","lat":36.673032,"lng":-76.88201,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 372. Plant 68970 Ho-Fel Solar (Ho-Fel Solar LLC), Isle of Wight County, VA; balancing authority PJM. Planned operation 2026-11.\nGenerator HOFEL: 50.2 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2216,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hohi Bn","state":"WA","name":"Hop Hill Solar Generation and BESS (Batteries, Onshore Wind Turbine, Solar Photovoltaic, 1200 MW)","type":"generation","voltage_kv":null,"location_ref":"Hop Hill Solar Generation and BESS, Benton County, WA","lat":46.324,"lng":-119.822,"route":null,"cost_usd":null,"start_date":"2031-09-01","end_date":"2031-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2276, 2277, 2278. Plant 68342 Hop Hill Solar Generation and BESS (HOHI bn, LLC), Benton County, WA; balancing authority BPAT. Planned operation 2031-09.\nGenerator HOHI: 200 MW Onshore Wind Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator HOHI1: 500 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction\nGenerator HOHI2: 500 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1763,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Holliday Solar I","state":"SC","name":"Holliday Solar I (Solar Photovoltaic, 74 MW)","type":"generation","voltage_kv":null,"location_ref":"Holliday Solar I, Horry County, SC","lat":34.054128,"lng":-79.20663,"route":null,"cost_usd":null,"start_date":"2028-11-01","end_date":"2028-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1708. Plant 62229 Holliday Solar I (Holliday Solar I), Horry County, SC; balancing authority SC. Planned operation 2028-11.\nGenerator 43: 74 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1194,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hollis Creek Pv I","state":"LA","name":"Hollis Creek Solar (Solar Photovoltaic, 220 MW)","type":"generation","voltage_kv":null,"location_ref":"Hollis Creek Solar, Sabine County, LA","lat":31.661627,"lng":-93.47361,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 827. Plant 69590 Hollis Creek Solar (Hollis Creek PV I, LLC), Sabine County, LA; balancing authority MISO. Planned operation 2027-05.\nGenerator HC1: 220 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1221,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Holyoke Ma Bess 1","state":"MA","name":"Holyoke MA BESS 1 (Batteries, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Holyoke MA BESS 1, Hampden County, MA","lat":42.16774,"lng":-72.64898,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 128. Plant 69551 Holyoke MA BESS 1 (Holyoke MA BESS 1 LLC), Hampden County, MA; balancing authority ISNE. Planned operation 2026-09.\nGenerator 90915: 5 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1701,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Homer City Generation L P","state":"PA","name":"Homer City Generating Station (Natural Gas Fired Combined Cycle, 1256 MW)","type":"generation","voltage_kv":null,"location_ref":"Homer City Generating Station, Indiana County, PA","lat":40.512825,"lng":-79.19611,"route":null,"cost_usd":null,"start_date":"2028-07-01","end_date":"2028-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1579, 1580, 1581, 1582. Plant 3122 Homer City Generating Station (Homer City Generation, L.P.), Indiana County, PA; balancing authority PJM. Planned operation 2028-07.\nGenerator CA5: 268 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator CA6: 268 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator CT5: 360 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator CT6: 360 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1702,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Homer City Generation L P","state":"PA","name":"Homer City Generating Station (Natural Gas Fired Combined Cycle, 1256 MW)","type":"generation","voltage_kv":null,"location_ref":"Homer City Generating Station, Indiana County, PA","lat":40.512825,"lng":-79.19611,"route":null,"cost_usd":null,"start_date":"2028-11-01","end_date":"2028-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1699, 1700, 1701, 1702. Plant 3122 Homer City Generating Station (Homer City Generation, L.P.), Indiana County, PA; balancing authority PJM. Planned operation 2028-11.\nGenerator CA2: 268 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator CA3: 268 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator CT2: 360 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator CT3: 360 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1703,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Homer City Generation L P","state":"PA","name":"Homer City Generating Station (Natural Gas Fired Combined Cycle, 628 MW)","type":"generation","voltage_kv":null,"location_ref":"Homer City Generating Station, Indiana County, PA","lat":40.512825,"lng":-79.19611,"route":null,"cost_usd":null,"start_date":"2029-03-01","end_date":"2029-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1866, 1867. Plant 3122 Homer City Generating Station (Homer City Generation, L.P.), Indiana County, PA; balancing authority PJM. Planned operation 2029-03.\nGenerator CA7: 268 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator CT7: 360 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1704,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Homer City Generation L P","state":"PA","name":"Homer City Generating Station (Natural Gas Fired Combined Cycle, 628 MW)","type":"generation","voltage_kv":null,"location_ref":"Homer City Generating Station, Indiana County, PA","lat":40.512825,"lng":-79.19611,"route":null,"cost_usd":null,"start_date":"2029-07-01","end_date":"2029-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1936, 1937. Plant 3122 Homer City Generating Station (Homer City Generation, L.P.), Indiana County, PA; balancing authority PJM. Planned operation 2029-07.\nGenerator CA4: 268 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator CT4: 360 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1705,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Homer City Generation L P","state":"PA","name":"Homer City Generating Station (Natural Gas Fired Combined Cycle, 628 MW)","type":"generation","voltage_kv":null,"location_ref":"Homer City Generating Station, Indiana County, PA","lat":40.512825,"lng":-79.19611,"route":null,"cost_usd":null,"start_date":"2029-11-01","end_date":"2029-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1992, 1993. Plant 3122 Homer City Generating Station (Homer City Generation, L.P.), Indiana County, PA; balancing authority PJM. Planned operation 2029-11.\nGenerator CA1: 268 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator CT1: 360 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1944,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Honeycomb Solar Holdco","state":"TX","name":"Honeycomb Solar and Storage (Batteries, Solar Photovoltaic, 151.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Honeycomb Solar and Storage, Bee County, TX","lat":28.184344,"lng":-97.77169,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 388, 389. Plant 69351 Honeycomb Solar and Storage (Honeycomb Solar Holdco, LLC), Bee County, TX; balancing authority ERCO. Planned operation 2026-11.\nGenerator HNYBS: 76.5 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator HNYPV: 74.8 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1752,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hope Solar One","state":"RI","name":"Hope Solar One (Solar Photovoltaic, 3.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Hope Solar One, Providence County, RI","lat":41.729285,"lng":-71.63759,"route":null,"cost_usd":null,"start_date":"2028-07-01","end_date":"2028-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1591. Plant 65060 Hope Solar One (Hope Solar One, LLC), Providence County, RI; balancing authority ISNE. Planned operation 2028-07.\nGenerator VCP02: 3.5 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1377,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hornet Solar","state":"NC","name":"Hornet Solar (Solar Photovoltaic, 73 MW)","type":"generation","voltage_kv":null,"location_ref":"Hornet Solar, Gaston County, NC","lat":35.387,"lng":-81.029,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 448. Plant 64167 Hornet Solar (Hornet Solar LLC), Gaston County, NC; balancing authority DUK. Planned operation 2026-12.\nGenerator GEN: 73 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2178,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Horsepen Branch Solar","state":"VA","name":"Horsepen Branch Solar (Solar Photovoltaic, 25 MW)","type":"generation","voltage_kv":null,"location_ref":"Horsepen Branch Solar, Louisa County, VA","lat":37.961,"lng":-77.792,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1763. Plant 66695 Horsepen Branch Solar (Horsepen Branch Solar), Louisa County, VA; balancing authority PJM. Planned operation 2028-12.\nGenerator HRSPN: 25 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":897,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Howard University","state":"DC","name":"CHP Plant (Natural Gas Fired Combustion Turbine, 5.7 MW)","type":"generation","voltage_kv":null,"location_ref":"CHP Plant, District of Columbia County, DC","lat":38.92033,"lng":-77.021,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 212. Plant 67265 CHP Plant (Howard University), District of Columbia County, DC; balancing authority PJM. Planned operation 2026-10.\nGenerator CTG-1: 5.7 MW Natural Gas Fired Combustion Turbine; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1021,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hqca Energy Solutions","state":"IL","name":"E 1300 Street Solar LLC (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"E 1300 Street Solar LLC, Henry County, IL","lat":41.310529,"lng":-90.18478,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1055. Plant 69894 E 1300 Street Solar LLC (HQCA Energy Solutions, LLC), Henry County, IL; balancing authority MISO. Planned operation 2027-09.\nGenerator 13PV1: 5 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":961,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Hu Honua Bioenergy","state":"HI","name":"Hu Honua Bioenergy Facility (Other Waste Biomass, 36 MW)","type":"generation","voltage_kv":null,"location_ref":"Hu Honua Bioenergy Facility, Hawaii County, HI","lat":19.843504,"lng":-155.0871,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1208. Plant 61364 Hu Honua Bioenergy Facility (Hu Honua Bioenergy, LLC), Hawaii County, HI; balancing authority HECO. Planned operation 2027-12.\nGenerator HHB: 36 MW Other Waste Biomass; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2015,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Iep Tejas Verde","state":"TX","name":"Orchard BESS (Batteries, 10 MW)","type":"generation","voltage_kv":null,"location_ref":"Orchard BESS, Fort Bend County, TX","lat":29.539579,"lng":-95.95732,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 398. Plant 69665 Orchard BESS (IEP Tejas Verde, LLC), Fort Bend County, TX; balancing authority ERCO. Planned operation 2026-11.\nGenerator ORCH: 10 MW Batteries; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1077,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Illinois Rural Electric Coop","state":"IL","name":"Pike County Solar (Solar Photovoltaic, 1 MW)","type":"generation","voltage_kv":null,"location_ref":"Pike County Solar, Pike County, IL","lat":39.6189,"lng":-90.8461,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 724. Plant 69724 Pike County Solar (Illinois Rural Electric Coop), Pike County, IL; balancing authority MISO. Planned operation 2027-03.\nGenerator PIKE: 1 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1037,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Il Solar Route 40 Project2","state":"IL","name":"IL - Forefront Ameren- Route 40 (Solar Photovoltaic, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"IL - Forefront Ameren- Route 40, Peoria County, IL","lat":40.923873,"lng":-89.63042,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 599. Plant 70350 IL - Forefront Ameren- Route 40 (IL Solar Route 40 Project2, LLC), Peoria County, IL; balancing authority MISO. Planned operation 2026-12.\nGenerator RT40: 2 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1038,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Il Solar Truitt Project1","state":"IL","name":"IL-Forefront Ameren-Truitt 1 (Solar Photovoltaic, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"IL-Forefront Ameren-Truitt 1, Peoria County, IL","lat":40.929207,"lng":-89.64177,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 600. Plant 70353 IL-Forefront Ameren-Truitt 1 (IL Solar Truitt Project1, LLC), Peoria County, IL; balancing authority MISO. Planned operation 2026-12.\nGenerator TRU1: 2 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1039,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Il Solar Truitt Project2","state":"IL","name":"IL-Forefront Ameren-Truitt 2 (Solar Photovoltaic, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"IL-Forefront Ameren-Truitt 2, Peoria County, IL","lat":40.929207,"lng":-89.64177,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 601. Plant 70354 IL-Forefront Ameren-Truitt 2 (IL Solar Truitt Project2, LLC), Peoria County, IL; balancing authority MISO. Planned operation 2026-12.\nGenerator TRU2: 2 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":761,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Imperator Solar","state":"CA","name":"Imperator Solar (Solar Photovoltaic, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"Imperator Solar, Kern County, CA","lat":35.4932,"lng":-119.1659,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 231. Plant 68465 Imperator Solar (Imperator Solar, LLC), Kern County, CA; balancing authority CISO. Planned operation 2026-10.\nGenerator 22324: 2 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":740,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Imperial Irrigation District","state":"CA","name":"El Centro Hybrid (Natural Gas Internal Combustion Engine, 112.8 MW)","type":"generation","voltage_kv":null,"location_ref":"El Centro Hybrid, Imperial County, CA","lat":32.802222,"lng":-115.54,"route":null,"cost_usd":null,"start_date":"2029-09-01","end_date":"2029-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1960, 1961, 1962, 1963, 1964, 1965. Plant 389 El Centro Hybrid (Imperial Irrigation District), Imperial County, CA; balancing authority IID. Planned operation 2029-09.\nGenerator RICE1: 18.8 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator RICE2: 18.8 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator RICE3: 18.8 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator RICE4: 18.8 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator RICE5: 18.8 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator RICE6: 18.8 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":762,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Imperial Sun Solar","state":"CA","name":"Imperial Sun Solar (Batteries, Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Imperial Sun Solar, Imperial County, CA","lat":32.6851,"lng":-115.2977,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 938, 939. Plant 68909 Imperial Sun Solar (Imperial Sun Solar LLC), Imperial County, CA; balancing authority IID. Planned operation 2027-07.\nGenerator ISSBA: 100 MW Batteries; (L) Regulatory approvals pending. Not under construction\nGenerator ISSPV: 100 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1954,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Industrial Bravo Project","state":"TX","name":"Isaac Solar (Solar Photovoltaic, 51.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Isaac Solar, Matagorda County, TX","lat":28.797223,"lng":-95.93717,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 499. Plant 68380 Isaac Solar (Industrial Bravo Project, LLC), Matagorda County, TX; balancing authority ERCO. Planned operation 2026-12.\nGenerator ISCPV: 51.4 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2004,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Industrial Kilo Project","state":"TX","name":"Noor Solar (Solar Photovoltaic, 188.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Noor Solar, Chambers County, TX","lat":29.909115,"lng":-94.96756,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1470. Plant 68411 Noor Solar (Industrial Kilo Project, LLC), Chambers County, TX; balancing authority ERCO. Planned operation 2028-03.\nGenerator NORPV: 188.2 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1952,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Innovative Solar 245","state":"TX","name":"Indigo Solar & Storage (Batteries, Solar Photovoltaic, 330 MW)","type":"generation","voltage_kv":null,"location_ref":"Indigo Solar & Storage, Fisher County, TX","lat":32.628061,"lng":-100.236,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 812, 813. Plant 66891 Indigo Solar & Storage (Innovative Solar 245 LLC), Fisher County, TX; balancing authority ERCO. Planned operation 2027-05.\nGenerator 245BS: 180 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator IS245: 150 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":727,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Intersect Usa","state":"CA","name":"Darden I Solar (Batteries, Solar Photovoltaic, 646.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Darden I Solar, Fresno County, CA","lat":36.504106,"lng":-120.2167,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1477, 1478. Plant 69661 Darden I Solar (Intersect USA, LLC), Fresno County, CA; balancing authority CISO. Planned operation 2028-03.\nGenerator IPD1B: 303.7 MW Batteries; (T) Regulatory approvals received. Not under construction\nGenerator IPD1S: 342.7 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":728,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Intersect Usa","state":"CA","name":"Darden II Solar (Batteries, Solar Photovoltaic, 646.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Darden II Solar, Fresno County, CA","lat":36.457086,"lng":-120.2248,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1479, 1480. Plant 69662 Darden II Solar (Intersect USA, LLC), Fresno County, CA; balancing authority CISO. Planned operation 2028-03.\nGenerator IPD2B: 303.7 MW Batteries; (T) Regulatory approvals received. Not under construction\nGenerator IPD2S: 342.7 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":729,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Intersect Usa","state":"CA","name":"Darden III Solar (Batteries, Solar Photovoltaic, 646.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Darden III Solar, Fresno County, CA","lat":36.499703,"lng":-120.1912,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1481, 1482. Plant 69663 Darden III Solar (Intersect USA, LLC), Fresno County, CA; balancing authority CISO. Planned operation 2028-03.\nGenerator IPD3B: 303.7 MW Batteries; (T) Regulatory approvals received. Not under construction\nGenerator IPD3S: 342.7 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":730,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Intersect Usa","state":"CA","name":"Darden IV Solar (Batteries, Solar Photovoltaic, 646.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Darden IV Solar, Fresno County, CA","lat":36.464339,"lng":-120.1862,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1483, 1484. Plant 69664 Darden IV Solar (Intersect USA, LLC), Fresno County, CA; balancing authority CISO. Planned operation 2028-03.\nGenerator IPD4B: 303.7 MW Batteries; (T) Regulatory approvals received. Not under construction\nGenerator IPD4S: 342.7 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1847,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Intersect Usa","state":"TX","name":"Briggs Solar, LLC (Batteries, Solar Photovoltaic, 375.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Briggs Solar, LLC, Haskell County, TX","lat":33.144326,"lng":-99.55977,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1258, 1259. Plant 66691 Briggs Solar, LLC (Intersect USA, LLC), Haskell County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator BRIGG: 305 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction\nGenerator BRUGG: 70.5 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1948,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Intersect Usa","state":"TX","name":"IP Meitner Solar (Solar Photovoltaic, 500 MW)","type":"generation","voltage_kv":null,"location_ref":"IP Meitner Solar, Gray County, TX","lat":35.562222,"lng":-100.6941,"route":null,"cost_usd":null,"start_date":"2028-04-01","end_date":"2028-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1502. Plant 68203 IP Meitner Solar (Intersect USA, LLC), Gray County, TX; balancing authority ERCO. Planned operation 2028-04.\nGenerator MEITS: 500 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1949,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Intersect Usa","state":"TX","name":"IP Meitner Wind (Onshore Wind Turbine, 500 MW)","type":"generation","voltage_kv":null,"location_ref":"IP Meitner Wind, Roberts County, TX","lat":35.696972,"lng":-100.8213,"route":null,"cost_usd":null,"start_date":"2028-02-01","end_date":"2028-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1442. Plant 68204 IP Meitner Wind (Intersect USA, LLC), Roberts County, TX; balancing authority ERCO. Planned operation 2028-02.\nGenerator MEITW: 500 MW Onshore Wind Turbine; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1950,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Intersect Usa","state":"TX","name":"IP Roman Solar (Solar Photovoltaic, 500 MW)","type":"generation","voltage_kv":null,"location_ref":"IP Roman Solar, Deaf Smith County, TX","lat":34.990891,"lng":-102.6076,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1568. Plant 68201 IP Roman Solar (Intersect USA, LLC), Deaf Smith County, TX; balancing authority ERCO. Planned operation 2028-06.\nGenerator ROMS: 500 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1951,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Intersect Usa","state":"TX","name":"IP Roman Wind (Onshore Wind Turbine, 670.5 MW)","type":"generation","voltage_kv":null,"location_ref":"IP Roman Wind, Deaf Smith County, TX","lat":34.990891,"lng":-102.6076,"route":null,"cost_usd":null,"start_date":"2028-09-01","end_date":"2028-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1671. Plant 68202 IP Roman Wind (Intersect USA, LLC), Deaf Smith County, TX; balancing authority ERCO. Planned operation 2028-09.\nGenerator ROMW: 670.5 MW Onshore Wind Turbine; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2040,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Intersect Usa","state":"TX","name":"Quantum BESS (Batteries, 422.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Quantum BESS, Haskell County, TX","lat":33.0121,"lng":-99.5604,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 363. Plant 68759 Quantum BESS (Intersect USA, LLC), Haskell County, TX; balancing authority ERCO. Planned operation 2026-11.\nGenerator IPQ1B: 422.4 MW Batteries; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2041,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Intersect Usa","state":"TX","name":"Quantum II BESS (Batteries, 422.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Quantum II BESS, Haskell County, TX","lat":33.135,"lng":-99.5719,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 365. Plant 68761 Quantum II BESS (Intersect USA, LLC), Haskell County, TX; balancing authority ERCO. Planned operation 2026-11.\nGenerator IPQ2B: 422.4 MW Batteries; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2042,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Intersect Usa","state":"TX","name":"Quantum II Solar (Solar Photovoltaic, 362.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Quantum II Solar, Haskell County, TX","lat":33.1377,"lng":-99.57,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 366. Plant 68762 Quantum II Solar (Intersect USA, LLC), Haskell County, TX; balancing authority ERCO. Planned operation 2026-11.\nGenerator IPQ2S: 362.8 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2043,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Intersect Usa","state":"TX","name":"Quantum Solar (Solar Photovoltaic, 362.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Quantum Solar, Haskell County, TX","lat":33.0129,"lng":-99.5604,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 364. Plant 68760 Quantum Solar (Intersect USA, LLC), Haskell County, TX; balancing authority ERCO. Planned operation 2026-11.\nGenerator IPQ1S: 362.8 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":642,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Invenergy Services","state":"AR","name":"Decoy Solar Energy LLC (Solar Photovoltaic, 155 MW)","type":"generation","voltage_kv":null,"location_ref":"Decoy Solar Energy LLC, Arkansas County, AR","lat":34.463496,"lng":-91.52053,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1385. Plant 70022 Decoy Solar Energy LLC (Invenergy Services LLC), Arkansas County, AR; balancing authority MISO. Planned operation 2027-12.\nGenerator DCYSO: 155 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":676,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Invenergy Services","state":"AZ","name":"Hashknife Energy Center II LLC (Batteries, Solar Photovoltaic, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"Hashknife Energy Center II LLC, Navajo County, AZ","lat":34.574259,"lng":-110.4946,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 725, 726. Plant 69779 Hashknife Energy Center II LLC (Invenergy Services LLC), Navajo County, AZ; balancing authority AZPS. Planned operation 2027-03.\nGenerator HK2SO: 200 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete\nGenerator HK2ST: 200 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":677,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Invenergy Services","state":"AZ","name":"Hashknife Energy Center LLC (Batteries, Solar Photovoltaic, 550 MW)","type":"generation","voltage_kv":null,"location_ref":"Hashknife Energy Center LLC, Navajo County, AZ","lat":34.574259,"lng":-110.4946,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 138, 139. Plant 69778 Hashknife Energy Center LLC (Invenergy Services LLC), Navajo County, AZ; balancing authority AZPS. Planned operation 2026-09.\nGenerator HK1SO: 275 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete\nGenerator HK1ST: 275 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1150,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Invenergy Services","state":"IN","name":"Sycamore Riverside Energy, LLC (Natural Gas Fired Combustion Turbine, 964 MW)","type":"generation","voltage_kv":null,"location_ref":"Sycamore Riverside Energy, LLC, Sullivan County, IN","lat":39.213906,"lng":-87.54727,"route":null,"cost_usd":null,"start_date":"2029-03-01","end_date":"2029-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1873. Plant 70359 Sycamore Riverside Energy, LLC (Invenergy Services LLC), Sullivan County, IN; balancing authority PJM. Planned operation 2029-03.\nGenerator SYRVS: 964 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1283,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Invenergy Services","state":"MI","name":"Superior Solar Project, LLC (Solar Photovoltaic, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Superior Solar Project, LLC, Marquette County, MI","lat":46.455,"lng":-87.466,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1809. Plant 69577 Superior Solar Project, LLC (Invenergy Services LLC), Marquette County, MI; balancing authority MISO. Planned operation 2028-12.\nGenerator SPROR: 150 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1372,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Invenergy Services","state":"NC","name":"Edgecombe Solar LLC (Solar Photovoltaic, 75 MW)","type":"generation","voltage_kv":null,"location_ref":"Edgecombe Solar LLC, Edgecombe County, NC","lat":35.949381,"lng":-77.65926,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1060. Plant 70023 Edgecombe Solar LLC (Invenergy Services LLC), Edgecombe County, NC; balancing authority PJM. Planned operation 2027-09.\nGenerator EDGCM: 75 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1451,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Invenergy Services","state":"NM","name":"Tip Top Solar Energy Center LLC (Solar Photovoltaic, 220 MW)","type":"generation","voltage_kv":null,"location_ref":"Tip Top Solar Energy Center LLC, Lea County, NM","lat":32.133136,"lng":-103.3235,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 443. Plant 63028 Tip Top Solar Energy Center LLC (Invenergy Services LLC), Lea County, NM; balancing authority SWPP. Planned operation 2026-12.\nGenerator GEN1: 220 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1483,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Invenergy Services","state":"NY","name":"Alle-Catt Wind Energy LLC (Onshore Wind Turbine, 340 MW)","type":"generation","voltage_kv":null,"location_ref":"Alle-Catt Wind Energy LLC, Allegany County, NY","lat":42.262038,"lng":-78.20154,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 442. Plant 62954 Alle-Catt Wind Energy LLC (Invenergy Services LLC), Allegany County, NY; balancing authority NYIS. Planned operation 2026-12.\nGenerator GEN1: 340 MW Onshore Wind Turbine; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1523,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Invenergy Services","state":"NY","name":"Horseshoe Solar Energy (Solar Photovoltaic, 180 MW)","type":"generation","voltage_kv":null,"location_ref":"Horseshoe Solar Energy, Livingston County, NY","lat":42.570762,"lng":-77.45296,"route":null,"cost_usd":null,"start_date":"2028-11-01","end_date":"2028-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1718. Plant 63096 Horseshoe Solar Energy (Invenergy Services LLC), Livingston County, NY; balancing authority NYIS. Planned operation 2028-11.\nGenerator GEN1: 180 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1622,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Invenergy Services","state":"OH","name":"Pleasant Prairie Solar Energy LLC (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Pleasant Prairie Solar Energy LLC, Franklin County, OH","lat":39.944801,"lng":-83.20397,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 534. Plant 69477 Pleasant Prairie Solar Energy LLC (Invenergy Services LLC), Franklin County, OH; balancing authority PJM. Planned operation 2026-12.\nGenerator PLSNT: 200 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1632,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Invenergy Services","state":"OH","name":"Yellow Wood Solar Energy LLC (Solar Photovoltaic, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Yellow Wood Solar Energy LLC, Clinton County, OH","lat":39.271465,"lng":-83.7904,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1382. Plant 69963 Yellow Wood Solar Energy LLC (Invenergy Services LLC), Clinton County, OH; balancing authority PJM. Planned operation 2027-12.\nGenerator YLWWD: 300 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1659,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Invenergy Services","state":"OR","name":"Powell Solar (Solar Photovoltaic, 55.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Powell Solar, Crook County, OR","lat":44.258414,"lng":-120.8895,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1272. Plant 67157 Powell Solar (Invenergy Services LLC), Crook County, OR; balancing authority PACW. Planned operation 2027-12.\nGenerator PV1: 55.9 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1865,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Invenergy Services","state":"TX","name":"Changing Winds (Onshore Wind Turbine, 288 MW)","type":"generation","voltage_kv":null,"location_ref":"Changing Winds, Castro County, TX","lat":34.511944,"lng":-102.0519,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1453. Plant 59243 Changing Winds (Invenergy Services LLC), Castro County, TX; balancing authority ERCO. Planned operation 2028-03.\nGenerator CHAN1: 288 MW Onshore Wind Turbine; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2231,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Invenergy Services","state":"WI","name":"Foundry Ridge Energy Center LLC (Natural Gas Fired Combustion Turbine, 324 MW)","type":"generation","voltage_kv":null,"location_ref":"Foundry Ridge Energy Center LLC, Walworth County, WI","lat":42.583072,"lng":-88.72461,"route":null,"cost_usd":null,"start_date":"2028-08-01","end_date":"2028-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1654, 1655, 1656. Plant 70360 Foundry Ridge Energy Center LLC (Invenergy Services LLC), Walworth County, WI; balancing authority MISO. Planned operation 2028-08.\nGenerator FNDRD: 108 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator FNRD2: 108 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator FNRD3: 108 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2233,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Invenergy Services","state":"WI","name":"High Noon Solar Energy LLC (Solar Photovoltaic, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"High Noon Solar Energy LLC, Columbia County, WI","lat":43.35326,"lng":-89.34738,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1029. Plant 69480 High Noon Solar Energy LLC (Invenergy Services LLC), Columbia County, WI; balancing authority MISO. Planned operation 2027-09.\nGenerator HGHNN: 300 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2234,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Invenergy Services","state":"WI","name":"Koshkonong Solar Energy Center LLC (Solar Photovoltaic, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Koshkonong Solar Energy Center LLC, Dane County, WI","lat":42.976875,"lng":-89.07209,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 535. Plant 69479 Koshkonong Solar Energy Center LLC (Invenergy Services LLC), Dane County, WI; balancing authority MISO. Planned operation 2026-12.\nGenerator KSHKS: 300 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2238,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Invenergy Services","state":"WI","name":"Sinnissippi Solar Energy LLC (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Sinnissippi Solar Energy LLC, Jefferson County, WI","lat":43.12592,"lng":-88.67098,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1811. Plant 69608 Sinnissippi Solar Energy LLC (Invenergy Services LLC), Jefferson County, WI; balancing authority MISO. Planned operation 2028-12.\nGenerator SNSPI: 100 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2245,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Invenergy Services","state":"WI","name":"Whitetail Wind Farm (Onshore Wind Turbine, 67.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Whitetail Wind Farm, Grant County, WI","lat":42.951448,"lng":-90.4407,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1279. Plant 67379 Whitetail Wind Farm (Invenergy Services LLC), Grant County, WI; balancing authority MISO. Planned operation 2027-12.\nGenerator 1: 67.2 MW Onshore Wind Turbine; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":706,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ip Aramis","state":"CA","name":"Aramis I Solar Project (Batteries, Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Aramis I Solar Project, Alameda County, CA","lat":37.749678,"lng":-121.7661,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 47, 48. Plant 66678 Aramis I Solar Project (IP Aramis, LLC), Alameda County, CA; balancing authority CISO. Planned operation 2026-09.\nGenerator IPAR1: 100 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete\nGenerator IPARB: 100 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":737,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ip Easley","state":"CA","name":"Easley Solar (Solar Photovoltaic, 290 MW)","type":"generation","voltage_kv":null,"location_ref":"Easley Solar, Riverside County, CA","lat":33.722655,"lng":-115.326,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 88. Plant 68758 Easley Solar (IP Easley, LLC), Riverside County, CA; balancing authority CISO. Planned operation 2026-09.\nGenerator IPEA1: 290 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":738,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ip Easley","state":"CA","name":"Easley Solar (Batteries, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Easley Solar, Riverside County, CA","lat":33.722655,"lng":-115.326,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1472. Plant 68758 Easley Solar (IP Easley, LLC), Riverside County, CA; balancing authority CISO. Planned operation 2028-03.\nGenerator IPEA3: 300 MW Batteries; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1222,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ipswich Ma Bess 1","state":"MA","name":"Ipswich MA BESS 1 (Batteries, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Ipswich MA BESS 1, Essex County, MA","lat":42.716353,"lng":-70.84202,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 279. Plant 69603 Ipswich MA BESS 1 (Ipswich MA BESS 1 LLC), Essex County, MA; balancing authority ISNE. Planned operation 2026-10.\nGenerator 90917: 5 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1953,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Iron Belt Energy Storage Project","state":"TX","name":"Iron Belt (Batteries, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"Iron Belt, Borden County, TX","lat":32.5557,"lng":-101.6601,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 859. Plant 67059 Iron Belt (Iron Belt Energy Storage Project, LLC), Borden County, TX; balancing authority ERCO. Planned operation 2027-06.\nGenerator 1: 400 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1042,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Itt Energy Tech Partners","state":"IL","name":"ITT Cogen Facility (Natural Gas Internal Combustion Engine, 8.2 MW)","type":"generation","voltage_kv":null,"location_ref":"ITT Cogen Facility, Cook County, IL","lat":41.83442,"lng":-87.62847,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 679, 680. Plant 52021 ITT Cogen Facility (ITT Energy Tech Partners, LLC), Cook County, IL; balancing authority PJM. Planned operation 2027-03.\nGenerator GEN3: 4.1 MW Natural Gas Internal Combustion Engine; (T) Regulatory approvals received. Not under construction\nGenerator GEN4: 4.1 MW Natural Gas Internal Combustion Engine; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1085,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Joppa Bess","state":"IL","name":"Pulaski Solar (Solar Photovoltaic, 417.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Pulaski Solar, Pulaski County, IL","lat":37.264918,"lng":-88.9524,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 515. Plant 69025 Pulaski Solar (Joppa BESS LLC), Pulaski County, IL; balancing authority GLHB. Planned operation 2026-12.\nGenerator PLSKI: 417.4 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":622,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Juneau Hydropower","state":"AK","name":"Sweetheart Lake Hydroelectric Facility (Conventional Hydroelectric, 19.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Sweetheart Lake Hydroelectric Facility, Juneau County, AK","lat":57.9449,"lng":-133.6867,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1420, 1421, 1422. Plant 60588 Sweetheart Lake Hydroelectric Facility (Juneau Hydropower, Inc), Juneau County, AK; balancing authority . Planned operation 2028-01.\nGenerator JHI01: 6.6 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator JHI02: 6.6 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator JHI03: 6.6 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1765,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Juniper Solar","state":"SC","name":"Juniper Solar (Solar Photovoltaic, 74.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Juniper Solar, Chesterfield County, SC","lat":34.638189,"lng":-79.86121,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 685. Plant 62234 Juniper Solar (Juniper Solar), Chesterfield County, SC; balancing authority CPLE. Planned operation 2027-03.\nGenerator 48: 74.9 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":765,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Jvr Energy Park","state":"CA","name":"JVR Energy Park LLC (Batteries, Solar Photovoltaic, 160 MW)","type":"generation","voltage_kv":null,"location_ref":"JVR Energy Park LLC, San Diego County, CA","lat":32.625903,"lng":-116.1749,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 690, 691. Plant 64428 JVR Energy Park LLC (JVR Energy Park LLC), San Diego County, CA; balancing authority CISO. Planned operation 2027-03.\nGenerator JVR1A: 90 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction\nGenerator JVR1B: 70 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":962,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Kauai Island Utility Cooperative","state":"HI","name":"KRS I Anahola Solar Hybrid (Batteries, 12 MW)","type":"generation","voltage_kv":null,"location_ref":"KRS I Anahola Solar Hybrid, Kauai County, HI","lat":22.131667,"lng":-159.3031,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 914. Plant 58639 KRS I Anahola Solar Hybrid (Kauai Island Utility Cooperative), Kauai County, HI; balancing authority . Planned operation 2027-07.\nGenerator BESS8: 12 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":963,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Kauai Island Utility Cooperative","state":"HI","name":"KRS II Koloa Solar (Batteries, 12 MW)","type":"generation","voltage_kv":null,"location_ref":"KRS II Koloa Solar, Kauai County, HI","lat":21.900833,"lng":-159.45,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 915. Plant 58640 KRS II Koloa Solar (Kauai Island Utility Cooperative), Kauai County, HI; balancing authority . Planned operation 2027-07.\nGenerator BESS7: 12 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1959,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Kaufman Solar","state":"TX","name":"Kaufman Solar (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Kaufman Solar, Kaufman County, TX","lat":32.536696,"lng":-96.22112,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 130. Plant 69585 Kaufman Solar (Kaufman Solar, LLC), Kaufman County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator 5568: 200 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1422,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Kearsarge Grissom","state":"NH","name":"Kearsarge Grissom (Solar Photovoltaic, 4 MW)","type":"generation","voltage_kv":null,"location_ref":"Kearsarge Grissom, Sullivan County, NH","lat":43.344697,"lng":-72.37781,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 159. Plant 70051 Kearsarge Grissom (Kearsarge Grissom LLC), Sullivan County, NH; balancing authority ISNE. Planned operation 2026-09.\nGenerator GRISS: 4 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1047,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Keithsburg North Solar Pv","state":"IL","name":"Keithsburg North Solar LLC PV (Solar Photovoltaic, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"Keithsburg North Solar LLC PV, Mercer County, IL","lat":41.120819,"lng":-90.94078,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 180. Plant 70448 Keithsburg North Solar LLC PV (Keithsburg North Solar, LLC PV), Mercer County, IL; balancing authority MISO. Planned operation 2026-09.\nGenerator 22258: 2 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1179,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Kentucky Municipal Energy Agency","state":"KY","name":"KYMEA Energy Center I (Natural Gas Internal Combustion Engine, 75.2 MW)","type":"generation","voltage_kv":null,"location_ref":"KYMEA Energy Center I, Hopkins County, KY","lat":37.319733,"lng":-87.55111,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 870, 871, 872, 873. Plant 68453 KYMEA Energy Center I (Kentucky Municipal Energy Agency), Hopkins County, KY; balancing authority LGEE. Planned operation 2027-06.\nGenerator 1: 18.8 MW Natural Gas Internal Combustion Engine; (U) Under construction, less than or equal to 50 percent complete\nGenerator 2: 18.8 MW Natural Gas Internal Combustion Engine; (U) Under construction, less than or equal to 50 percent complete\nGenerator 3: 18.8 MW Natural Gas Internal Combustion Engine; (U) Under construction, less than or equal to 50 percent complete\nGenerator 4: 18.8 MW Natural Gas Internal Combustion Engine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2058,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Kerrville Public Utility Board Public Facility","state":"TX","name":"Rock Island Generation Project (Natural Gas Internal Combustion Engine, 121.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Rock Island Generation Project, Colorado County, TX","lat":29.55068,"lng":-96.53675,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1032, 1033, 1034, 1035, 1036, 1037. Plant 69760 Rock Island Generation Project (Kerrville Public Utility Board Public Facility Corp), Colorado County, TX; balancing authority ERCO. Planned operation 2027-09.\nGenerator RIG1: 20.3 MW Natural Gas Internal Combustion Engine; (L) Regulatory approvals pending. Not under construction\nGenerator RIG2: 20.3 MW Natural Gas Internal Combustion Engine; (L) Regulatory approvals pending. Not under construction\nGenerator RIG3: 20.3 MW Natural Gas Internal Combustion Engine; (L) Regulatory approvals pending. Not under construction\nGenerator RIG4: 20.3 MW Natural Gas Internal Combustion Engine; (L) Regulatory approvals pending. Not under construction\nGenerator RIG5: 20.3 MW Natural Gas Internal Combustion Engine; (L) Regulatory approvals pending. Not under construction\nGenerator RIG6: 20.3 MW Natural Gas Internal Combustion Engine; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":621,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ketchikan Electric","state":"AK","name":"Mahoney Lake Hydroelectric (Conventional Hydroelectric, 9.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Mahoney Lake Hydroelectric, Ketchikan Gateway County, AK","lat":55.419444,"lng":-131.5378,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1205. Plant 59027 Mahoney Lake Hydroelectric (Ketchikan Electric Company), Ketchikan Gateway County, AK; balancing authority . Planned operation 2027-12.\nGenerator GEN 1: 9.6 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":893,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Key Capture Energy","state":"CT","name":"KCE CT 1, LLC (Batteries, 45 MW)","type":"generation","voltage_kv":null,"location_ref":"KCE CT 1, LLC, Windham County, CT","lat":41.882568,"lng":-71.89481,"route":null,"cost_usd":null,"start_date":"2031-04-01","end_date":"2031-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2274. Plant 66879 KCE CT 1, LLC (Key Capture Energy), Windham County, CT; balancing authority ISNE. Planned operation 2031-04.\nGenerator CT1: 45 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1525,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Key Capture Energy","state":"NY","name":"KCE NY 10, LLC (Batteries, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"KCE NY 10, LLC, Erie County, NY","lat":42.907908,"lng":-78.66011,"route":null,"cost_usd":null,"start_date":"2028-10-01","end_date":"2028-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1688. Plant 66682 KCE NY 10, LLC (Key Capture Energy), Erie County, NY; balancing authority NYIS. Planned operation 2028-10.\nGenerator NY10: 20 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1526,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Key Capture Energy","state":"NY","name":"KCE NY 29, LLC (Batteries, 79 MW)","type":"generation","voltage_kv":null,"location_ref":"KCE NY 29, LLC, Suffolk County, NY","lat":40.81278,"lng":-73.21729,"route":null,"cost_usd":null,"start_date":"2030-03-01","end_date":"2030-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2051. Plant 66862 KCE NY 29, LLC (Key Capture Energy), Suffolk County, NY; balancing authority NYIS. Planned operation 2030-03.\nGenerator NY29: 79 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1527,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Key Capture Energy","state":"NY","name":"KCE NY 30, LLC (Batteries, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"KCE NY 30, LLC, Suffolk County, NY","lat":40.69477,"lng":-73.35182,"route":null,"cost_usd":null,"start_date":"2030-12-01","end_date":"2030-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2109. Plant 67838 KCE NY 30, LLC (Key Capture Energy), Suffolk County, NY; balancing authority NYIS. Planned operation 2030-12.\nGenerator NY30: 50 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1528,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Key Capture Energy","state":"NY","name":"KCE NY 31, LLC (Batteries, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"KCE NY 31, LLC, Suffolk County, NY","lat":40.9581,"lng":-72.86654,"route":null,"cost_usd":null,"start_date":"2031-05-01","end_date":"2031-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2275. Plant 67839 KCE NY 31, LLC (Key Capture Energy), Suffolk County, NY; balancing authority NYIS. Planned operation 2031-05.\nGenerator NY31: 50 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1550,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Key Capture Energy","state":"NY","name":"NY2 Battery (Batteries, 151.5 MW)","type":"generation","voltage_kv":null,"location_ref":"NY2 Battery, Orange County, NY","lat":41.52667,"lng":-74.14226,"route":null,"cost_usd":null,"start_date":"2028-07-01","end_date":"2028-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1589. Plant 63584 NY2 Battery (Key Capture Energy), Orange County, NY; balancing authority NYIS. Planned operation 2028-07.\nGenerator NY2: 151.5 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":769,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Key Energy Storage","state":"CA","name":"Key Energy Storage (Batteries, 75 MW)","type":"generation","voltage_kv":null,"location_ref":"Key Energy Storage, Fresno County, CA","lat":36.13681,"lng":-120.1312,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 502. Plant 68461 Key Energy Storage (Key Energy Storage LLC), Fresno County, CA; balancing authority CISO. Planned operation 2026-12.\nGenerator KEYBA: 75 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":770,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Key Energy Storage","state":"CA","name":"Key Energy Storage (Batteries, 225 MW)","type":"generation","voltage_kv":null,"location_ref":"Key Energy Storage, Fresno County, CA","lat":36.13681,"lng":-120.1312,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 762, 763. Plant 68461 Key Energy Storage (Key Energy Storage LLC), Fresno County, CA; balancing authority CISO. Planned operation 2027-04.\nGenerator KEYBB: 190 MW Batteries; (T) Regulatory approvals received. Not under construction\nGenerator KEYBC: 35 MW Batteries; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":771,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Kifer Energy Storage","state":"CA","name":"Kifer BESS 1 (Batteries, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"Kifer BESS 1, Santa Clara County, CA","lat":37.376214,"lng":-121.952,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 371. Plant 68953 Kifer BESS 1 (Kifer Energy Storage, LLC), Santa Clara County, CA; balancing authority CISO. Planned operation 2026-11.\nGenerator KB1: 50 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1960,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"King Mountain Solar","state":"TX","name":"King Mountain Solar (Solar Photovoltaic, 175 MW)","type":"generation","voltage_kv":null,"location_ref":"King Mountain Solar, Upton County, TX","lat":31.235934,"lng":-102.1229,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 137. Plant 69755 King Mountain Solar (King Mountain Solar, LLC), Upton County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator 5568: 175 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":796,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Kings River Conservation Dist","state":"CA","name":"Pine Flat (Conventional Hydroelectric, 3.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Pine Flat, Fresno County, CA","lat":36.8326,"lng":-119.327,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1452. Plant 7907 Pine Flat (Kings River Conservation Dist), Fresno County, CA; balancing authority CISO. Planned operation 2028-03.\nGenerator 4: 3.8 MW Conventional Hydroelectric; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1766,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Kingstree East 230","state":"SC","name":"Kingstree East 230 Solar Project (Solar Photovoltaic, 249 MW)","type":"generation","voltage_kv":null,"location_ref":"Kingstree East 230 Solar Project, Georgetown County, SC","lat":33.563633,"lng":-79.46326,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2021. Plant 67862 Kingstree East 230 Solar Project (Kingstree East 230 LLC), Georgetown County, SC; balancing authority SC. Planned operation 2029-12.\nGenerator SOLAR: 249 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1767,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Kingstree West 115","state":"SC","name":"Kingstree West 115 (Solar Photovoltaic, 74.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Kingstree West 115, Williamsburg County, SC","lat":33.693976,"lng":-79.95404,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 213. Plant 67723 Kingstree West 115 (Kingstree West 115 LLC), Williamsburg County, SC; balancing authority CPLE. Planned operation 2026-10.\nGenerator SOLAR: 74.9 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1529,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Knox Ii Pv","state":"NY","name":"Knox II PV (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Knox II PV, Albany County, NY","lat":42.67591,"lng":-74.07563,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 390. Plant 69372 Knox II PV (Knox II PV LLC), Albany County, NY; balancing authority NYIS. Planned operation 2026-11.\nGenerator KNOXS: 5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":733,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Laketricity Usa","state":"CA","name":"Dynamo Solar LLC (Solar Photovoltaic, 24.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Dynamo Solar LLC, Napa County, CA","lat":38.229106,"lng":-122.2937,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1321. Plant 68528 Dynamo Solar LLC (Laketricity USA Inc.), Napa County, CA; balancing authority CISO. Planned operation 2027-12.\nGenerator 77: 24.5 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1137,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lake Trout Solar","state":"IN","name":"Lake Trout Solar (Solar Photovoltaic, 245 MW)","type":"generation","voltage_kv":null,"location_ref":"Lake Trout Solar, Blackford County, IN","lat":40.524925,"lng":-85.30333,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1311. Plant 68302 Lake Trout Solar (Lake Trout Solar), Blackford County, IN; balancing authority PJM. Planned operation 2027-12.\nGenerator LAKET: 245 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1964,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lake Whitney Solar","state":"TX","name":"Lake Whitney Solar (Solar Photovoltaic, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Lake Whitney Solar, Bosque County, TX","lat":31.837644,"lng":-97.39844,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1278. Plant 67358 Lake Whitney Solar (Lake Whitney Solar, LLC), Bosque County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator 4670: 150 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1342,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Landshark Energy Generation Facility","state":"MS","name":"Landshark Energy Generation Facility (Solar Photovoltaic, 160 MW)","type":"generation","voltage_kv":null,"location_ref":"Landshark Energy Generation Facility, Calhoun County, MS","lat":33.898797,"lng":-89.14577,"route":null,"cost_usd":null,"start_date":"2030-12-01","end_date":"2030-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2121. Plant 69638 Landshark Energy Generation Facility (Landshark Energy Generation Facility LLC), Calhoun County, MS; balancing authority MISO. Planned operation 2030-12.\nGenerator 11767: 160 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1962,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"La Salle Ess","state":"TX","name":"La Salle ESS (Batteries, 500 MW)","type":"generation","voltage_kv":null,"location_ref":"La Salle ESS, LaSalle County, TX","lat":28.094701,"lng":-99.05554,"route":null,"cost_usd":null,"start_date":"2029-07-01","end_date":"2029-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1948. Plant 68353 La Salle ESS (La Salle ESS LLC), LaSalle County, TX; balancing authority ERCO. Planned operation 2029-07.\nGenerator LSBS1: 500 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1963,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"La Salle Solar","state":"TX","name":"La Salle Solar (Solar Photovoltaic, 500 MW)","type":"generation","voltage_kv":null,"location_ref":"La Salle Solar, LaSalle County, TX","lat":28.092519,"lng":-99.05701,"route":null,"cost_usd":null,"start_date":"2028-09-01","end_date":"2028-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1672. Plant 68354 La Salle Solar (La Salle Solar LLC), LaSalle County, TX; balancing authority ERCO. Planned operation 2028-09.\nGenerator LSPV1: 500 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":774,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Las Virgenes Road Solar Project 2022","state":"CA","name":"Las Virgenes MWD - Composting Plant (Batteries, Solar Photovoltaic, 1.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Las Virgenes MWD - Composting Plant, Los Angeles County, CA","lat":34.126481,"lng":-118.6981,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 238, 239. Plant 68600 Las Virgenes MWD - Composting Plant (Las Virgenes Road Solar Project 2022, LLC), Los Angeles County, CA; balancing authority CISO. Planned operation 2026-10.\nGenerator 7236B: 0.5 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator 7236G: 0.9 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":942,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Laurens Solar I","state":"GA","name":"Laurens Solar (Solar Photovoltaic, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Laurens Solar, Laurens County, GA","lat":32.577504,"lng":-83.11216,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1570. Plant 68480 Laurens Solar (Laurens Solar I, LLC), Laurens County, GA; balancing authority SOCO. Planned operation 2028-06.\nGenerator LS1: 150 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1966,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lazy U Ess 1","state":"TX","name":"Lazy U ESS 1 (Batteries, 250 MW)","type":"generation","voltage_kv":null,"location_ref":"Lazy U ESS 1, Hardeman County, TX","lat":34.265496,"lng":-99.87214,"route":null,"cost_usd":null,"start_date":"2030-07-01","end_date":"2030-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2073. Plant 68355 Lazy U ESS 1 (Lazy U ESS 1 LLC), Hardeman County, TX; balancing authority ERCO. Planned operation 2030-07.\nGenerator LUBA1: 250 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1967,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lazy U Ess 2","state":"TX","name":"Lazy U ESS 2 (Batteries, 250 MW)","type":"generation","voltage_kv":null,"location_ref":"Lazy U ESS 2, Hardeman County, TX","lat":34.265496,"lng":-99.87214,"route":null,"cost_usd":null,"start_date":"2029-07-01","end_date":"2029-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1949. Plant 68356 Lazy U ESS 2 (Lazy U ESS 2 LLC), Hardeman County, TX; balancing authority ERCO. Planned operation 2029-07.\nGenerator LUBA2: 250 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1968,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lazy U Solar 1","state":"TX","name":"Lazy U Solar 1 (Solar Photovoltaic, 250 MW)","type":"generation","voltage_kv":null,"location_ref":"Lazy U Solar 1, Hardeman County, TX","lat":34.265496,"lng":-99.87214,"route":null,"cost_usd":null,"start_date":"2029-07-01","end_date":"2029-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1950. Plant 68357 Lazy U Solar 1 (Lazy U Solar 1 LLC), Hardeman County, TX; balancing authority ERCO. Planned operation 2029-07.\nGenerator LUPV1: 250 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1969,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lazy U Solar 2","state":"TX","name":"Lazy U Solar 2 (Solar Photovoltaic, 250 MW)","type":"generation","voltage_kv":null,"location_ref":"Lazy U Solar 2, Hardeman County, TX","lat":34.265496,"lng":-99.87214,"route":null,"cost_usd":null,"start_date":"2029-07-01","end_date":"2029-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1951. Plant 68358 Lazy U Solar 2 (Lazy U Solar 2 LLC), Hardeman County, TX; balancing authority ERCO. Planned operation 2029-07.\nGenerator LUPV2: 250 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":675,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Leeward Asset Management","state":"AZ","name":"Elisabeth Solar (Solar Photovoltaic, 350 MW)","type":"generation","voltage_kv":null,"location_ref":"Elisabeth Solar, Yuma County, AZ","lat":32.95453,"lng":-113.4954,"route":null,"cost_usd":null,"start_date":"2028-09-01","end_date":"2028-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1669. Plant 68039 Elisabeth Solar (Leeward Asset Management, LLC), Yuma County, AZ; balancing authority CISO. Planned operation 2028-09.\nGenerator ELISA: 350 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":880,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Leeward Asset Management","state":"CO","name":"Stagecoach LRE (Solar Photovoltaic, 230 MW)","type":"generation","voltage_kv":null,"location_ref":"Stagecoach LRE, Pueblo County, CO","lat":38.17739,"lng":-104.5012,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2023. Plant 68079 Stagecoach LRE (Leeward Asset Management, LLC), Pueblo County, CO; balancing authority PSCO. Planned operation 2029-12.\nGenerator STAS1: 230 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1086,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Leeward Asset Management","state":"IL","name":"Red Maple LRE (Solar Photovoltaic, 95 MW)","type":"generation","voltage_kv":null,"location_ref":"Red Maple LRE, DeKalb County, IL","lat":41.886064,"lng":-88.72725,"route":null,"cost_usd":null,"start_date":"2028-09-01","end_date":"2028-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1670. Plant 68085 Red Maple LRE (Leeward Asset Management, LLC), DeKalb County, IL; balancing authority PJM. Planned operation 2028-09.\nGenerator RMS1: 95 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1128,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Leeward Asset Management","state":"IN","name":"Blackford Solar (Solar Photovoltaic, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Blackford Solar, Blackford County, IN","lat":40.41608,"lng":-85.25979,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 211. Plant 66960 Blackford Solar (Leeward Asset Management, LLC), Blackford County, IN; balancing authority PJM. Planned operation 2026-10.\nGenerator BLKSL: 150 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1129,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Leeward Asset Management","state":"IN","name":"Blackford Wind (Onshore Wind Turbine, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Blackford Wind, Blackford County, IN","lat":40.402078,"lng":-85.30058,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 470. Plant 66968 Blackford Wind (Leeward Asset Management, LLC), Blackford County, IN; balancing authority PJM. Planned operation 2026-12.\nGenerator BFW00: 200 MW Onshore Wind Turbine; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1135,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Leeward Asset Management","state":"IN","name":"Honey Creek Solar (Batteries, Solar Photovoltaic, 220 MW)","type":"generation","voltage_kv":null,"location_ref":"Honey Creek Solar, White County, IN","lat":40.7971,"lng":-86.8572,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1239, 1240. Plant 65821 Honey Creek Solar (Leeward Asset Management, LLC), White County, IN; balancing authority PJM. Planned operation 2027-12.\nGenerator HNYBA: 20 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator HNYSR: 200 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1136,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Leeward Asset Management","state":"IN","name":"Hoosier Line Solar (Solar Photovoltaic, 180 MW)","type":"generation","voltage_kv":null,"location_ref":"Hoosier Line Solar, White County, IN","lat":40.851153,"lng":-86.94475,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1078. Plant 67173 Hoosier Line Solar (Leeward Asset Management, LLC), White County, IN; balancing authority PJM. Planned operation 2027-10.\nGenerator HLW00: 180 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1146,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Leeward Asset Management","state":"IN","name":"Rose Gold Solar (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Rose Gold Solar, Jay County, IN","lat":40.404357,"lng":-85.19716,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1238. Plant 65471 Rose Gold Solar (Leeward Asset Management, LLC), Jay County, IN; balancing authority PJM. Planned operation 2027-12.\nGenerator RGS23: 100 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1613,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Leeward Asset Management","state":"OH","name":"Harvey Solar (Solar Photovoltaic, 350 MW)","type":"generation","voltage_kv":null,"location_ref":"Harvey Solar, Licking County, OH","lat":40.273115,"lng":-82.71962,"route":null,"cost_usd":null,"start_date":"2028-08-01","end_date":"2028-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1649. Plant 69796 Harvey Solar (Leeward Asset Management, LLC), Licking County, OH; balancing authority PJM. Planned operation 2028-08.\nGenerator HARVS: 350 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1626,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Leeward Asset Management","state":"OH","name":"South Branch Solar (Solar Photovoltaic, 115 MW)","type":"generation","voltage_kv":null,"location_ref":"South Branch Solar, Hancock County, OH","lat":41.128477,"lng":-83.51517,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 868. Plant 68086 South Branch Solar (Leeward Asset Management, LLC), Hancock County, OH; balancing authority PJM. Planned operation 2027-06.\nGenerator SBS: 115 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1647,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Leeward Asset Management","state":"OK","name":"Twelvemile Solar 3 (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Twelvemile Solar 3, Mayes County, OK","lat":36.331569,"lng":-95.22931,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 483. Plant 68089 Twelvemile Solar 3 (Leeward Asset Management, LLC), Mayes County, OK; balancing authority SWPP. Planned operation 2026-12.\nGenerator TS03: 200 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1790,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Leeward Asset Management","state":"TN","name":"Ridgely Energy Farm (Batteries, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"Ridgely Energy Farm, Lake County, TN","lat":36.306319,"lng":-89.46202,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2011. Plant 65445 Ridgely Energy Farm (Leeward Asset Management, LLC), Lake County, TN; balancing authority TVA. Planned operation 2029-12.\nGenerator RBESS: 50 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1837,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Leeward Asset Management","state":"TX","name":"Bluebonnet Prairie Wind (Onshore Wind Turbine, 170 MW)","type":"generation","voltage_kv":null,"location_ref":"Bluebonnet Prairie Wind, Navarro County, TX","lat":32.143863,"lng":-96.30097,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1297. Plant 68082 Bluebonnet Prairie Wind (Leeward Asset Management, LLC), Navarro County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator BBP: 170 MW Onshore Wind Turbine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1995,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Leeward Asset Management","state":"TX","name":"Morrow Lake BESS (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Morrow Lake BESS, Frio County, TX","lat":28.936239,"lng":-99.08318,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2024. Plant 68084 Morrow Lake BESS (Leeward Asset Management, LLC), Frio County, TX; balancing authority ERCO. Planned operation 2029-12.\nGenerator MLB: 200 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2148,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Leeward Asset Management","state":"UT","name":"Parowan Solar (Batteries, Solar Photovoltaic, 116 MW)","type":"generation","voltage_kv":null,"location_ref":"Parowan Solar, Iron County, UT","lat":37.875795,"lng":-112.8885,"route":null,"cost_usd":null,"start_date":"2028-02-01","end_date":"2028-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1439, 1440. Plant 65823 Parowan Solar (Leeward Asset Management, LLC), Iron County, UT; balancing authority PACE. Planned operation 2028-02.\nGenerator PARB: 58 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator PARS0: 58 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2236,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Leeward Asset Management","state":"WI","name":"Northern Prairie 1 (Solar Photovoltaic, 101 MW)","type":"generation","voltage_kv":null,"location_ref":"Northern Prairie 1, St Croix County, WI","lat":45.131813,"lng":-92.31686,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1765. Plant 66958 Northern Prairie 1 (Leeward Asset Management, LLC), St Croix County, WI; balancing authority MISO. Planned operation 2028-12.\nGenerator NOPR1: 101 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1172,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"LG&E and KU","state":"KY","name":"E W Brown (Batteries, 125 MW)","type":"generation","voltage_kv":null,"location_ref":"E W Brown, Mercer County, KY","lat":37.78831,"lng":-84.71257,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 794. Plant 1355 E W Brown (Kentucky Utilities Co), Mercer County, KY; balancing authority LGEE. Planned operation 2027-05.\nGenerator BESS: 125 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1182,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"LG&E and KU","state":"KY","name":"Mill Creek (KY) (Natural Gas Fired Combined Cycle, 740 MW)","type":"generation","voltage_kv":null,"location_ref":"Mill Creek (KY), Jefferson County, KY","lat":38.0525,"lng":-85.9103,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 843. Plant 1364 Mill Creek (KY) (Louisville Gas & Electric Co), Jefferson County, KY; balancing authority LGEE. Planned operation 2027-06.\nGenerator 5: 740 MW Natural Gas Fired Combined Cycle; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2773,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"LG&E and KU","state":null,"name":"Cane Run Sw - Lake Dreamland 138 Kv Transmission Line 1","type":"transmission line","voltage_kv":138,"location_ref":"Cane Run Sw - Lake Dreamland (KY/VA)","lat":38.173,"lng":-85.851,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":24,"raw_excerpt":"SERTP LG&E/KU Balancing Authority Area, page 24.\nIn-Service Year: 2027\nProject Name: CANE RUN SW - LAKE DREAMLAND 138 KV TRANSMISSION LINE 1\nDescription: Increase the maximum operating temperature of 2.04 miles of bundled 795 ACSR 138 kV conductor to 212°F from Cane Run Switching to the new Lake Dreamland 138 kV station. Replace all terminal equipment at Cane Run Switch associated with this line.\nSupporting Statement: The Cane Run - Lake Dreamland (3801) 138 kV transmission line overloads under contingency.\nLocated: CANE RUN SW = OSM substation 'Cane Run Switching Substation' (KY)","reviewed":false,"approximate":true,"requires_review":false},{"id":2774,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"LG&E and KU","state":null,"name":"Cane Run Sw - Lake Dreamland 138 Kv Transmission Line 2","type":"transmission line","voltage_kv":138,"location_ref":"Cane Run Sw - Lake Dreamland (KY/VA)","lat":38.173,"lng":-85.851,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":24,"raw_excerpt":"SERTP LG&E/KU Balancing Authority Area, page 24.\nIn-Service Year: 2027\nProject Name: CANE RUN SW - LAKE DREAMLAND 138 KV TRANSMISSION LINE 2\nDescription: Increase the maximum operating temperature of 2.04 miles of bundled 795 ACSR 138 kV conductor to 212°F from Cane Run Switching to the new Lake Dreamland 138 kV station. Replace all terminal equipment at Cane Run Switching associated with this line.\nSupporting Statement: The Cane Run - Lake Dreamland (3808) 138 kV transmission line overloads under contingency.\nLocated: CANE RUN SW = OSM substation 'Cane Run Switching Substation' (KY)","reviewed":false,"approximate":true,"requires_review":false},{"id":2775,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"LG&E and KU","state":null,"name":"Pineville Sw - Artemus 161 Kv Terminal Equipment, Replace","type":"transmission line","voltage_kv":161,"location_ref":"Pineville Sw - Artemus (KY/VA)","lat":36.843,"lng":-83.807,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":24,"raw_excerpt":"SERTP LG&E/KU Balancing Authority Area, page 24.\nIn-Service Year: 2027\nProject Name: PINEVILLE SW - ARTEMUS 161 KV TERMINAL EQUIPMENT, REPLACE\nDescription: Replace the switches at Pineville Switching associated with Pineville Sw-Artemus 161kV line.\nSupporting Statement: The Pineville SW - Artemus 161 kV transmission line overloads under contingency.\nLocated: PINEVILLE SW = OSM substation 'Pineville' (KY); ARTEMUS ~ Knox County, KY (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2776,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"LG&E and KU","state":null,"name":"Middletown 138 Kv Terminal Equipment, Replace","type":"substation","voltage_kv":138,"location_ref":"Middletown (KY/VA)","lat":38.19,"lng":-85.658,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":24,"raw_excerpt":"SERTP LG&E/KU Balancing Authority Area, page 24.\nIn-Service Year: 2028\nProject Name: MIDDLETOWN 138 KV TERMINAL EQUIPMENT, REPLACE\nDescription: Replace nine pieces of station conductor with equipment rated 1320 amps SE or greater at Middletown 138kV.\nSupporting Statement: The Middletown 138 kV bus overloads under contingency.\nLocated: MIDDLETOWN ~ Jefferson County, KY (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2777,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"LG&E and KU","state":null,"name":"Mill Creek - Cane Run Tp 345 Kv Transmission Line. Replace","type":"transmission line","voltage_kv":345,"location_ref":"Mill Creek - Cane Run Tp (KY/VA)","lat":37.933,"lng":-85.394,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":25,"raw_excerpt":"SERTP LG&E/KU Balancing Authority Area, page 25.\nIn-Service Year: 2028\nProject Name: MILL CREEK - CANE RUN TP 345 KV TRANSMISSION LINE. REPLACE\nDescription: Replace 0.38 miles of transmission line with bundled 954 ACSR and increase the maximum operating temperature of 10.23 miles of bundled 954 ACSR to 205F in the Mill Creek to Cane Run Tap 345 kV transmission line.\nSupporting Statement: New generation causes the Mill Creek - Cane Run Tap 345 kV transmission line to become overloaded.\nLocated: MILL CREEK = OSM substation 'Mill Creek Station' (KY); CANE RUN TP ~ Mercer County, KY (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2778,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"LG&E and KU","state":null,"name":"Middletown - Mt Jt T1 138 Kv Transmission Line, Replace","type":"transmission line","voltage_kv":138,"location_ref":"Middletown - Mt Jt T1 (KY/VA)","lat":38.19,"lng":-85.658,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":25,"raw_excerpt":"SERTP LG&E/KU Balancing Authority Area, page 25.\nIn-Service Year: 2030\nProject Name: MIDDLETOWN - MT JT T1 138 KV TRANSMISSION LINE, REPLACE\nDescription: Replace 1.52 miles of transmission line with 2-954 MCM 45X7 ACSR in the Middletown - MT JT T1 138 kV transmission line and six pieces of station conductor at Middletown.\nSupporting Statement: The Middletown - MT JT T1 138 kV transmission line overloads under contingency.\nLocated: MIDDLETOWN ~ Jefferson County, KY (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2779,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"LG&E and KU","state":null,"name":"Brown N - Tyrone 138 Kv Transmission Line, Replace","type":"transmission line","voltage_kv":138,"location_ref":"Brown N - Tyrone (KY/VA)","lat":38.005,"lng":-84.986,"route":null,"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":25,"raw_excerpt":"SERTP LG&E/KU Balancing Authority Area, page 25.\nIn-Service Year: 2031\nProject Name: BROWN N - TYRONE 138 KV TRANSMISSION LINE, REPLACE\nDescription: Replace 20.12 miles of transmission line with 556.5 ACSS or better in the Brown North to Tyrone 138 kV transmission line.\nSupporting Statement: The Brown N - Tyrone 138 kV transmission line overloads in the base case.\nLocated: TYRONE ~ Anderson County, KY (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2780,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"LG&E and KU","state":null,"name":"Brown Plant - Fawkes 138 Kv Transmission Line","type":"transmission line","voltage_kv":138,"location_ref":"Brown Plant - Fawkes (KY/VA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2032-01-01","end_date":"2032-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":25,"raw_excerpt":"SERTP LG&E/KU Balancing Authority Area, page 25.\nIn-Service Year: 2032\nProject Name: BROWN PLANT - FAWKES 138 KV TRANSMISSION LINE\nDescription: Replace 21.3 miles of transmission line and two station conductors with 556.5 ACSS or better in the Brown Plant to Fawkes 138 kV transmission line.\nSupporting Statement: The Brown Plant - Fawkes 138 kV transmission line overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2781,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"LG&E and KU","state":null,"name":"Cane Run Switch - Cane Run Ct 138 Kv Terminal Equipment, Replace","type":"transmission line","voltage_kv":138,"location_ref":"Cane Run Switch - Cane Run Ct (KY/VA)","lat":38.173,"lng":-85.851,"route":[[38.173,-85.851],[38.173,-85.851]],"cost_usd":null,"start_date":"2034-01-01","end_date":"2034-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":26,"raw_excerpt":"SERTP LG&E/KU Balancing Authority Area, page 26.\nIn-Service Year: 2034\nProject Name: CANE RUN SWITCH - CANE RUN CT 138 KV TERMINAL EQUIPMENT, REPLACE\nDescription: Replace Line Riser at Cane Run Switch associated with the Cane Run Switch to Cane Run CT/NGCC 138 kV circuit 22.\nSupporting Statement: The Cane Run Sw - Cane Run CT 138 kV transmission line overloads under contingency.\nLocated: CANE RUN SWITCH = OSM substation 'Cane Run Switching Substation' (KY); CANE RUN CT = OSM substation 'Cane Run Switching Substation' (KY) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2782,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"LG&E and KU","state":null,"name":"Greeen River 161/138 Kv Transformer, Replace","type":"substation","voltage_kv":161,"location_ref":"Greeen River (KY/VA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2035-01-01","end_date":"2035-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":26,"raw_excerpt":"SERTP LG&E/KU Balancing Authority Area, page 26.\nIn-Service Year: 2035\nProject Name: GREEEN RIVER 161/138 KV TRANSFORMER, REPLACE\nDescription: Replace 138 kV bushing CT on the Green River T03 161/138 kV transformer to meet or exceed the transformer limit.\nSupporting Statement: The Green River T03 161/138 kV transformer overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":1481,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Liberty Renewables Incorporated","state":"NY","name":"Agricola Wind (Onshore Wind Turbine, 99 MW)","type":"generation","voltage_kv":null,"location_ref":"Agricola Wind, Cayuga County, NY","lat":42.755287,"lng":-76.53902,"route":null,"cost_usd":null,"start_date":"2029-04-01","end_date":"2029-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1875. Plant 68228 Agricola Wind (Liberty Renewables Incorporated), Cayuga County, NY; balancing authority NYIS. Planned operation 2029-04.\nGenerator Q1448: 99 MW Onshore Wind Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1521,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Liberty Renewables Incorporated","state":"NY","name":"Hoffman Falls Wind 2 (Onshore Wind Turbine, 103.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Hoffman Falls Wind 2, Madison County, NY","lat":42.964628,"lng":-75.75371,"route":null,"cost_usd":null,"start_date":"2029-03-01","end_date":"2029-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1869. Plant 67346 Hoffman Falls Wind 2 (Liberty Renewables Incorporated), Madison County, NY; balancing authority NYIS. Planned operation 2029-03.\nGenerator Q1335: 103.5 MW Onshore Wind Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1468,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Libra Solar","state":"NV","name":"Libra Solar (Batteries, Solar Photovoltaic, 1400 MW)","type":"generation","voltage_kv":null,"location_ref":"Libra Solar, Lyon County, NV","lat":38.902103,"lng":-118.9614,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1379, 1380. Plant 69857 Libra Solar (Libra Solar LLC), Lyon County, NV; balancing authority NEVP. Planned operation 2027-12.\nGenerator LBRBS: 700 MW Batteries; (U) Under construction, less than or equal to 50 percent complete\nGenerator LBRPV: 700 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1504,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lighthouse Arthur Kill","state":"NY","name":"Elevate Arthur Kill (Batteries, 15.1 MW)","type":"generation","voltage_kv":null,"location_ref":"Elevate Arthur Kill, Richmond County, NY","lat":40.590066,"lng":-74.19836,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 50. Plant 66785 Elevate Arthur Kill (Lighthouse Arthur Kill, LLC), Richmond County, NY; balancing authority NYIS. Planned operation 2026-09.\nGenerator ELVAK: 15.1 MW Batteries; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":891,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lighthouse Middletown","state":"CT","name":"Elevate Middletown (Batteries, 275 MW)","type":"generation","voltage_kv":null,"location_ref":"Elevate Middletown, Middlesex County, CT","lat":41.554321,"lng":-72.57832,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1260. Plant 66786 Elevate Middletown (Lighthouse Middletown, LLC), Middlesex County, CT; balancing authority ISNE. Planned operation 2027-12.\nGenerator ELVMT: 275 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":741,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lighthouse Pier S","state":"CA","name":"Elevate Pier S (Batteries, 70 MW)","type":"generation","voltage_kv":null,"location_ref":"Elevate Pier S, Los Angeles County, CA","lat":33.764993,"lng":-118.2237,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 468. Plant 66787 Elevate Pier S (Lighthouse Pier S, LLC), Los Angeles County, CA; balancing authority CISO. Planned operation 2026-12.\nGenerator ELVPS: 70 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1141,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lightsource Renewable Energy Asset Management","state":"IN","name":"Mayapple Solar 1 (Solar Photovoltaic, 224 MW)","type":"generation","voltage_kv":null,"location_ref":"Mayapple Solar 1, Pulaski County, IN","lat":41.055223,"lng":-86.71323,"route":null,"cost_usd":null,"start_date":"2029-03-01","end_date":"2029-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1868. Plant 66138 Mayapple Solar 1 (Lightsource Renewable Energy Asset Management, LLC), Pulaski County, IN; balancing authority PJM. Planned operation 2029-03.\nGenerator INMA1: 224 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1142,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lightsource Renewable Energy Asset Management","state":"IN","name":"Merrillville Solar (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Merrillville Solar, Lake County, IN","lat":41.462794,"lng":-87.27285,"route":null,"cost_usd":null,"start_date":"2028-11-01","end_date":"2028-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1720. Plant 66114 Merrillville Solar (Lightsource Renewable Energy Asset Management, LLC), Lake County, IN; balancing authority MISO. Planned operation 2028-11.\nGenerator INRD1: 100 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1195,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lightsource Renewable Energy Asset Management","state":"LA","name":"Mowata Solar (Solar Photovoltaic, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Mowata Solar, Acadia County, LA","lat":30.3918,"lng":-92.4044,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1255. Plant 66558 Mowata Solar (Lightsource Renewable Energy Asset Management, LLC), Acadia County, LA; balancing authority MISO. Planned operation 2027-12.\nGenerator LAMO1: 150 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1411,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lightsource Renewable Energy Asset Management","state":"NE","name":"Big Elk Solar (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Big Elk Solar, Washington County, NE","lat":41.475678,"lng":-96.29309,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1245. Plant 66113 Big Elk Solar (Lightsource Renewable Energy Asset Management, LLC), Washington County, NE; balancing authority SWPP. Planned operation 2027-12.\nGenerator NEBE1: 100 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1615,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lightsource Renewable Energy Asset Management","state":"OH","name":"Juliet Energy Project, LLC (Solar Photovoltaic, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"Juliet Energy Project, LLC, Wood County, OH","lat":41.343803,"lng":-83.81598,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 244. Plant 68938 Juliet Energy Project, LLC (Lightsource Renewable Energy Asset Management, LLC), Wood County, OH; balancing authority PJM. Planned operation 2026-10.\nGenerator OHJE1: 50 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1634,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lightsource Renewable Energy Asset Management","state":"OK","name":"Fiddle Leaf Solar, LLC (Solar Photovoltaic, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"Fiddle Leaf Solar, LLC, Delaware County, OK","lat":36.256047,"lng":-94.58653,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1112. Plant 70271 Fiddle Leaf Solar, LLC (Lightsource Renewable Energy Asset Management, LLC), Delaware County, OK; balancing authority SWPP. Planned operation 2027-10.\nGenerator OKFL1: 80 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1955,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lightsource Renewable Energy Asset Management","state":"TX","name":"Jones City 1 Solar (Solar Photovoltaic, 215 MW)","type":"generation","voltage_kv":null,"location_ref":"Jones City 1 Solar, Jones County, TX","lat":32.781168,"lng":-100.0065,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 206. Plant 66559 Jones City 1 Solar (Lightsource Renewable Energy Asset Management, LLC), Jones County, TX; balancing authority ERCO. Planned operation 2026-10.\nGenerator TXJC1: 215 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1956,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lightsource Renewable Energy Asset Management","state":"TX","name":"Jones City 2 Solar (Solar Photovoltaic, 185 MW)","type":"generation","voltage_kv":null,"location_ref":"Jones City 2 Solar, Jones County, TX","lat":32.794928,"lng":-99.99293,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 208. Plant 66893 Jones City 2 Solar (Lightsource Renewable Energy Asset Management, LLC), Jones County, TX; balancing authority ERCO. Planned operation 2026-10.\nGenerator TXJC2: 185 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1957,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lightsource Renewable Energy Asset Management","state":"TX","name":"Jones City 2 Solar (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Jones City 2 Solar, Jones County, TX","lat":32.794928,"lng":-99.99293,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 700. Plant 66893 Jones City 2 Solar (Lightsource Renewable Energy Asset Management, LLC), Jones County, TX; balancing authority ERCO. Planned operation 2027-03.\nGenerator TXJS2: 200 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2075,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lightsource Renewable Energy Asset Management","state":"TX","name":"Second Division Solar (Batteries, 30 MW)","type":"generation","voltage_kv":null,"location_ref":"Second Division Solar, Brazoria County, TX","lat":29.170545,"lng":-95.74157,"route":null,"cost_usd":null,"start_date":"2031-12-01","end_date":"2031-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2298. Plant 65981 Second Division Solar (Lightsource Renewable Energy Asset Management, LLC), Brazoria County, TX; balancing authority ERCO. Planned operation 2031-12.\nGenerator TXSD2: 30 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2084,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lightsource Renewable Energy Asset Management","state":"TX","name":"Starr Solar Ranch (Batteries, 180 MW)","type":"generation","voltage_kv":null,"location_ref":"Starr Solar Ranch, Starr County, TX","lat":26.523359,"lng":-99.01711,"route":null,"cost_usd":null,"start_date":"2031-12-01","end_date":"2031-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2297. Plant 65975 Starr Solar Ranch (Lightsource Renewable Energy Asset Management, LLC), Starr County, TX; balancing authority ERCO. Planned operation 2031-12.\nGenerator TXSD2: 180 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2112,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lightsource Renewable Energy Asset Management","state":"TX","name":"Trinity River Solar 1 (Solar Photovoltaic, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Trinity River Solar 1, Liberty County, TX","lat":30.010255,"lng":-94.48631,"route":null,"cost_usd":null,"start_date":"2028-07-01","end_date":"2028-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1594. Plant 66132 Trinity River Solar 1 (Lightsource Renewable Energy Asset Management, LLC), Liberty County, TX; balancing authority ERCO. Planned operation 2028-07.\nGenerator TXTR1: 150 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1973,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Limewood Bell Renewables","state":"TX","name":"Limewood Bell Renewables Solar (Solar Photovoltaic, 204 MW)","type":"generation","voltage_kv":null,"location_ref":"Limewood Bell Renewables Solar, Bell County, TX","lat":31.129365,"lng":-97.26139,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 242. Plant 68853 Limewood Bell Renewables Solar (Limewood Bell Renewables LLC), Bell County, TX; balancing authority ERCO. Planned operation 2026-10.\nGenerator LMWOD: 204 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1419,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lincoln Electric System","state":"NE","name":"Terry Bundy Generating Station (Natural Gas Fired Combustion Turbine, 104 MW)","type":"generation","voltage_kv":null,"location_ref":"Terry Bundy Generating Station, Lancaster County, NE","lat":40.909653,"lng":-96.61309,"route":null,"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1905, 1906. Plant 7887 Terry Bundy Generating Station (Lincoln Electric System), Lancaster County, NE; balancing authority SWPP. Planned operation 2029-06.\nGenerator 5: 52 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator 6: 52 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1049,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lincoln Land Energy Center","state":"IL","name":"Lincoln Land Energy Center (Natural Gas Fired Combined Cycle, 1276.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Lincoln Land Energy Center, Sangamon County, IL","lat":39.5788,"lng":-89.57984,"route":null,"cost_usd":null,"start_date":"2030-06-01","end_date":"2030-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2065, 2066. Plant 62022 Lincoln Land Energy Center (Lincoln Land Energy Center LLC), Sangamon County, IL; balancing authority MISO. Planned operation 2030-06.\nGenerator GEN1: 638.4 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator GEN2: 638.4 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1531,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lincoln Medical and Mental Health Center","state":"NY","name":"Lincoln Medical and Mental Health Center (Petroleum Liquids, 1 MW)","type":"generation","voltage_kv":null,"location_ref":"Lincoln Medical and Mental Health Center, Bronx County, NY","lat":40.816971,"lng":-73.92411,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 454. Plant 64291 Lincoln Medical and Mental Health Center (Lincoln Medical and Mental Health Center), Bronx County, NY; balancing authority NYIS. Planned operation 2026-12.\nGenerator B4: 1 MW Petroleum Liquids; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":646,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lion Solar","state":"AR","name":"Lion Solar (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Lion Solar, Jefferson County, AR","lat":34.324581,"lng":-91.9253,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2037. Plant 69633 Lion Solar (Lion Solar LLC), Jefferson County, AR; balancing authority MISO. Planned operation 2029-12.\nGenerator 99757: 200 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1533,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Little Falls Pv","state":"NY","name":"Little Falls PV (Solar Photovoltaic, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Little Falls PV, Herkimer County, NY","lat":42.98791,"lng":-74.86305,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 263. Plant 69373 Little Falls PV (Little Falls PV LLC), Herkimer County, NY; balancing authority NYIS. Planned operation 2026-10.\nGenerator LITTL: 2.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1178,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lock 11 Hydro Partners","state":"KY","name":"KY No. 11 L&D Hydroelectric Project (Conventional Hydroelectric, 2.8 MW)","type":"generation","voltage_kv":null,"location_ref":"KY No. 11 L&D Hydroelectric Project, Estill County, KY","lat":37.78401,"lng":-84.10329,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1122, 1123, 1124, 1125, 1126, 1127. Plant 62390 KY No. 11 L&D Hydroelectric Project (Lock 11 Hydro Partners, LLC), Estill County, KY; balancing authority PJM. Planned operation 2027-11.\nGenerator 6: 0.6 MW Conventional Hydroelectric; (T) Regulatory approvals received. Not under construction\nGenerator NA1: 0.6 MW Conventional Hydroelectric; (T) Regulatory approvals received. Not under construction\nGenerator NA2: 0.6 MW Conventional Hydroelectric; (T) Regulatory approvals received. Not under construction\nGenerator NA3: 0.2 MW Conventional Hydroelectric; (T) Regulatory approvals received. Not under construction\nGenerator NA4: 0.2 MW Conventional Hydroelectric; (T) Regulatory approvals received. Not under construction\nGenerator NA5: 0.6 MW Conventional Hydroelectric; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1173,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lock 13 Hydro Partners","state":"KY","name":"Evelyn Hydroelectric Project (Conventional Hydroelectric, 2.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Evelyn Hydroelectric Project, Lee County, KY","lat":37.601982,"lng":-83.83297,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2002, 2003, 2004, 2005, 2006, 2007. Plant 62748 Evelyn Hydroelectric Project (Lock 13 Hydro Partners), Lee County, KY; balancing authority PJM. Planned operation 2029-12.\nGenerator 1: 0.6 MW Conventional Hydroelectric; (T) Regulatory approvals received. Not under construction\nGenerator 2: 0.6 MW Conventional Hydroelectric; (T) Regulatory approvals received. Not under construction\nGenerator 3: 0.2 MW Conventional Hydroelectric; (T) Regulatory approvals received. Not under construction\nGenerator 4: 0.2 MW Conventional Hydroelectric; (T) Regulatory approvals received. Not under construction\nGenerator 5: 0.6 MW Conventional Hydroelectric; (T) Regulatory approvals received. Not under construction\nGenerator 6: 0.6 MW Conventional Hydroelectric; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1176,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lock 14 Hydro Partners","state":"KY","name":"Heidelberg Hydroelectric Project (Conventional Hydroelectric, 2.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Heidelberg Hydroelectric Project, Lee County, KY","lat":37.552399,"lng":-83.77001,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 17, 18, 19, 20, 21, 22. Plant 62749 Heidelberg Hydroelectric Project (Lock 14 Hydro Partners, LLC), Lee County, KY; balancing authority PJM. Planned operation 2026-09.\nGenerator 1: 0.6 MW Conventional Hydroelectric; (TS) Construction complete, but not yet in commercial operation\nGenerator 2: 0.6 MW Conventional Hydroelectric; (TS) Construction complete, but not yet in commercial operation\nGenerator 3: 0.2 MW Conventional Hydroelectric; (TS) Construction complete, but not yet in commercial operation\nGenerator 4: 0.2 MW Conventional Hydroelectric; (TS) Construction complete, but not yet in commercial operation\nGenerator 5: 0.6 MW Conventional Hydroelectric; (TS) Construction complete, but not yet in commercial operation\nGenerator 6: 0.6 MW Conventional Hydroelectric; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1679,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lock+ Hydro Friends Fund Xlii","state":"PA","name":"Braddock Lock and Dam (Conventional Hydroelectric, 5.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Braddock Lock and Dam, Allegheny County, PA","lat":40.388889,"lng":-79.85889,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 682. Plant 59091 Braddock Lock and Dam (Lock+ Hydro Friends Fund XLII, LLC), Allegheny County, PA; balancing authority PJM. Planned operation 2027-03.\nGenerator GEN1: 5.3 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1975,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lorenzo Energy Storage","state":"TX","name":"Lorenzo Energy Storage (Batteries, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"Lorenzo Energy Storage, Crosby County, TX","lat":33.749367,"lng":-101.4829,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1163. Plant 70197 Lorenzo Energy Storage (Lorenzo Energy Storage, LLC), Crosby County, TX; balancing authority SWPP. Planned operation 2027-11.\nGenerator LORE1: 50 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2217,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"LOSN","state":"WA","name":"Lower Snake Solar Generation BESS (Batteries, Solar Photovoltaic, 600 MW)","type":"generation","voltage_kv":null,"location_ref":"Lower Snake Solar Generation BESS, Garfield County, WA","lat":46.502392,"lng":-117.8263,"route":null,"cost_usd":null,"start_date":"2029-10-01","end_date":"2029-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1986, 1987. Plant 68344 Lower Snake Solar Generation BESS (LOSN, LLC), Garfield County, WA; balancing authority BPAT. Planned operation 2029-10.\nGenerator LOSN1: 300 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction\nGenerator LOSN2: 300 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1769,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lotus Solar","state":"SC","name":"Lotus Solar (Solar Photovoltaic, 75 MW)","type":"generation","voltage_kv":null,"location_ref":"Lotus Solar, Darlington County, SC","lat":34.447832,"lng":-80.10356,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1094. Plant 68337 Lotus Solar (Lotus Solar LLC), Darlington County, SC; balancing authority CPLE. Planned operation 2027-10.\nGenerator LOTUS: 75 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1976,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lucky 7 Solar Farm","state":"TX","name":"Lucky 7 Solar Farm LLC (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Lucky 7 Solar Farm LLC, Hopkins County, TX","lat":33.082,"lng":-95.721,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1104. Plant 69687 Lucky 7 Solar Farm LLC (Lucky 7 Solar Farm LLC), Hopkins County, TX; balancing authority ERCO. Planned operation 2027-10.\nGenerator L7SF: 100 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1978,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lumberton Pv I","state":"TX","name":"Lumberton PV I, LLC (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Lumberton PV I, LLC, Hardin County, TX","lat":30.298323,"lng":-94.27631,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1268. Plant 66904 Lumberton PV I, LLC (Lumberton PV I, LLC), Hardin County, TX; balancing authority MISO. Planned operation 2027-12.\nGenerator LBTN: 200 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1810,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Luminant Generation","state":"TX","name":"Alira (Solar Photovoltaic, 222.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Alira, Andrews County, TX","lat":32.347392,"lng":-102.9677,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2045. Plant 63193 Alira (Luminant Generation Company LLC), Andrews County, TX; balancing authority ERCO. Planned operation 2030-01.\nGenerator UNIT1: 222.8 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1434,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lydian Energy","state":"NM","name":"AC Ranch I (Solar Photovoltaic, 75 MW)","type":"generation","voltage_kv":null,"location_ref":"AC Ranch I, Lea County, NM","lat":32.732263,"lng":-103.2748,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 822. Plant 68578 AC Ranch I (Lydian Energy), Lea County, NM; balancing authority SWPP. Planned operation 2027-05.\nGenerator AC1S: 75 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1435,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lydian Energy","state":"NM","name":"AC Ranch II (Solar Photovoltaic, 230 MW)","type":"generation","voltage_kv":null,"location_ref":"AC Ranch II, Lea County, NM","lat":32.732263,"lng":-103.2748,"route":null,"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1918. Plant 68579 AC Ranch II (Lydian Energy), Lea County, NM; balancing authority SWPP. Planned operation 2029-06.\nGenerator AC2S: 230 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1606,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lydian Energy","state":"NY","name":"Yellow Barn Solar (Solar Photovoltaic, 160 MW)","type":"generation","voltage_kv":null,"location_ref":"Yellow Barn Solar, Tompkins County, NY","lat":42.56495,"lng":-76.43907,"route":null,"cost_usd":null,"start_date":"2028-09-01","end_date":"2028-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1673. Plant 68584 Yellow Barn Solar (Lydian Energy), Tompkins County, NY; balancing authority NYIS. Planned operation 2028-09.\nGenerator YBS: 160 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1607,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lydian Energy","state":"NY","name":"York Run Solar (Solar Photovoltaic, 90 MW)","type":"generation","voltage_kv":null,"location_ref":"York Run Solar, Chautauqua County, NY","lat":42.011319,"lng":-79.2243,"route":null,"cost_usd":null,"start_date":"2028-09-01","end_date":"2028-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1674. Plant 68585 York Run Solar (Lydian Energy), Chautauqua County, NY; balancing authority NYIS. Planned operation 2028-09.\nGenerator YRS: 90 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1990,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lydian Energy","state":"TX","name":"Mendoza Trail BESS (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Mendoza Trail BESS, Crane County, TX","lat":31.19371,"lng":-102.3159,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 83. Plant 68581 Mendoza Trail BESS (Lydian Energy), Crane County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator MTB: 200 MW Batteries; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2030,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lydian Energy","state":"TX","name":"Pintail BESS (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Pintail BESS, San Patricio County, TX","lat":28.04268,"lng":-97.44014,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 84. Plant 68582 Pintail BESS (Lydian Energy), San Patricio County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator PPB: 200 MW Batteries; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2059,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lydian Energy","state":"TX","name":"Rock N' Roll (Batteries, 250 MW)","type":"generation","voltage_kv":null,"location_ref":"Rock N' Roll, Brazoria County, TX","lat":29.299371,"lng":-95.42218,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1096. Plant 68583 Rock N' Roll (Lydian Energy), Brazoria County, TX; balancing authority ERCO. Planned operation 2027-10.\nGenerator RRB: 250 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2133,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lydian Energy","state":"TX","name":"Yellow Viking Solar (Solar Photovoltaic, 170 MW)","type":"generation","voltage_kv":null,"location_ref":"Yellow Viking Solar, Somervell County, TX","lat":32.31664,"lng":-97.62889,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1079. Plant 67222 Yellow Viking Solar (Lydian Energy), Somervell County, TX; balancing authority ERCO. Planned operation 2027-10.\nGenerator 1: 170 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2141,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lydian Energy","state":"UT","name":"Faraday Energy Storage (Batteries, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Faraday Energy Storage, Utah County, UT","lat":40.082,"lng":-112.069,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 122. Plant 69424 Faraday Energy Storage (Lydian Energy), Utah County, UT; balancing authority PACE. Planned operation 2026-09.\nGenerator FBS1: 150 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1538,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Lysander Iii Pv","state":"NY","name":"Lysander III PV (Solar Photovoltaic, 2.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Lysander III PV, Onondaga County, NY","lat":43.219759,"lng":-76.38847,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 264. Plant 69375 Lysander III PV (Lysander III PV LLC), Onondaga County, NY; balancing authority NYIS. Planned operation 2026-10.\nGenerator LYSAN: 2.4 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1053,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Madden Creek Solar","state":"IL","name":"Madden Creek Solar (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Madden Creek Solar, Piatt County, IL","lat":40.201889,"lng":-88.46611,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 782. Plant 69825 Madden Creek Solar (Madden Creek Solar, LLC), Piatt County, IL; balancing authority MISO. Planned operation 2027-04.\nGenerator MADCR: 5 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":788,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Madison Energy Investments","state":"CA","name":"NorCal FPV 1 (Solar Photovoltaic, 10 MW)","type":"generation","voltage_kv":null,"location_ref":"NorCal FPV 1, Alameda County, CA","lat":37.6778,"lng":-121.8275,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 230. Plant 68439 NorCal FPV 1 (Madison Energy Investments LLC), Alameda County, CA; balancing authority CISO. Planned operation 2026-10.\nGenerator 17184: 10 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1040,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Madison Energy Investments","state":"IL","name":"IL2 - W109 (Solar Photovoltaic, 4.9 MW)","type":"generation","voltage_kv":null,"location_ref":"IL2 - W109, Will County, IL","lat":41.470454,"lng":-88.02366,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 77. Plant 68392 IL2 - W109 (Madison Energy Investments LLC), Will County, IL; balancing authority PJM. Planned operation 2026-09.\nGenerator IL2PV: 4.9 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1231,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Madison Energy Investments","state":"MA","name":"Sturbridge Road Solar (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Sturbridge Road Solar, Worcester County, MA","lat":42.174611,"lng":-72.01786,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 199. Plant 63677 Sturbridge Road Solar (Madison Energy Investments LLC), Worcester County, MA; balancing authority ISNE. Planned operation 2026-10.\nGenerator STURB: 5 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2241,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Madison Gas & Electric","state":"WI","name":"Sunnyside Solar Energy Center (Batteries, Solar Photovoltaic, 60 MW)","type":"generation","voltage_kv":null,"location_ref":"Sunnyside Solar Energy Center, Dane County, WI","lat":42.985244,"lng":-89.43607,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 350, 351. Plant 68054 Sunnyside Solar Energy Center (Madison Gas & Electric Co), Dane County, WI; balancing authority MISO. Planned operation 2026-11.\nGenerator SNSB: 40 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator SNSS: 20 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":822,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Magic Mountain Parkway Solar Project 2023","state":"CA","name":"Six Flags Magic Mountain (Batteries, Solar Photovoltaic, 12 MW)","type":"generation","voltage_kv":null,"location_ref":"Six Flags Magic Mountain, Los Angeles County, CA","lat":34.428209,"lng":-118.5993,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 54, 55. Plant 67283 Six Flags Magic Mountain (Magic Mountain Parkway Solar Project 2023, LLC), Los Angeles County, CA; balancing authority CISO. Planned operation 2026-09.\nGenerator 6569: 10 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete\nGenerator 6569B: 2 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1134,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Mahi Bn","state":"IN","name":"Flag Run Solar (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Flag Run Solar, Clark County, IN","lat":38.556,"lng":-85.201,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2026. Plant 68288 Flag Run Solar (MAHI bn, LLC), Clark County, IN; balancing authority MISO. Planned operation 2029-12.\nGenerator MAHI: 200 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1984,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Main Horn Solar","state":"TX","name":"Main Horn Solar (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Main Horn Solar, Navarro County, TX","lat":31.984498,"lng":-96.36558,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2038. Plant 69636 Main Horn Solar (Main Horn Solar LLC), Navarro County, TX; balancing authority ERCO. Planned operation 2029-12.\nGenerator 69363: 100 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1985,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Mallard Energy Storage","state":"TX","name":"Mallard Energy Storage (Batteries, 250 MW)","type":"generation","voltage_kv":null,"location_ref":"Mallard Energy Storage, Collin County, TX","lat":33.064274,"lng":-96.45051,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 282. Plant 69681 Mallard Energy Storage (Mallard Energy Storage, LLC), Collin County, TX; balancing authority ERCO. Planned operation 2026-10.\nGenerator DRAKE: 250 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1540,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Mallory South Pv I","state":"NY","name":"Mallory South PV I (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Mallory South PV I, Oswego County, NY","lat":43.2669,"lng":-76.137,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 266. Plant 69383 Mallory South PV I (Mallory South PV I LLC), Oswego County, NY; balancing authority NYIS. Planned operation 2026-10.\nGenerator MALL1: 5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1541,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Mallory South Pv Ii","state":"NY","name":"Mallory South PV II (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Mallory South PV II, Oswego County, NY","lat":43.2669,"lng":-76.137,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 267. Plant 69384 Mallory South PV II (Mallory South PV II LLC), Oswego County, NY; balancing authority NYIS. Planned operation 2026-10.\nGenerator MALL2: 5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1139,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Mammoth Central","state":"IN","name":"Mammoth Central Solar Project (Solar Photovoltaic, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Mammoth Central Solar Project, Pulaski County, IN","lat":41.090899,"lng":-86.71283,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 342. Plant 66546 Mammoth Central Solar Project (Mammoth Central LLC), Pulaski County, IN; balancing authority PJM. Planned operation 2026-11.\nGenerator MMTHC: 300 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1138,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Mammoth Central Ii","state":"IN","name":"Mammoth Central II Solar Facility (Solar Photovoltaic, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Mammoth Central II Solar Facility, Pulaski County, IN","lat":41.090053,"lng":-86.69398,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 234. Plant 68514 Mammoth Central II Solar Facility (Mammoth Central II LLC), Pulaski County, IN; balancing authority PJM. Planned operation 2026-10.\nGenerator MC201: 300 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1640,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Mammoth Plains Energy Center","state":"OK","name":"Mammoth Plains Energy Storage II (Batteries, 101.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Mammoth Plains Energy Storage II, Dewey County, OK","lat":35.97972,"lng":-98.70606,"route":null,"cost_usd":null,"start_date":"2029-05-01","end_date":"2029-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1900. Plant 70443 Mammoth Plains Energy Storage II (Mammoth Plains Energy Center, LLC), Dewey County, OK; balancing authority SWPP. Planned operation 2029-05.\nGenerator MAMM2: 101.2 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1639,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Mammoth Plains Energy Storage","state":"OK","name":"Mammoth Plains Energy Storage (Batteries, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Mammoth Plains Energy Storage, Dewey County, OK","lat":35.981842,"lng":-98.70672,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1162. Plant 70195 Mammoth Plains Energy Storage (Mammoth Plains Energy Storage, LLC), Dewey County, OK; balancing authority SPA. Planned operation 2027-11.\nGenerator MAMM1: 150 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1140,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Mammoth South","state":"IN","name":"Mammoth South Solar Project (Solar Photovoltaic, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Mammoth South Solar Project, Pulaski County, IN","lat":41.095334,"lng":-86.69157,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 205. Plant 66545 Mammoth South Solar Project (Mammoth South LLC), Pulaski County, IN; balancing authority PJM. Planned operation 2026-10.\nGenerator MMTHS: 300 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":780,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Marici Project","state":"CA","name":"Marici (Batteries, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"Marici, Los Angeles County, CA","lat":34.007751,"lng":-117.9462,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 884. Plant 69508 Marici (Marici Project LLC), Los Angeles County, CA; balancing authority CISO. Planned operation 2027-06.\nGenerator 1: 400 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":681,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Maricopa Solar","state":"AZ","name":"Maricopa Solar (Batteries, 550 MW)","type":"generation","voltage_kv":null,"location_ref":"Maricopa Solar, Maricopa County, AZ","lat":33.46303,"lng":-113.1101,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 136. Plant 69684 Maricopa Solar (Maricopa Solar), Maricopa County, AZ; balancing authority AZPS. Planned operation 2026-09.\nGenerator 70125: 550 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1054,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Marseilles Land and Water","state":"IL","name":"Marseilles Lock and Dam Hydro (Conventional Hydroelectric, 10.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Marseilles Lock and Dam Hydro, LaSalle County, IL","lat":41.327778,"lng":-88.70111,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1201, 1202, 1203, 1204. Plant 58903 Marseilles Lock and Dam Hydro (Marseilles Land and Water Company), LaSalle County, IL; balancing authority MISO. Planned operation 2027-12.\nGenerator UNIT1: 2.6 MW Conventional Hydroelectric; (U) Under construction, less than or equal to 50 percent complete\nGenerator UNIT2: 2.6 MW Conventional Hydroelectric; (U) Under construction, less than or equal to 50 percent complete\nGenerator UNIT3: 2.6 MW Conventional Hydroelectric; (U) Under construction, less than or equal to 50 percent complete\nGenerator UNIT4: 2.6 MW Conventional Hydroelectric; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":904,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Maryland Line Road Solar","state":"DE","name":"Maryland Line Road Solar (Solar Photovoltaic, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Maryland Line Road Solar, New Castle County, DE","lat":39.372,"lng":-75.763,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 707. Plant 68212 Maryland Line Road Solar (Maryland Line Road Solar, LLC), New Castle County, DE; balancing authority PJM. Planned operation 2027-03.\nGenerator MDLN: 2.5 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":749,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Matrix Renewables","state":"CA","name":"Gaskell West Storage 1, LLC (Batteries, 21.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Gaskell West Storage 1, LLC, Kern County, CA","lat":34.833541,"lng":-118.5469,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 142. Plant 69806 Gaskell West Storage 1, LLC (Matrix Renewables), Kern County, CA; balancing authority CISO. Planned operation 2026-09.\nGenerator GWBS1: 21.6 MW Batteries; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":641,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Maynard Hydroelectric","state":"AR","name":"Colonel Charles D. Maynard Project (Conventional Hydroelectric, 25.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Colonel Charles D. Maynard Project, Jefferson County, AR","lat":34.411873,"lng":-92.10319,"route":null,"cost_usd":null,"start_date":"2031-11-01","end_date":"2031-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2290, 2291, 2292. Plant 69695 Colonel Charles D. Maynard Project (Maynard Hydroelectric LLC), Jefferson County, AR; balancing authority MISO. Planned operation 2031-11.\nGenerator CCM-1: 8.6 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator CCM-2: 8.6 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator CCM-3: 8.6 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1988,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Mccrae Wind Energy Ii","state":"TX","name":"McCrae Wind Energy II (Onshore Wind Turbine, 162.1 MW)","type":"generation","voltage_kv":null,"location_ref":"McCrae Wind Energy II, Glasscock County, TX","lat":31.754037,"lng":-101.6752,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 444. Plant 63342 McCrae Wind Energy II (McCrae Wind Energy II, LLC), Glasscock County, TX; balancing authority ERCO. Planned operation 2026-12.\nGenerator BKII: 162.1 MW Onshore Wind Turbine; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1381,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Mcdowell Creek Solar","state":"NC","name":"McDowell Creek Solar LLC (Solar Photovoltaic, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"McDowell Creek Solar LLC, Mecklenburg County, NC","lat":35.394168,"lng":-80.94389,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 214. Plant 67857 McDowell Creek Solar LLC (McDowell Creek Solar LLC), Mecklenburg County, NC; balancing authority DUK. Planned operation 2026-10.\nGenerator MCDOW: 2 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1713,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Mc Solar","state":"PA","name":"MC Solar (Solar Photovoltaic, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"MC Solar, Mercer County, PA","lat":41.412805,"lng":-80.43245,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 630. Plant 68930 MC Solar (MC Solar, LLC), Mercer County, PA; balancing authority PJM. Planned operation 2027-01.\nGenerator ENX36: 50 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2797,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"MEAG Power","state":"GA","name":"Fortson Substation Modernization","type":"substation","voltage_kv":500,"location_ref":"Fortson (GA)","lat":32.61,"lng":-84.916,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":31,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 31.\nIn-Service Year: 2027\nProject Name: MEAG: FORTSON SUBSTATION MODERNIZATION\nDescription: Complete modernization and replacement of obsolete equipment and relays for the 500 kV, 230 kV, and 115 kV yards. Add a redundant relay scheme at Fortson.\nSupporting Statement: Several 115 kV lines overloads under contingency. Substation modernization needed due to obsolete equipment and relays.\nLocated: FORTSON = OSM substation 'Fortson Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":2798,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"MEAG Power","state":"GA","name":"Ray Place Rd - Warrenton Primary 115 Kv Reconductor","type":"transmission line","voltage_kv":115,"location_ref":"Ray Place Rd - Warrenton Primary (GA)","lat":33.437,"lng":-82.745,"route":[[33.468,-82.82],[33.406,-82.671]],"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":31,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 31.\nIn-Service Year: 2027\nProject Name: MEAG: RAY PLACE RD - WARRENTON PRIMARY 115 KV RECONDUCTOR\nDescription: Reconductor approximately 10 miles of the Ray Place - Warrenton Primary 115 kV line with 170°C ACSS conductor. Upgrade limiting element at substation along the line.\nSupporting Statement: Ray Place Rd - Warrenton 115 kV line overloads under contingency.\nLocated: RAY PLACE RD = OSM substation 'Ray Place Road Switching Station' (GA); WARRENTON PRIMARY = OSM substation 'Warrenton Substation' (GA), nearest of 2 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2844,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"MEAG Power","state":"GA","name":"Brumbley Creek - South Bainbridge 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Brumbley Creek - South Bainbridge (GA)","lat":30.84,"lng":-84.489,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":43,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 43.\nIn-Service Year: 2028\nProject Name: MEAG: BRUMBLEY CREEK - SOUTH BAINBRIDGE 115 KV REBUILD\nDescription: Rebuild approximately 2.1 miles of the South Bainbridge - Thomasville 115 kV line with 200°C 1351 ACSS conductor.\nSupporting Statement: The South Bainbridge - Thomasville 115 kV line overloads under contingency.\nLocated: SOUTH BAINBRIDGE = OSM substation 'South Bainbridge Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":2845,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"MEAG Power","state":"GA","name":"New South Griffin 230/115 Kv Substation","type":"substation","voltage_kv":230,"location_ref":"New South Griffin (GA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":43,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 43.\nIn-Service Year: 2028\nProject Name: MEAG: NEW SOUTH GRIFFIN 230/115 KV SUBSTATION\nDescription: Build a new 230/115 kV substation and relocate all lines except for the South Coweta and Griffin #1 115 kV lines from the existing South Griffin substation. Terminate the newly converted Hampton 230 kV line at South Griffin.\nSupporting Statement: The project will address multiple thermal overloads that occur under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2846,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"MEAG Power","state":"GA","name":"Thomasville 230/115 Kv Autobank Replacement","type":"substation","voltage_kv":230,"location_ref":"Thomasville (GA)","lat":30.909,"lng":-84.005,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":43,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 43.\nIn-Service Year: 2028\nProject Name: MEAG: THOMASVILLE 230/115 KV AUTOBANK REPLACEMENT\nDescription: Replace the 230/115 kV auto transformer #4 at Thomasville substation.\nSupporting Statement: The 230/115 kV auto transformer #4 at Thomasville substation overloads under contingency.\nLocated: THOMASVILLE = OSM substation 'Thomasville Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":2907,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"MEAG Power","state":"GA","name":"Aultman Road - Fort Valley #1 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Aultman Road - Fort Valley #1 (GA)","lat":32.561,"lng":-83.872,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":59,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 59.\nIn-Service Year: 2029\nProject Name: MEAG: AULTMAN ROAD - FORT VALLEY #1 115 KV REBUILD\nDescription: Rebuild approximately 8 miles of the Aultman Road - Fort Valley #1 115 kV line with 200°C 1351 ACSS conductor.\nSupporting Statement: The Aultman Road - Fort Valley #1 115 kV line overloads under contingency.\nLocated: FORT VALLEY #1 = OSM substation 'Fort Valley Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":2908,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"MEAG Power","state":"GA","name":"Slappey Drive - Westover 115 Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Slappey Drive - Westover (GA)","lat":31.533,"lng":-84.209,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":59,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 59.\nIn-Service Year: 2029\nProject Name: MEAG: SLAPPEY DRIVE - WESTOVER 115 KV LINE REBUILD\nDescription: Rebuild approximately 2.92 miles of Slappey Drive - Westover 115 kV line with 200°C 1351 ACSS.\nSupporting Statement: Slappey Drive - Westover 115 kV line overloads under contingency.\nLocated: WESTOVER ~ Dougherty County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2972,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"MEAG Power","state":"GA","name":"Athena - Warrenton 230 Kv Conversion","type":"transmission line","voltage_kv":230,"location_ref":"Athena - Warrenton (GA)","lat":33.691,"lng":-83.008,"route":[[33.976,-83.346],[33.406,-82.671]],"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":76,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 76.\nIn-Service Year: 2030\nProject Name: MEAG: ATHENA - WARRENTON 230 KV CONVERSION\nDescription: Convert the 115 kV lines from Athena - Union Point - Ray Place Road - Warrenton Primary to 230 kV operation using 200°C 1351 ACSS conductor. Add 230/115 kV transformers at Union Point Primary and Ray Place Road. Replace limiting equipment along the lines.\nSupporting Statement: The Ray Place Road - Warrenton 115 kV overloads under contingency.\nLocated: ATHENA = OSM substation 'Athena Substation' (GA); WARRENTON = OSM substation 'Warrenton Substation' (GA), nearest of 2 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2973,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"MEAG Power","state":"GA","name":"Barnesville Primary 230/115 Kv Bank B Replacement","type":"substation","voltage_kv":230,"location_ref":"Barnesville Primary (GA)","lat":33.044,"lng":-84.177,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":76,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 76.\nIn-Service Year: 2030\nProject Name: MEAG: BARNESVILLE PRIMARY 230/115 KV BANK B REPLACEMENT\nDescription: Replace the Barnesville Primary 230/115 kV bank with higher rated auto transformer.\nSupporting Statement: The Barnesville Primary 230/115 kV auto transformer surpasses its rating under contingency.\nLocated: BARNESVILLE PRIMARY ~ centre of 2 nearby same-named OSM substations","reviewed":false,"approximate":true,"requires_review":false},{"id":2974,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"MEAG Power","state":"GA","name":"Fortson - Talbot Co #2 230 Kv Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Fortson - Talbot Co #2 (GA)","lat":32.657,"lng":-84.723,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":77,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 77.\nIn-Service Year: 2030\nProject Name: MEAG: FORTSON - TALBOT CO #2 230 KV REBUILD\nDescription: Rebuild the Fortson - Talbot County #2 230 kV line with 200°C 1351 ACSS conductor and replace associated jumpers.\nSupporting Statement: A multiple contingency event causes the Fortson - Talbot County #2 230 kV line to overload.\nLocated: FORTSON = OSM substation 'Fortson Substation' (GA); TALBOT CO #2 ~ Talbot County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2975,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"MEAG Power","state":"GA","name":"Goshen Area Strategic Solution","type":"substation","voltage_kv":230,"location_ref":"Goshen (GA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":77,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 77.\nIn-Service Year: 2030\nProject Name: MEAG: GOSHEN AREA STRATEGIC SOLUTION\nDescription: GPC: Construct a 230 kV switching station on the Waynesboro - Wilson 230 kV line. MEAG: Build a new 230 kV line between the switching station and Goshen, approximately 12.3 miles using 200°C 1351 ACSS conductor.\nSupporting Statement: The Augusta Corporate Park - Vogtle 230 kV line overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3017,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"MEAG Power","state":"GA","name":"Pio Nono 230/115 Kv Area Solution","type":"substation","voltage_kv":230,"location_ref":"Pio Nono (GA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":88,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 88.\nIn-Service Year: 2031\nProject Name: MEAG: PIO NONO 230/115 KV AREA SOLUTION\nDescription: Build a 4 - breaker 230 kV ring bus to terminate lines from Dorsett, South Griffin, and Pitts. Install an auto transformer and build a 115 kV yard to terminate a line from Broadway. Make all neccesary modifications to accommodate all the 230 kV and 115 kV lines terminations.\nSupporting Statement: This project addresses 230 kV and 115 kV thermal overloads that occur under contingency in the Central area and increases area capacility to move solar generation from the South into Central and Metro South areas.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":1274,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Mec North","state":"MI","name":"MEC North (Natural Gas Fired Combined Cycle, 500 MW)","type":"generation","voltage_kv":null,"location_ref":"MEC North, Calhoun County, MI","lat":42.233559,"lng":-84.96234,"route":null,"cost_usd":null,"start_date":"2034-06-01","end_date":"2034-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2309. Plant 63911 MEC North (MEC North), Calhoun County, MI; balancing authority MISO. Planned operation 2034-06.\nGenerator MECN: 500 MW Natural Gas Fired Combined Cycle; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1275,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Mec South","state":"MI","name":"MEC South (Natural Gas Fired Combined Cycle, 500 MW)","type":"generation","voltage_kv":null,"location_ref":"MEC South, Calhoun County, MI","lat":42.237103,"lng":-84.95915,"route":null,"cost_usd":null,"start_date":"2034-06-01","end_date":"2034-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2310. Plant 63912 MEC South (MEC South), Calhoun County, MI; balancing authority MISO. Planned operation 2034-06.\nGenerator MECS: 500 MW Natural Gas Fired Combined Cycle; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1617,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Medical Center","state":"OH","name":"MCCo BESS Generating Facility (Batteries, 15.6 MW)","type":"generation","voltage_kv":null,"location_ref":"MCCo BESS Generating Facility, Cuyahoga County, OH","lat":41.3026,"lng":-81.3604,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 275, 276, 277, 278. Plant 69593 MCCo BESS Generating Facility (The Medical Center Company), Cuyahoga County, OH; balancing authority PJM. Planned operation 2026-10.\nGenerator 1: 3.9 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator 2: 3.9 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator 3: 3.9 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator 4: 3.9 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1424,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Meister Avenue Branchburg Solar Project 2024","state":"NJ","name":"50 Meister Ave (Solar Photovoltaic, 1.5 MW)","type":"generation","voltage_kv":null,"location_ref":"50 Meister Ave, Somerset County, NJ","lat":40.600337,"lng":-74.69818,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 286. Plant 69753 50 Meister Ave (Meister Avenue Branchburg Solar Project 2024, LLC), Somerset County, NJ; balancing authority PJM. Planned operation 2026-10.\nGenerator 13790: 1.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1770,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Melsam Solar","state":"SC","name":"Melsam Solar (Solar Photovoltaic, 65 MW)","type":"generation","voltage_kv":null,"location_ref":"Melsam Solar, Dillon County, SC","lat":34.344878,"lng":-79.37456,"route":null,"cost_usd":null,"start_date":"2028-11-01","end_date":"2028-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1709. Plant 62280 Melsam Solar (Melsam Solar), Dillon County, SC; balancing authority CPLE. Planned operation 2028-11.\nGenerator 58: 65 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1750,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Merck & -west Point","state":"PA","name":"West Point (PA) (Natural Gas Internal Combustion Engine, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"West Point (PA), Montgomery County, PA","lat":40.217963,"lng":-75.29882,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 190. Plant 52149 West Point (PA) (Merck & Co Inc-West Point), Montgomery County, PA; balancing authority PJM. Planned operation 2026-10.\nGenerator GEN21: 2.5 MW Natural Gas Internal Combustion Engine; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1992,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Metro Bess","state":"TX","name":"Metro BESS (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Metro BESS, Caldwell County, TX","lat":30.003245,"lng":-97.67794,"route":null,"cost_usd":null,"start_date":"2030-12-01","end_date":"2030-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2123. Plant 69641 Metro BESS (Metro BESS LLC), Caldwell County, TX; balancing authority ERCO. Planned operation 2030-12.\nGenerator 49453: 200 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1284,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Michigan State University","state":"MI","name":"T B Simon Power Plant (Natural Gas Fired Combustion Turbine, 15 MW)","type":"generation","voltage_kv":null,"location_ref":"T B Simon Power Plant, Ingham County, MI","lat":42.7178,"lng":-84.4836,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1418. Plant 10328 T B Simon Power Plant (Michigan State University), Ingham County, MI; balancing authority MISO. Planned operation 2028-01.\nGenerator GEN11: 15 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":973,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Midamerican Energy","state":"IA","name":"Mills Solar Project (Solar Photovoltaic, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"Mills Solar Project, Mills County, IA","lat":41.033333,"lng":-95.45192,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 588. Plant 70107 Mills Solar Project (MidAmerican Energy Co), Mills County, IA; balancing authority MISO. Planned operation 2026-12.\nGenerator MSP: 50 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":835,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Middle River Power","state":"CA","name":"Tracy BESS (Batteries, 40 MW)","type":"generation","voltage_kv":null,"location_ref":"Tracy BESS, San Joaquin County, CA","lat":37.711459,"lng":-121.4895,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 826. Plant 69539 Tracy BESS (Middle River Power), San Joaquin County, CA; balancing authority CISO. Planned operation 2027-05.\nGenerator TRAB: 40 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1720,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Middle Road Solar Partners","state":"PA","name":"Middle Road Solar Partners (Solar Photovoltaic, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Middle Road Solar Partners, Dauphin County, PA","lat":40.516,"lng":-76.937,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 119. Plant 69371 Middle Road Solar Partners (Middle Road Solar Partners LLC), Dauphin County, PA; balancing authority PJM. Planned operation 2026-09.\nGenerator HALIF: 2.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":784,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Midway Bess","state":"CA","name":"Midway BESS (Batteries, 124.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Midway BESS, Fresno County, CA","lat":36.652653,"lng":-120.5783,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 878. Plant 68925 Midway BESS (Midway BESS LLC), Fresno County, CA; balancing authority CISO. Planned operation 2027-06.\nGenerator MIDB: 124.6 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2146,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Milford Solar Phase Ii","state":"UT","name":"Milford Solar Phase II (Solar Photovoltaic, 310 MW)","type":"generation","voltage_kv":null,"location_ref":"Milford Solar Phase II, Beaver County, UT","lat":38.522442,"lng":-113.0148,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1056. Plant 69930 Milford Solar Phase II (Milford Solar Phase II, LLC), Beaver County, UT; balancing authority LDWP. Planned operation 2027-09.\nGenerator MS2: 310 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1432,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Milltown Onsite Generation","state":"NJ","name":"Milltown Onsite BESS (Batteries, 13.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Milltown Onsite BESS, Middlesex County, NJ","lat":40.453346,"lng":-74.43502,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 310. Plant 70296 Milltown Onsite BESS (Milltown Onsite Generation, LLC), Middlesex County, NJ; balancing authority PJM. Planned operation 2026-10.\nGenerator MTBAT: 13.2 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1721,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Mineral Basin Solar Power","state":"PA","name":"Mineral Basin Solar Power (Solar Photovoltaic, 401.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Mineral Basin Solar Power, Clearfield County, PA","lat":41.106469,"lng":-78.29426,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1767. Plant 67378 Mineral Basin Solar Power (Mineral Basin Solar Power, LLC), Clearfield County, PA; balancing authority NYIS. Planned operation 2028-12.\nGenerator MB: 401.6 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":785,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Minneola Solar","state":"CA","name":"Minneola Solar (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Minneola Solar, San Bernardino County, CA","lat":34.846914,"lng":-116.7698,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 395. Plant 69562 Minneola Solar (Minneola Solar), San Bernardino County, CA; balancing authority CISO. Planned operation 2026-11.\nGenerator MINNE: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":860,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Mirasol Energy Center","state":"CO","name":"Mirasol Energy Center, LLC. (Solar Photovoltaic, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"Mirasol Energy Center, LLC., Pueblo County, CO","lat":38.11439,"lng":-104.2017,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1833. Plant 70331 Mirasol Energy Center, LLC. (Mirasol Energy Center, LLC), Pueblo County, CO; balancing authority PSCO. Planned operation 2028-12.\nGenerator MRASL: 400 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1842,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Mission Clean Energy Devco","state":"TX","name":"Bramble Energy Center (Batteries, 225.1 MW)","type":"generation","voltage_kv":null,"location_ref":"Bramble Energy Center, Zavala County, TX","lat":28.955627,"lng":-99.72318,"route":null,"cost_usd":null,"start_date":"2029-04-01","end_date":"2029-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1874. Plant 67767 Bramble Energy Center (Mission Clean Energy Devco LLC), Zavala County, TX; balancing authority ERCO. Planned operation 2029-04.\nGenerator BECBA: 225.1 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1884,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Mission Clean Energy Devco","state":"TX","name":"Cumbia Energy Center (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Cumbia Energy Center, Nueces County, TX","lat":27.739083,"lng":-97.44955,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1012. Plant 67768 Cumbia Energy Center (Mission Clean Energy Devco LLC), Nueces County, TX; balancing authority ERCO. Planned operation 2027-09.\nGenerator CECBA: 200 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1318,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Missouri Jnt Muni Pwr Elec Ut Comm","state":"MO","name":"Fulton Energy Center (Natural Gas Fired Combustion Turbine, 16.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Fulton Energy Center, Callaway County, MO","lat":38.8676,"lng":-91.94778,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1381. Plant 69868 Fulton Energy Center (Missouri Jnt Muni.Pwr Elec. Ut. Comm.), Callaway County, MO; balancing authority MISO. Planned operation 2027-12.\nGenerator UNIT1: 16.5 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1319,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Missouri Jnt Muni Pwr Elec Ut Comm","state":"MO","name":"Hannibal Energy Center (Natural Gas Fired Combustion Turbine, 76 MW)","type":"generation","voltage_kv":null,"location_ref":"Hannibal Energy Center, Marion County, MO","lat":39.70965,"lng":-91.44026,"route":null,"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1933, 1934. Plant 69869 Hannibal Energy Center (Missouri Jnt Muni.Pwr Elec. Ut. Comm.), Marion County, MO; balancing authority MISO. Planned operation 2029-06.\nGenerator UNIT1: 38 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator UNIT2: 38 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1322,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Missouri Jnt Muni Pwr Elec Ut Comm","state":"MO","name":"Marshall Energy Center (Natural Gas Fired Combustion Turbine, 46.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Marshall Energy Center, Saline County, MO","lat":39.12358,"lng":-93.20592,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 572, 573. Plant 69890 Marshall Energy Center (Missouri Jnt Muni.Pwr Elec. Ut. Comm.), Saline County, MO; balancing authority SWPP. Planned operation 2026-12.\nGenerator UNIT1: 23.1 MW Natural Gas Fired Combustion Turbine; (V) Under construction, more than 50 percent complete\nGenerator UNIT2: 23.1 MW Natural Gas Fired Combustion Turbine; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1323,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Missouri Jnt Muni Pwr Elec Ut Comm","state":"MO","name":"Marshall Energy Center (Natural Gas Fired Combustion Turbine, 76 MW)","type":"generation","voltage_kv":null,"location_ref":"Marshall Energy Center, Saline County, MO","lat":39.12358,"lng":-93.20592,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1828, 1829. Plant 69890 Marshall Energy Center (Missouri Jnt Muni.Pwr Elec. Ut. Comm.), Saline County, MO; balancing authority SWPP. Planned operation 2028-12.\nGenerator UNIT3: 38 MW Natural Gas Fired Combustion Turbine; (T) Regulatory approvals received. Not under construction\nGenerator UNIT4: 38 MW Natural Gas Fired Combustion Turbine; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1748,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Mn8 Energy","state":"PA","name":"Walker Solar (Solar Photovoltaic, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"Walker Solar, Juniata County, PA","lat":40.585531,"lng":-77.34537,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 602. Plant 70364 Walker Solar (MN8 Energy LLC), Juniata County, PA; balancing authority PJM. Planned operation 2026-12.\nGenerator GEN1: 80 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1301,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Mn Csg 2019-57","state":"MN","name":"MN CSG 2019-57 (Solar Photovoltaic, 1 MW)","type":"generation","voltage_kv":null,"location_ref":"MN CSG 2019-57, Blue Earth County, MN","lat":44.224001,"lng":-93.9787,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 742. Plant 70301 MN CSG 2019-57 (MN CSG 2019-57 LLC), Blue Earth County, MN; balancing authority MISO. Planned operation 2027-03.\nGenerator BOHRE: 1 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1994,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Monarch Creek Wind","state":"TX","name":"Monarch Creek Wind, LLC (Onshore Wind Turbine, 287.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Monarch Creek Wind, LLC, Throckmorton County, TX","lat":33.183899,"lng":-99.42239,"route":null,"cost_usd":null,"start_date":"2027-02-01","end_date":"2027-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 660. Plant 69606 Monarch Creek Wind, LLC (Monarch Creek Wind, LLC), Throckmorton County, TX; balancing authority ERCO. Planned operation 2027-02.\nGenerator 7496: 287.6 MW Onshore Wind Turbine; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2247,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Monongahela Power","state":"WV","name":"Davis Solar (WV) (Solar Photovoltaic, 11.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Davis Solar (WV), Tucker County, WV","lat":39.155005,"lng":-79.44334,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1764. Plant 66870 Davis Solar (WV) (Monongahela Power Co), Tucker County, WV; balancing authority PJM. Planned operation 2028-12.\nGenerator DAVS: 11.5 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2257,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Monongahela Power","state":"WV","name":"Wylie Ridge Solar (Solar Photovoltaic, 8.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Wylie Ridge Solar, Hancock County, WV","lat":40.452683,"lng":-80.57255,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1267. Plant 66901 Wylie Ridge Solar (Monongahela Power Co), Hancock County, WV; balancing authority PJM. Planned operation 2027-12.\nGenerator WRS: 8.4 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":781,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Monterey Regional Waste Mgmt","state":"CA","name":"Marina Landfill Gas (Landfill Gas, 6.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Marina Landfill Gas, Monterey County, CA","lat":36.7131,"lng":-121.7686,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1195, 1196, 1197, 1198. Plant 10748 Marina Landfill Gas (Monterey Regional Waste Mgmt), Monterey County, CA; balancing authority CISO. Planned operation 2027-12.\nGenerator FUTR1: 1.6 MW Landfill Gas; (P) Planned for installation, but regulatory approvals not initiated\nGenerator FUTR2: 1.6 MW Landfill Gas; (P) Planned for installation, but regulatory approvals not initiated\nGenerator FUTR3: 1.6 MW Landfill Gas; (P) Planned for installation, but regulatory approvals not initiated\nGenerator FUTR4: 1.6 MW Landfill Gas; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1731,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Moonlight Flats Solar Power","state":"PA","name":"Moonlight Flats Solar Power 1 (Solar Photovoltaic, 250 MW)","type":"generation","voltage_kv":null,"location_ref":"Moonlight Flats Solar Power 1, Clearfield County, PA","lat":41.092288,"lng":-78.17989,"route":null,"cost_usd":null,"start_date":"2030-12-01","end_date":"2030-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2111. Plant 67950 Moonlight Flats Solar Power 1 (Moonlight Flats Solar Power, LLC), Clearfield County, PA; balancing authority NYIS. Planned operation 2030-12.\nGenerator MFS1: 250 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":861,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Morel Energy Storage","state":"CO","name":"Morel Energy Storage (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Morel Energy Storage, Moffat County, CO","lat":40.469217,"lng":-107.6032,"route":null,"cost_usd":null,"start_date":"2030-12-01","end_date":"2030-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2264. Plant 70136 Morel Energy Storage (Morel Energy Storage LLC), Moffat County, CO; balancing authority SWPP. Planned operation 2030-12.\nGenerator MORL1: 200 MW Batteries; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1233,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Mountain Street Solar Project 2019","state":"MA","name":"Town of Sharon Portfolio -Mt St Landfill (Batteries, Solar Photovoltaic, 10.7 MW)","type":"generation","voltage_kv":null,"location_ref":"Town of Sharon Portfolio -Mt St Landfill, Norfolk County, MA","lat":42.102685,"lng":-71.15906,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 626, 627. Plant 68543 Town of Sharon Portfolio -Mt St Landfill (Mountain Street Solar Project 2019, LLC), Norfolk County, MA; balancing authority ISNE. Planned operation 2027-01.\nGenerator 3850B: 5.7 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator 3850G: 5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1714,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Mpg Solar","state":"PA","name":"MPG Solar (Solar Photovoltaic, 162 MW)","type":"generation","voltage_kv":null,"location_ref":"MPG Solar, Centre County, PA","lat":41.060649,"lng":-78.04193,"route":null,"cost_usd":null,"start_date":"2028-07-01","end_date":"2028-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1620. Plant 68993 MPG Solar (MPG Solar, LLC), Centre County, PA; balancing authority PJM. Planned operation 2028-07.\nGenerator ENX40: 162 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":972,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Mpw Solar 1","state":"IA","name":"MPW Solar 1 (Solar Photovoltaic, 24 MW)","type":"generation","voltage_kv":null,"location_ref":"MPW Solar 1, Muscatine County, IA","lat":41.3849,"lng":-91.0964,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1424. Plant 66978 MPW Solar 1 (MPW Solar 1, LLC), Muscatine County, IA; balancing authority MISO. Planned operation 2028-01.\nGenerator MS1: 24 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1996,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Mule Shoe Energy Storage","state":"TX","name":"Mule Shoe Energy Storage (Batteries, 207 MW)","type":"generation","voltage_kv":null,"location_ref":"Mule Shoe Energy Storage, Yoakum County, TX","lat":33.125909,"lng":-102.76,"route":null,"cost_usd":null,"start_date":"2028-08-01","end_date":"2028-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1653. Plant 70237 Mule Shoe Energy Storage (Mule Shoe Energy Storage LLC), Yoakum County, TX; balancing authority SWPP. Planned operation 2028-08.\nGenerator MULE1: 207 MW Batteries; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":786,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Mulqueeney Wind Energy","state":"CA","name":"Mulqueeney Wind Energy (Onshore Wind Turbine, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"Mulqueeney Wind Energy, Alameda County, CA","lat":37.69742,"lng":-121.5891,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 309. Plant 70235 Mulqueeney Wind Energy (Mulqueeney Wind Energy LLC), Alameda County, CA; balancing authority CISO. Planned operation 2026-10.\nGenerator 68372: 80 MW Onshore Wind Turbine; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1276,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Murch Solar","state":"MI","name":"Murch Solar, LLC (Solar Photovoltaic, 85 MW)","type":"generation","voltage_kv":null,"location_ref":"Murch Solar, LLC, Van Buren County, MI","lat":42.401,"lng":-86.03,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 640. Plant 70089 Murch Solar, LLC (Murch Solar, LLC), Van Buren County, MI; balancing authority PJM. Planned operation 2027-01.\nGenerator MURCH: 85 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1887,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Mustang Creek Solar I","state":"TX","name":"Darkwood Solar (Solar Photovoltaic, 150.7 MW)","type":"generation","voltage_kv":null,"location_ref":"Darkwood Solar, Comanche County, TX","lat":31.928528,"lng":-98.4241,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1095. Plant 68478 Darkwood Solar (Mustang Creek Solar I, LLC), Comanche County, TX; balancing authority ERCO. Planned operation 2027-10.\nGenerator DRK: 150.7 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1998,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Myrtle Solar","state":"TX","name":"Myrtle Solar, LLC (Solar Photovoltaic, 313 MW)","type":"generation","voltage_kv":null,"location_ref":"Myrtle Solar, LLC, Brazoria County, TX","lat":29.228486,"lng":-95.42744,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 210. Plant 66910 Myrtle Solar, LLC (Myrtle Solar, LLC), Brazoria County, TX; balancing authority ERCO. Planned operation 2026-10.\nGenerator MYR: 313 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":704,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Napa Junction Rv Storage","state":"CA","name":"American Canyon RV Boat Storage (Solar Photovoltaic, 1.9 MW)","type":"generation","voltage_kv":null,"location_ref":"American Canyon RV Boat Storage, Napa County, CA","lat":38.198033,"lng":-122.257,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 380. Plant 69222 American Canyon RV Boat Storage (Napa Junction RV Storage LLC), Napa County, CA; balancing authority CISO. Planned operation 2026-11.\nGenerator 5381: 1.9 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1269,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Naps - Hastings","state":"MI","name":"Hastings Generating Facility (Landfill Gas, 1.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Hastings Generating Facility, Barry County, MI","lat":42.67856,"lng":-85.29629,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 778. Plant 69385 Hastings Generating Facility (NAPS - Hastings LLC), Barry County, MI; balancing authority MISO. Planned operation 2027-04.\nGenerator GEN1: 1.6 MW Landfill Gas; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1618,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Naturgy Solar Operation Usa","state":"OH","name":"Mark Center Solar Project (Solar Photovoltaic, 90 MW)","type":"generation","voltage_kv":null,"location_ref":"Mark Center Solar Project, Defiance County, OH","lat":41.288044,"lng":-84.61132,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 31. Plant 65050 Mark Center Solar Project (Naturgy Solar Operation USA LLC), Defiance County, OH; balancing authority PJM. Planned operation 2026-09.\nGenerator MRC1: 90 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1444,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Navajo Transitional Energy","state":"NM","name":"NTEC Gas Plant (Natural Gas Fired Combustion Turbine, 1089 MW)","type":"generation","voltage_kv":null,"location_ref":"NTEC Gas Plant, San Juan County, NM","lat":36.682944,"lng":-108.4502,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1541, 1542, 1543, 1544, 1545, 1546, 1547, 1548, 1549, 1550, 1551, 1552, 1553, 1554, 1555, 1556, 1557, 1558. Plant 66478 NTEC Gas Plant (Navajo Transitional Energy Company), San Juan County, NM; balancing authority PNM. Planned operation 2028-06.\nGenerator GEN1: 60.5 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator GEN10: 60.5 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator GEN11: 60.5 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator GEN12: 60.5 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator GEN13: 60.5 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator GEN14: 60.5 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator GEN15: 60.5 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator GEN16: 60.5 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator GEN17: 60.5 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator GEN18: 60.5 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator GEN2: 60.5 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator GEN3: 60.5 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator GEN4: 60.5 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator GEN5: 60.5 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator GEN6: 60.5 MW Natural Gas Fired Combus","reviewed":false,"approximate":false,"requires_review":false},{"id":1029,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Navisun","state":"IL","name":"Galva School (Solar Photovoltaic, 1.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Galva School, Henry County, IL","lat":41.179241,"lng":-90.04677,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1109. Plant 69862 Galva School (Navisun LLC), Henry County, IL; balancing authority PJM. Planned operation 2027-10.\nGenerator GALF: 1.5 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1060,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Navisun","state":"IL","name":"Murphysboro 1 (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Murphysboro 1, Jackson County, IL","lat":37.794585,"lng":-89.35141,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1106. Plant 69859 Murphysboro 1 (Navisun LLC), Jackson County, IL; balancing authority PJM. Planned operation 2027-10.\nGenerator MURP1: 5 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1061,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Navisun","state":"IL","name":"Murphysboro 2 (Solar Photovoltaic, 1.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Murphysboro 2, Jackson County, IL","lat":37.794585,"lng":-89.35141,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1107. Plant 69860 Murphysboro 2 (Navisun LLC), Jackson County, IL; balancing authority PJM. Planned operation 2027-10.\nGenerator MURP2: 1.3 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1065,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Navisun","state":"IL","name":"Norris City 2 (Solar Photovoltaic, 3.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Norris City 2, White County, IL","lat":38.020585,"lng":-88.27321,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1108. Plant 69861 Norris City 2 (Navisun LLC), White County, IL; balancing authority PJM. Planned operation 2027-10.\nGenerator NORR2: 3.2 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1415,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Nebraska Public Power District","state":"NE","name":"Princeton Road Station (Natural Gas Internal Combustion Engine, 217.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Princeton Road Station, Lancaster County, NE","lat":40.570394,"lng":-96.78647,"route":null,"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1921, 1922, 1923, 1924, 1925, 1926, 1927, 1928, 1929, 1930, 1931, 1932. Plant 69808 Princeton Road Station (Nebraska Public Power District), Lancaster County, NE; balancing authority SWPP. Planned operation 2029-06.\nGenerator R01: 18.1 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator R02: 18.1 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator R03: 18.1 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator R04: 18.1 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator R05: 18.1 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator R06: 18.1 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator R07: 18.1 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator R08: 18.1 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator R09: 18.1 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator R10: 18.1 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator R11: 18.1 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator R12: 18.1 MW Natural Gas Internal Combustion Engine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1416,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Nebraska Public Power District","state":"NE","name":"Princeton Road Station (Natural Gas Fired Combustion Turbine, 530.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Princeton Road Station, Lancaster County, NE","lat":40.570394,"lng":-96.78647,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2041, 2042. Plant 69808 Princeton Road Station (Nebraska Public Power District), Lancaster County, NE; balancing authority SWPP. Planned operation 2029-12.\nGenerator CT1: 265.4 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator CT2: 265.4 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1736,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"New Freedom Solar Partners","state":"PA","name":"New Freedom Solar Partners (Solar Photovoltaic, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"New Freedom Solar Partners, York County, PA","lat":39.745,"lng":-76.696,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 265. Plant 69377 New Freedom Solar Partners (New Freedom Solar Partners LLC), York County, PA; balancing authority PJM. Planned operation 2026-10.\nGenerator NEWFR: 2.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2002,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"New Hickory Solar","state":"TX","name":"New Hickory Solar (Solar Photovoltaic, 206 MW)","type":"generation","voltage_kv":null,"location_ref":"New Hickory Solar, Jackson County, TX","lat":29.069747,"lng":-96.8782,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 393. Plant 69507 New Hickory Solar (New Hickory Solar LLC), Jackson County, TX; balancing authority ERCO. Planned operation 2026-11.\nGenerator NHKRY: 206 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1407,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"New Salem Wind I","state":"ND","name":"New Salem Wind I (Onshore Wind Turbine, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"New Salem Wind I, Morton County, ND","lat":46.730181,"lng":-101.3054,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1812. Plant 69657 New Salem Wind I (New Salem Wind I), Morton County, ND; balancing authority MISO. Planned operation 2028-12.\nGenerator NS1: 200 MW Onshore Wind Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1408,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"New Salem Wind Ii","state":"ND","name":"New Salem Wind II (Onshore Wind Turbine, 226 MW)","type":"generation","voltage_kv":null,"location_ref":"New Salem Wind II, Morton County, ND","lat":46.797929,"lng":-101.4344,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1813. Plant 69658 New Salem Wind II (New Salem Wind II), Morton County, ND; balancing authority MISO. Planned operation 2028-12.\nGenerator NS2: 226 MW Onshore Wind Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1552,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"New York University","state":"NY","name":"New York University Central Plant (Natural Gas Internal Combustion Engine, 2.6 MW)","type":"generation","voltage_kv":null,"location_ref":"New York University Central Plant, New York County, NY","lat":40.7899,"lng":-73.9233,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 15. Plant 54808 New York University Central Plant (New York University), New York County, NY; balancing authority NYIS. Planned operation 2026-09.\nGenerator GR1: 2.6 MW Natural Gas Internal Combustion Engine; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1553,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"New York University","state":"NY","name":"New York University Central Plant (Natural Gas Fired Combined Cycle, 2.9 MW)","type":"generation","voltage_kv":null,"location_ref":"New York University Central Plant, New York County, NY","lat":40.7899,"lng":-73.9233,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 801. Plant 54808 New York University Central Plant (New York University), New York County, NY; balancing authority NYIS. Planned operation 2027-05.\nGenerator STG1: 2.9 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1159,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Nextera Energy Resources","state":"KS","name":"Ninnescah Flats Solar (Solar Photovoltaic, 201.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Ninnescah Flats Solar, Pratt County, KS","lat":37.628817,"lng":-98.59311,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 565. Plant 69879 Ninnescah Flats Solar (Nextera Energy Resources), Pratt County, KS; balancing authority SWPP. Planned operation 2026-12.\nGenerator N3884: 201.6 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1160,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Nextera Energy Resources","state":"KS","name":"Pioneer Creek Wind, LLC (Onshore Wind Turbine, 252 MW)","type":"generation","voltage_kv":null,"location_ref":"Pioneer Creek Wind, LLC, Ford County, KS","lat":37.735053,"lng":-99.80556,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 741. Plant 70299 Pioneer Creek Wind, LLC (NextEra Energy Resources, LLC), Ford County, KS; balancing authority SWPP. Planned operation 2027-03.\nGenerator 814: 252 MW Onshore Wind Turbine; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1831,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Nextera Energy Resources - Ercot","state":"TX","name":"Bighorn Ridge Solar (Solar Photovoltaic, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Bighorn Ridge Solar, Pecos County, TX","lat":30.956251,"lng":-103.028,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1409. Plant 70330 Bighorn Ridge Solar (NextEra Energy Resources - ERCOT), Pecos County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator BRSPV: 300 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2077,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Nextera Energy Resources - Ercot","state":"TX","name":"Selenite Springs Solar (Solar Photovoltaic, 250 MW)","type":"generation","voltage_kv":null,"location_ref":"Selenite Springs Solar, Pecos County, TX","lat":30.992503,"lng":-103.0571,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1386. Plant 70047 Selenite Springs Solar (NextEra Energy Resources - ERCOT), Pecos County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator SSPV: 250 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2135,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Nextera Energy Resources - Ercot","state":"TX","name":"ZSS Solar (Solar Photovoltaic, 450 MW)","type":"generation","voltage_kv":null,"location_ref":"ZSS Solar, Knox County, TX","lat":33.479935,"lng":-99.67475,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1401. Plant 70175 ZSS Solar (NextEra Energy Resources - ERCOT), Knox County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator ZSPV: 450 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1983,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Nexus Renewable Power","state":"TX","name":"MRG Goody Solar Project Hybrid (Batteries, Solar Photovoltaic, 221.2 MW)","type":"generation","voltage_kv":null,"location_ref":"MRG Goody Solar Project Hybrid, Lamar County, TX","lat":33.639193,"lng":-95.62905,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 39, 40. Plant 66390 MRG Goody Solar Project Hybrid (Nexus Renewable Power, LLC), Lamar County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator GDYES: 50.4 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator GDYPV: 170.8 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2005,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Nexus Renewable Power","state":"TX","name":"Noria Hondo Solar (Hybrid) (Batteries, Solar Photovoltaic, 220 MW)","type":"generation","voltage_kv":null,"location_ref":"Noria Hondo Solar (Hybrid), Kleberg County, TX","lat":27.553355,"lng":-97.67528,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1233, 1234. Plant 65344 Noria Hondo Solar (Hybrid) (Nexus Renewable Power, LLC), Kleberg County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator 66148: 145 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction\nGenerator 66149: 75 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1827,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Nexus Renewables U S","state":"TX","name":"Bell Creek BESS LLC (Batteries, 200.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Bell Creek BESS LLC, Brazoria County, TX","lat":29.137519,"lng":-95.66797,"route":null,"cost_usd":null,"start_date":"2028-11-01","end_date":"2028-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1721. Plant 67535 Bell Creek BESS LLC (Nexus Renewables U.S. Inc.), Brazoria County, TX; balancing authority ERCO. Planned operation 2028-11.\nGenerator ASHU1: 200.9 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1846,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Nexus Renewables U S","state":"TX","name":"Brazos River BESS LLC (Batteries, 180 MW)","type":"generation","voltage_kv":null,"location_ref":"Brazos River BESS LLC, Brazoria County, TX","lat":29.150409,"lng":-95.62124,"route":null,"cost_usd":null,"start_date":"2028-11-01","end_date":"2028-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1728. Plant 68814 Brazos River BESS LLC (Nexus Renewables U.S. Inc.), Brazoria County, TX; balancing authority ERCO. Planned operation 2028-11.\nGenerator ASHU2: 180 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":647,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Nimbus Wind Farm","state":"AR","name":"Nimbus Wind Farm (Onshore Wind Turbine, 183 MW)","type":"generation","voltage_kv":null,"location_ref":"Nimbus Wind Farm, Carroll County, AR","lat":36.27118,"lng":-93.40682,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 227. Plant 68319 Nimbus Wind Farm (Nimbus Wind Farm LLC), Carroll County, AR; balancing authority MISO. Planned operation 2026-10.\nGenerator NIM: 183 MW Onshore Wind Turbine; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1489,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ninedot Holdings","state":"NY","name":"Blue Aster B Clean Energy LLC (Batteries, 4.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Blue Aster B Clean Energy LLC, Kings County, NY","lat":40.674137,"lng":-73.90102,"route":null,"cost_usd":null,"start_date":"2027-08-01","end_date":"2027-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 991. Plant 70309 Blue Aster B Clean Energy LLC (NineDot Holdings, LLC), Kings County, NY; balancing authority NYIS. Planned operation 2027-08.\nGenerator ND031: 4.9 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1490,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ninedot Holdings","state":"NY","name":"Blue Aster C Clean Energy LLC (Batteries, 4.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Blue Aster C Clean Energy LLC, Kings County, NY","lat":40.674137,"lng":-73.90102,"route":null,"cost_usd":null,"start_date":"2027-08-01","end_date":"2027-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 992. Plant 70310 Blue Aster C Clean Energy LLC (NineDot Holdings, LLC), Kings County, NY; balancing authority NYIS. Planned operation 2027-08.\nGenerator ND028: 4.9 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1491,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ninedot Holdings","state":"NY","name":"Blue Aster Clean Energy LLC (Batteries, 4.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Blue Aster Clean Energy LLC, Kings County, NY","lat":40.674137,"lng":-73.90102,"route":null,"cost_usd":null,"start_date":"2027-08-01","end_date":"2027-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 990. Plant 70308 Blue Aster Clean Energy LLC (NineDot Holdings, LLC), Kings County, NY; balancing authority NYIS. Planned operation 2027-08.\nGenerator ND030: 4.9 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1500,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ninedot Holdings","state":"NY","name":"Coral Honeysuckle Clean Energy LLC (Batteries, 3.7 MW)","type":"generation","voltage_kv":null,"location_ref":"Coral Honeysuckle Clean Energy LLC, Queens County, NY","lat":40.679023,"lng":-73.82032,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 743. Plant 70326 Coral Honeysuckle Clean Energy LLC (NineDot Holdings, LLC), Queens County, NY; balancing authority NYIS. Planned operation 2027-03.\nGenerator ND014: 3.7 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1503,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ninedot Holdings","state":"NY","name":"Eastern BlueBird Clean Energy LLC (Batteries, 4.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Eastern BlueBird Clean Energy LLC, Bronx County, NY","lat":40.884948,"lng":-73.82901,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 903. Plant 70311 Eastern BlueBird Clean Energy LLC (NineDot Holdings, LLC), Bronx County, NY; balancing authority NYIS. Planned operation 2027-06.\nGenerator ND020: 4.4 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1517,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ninedot Holdings","state":"NY","name":"Heron Clean Energy, LLC (Batteries, 4.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Heron Clean Energy, LLC, Kings County, NY","lat":40.618159,"lng":-73.93242,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 596. Plant 70327 Heron Clean Energy, LLC (NineDot Holdings, LLC), Kings County, NY; balancing authority NYIS. Planned operation 2026-12.\nGenerator ND012: 4.9 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1524,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ninedot Holdings","state":"NY","name":"Jamaica Community Energy, LLC (Batteries, 4.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Jamaica Community Energy, LLC, Kings County, NY","lat":40.637975,"lng":-73.92817,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 646. Plant 70328 Jamaica Community Energy, LLC (NineDot Holdings, LLC), Kings County, NY; balancing authority NYIS. Planned operation 2027-01.\nGenerator ND013: 4.9 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1532,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ninedot Holdings","state":"NY","name":"Linden Clean Energy, LLC (Batteries, 3.7 MW)","type":"generation","voltage_kv":null,"location_ref":"Linden Clean Energy, LLC, Queens County, NY","lat":40.679074,"lng":-73.82041,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 744. Plant 70329 Linden Clean Energy, LLC (NineDot Holdings, LLC), Queens County, NY; balancing authority NYIS. Planned operation 2027-03.\nGenerator ND015: 3.7 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1534,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ninedot Holdings","state":"NY","name":"Lobelia 4452 Clean Energy LLC (Batteries, 4.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Lobelia 4452 Clean Energy LLC, Bronx County, NY","lat":40.853722,"lng":-73.89525,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 962. Plant 70313 Lobelia 4452 Clean Energy LLC (NineDot Holdings, LLC), Bronx County, NY; balancing authority NYIS. Planned operation 2027-07.\nGenerator ND024: 4.9 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1535,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ninedot Holdings","state":"NY","name":"Lobelia Clean Energy LLC (Batteries, 4.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Lobelia Clean Energy LLC, Bronx County, NY","lat":40.853531,"lng":-73.89531,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 961. Plant 70312 Lobelia Clean Energy LLC (NineDot Holdings, LLC), Bronx County, NY; balancing authority NYIS. Planned operation 2027-07.\nGenerator ND022: 4.9 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1554,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ninedot Holdings","state":"NY","name":"Northern Cardinal Clean Energy, LLC (Batteries, 4.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Northern Cardinal Clean Energy, LLC, Bronx County, NY","lat":40.884948,"lng":-73.82901,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 904. Plant 70315 Northern Cardinal Clean Energy, LLC (NineDot Holdings, LLC), Bronx County, NY; balancing authority NYIS. Planned operation 2027-06.\nGenerator ND021: 4.4 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1558,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ninedot Holdings","state":"NY","name":"Piping Plover Clean Energy, LLC (Batteries, 2.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Piping Plover Clean Energy, LLC, Bronx County, NY","lat":40.815382,"lng":-73.86015,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 790. Plant 70316 Piping Plover Clean Energy, LLC (NineDot Holdings, LLC), Bronx County, NY; balancing authority NYIS. Planned operation 2027-04.\nGenerator ND017: 2.3 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1566,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ninedot Holdings","state":"NY","name":"Roseate Tern Clean Energy LLC (Batteries, 3.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Roseate Tern Clean Energy LLC, Bronx County, NY","lat":40.715572,"lng":-73.88673,"route":null,"cost_usd":null,"start_date":"2027-08-01","end_date":"2027-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 993. Plant 70317 Roseate Tern Clean Energy LLC (NineDot Holdings, LLC), Bronx County, NY; balancing authority NYIS. Planned operation 2027-08.\nGenerator ND029: 3.3 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1595,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ninedot Holdings","state":"NY","name":"Warbler Clean Energy LLC (Batteries, 2.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Warbler Clean Energy LLC, Bronx County, NY","lat":40.815404,"lng":-73.86023,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 791. Plant 70319 Warbler Clean Energy LLC (NineDot Holdings, LLC), Bronx County, NY; balancing authority NYIS. Planned operation 2027-04.\nGenerator ND016: 2.3 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1596,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ninedot Holdings","state":"NY","name":"Water Willow A Clean Energy LLC (Batteries, 3.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Water Willow A Clean Energy LLC, Queens County, NY","lat":40.708897,"lng":-73.77939,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 792. Plant 70320 Water Willow A Clean Energy LLC (NineDot Holdings, LLC), Queens County, NY; balancing authority NYIS. Planned operation 2027-04.\nGenerator ND018: 3.9 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1597,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ninedot Holdings","state":"NY","name":"Water Willow B Clean Energy LLC (Batteries, 3.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Water Willow B Clean Energy LLC, Queens County, NY","lat":40.708897,"lng":-73.77939,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 793. Plant 70321 Water Willow B Clean Energy LLC (NineDot Holdings, LLC), Queens County, NY; balancing authority NYIS. Planned operation 2027-04.\nGenerator ND019: 3.9 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1602,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ninedot Holdings","state":"NY","name":"Wintergreen B Clean Energy LLC (Batteries, 4.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Wintergreen B Clean Energy LLC, Bronx County, NY","lat":40.812516,"lng":-73.89011,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 964. Plant 70323 Wintergreen B Clean Energy LLC (NineDot Holdings, LLC), Bronx County, NY; balancing authority NYIS. Planned operation 2027-07.\nGenerator ND027: 4.9 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1603,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ninedot Holdings","state":"NY","name":"Wintergreen C Clean Energy LLC (Batteries, 4.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Wintergreen C Clean Energy LLC, Bronx County, NY","lat":40.812516,"lng":-73.89011,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 965. Plant 70324 Wintergreen C Clean Energy LLC (NineDot Holdings, LLC), Bronx County, NY; balancing authority NYIS. Planned operation 2027-07.\nGenerator ND023: 4.9 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1604,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ninedot Holdings","state":"NY","name":"Wintergreen Clean Energy, LLC (Batteries, 4.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Wintergreen Clean Energy, LLC, Bronx County, NY","lat":40.812557,"lng":-73.89,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 963. Plant 70322 Wintergreen Clean Energy, LLC (NineDot Holdings, LLC), Bronx County, NY; balancing authority NYIS. Planned operation 2027-07.\nGenerator ND025: 4.9 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1605,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ninedot Holdings","state":"NY","name":"Wintergreen D Clean Energy LLC (Batteries, 4.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Wintergreen D Clean Energy LLC, Bronx County, NY","lat":40.812516,"lng":-73.89011,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 966. Plant 70325 Wintergreen D Clean Energy LLC (NineDot Holdings, LLC), Bronx County, NY; balancing authority NYIS. Planned operation 2027-07.\nGenerator ND026: 4.9 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":892,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Njr Clean Energy Ventures","state":"CT","name":"Groton Flanders Road Landfill (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Groton Flanders Road Landfill, New London County, CT","lat":41.35,"lng":-72.05,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 968. Plant 70437 Groton Flanders Road Landfill (NJR Clean Energy Ventures Corporation), New London County, CT; balancing authority ISNE. Planned operation 2027-07.\nGenerator GROTN: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1430,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Njr Clean Energy Ventures","state":"NJ","name":"Hamms Landfill (Solar Photovoltaic, 6 MW)","type":"generation","voltage_kv":null,"location_ref":"Hamms Landfill, Sussex County, NJ","lat":41.1015,"lng":-74.6706,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 127. Plant 69516 Hamms Landfill (NJR Clean Energy Ventures Corporation), Sussex County, NJ; balancing authority PJM. Planned operation 2026-09.\nGenerator HAMM: 6 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1470,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Noble Solar","state":"NV","name":"Purple Sage Energy Center (Batteries, Solar Photovoltaic, 800 MW)","type":"generation","voltage_kv":null,"location_ref":"Purple Sage Energy Center, Clark County, NV","lat":36.029139,"lng":-115.8062,"route":null,"cost_usd":null,"start_date":"2028-11-01","end_date":"2028-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1724, 1725. Plant 68209 Purple Sage Energy Center (Noble Solar LLC), Clark County, NV; balancing authority CISO. Planned operation 2028-11.\nGenerator PSGBS: 400 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator PSGPV: 400 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1655,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Nolin Hills Wind","state":"OR","name":"Nolin Hills (Onshore Wind Turbine, Solar Photovoltaic, 600 MW)","type":"generation","voltage_kv":null,"location_ref":"Nolin Hills, Umatilla County, OR","lat":45.55455,"lng":-119.1143,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1206, 1207. Plant 60070 Nolin Hills (Nolin Hills Wind, LLC), Umatilla County, OR; balancing authority BPAT. Planned operation 2027-12.\nGenerator GEN: 300 MW Onshore Wind Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator GEN2: 300 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":789,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Norcal Fpv 1","state":"CA","name":"NorCal FPV 1 (Pond 2) (Solar Photovoltaic, 1.8 MW)","type":"generation","voltage_kv":null,"location_ref":"NorCal FPV 1 (Pond 2), Alameda County, CA","lat":37.6779,"lng":-121.8276,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 509. Plant 68787 NorCal FPV 1 (Pond 2) (NorCal FPV 1, LLC), Alameda County, CA; balancing authority CISO. Planned operation 2026-12.\nGenerator 23889: 1.8 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1387,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"North Carolina El Member","state":"NC","name":"Parkwood BESS (Batteries, 11.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Parkwood BESS, Union County, NC","lat":34.891701,"lng":-80.63255,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 561. Plant 69870 Parkwood BESS (North Carolina El Member Corp), Union County, NC; balancing authority DUK. Planned operation 2026-12.\nGenerator BAT1: 11.6 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1395,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"North Carolina El Member","state":"NC","name":"Tanglewood BESS (Batteries, 3.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Tanglewood BESS, Pasquotank County, NC","lat":36.272111,"lng":-76.30127,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 562. Plant 69871 Tanglewood BESS (North Carolina El Member Corp), Pasquotank County, NC; balancing authority PJM. Planned operation 2026-12.\nGenerator BAT1: 3.9 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1402,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"North Carolina El Member","state":"NC","name":"Windsor BESS (Batteries, 3.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Windsor BESS, Bertie County, NC","lat":36.025838,"lng":-76.98179,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 563. Plant 69872 Windsor BESS (North Carolina El Member Corp), Bertie County, NC; balancing authority PJM. Planned operation 2026-12.\nGenerator BAT1: 3.9 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1409,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Northern Divide Energy Storage","state":"ND","name":"Northern Divide Energy Storage (Batteries, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Northern Divide Energy Storage, Burke County, ND","lat":48.769875,"lng":-102.7678,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 557. Plant 69809 Northern Divide Energy Storage (Northern Divide Energy Storage, LLC), Burke County, ND; balancing authority SWPP. Planned operation 2026-12.\nGenerator 5756: 100 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1020,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Northern Illinois Hydropower","state":"IL","name":"Dresden Island Hydroelectric Project (Conventional Hydroelectric, 10 MW)","type":"generation","voltage_kv":null,"location_ref":"Dresden Island Hydroelectric Project, Grundy County, IL","lat":41.401926,"lng":-88.28172,"route":null,"cost_usd":null,"start_date":"2030-12-01","end_date":"2030-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2126, 2127, 2128, 2129, 2130, 2131, 2132, 2133, 2134, 2135. Plant 69699 Dresden Island Hydroelectric Project (Northern Illinois Hydropower, LLC), Grundy County, IL; balancing authority PJM. Planned operation 2030-12.\nGenerator DI-1: 1 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator DI-10: 1 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator DI-2: 1 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator DI-3: 1 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator DI-4: 1 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator DI-5: 1 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator DI-6: 1 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator DI-7: 1 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator DI-8: 1 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator DI-9: 1 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1145,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Northern Indiana Pub Serv","state":"IN","name":"R M Schahfer (Natural Gas Fired Combustion Turbine, 448.3 MW)","type":"generation","voltage_kv":null,"location_ref":"R M Schahfer, Jasper County, IN","lat":41.2164,"lng":-87.0261,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1187, 1188, 1189, 1190. Plant 6085 R M Schahfer (Northern Indiana Pub Serv Co), Jasper County, IN; balancing authority MISO. Planned operation 2027-12.\nGenerator 19A: 71.5 MW Natural Gas Fired Combustion Turbine; (T) Regulatory approvals received. Not under construction\nGenerator 19B: 71.5 MW Natural Gas Fired Combustion Turbine; (T) Regulatory approvals received. Not under construction\nGenerator 19C: 71.5 MW Natural Gas Fired Combustion Turbine; (T) Regulatory approvals received. Not under construction\nGenerator 20: 233.8 MW Natural Gas Fired Combustion Turbine; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1289,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Northern States Power - Minnesota","state":"MN","name":"Blue Lake BESS (Batteries, 135.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Blue Lake BESS, Scott County, MN","lat":44.786793,"lng":-93.4269,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 836. Plant 70098 Blue Lake BESS (Northern States Power Co - Minnesota), Scott County, MN; balancing authority MISO. Planned operation 2027-05.\nGenerator BEB: 135.5 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1300,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Northern States Power - Minnesota","state":"MN","name":"Lyon County Generating Station (Natural Gas Fired Combustion Turbine, 420 MW)","type":"generation","voltage_kv":null,"location_ref":"Lyon County Generating Station, Lyon County, MN","lat":44.226167,"lng":-95.75362,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1807, 1808. Plant 69537 Lyon County Generating Station (Northern States Power Co - Minnesota), Lyon County, MN; balancing authority MISO. Planned operation 2028-12.\nGenerator 1: 210 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator 2: 210 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1309,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Northern States Power - Minnesota","state":"MN","name":"Sherco BESS (Batteries, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Sherco BESS, Sherburne County, MN","lat":45.372125,"lng":-93.89978,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1155. Plant 70097 Sherco BESS (Northern States Power Co - Minnesota), Sherburne County, MN; balancing authority MISO. Planned operation 2027-11.\nGenerator SWB: 300 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1310,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Northern States Power - Minnesota","state":"MN","name":"Sherco BESS (Batteries, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Sherco BESS, Sherburne County, MN","lat":45.372125,"lng":-93.89978,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1390. Plant 70097 Sherco BESS (Northern States Power Co - Minnesota), Sherburne County, MN; balancing authority MISO. Planned operation 2027-12.\nGenerator SSB: 300 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1311,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Northern States Power - Minnesota","state":"MN","name":"Sherco LDES (Batteries, 10 MW)","type":"generation","voltage_kv":null,"location_ref":"Sherco LDES, Sherburne County, MN","lat":45.374997,"lng":-93.89719,"route":null,"cost_usd":null,"start_date":"2028-05-01","end_date":"2028-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1528. Plant 68988 Sherco LDES (Northern States Power Co - Minnesota), Sherburne County, MN; balancing authority MISO. Planned operation 2028-05.\nGenerator SHB01: 10 MW Batteries; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1303,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"North Star Energy Storage","state":"MN","name":"North Star Energy Storage, LLC (Batteries, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"North Star Energy Storage, LLC, Chisago County, MN","lat":45.480911,"lng":-92.90814,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 786. Plant 70035 North Star Energy Storage, LLC (North Star Energy Storage, LLC), Chisago County, MN; balancing authority MISO. Planned operation 2027-04.\nGenerator NSES: 80 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1357,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Northwestern Energy (mt Hydro)","state":"MT","name":"Hauser (Conventional Hydroelectric, 3.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Hauser, Lewis and Clark County, MT","lat":46.765941,"lng":-111.8873,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1534. Plant 2185 Hauser (NorthWestern Energy (MT Hydro)), Lewis and Clark County, MT; balancing authority NWMT. Planned operation 2028-06.\nGenerator HAU9: 3.5 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1358,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Northwestern Energy (mt Hydro)","state":"MT","name":"Hauser (Conventional Hydroelectric, 3.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Hauser, Lewis and Clark County, MT","lat":46.765941,"lng":-111.8873,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1999. Plant 2185 Hauser (NorthWestern Energy (MT Hydro)), Lewis and Clark County, MT; balancing authority NWMT. Planned operation 2029-12.\nGenerator HAU12: 3.5 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1782,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Northwestern Energy - (sd)","state":"SD","name":"Aberdeen CT (Natural Gas Fired Combustion Turbine, 32 MW)","type":"generation","voltage_kv":null,"location_ref":"Aberdeen CT, Brown County, SD","lat":45.429884,"lng":-98.49396,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 188, 189. Plant 3338 Aberdeen CT (NorthWestern Energy - (SD)), Brown County, SD; balancing authority SWPP. Planned operation 2026-10.\nGenerator 3: 16 MW Natural Gas Fired Combustion Turbine; (V) Under construction, more than 50 percent complete\nGenerator 4: 16 MW Natural Gas Fired Combustion Turbine; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2147,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Notch Peak Solar","state":"UT","name":"Notch Peak Solar LLC (Solar Photovoltaic, 324 MW)","type":"generation","voltage_kv":null,"location_ref":"Notch Peak Solar LLC, Millard County, UT","lat":39.520131,"lng":-112.6602,"route":null,"cost_usd":null,"start_date":"2028-09-01","end_date":"2028-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1662. Plant 64669 Notch Peak Solar LLC (Notch Peak Solar LLC), Millard County, UT; balancing authority LDWP. Planned operation 2028-09.\nGenerator KOV4A: 324 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1304,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Novel Blilie Solar","state":"MN","name":"Novel Blilie Solar LLC (Solar Photovoltaic, 1 MW)","type":"generation","voltage_kv":null,"location_ref":"Novel Blilie Solar LLC, Wilkin County, MN","lat":46.630077,"lng":-96.75811,"route":null,"cost_usd":null,"start_date":"2027-02-01","end_date":"2027-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 650. Plant 64865 Novel Blilie Solar LLC (Novel Blilie Solar, LLC), Wilkin County, MN; balancing authority MISO. Planned operation 2027-02.\nGenerator BLILE: 1 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1305,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Novel Gertken Solar","state":"MN","name":"Novel Gertken Solar LLC (Solar Photovoltaic, 1 MW)","type":"generation","voltage_kv":null,"location_ref":"Novel Gertken Solar LLC, Stearns County, MN","lat":45.618191,"lng":-94.4891,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 152. Plant 69983 Novel Gertken Solar LLC (Novel Gertken Solar LLC), Stearns County, MN; balancing authority MISO. Planned operation 2026-09.\nGenerator GRTKN: 1 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1922,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Nrg Greens Bayou 6","state":"TX","name":"Greens Bayou 6 (Natural Gas Fired Combustion Turbine, 447 MW)","type":"generation","voltage_kv":null,"location_ref":"Greens Bayou 6, Harris County, TX","lat":29.821222,"lng":-95.21786,"route":null,"cost_usd":null,"start_date":"2028-05-01","end_date":"2028-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1531. Plant 69691 Greens Bayou 6 (NRG Greens Bayou 6 LLC), Harris County, TX; balancing authority ERCO. Planned operation 2028-05.\nGenerator 06: 447 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1575,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ny Avoca I","state":"NY","name":"SR 415 - NY Avoca I (Solar Photovoltaic, 3.3 MW)","type":"generation","voltage_kv":null,"location_ref":"SR 415 - NY Avoca I, Steuben County, NY","lat":42.401191,"lng":-77.41787,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 907. Plant 70439 SR 415 - NY Avoca I (NY Avoca I, LLC), Steuben County, NY; balancing authority NYIS. Planned operation 2027-06.\nGenerator PV1: 3.3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1548,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ny Cdg 009","state":"NY","name":"NY CDG 009 (Solar Photovoltaic, 1 MW)","type":"generation","voltage_kv":null,"location_ref":"NY CDG 009, Suffolk County, NY","lat":40.808538,"lng":-72.95773,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 89. Plant 68783 NY CDG 009 (NY CDG 009 LLC), Suffolk County, NY; balancing authority NYIS. Planned operation 2026-09.\nGenerator NY009: 1 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1549,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ny Cdg Genesee 1","state":"NY","name":"NY ELBA 7195 OAK ORCHARD RD - Genesee 1 (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"NY ELBA 7195 OAK ORCHARD RD - Genesee 1, Genesee County, NY","lat":43.064414,"lng":-78.18456,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 476. Plant 67609 NY ELBA 7195 OAK ORCHARD RD - Genesee 1 (NY CDG Genesee 1 LLC), Genesee County, NY; balancing authority NYIS. Planned operation 2026-12.\nGenerator 21599: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1546,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Nyc Energy","state":"NY","name":"NISA Electric Generation Project (Batteries, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"NISA Electric Generation Project, Kings County, NY","lat":40.7065,"lng":-73.9702,"route":null,"cost_usd":null,"start_date":"2028-10-01","end_date":"2028-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1676, 1677. Plant 61331 NISA Electric Generation Project (NYC Energy LLC), Kings County, NY; balancing authority NYIS. Planned operation 2028-10.\nGenerator BA1: 79.9 MW Batteries; (T) Regulatory approvals received. Not under construction\nGenerator BA2: 220.1 MW Batteries; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1502,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ny Fallsburg Ii","state":"NY","name":"Cypert - Fallsburg I (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Cypert - Fallsburg I, Sullivan County, NY","lat":41.783296,"lng":-74.60056,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 900. Plant 70210 Cypert - Fallsburg I (NY Fallsburg II, LLC), Sullivan County, NY; balancing authority NYIS. Planned operation 2027-06.\nGenerator PV1: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1496,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ny Pulteney I","state":"NY","name":"Chidsey Hill Road Solar (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Chidsey Hill Road Solar, Steuben County, NY","lat":42.573062,"lng":-77.16598,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 751. Plant 65828 Chidsey Hill Road Solar (NY Pulteney I, LLC), Steuben County, NY; balancing authority NYIS. Planned operation 2027-04.\nGenerator 1666: 3 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1551,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Nysolar06","state":"NY","name":"NYSolar06 (Solar Photovoltaic, 3.5 MW)","type":"generation","voltage_kv":null,"location_ref":"NYSolar06, Erie County, NY","lat":43.021667,"lng":-78.98806,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 269. Plant 69472 NYSolar06 (NYSolar06, LLC), Erie County, NY; balancing authority NYIS. Planned operation 2026-10.\nGenerator 18198: 3.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1513,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ny Tioga Iv","state":"NY","name":"Glen Mary (Solar Photovoltaic, 3.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Glen Mary, Tioga County, NY","lat":42.128604,"lng":-76.27895,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1344. Plant 68884 Glen Mary (NY Tioga IV, LLC), Tioga County, NY; balancing authority NYIS. Planned operation 2027-12.\nGenerator PV1: 3.4 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1598,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ny Union I","state":"NY","name":"Watson 1 (Solar Photovoltaic, 4.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Watson 1, Broome County, NY","lat":42.124945,"lng":-75.99177,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 771. Plant 68869 Watson 1 (NY Union I, LLC), Broome County, NY; balancing authority NYIS. Planned operation 2027-04.\nGenerator PV1: 4.8 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1599,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ny Union Ii","state":"NY","name":"Watson 2 (Solar Photovoltaic, 4.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Watson 2, Broome County, NY","lat":42.124945,"lng":-75.99177,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 718. Plant 68870 Watson 2 (NY Union II, LLC), Broome County, NY; balancing authority NYIS. Planned operation 2027-03.\nGenerator PV1: 4.9 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2012,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Oakley Bess","state":"TX","name":"Oakley BESS (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Oakley BESS, Denton County, TX","lat":33.41854,"lng":-97.18809,"route":null,"cost_usd":null,"start_date":"2030-12-01","end_date":"2030-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2120. Plant 69637 Oakley BESS (Oakley BESS LLC), Denton County, TX; balancing authority ERCO. Planned operation 2030-12.\nGenerator 28152: 200 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2011,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Oak Valley Solar","state":"TX","name":"Oak Valley Solar (Solar Photovoltaic, 251.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Oak Valley Solar, Ellis County, TX","lat":32.012951,"lng":-96.49974,"route":null,"cost_usd":null,"start_date":"2029-09-01","end_date":"2029-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1978. Plant 69892 Oak Valley Solar (Oak Valley Solar LLC), Ellis County, TX; balancing authority ERCO. Planned operation 2029-09.\nGenerator OAK: 251.3 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2007,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"O'bannion Energy Storage","state":"TX","name":"O'Bannion Energy Storage (Batteries, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"O'Bannion Energy Storage, Jack County, TX","lat":33.041,"lng":-98.339,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1836. Plant 70367 O'Bannion Energy Storage (O'Bannion Energy Storage, LLC), Jack County, TX; balancing authority ERCO. Planned operation 2028-12.\nGenerator OBAES: 300 MW Batteries; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1657,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Obsidian Solar Center","state":"OR","name":"Obsidian Solar Center (Solar Photovoltaic, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"Obsidian Solar Center, Lake County, OR","lat":43.312167,"lng":-120.8218,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1742. Plant 63488 Obsidian Solar Center (Obsidian Solar Center LLC), Lake County, OR; balancing authority BPAT. Planned operation 2028-12.\nGenerator OBSLR: 400 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2010,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Oci Energy","state":"TX","name":"OCI SunRoper (Solar Photovoltaic, 260 MW)","type":"generation","voltage_kv":null,"location_ref":"OCI SunRoper, Wharton County, TX","lat":29.240399,"lng":-96.01154,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1242. Plant 65893 OCI SunRoper (OCI Energy LLC), Wharton County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator OCIRO: 260 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":953,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Oglethorpe Power","state":"GA","name":"Smarr Combined Cycle Energy Facility (Natural Gas Fired Combined Cycle, 804 MW)","type":"generation","voltage_kv":null,"location_ref":"Smarr Combined Cycle Energy Facility, Monroe County, GA","lat":32.975936,"lng":-83.84369,"route":null,"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1916, 1917. Plant 68546 Smarr Combined Cycle Energy Facility (Oglethorpe Power Corporation), Monroe County, GA; balancing authority SOCO. Planned operation 2029-06.\nGenerator 1: 459 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator 2: 345 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":955,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Oglethorpe Power","state":"GA","name":"Talbot County Energy (Natural Gas Fired Combustion Turbine, 262 MW)","type":"generation","voltage_kv":null,"location_ref":"Talbot County Energy, Talbot County, GA","lat":32.5892,"lng":-84.6917,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1839. Plant 7916 Talbot County Energy (Oglethorpe Power Corporation), Talbot County, GA; balancing authority SOCO. Planned operation 2029-01.\nGenerator 7: 262 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2254,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ohio Power and Light","state":"WV","name":"R.C. Byrd L&D Hydroelectric Project (Conventional Hydroelectric, 28.8 MW)","type":"generation","voltage_kv":null,"location_ref":"R.C. Byrd L&D Hydroelectric Project, Mason County, WV","lat":38.68,"lng":-82.179,"route":null,"cost_usd":null,"start_date":"2029-02-01","end_date":"2029-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1860, 1861, 1862, 1863, 1864, 1865. Plant 69704 R.C. Byrd L&D Hydroelectric Project (Ohio Power and Light LLC), Mason County, WV; balancing authority PJM. Planned operation 2029-02.\nGenerator RC-1: 4.8 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator RC-2: 4.8 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator RC-3: 4.8 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator RC-4: 4.8 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator RC-5: 4.8 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator RC-6: 4.8 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1637,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Oklahoma Gas & Electric","state":"OK","name":"Horseshoe Lake (Natural Gas Fired Combustion Turbine, 448 MW)","type":"generation","voltage_kv":null,"location_ref":"Horseshoe Lake, Oklahoma County, OK","lat":35.50866,"lng":-97.17969,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 186, 187. Plant 2951 Horseshoe Lake (Oklahoma Gas & Electric Co), Oklahoma County, OK; balancing authority SWPP. Planned operation 2026-10.\nGenerator 11: 224 MW Natural Gas Fired Combustion Turbine; (TS) Construction complete, but not yet in commercial operation\nGenerator 12: 224 MW Natural Gas Fired Combustion Turbine; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1638,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Oklahoma Gas & Electric","state":"OK","name":"Horseshoe Lake (Natural Gas Fired Combustion Turbine, 448 MW)","type":"generation","voltage_kv":null,"location_ref":"Horseshoe Lake, Oklahoma County, OK","lat":35.50866,"lng":-97.17969,"route":null,"cost_usd":null,"start_date":"2029-02-01","end_date":"2029-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1847, 1848. Plant 2951 Horseshoe Lake (Oklahoma Gas & Electric Co), Oklahoma County, OK; balancing authority SWPP. Planned operation 2029-02.\nGenerator 13: 224 MW Natural Gas Fired Combustion Turbine; (T) Regulatory approvals received. Not under construction\nGenerator 14: 224 MW Natural Gas Fired Combustion Turbine; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1344,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Okolona Solar","state":"MS","name":"Okolona Solar (Solar Photovoltaic, 145 MW)","type":"generation","voltage_kv":null,"location_ref":"Okolona Solar, Henderson County, MS","lat":37.693,"lng":-87.549,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1343. Plant 68876 Okolona Solar (Okolona Solar, LLC), Henderson County, MS; balancing authority MISO. Planned operation 2027-12.\nGenerator 6339: 145 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1345,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Okolona Solar","state":"MS","name":"Okolona Solar (Batteries, 145 MW)","type":"generation","voltage_kv":null,"location_ref":"Okolona Solar, Henderson County, MS","lat":37.693,"lng":-87.549,"route":null,"cost_usd":null,"start_date":"2028-08-01","end_date":"2028-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1640. Plant 68876 Okolona Solar (Okolona Solar, LLC), Henderson County, MS; balancing authority MISO. Planned operation 2028-08.\nGenerator 6340: 145 MW Batteries; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1071,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Old Town Wind","state":"IL","name":"Old Town Wind (Onshore Wind Turbine, 178 MW)","type":"generation","voltage_kv":null,"location_ref":"Old Town Wind, Marshall County, IL","lat":40.988976,"lng":-89.17326,"route":null,"cost_usd":null,"start_date":"2029-10-01","end_date":"2029-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1989. Plant 68413 Old Town Wind (Old Town Wind LLC), Marshall County, IL; balancing authority MISO. Planned operation 2029-10.\nGenerator OT: 178 MW Onshore Wind Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1413,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Omaha Public Power District","state":"NE","name":"Cass County (Natural Gas Fired Combustion Turbine, 792 MW)","type":"generation","voltage_kv":null,"location_ref":"Cass County, Cass County, NE","lat":40.947913,"lng":-95.96403,"route":null,"cost_usd":null,"start_date":"2029-02-01","end_date":"2029-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1849, 1850, 1851. Plant 55972 Cass County (Omaha Public Power District), Cass County, NE; balancing authority SWPP. Planned operation 2029-02.\nGenerator CT-3: 264 MW Natural Gas Fired Combustion Turbine; (T) Regulatory approvals received. Not under construction\nGenerator CT-4: 264 MW Natural Gas Fired Combustion Turbine; (T) Regulatory approvals received. Not under construction\nGenerator CT-5: 264 MW Natural Gas Fired Combustion Turbine; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1420,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Omaha Public Power District","state":"NE","name":"Turtle Creek (Natural Gas Fired Combustion Turbine, 264 MW)","type":"generation","voltage_kv":null,"location_ref":"Turtle Creek, Sarpy County, NE","lat":41.092238,"lng":-96.16831,"route":null,"cost_usd":null,"start_date":"2028-08-01","end_date":"2028-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1631. Plant 64547 Turtle Creek (Omaha Public Power District), Sarpy County, NE; balancing authority SWPP. Planned operation 2028-08.\nGenerator 3: 264 MW Natural Gas Fired Combustion Turbine; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":977,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Oneenergy","state":"IA","name":"Teeple Creek (Solar Photovoltaic, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Teeple Creek, Allamakee County, IA","lat":43.234672,"lng":-91.50468,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 575. Plant 69940 Teeple Creek (OneEnergy, Inc.), Allamakee County, IA; balancing authority MISO. Planned operation 2026-12.\nGenerator TEEPL: 2.5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1298,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Oneenergy","state":"MN","name":"Kalmar (Solar Photovoltaic, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Kalmar, Olmsted County, MN","lat":44.024642,"lng":-92.578,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 412. Plant 69936 Kalmar (OneEnergy, Inc.), Olmsted County, MN; balancing authority MISO. Planned operation 2026-11.\nGenerator KALMR: 2.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1308,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Oneenergy","state":"MN","name":"Ringe (Solar Photovoltaic, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Ringe, Olmsted County, MN","lat":44.107842,"lng":-92.40043,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 295. Plant 69938 Ringe (OneEnergy, Inc.), Olmsted County, MN; balancing authority MISO. Planned operation 2026-10.\nGenerator RINGE: 2.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2223,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Oneenergy","state":"WI","name":"Bjorn (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Bjorn, Barron County, WI","lat":45.395931,"lng":-91.881,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 410. Plant 69931 Bjorn (OneEnergy, Inc.), Barron County, WI; balancing authority MISO. Planned operation 2026-11.\nGenerator BJORN: 5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2224,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Oneenergy","state":"WI","name":"Castle Rock Lake Solar (Solar Photovoltaic, 4.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Castle Rock Lake Solar, Juneau County, WI","lat":43.972048,"lng":-90.06761,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 292. Plant 69932 Castle Rock Lake Solar (OneEnergy, Inc.), Juneau County, WI; balancing authority MISO. Planned operation 2026-10.\nGenerator CSTLO: 4.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2226,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Oneenergy","state":"WI","name":"Clark Solar-Longwood (Solar Photovoltaic, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Clark Solar-Longwood, Clark County, WI","lat":44.928616,"lng":-90.65894,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 293. Plant 69933 Clark Solar-Longwood (OneEnergy, Inc.), Clark County, WI; balancing authority MISO. Planned operation 2026-10.\nGenerator CLARK: 2.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2230,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Oneenergy","state":"WI","name":"Falun (Solar Photovoltaic, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Falun, Burnett County, WI","lat":45.779061,"lng":-92.5306,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 574. Plant 69934 Falun (OneEnergy, Inc.), Burnett County, WI; balancing authority MISO. Planned operation 2026-12.\nGenerator FALUN: 2.5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2232,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Oneenergy","state":"WI","name":"Gilman (Solar Photovoltaic, 3.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Gilman, Chippewa County, WI","lat":45.119204,"lng":-90.87405,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 411. Plant 69935 Gilman (OneEnergy, Inc.), Chippewa County, WI; balancing authority MISO. Planned operation 2026-11.\nGenerator GILMN: 3.8 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2235,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Oneenergy","state":"WI","name":"Mondovi (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Mondovi, Buffalo County, WI","lat":44.569282,"lng":-91.70856,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 294. Plant 69937 Mondovi (OneEnergy, Inc.), Buffalo County, WI; balancing authority MISO. Planned operation 2026-10.\nGenerator MNDVI: 3 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2240,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Oneenergy","state":"WI","name":"Spooner (Solar Photovoltaic, 2.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Spooner, Washburn County, WI","lat":45.84628,"lng":-91.8634,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 296. Plant 69939 Spooner (OneEnergy, Inc.), Washburn County, WI; balancing authority MISO. Planned operation 2026-10.\nGenerator SPOON: 2.3 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1873,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"On Energy Storage","state":"TX","name":"Colorado Clean Energy Center (BESS) (Batteries, 10.1 MW)","type":"generation","voltage_kv":null,"location_ref":"Colorado Clean Energy Center (BESS), Colorado County, TX","lat":29.649,"lng":-96.51519,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 559. Plant 69864 Colorado Clean Energy Center (BESS) (On Energy Storage), Colorado County, TX; balancing authority ERCO. Planned operation 2026-12.\nGenerator COBA1: 10.1 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1874,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"On Energy Storage","state":"TX","name":"Columbus Clean Energy Center (BESS) (Batteries, 10.1 MW)","type":"generation","voltage_kv":null,"location_ref":"Columbus Clean Energy Center (BESS), Colorado County, TX","lat":29.6789,"lng":-96.53042,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 406. Plant 69865 Columbus Clean Energy Center (BESS) (On Energy Storage), Colorado County, TX; balancing authority ERCO. Planned operation 2026-11.\nGenerator CLBA1: 10.1 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1987,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"On Energy Storage","state":"TX","name":"Matagorda Clean Energy Center (BESS) (Batteries, 10.1 MW)","type":"generation","voltage_kv":null,"location_ref":"Matagorda Clean Energy Center (BESS), Matagorda County, TX","lat":28.99489,"lng":-96.12536,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 560. Plant 69866 Matagorda Clean Energy Center (BESS) (On Energy Storage), Matagorda County, TX; balancing authority ERCO. Planned operation 2026-12.\nGenerator MGBA1: 10.1 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1991,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"On Energy Storage","state":"TX","name":"Mesquite Clean Energy Center (BESS) (Batteries, 10.1 MW)","type":"generation","voltage_kv":null,"location_ref":"Mesquite Clean Energy Center (BESS), Cameron County, TX","lat":26.098447,"lng":-97.82261,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 125. Plant 69457 Mesquite Clean Energy Center (BESS) (On Energy Storage), Cameron County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator MEBA1: 10.1 MW Batteries; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":790,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Organic Energy Solutions","state":"CA","name":"OES Biogas Power (Other Waste Biomass, 2.6 MW)","type":"generation","voltage_kv":null,"location_ref":"OES Biogas Power, San Bernardino County, CA","lat":34.17325,"lng":-117.3464,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 332, 333. Plant 63622 OES Biogas Power (Organic Energy Solutions, Inc.), San Bernardino County, CA; balancing authority CISO. Planned operation 2026-11.\nGenerator OES01: 1.3 MW Other Waste Biomass; (TS) Construction complete, but not yet in commercial operation\nGenerator OES02: 1.3 MW Other Waste Biomass; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":723,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Origis Energy Usa","state":"CA","name":"Chalan (Batteries, Solar Photovoltaic, 89.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Chalan, Kern County, CA","lat":35.7803,"lng":-119.911,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 505, 506. Plant 68672 Chalan (Origis Energy USA, Inc), Kern County, CA; balancing authority CISO. Planned operation 2026-12.\nGenerator CHA_B: 25 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator OECHA: 64.9 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":817,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Origis Energy Usa","state":"CA","name":"Sand Luis West (Batteries, Solar Photovoltaic, 156.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Sand Luis West, Fresno County, CA","lat":36.1676,"lng":-120.054,"route":null,"cost_usd":null,"start_date":"2028-11-01","end_date":"2028-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1726, 1727. Plant 68673 Sand Luis West (Origis Energy USA, Inc), Fresno County, CA; balancing authority CISO. Planned operation 2028-11.\nGenerator OESLW: 125 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction\nGenerator SLW_S: 31.3 MW Batteries; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1332,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Origis Energy Usa","state":"MS","name":"Covington (MS) (Solar Photovoltaic, 96 MW)","type":"generation","voltage_kv":null,"location_ref":"Covington (MS), Covington County, MS","lat":31.4395,"lng":-89.4846,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1456. Plant 65293 Covington (MS) (Origis Energy USA, Inc), Covington County, MS; balancing authority MISO. Planned operation 2028-03.\nGenerator OEMS4: 96 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2061,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Origis Energy Usa","state":"TX","name":"Rockhound A (Solar Photovoltaic, 245 MW)","type":"generation","voltage_kv":null,"location_ref":"Rockhound A, Ector County, TX","lat":31.723088,"lng":-102.5196,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 85. Plant 68592 Rockhound A (Origis Energy USA, Inc), Ector County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator OERHA: 245 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2062,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Origis Energy Usa","state":"TX","name":"Rockhound C (Solar Photovoltaic, 61 MW)","type":"generation","voltage_kv":null,"location_ref":"Rockhound C, Ector County, TX","lat":31.723088,"lng":-102.5196,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 86. Plant 68593 Rockhound C (Origis Energy USA, Inc), Ector County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator OERHC: 61 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2063,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Origis Energy Usa","state":"TX","name":"Rockhound D (Solar Photovoltaic, 28 MW)","type":"generation","voltage_kv":null,"location_ref":"Rockhound D, Ector County, TX","lat":31.6859,"lng":-102.518,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 87. Plant 68594 Rockhound D (Origis Energy USA, Inc), Ector County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator OERHD: 28 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1469,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ormat Nevada","state":"NV","name":"McGinness Hills 3 (Solar Photovoltaic, 14 MW)","type":"generation","voltage_kv":null,"location_ref":"McGinness Hills 3, Lander County, NV","lat":39.5963,"lng":-116.8942,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 609. Plant 61912 McGinness Hills 3 (Ormat Nevada Inc), Lander County, NV; balancing authority NEVP. Planned operation 2027-01.\nGenerator MHSOL: 14 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1588,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Orsted Wind Power North America","state":"NY","name":"Sunrise Wind (Offshore Wind Turbine, 924 MW)","type":"generation","voltage_kv":null,"location_ref":"Sunrise Wind, Suffolk County, NY","lat":40.977859,"lng":-71.04454,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1080. Plant 67435 Sunrise Wind (Orsted Wind Power North America LLC), Suffolk County, NY; balancing authority NYIS. Planned operation 2027-10.\nGenerator SRWND: 924 MW Offshore Wind Turbine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1753,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Orsted Wind Power North America","state":"RI","name":"Revolution Wind (Offshore Wind Turbine, 715 MW)","type":"generation","voltage_kv":null,"location_ref":"Revolution Wind, Washington County, RI","lat":41.15217,"lng":-71.07783,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 335. Plant 65500 Revolution Wind (Orsted Wind Power North America LLC), Washington County, RI; balancing authority ISNE. Planned operation 2026-11.\nGenerator REVWD: 715 MW Offshore Wind Turbine; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1445,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Oso Negro","state":"NM","name":"Oso Negro (Batteries, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Oso Negro, Bernalillo County, NM","lat":35.111657,"lng":-106.7205,"route":null,"cost_usd":null,"start_date":"2028-05-01","end_date":"2028-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1532. Plant 69973 Oso Negro (Oso Negro, LLC), Bernalillo County, NM; balancing authority PNM. Planned operation 2028-05.\nGenerator OSON1: 100 MW Batteries; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1312,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Otter Tail Power","state":"MN","name":"Solway Solar (Solar Photovoltaic, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"Solway Solar, Beltrami County, MN","lat":47.546501,"lng":-95.13,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 497. Plant 68340 Solway Solar (Otter Tail Power Co), Beltrami County, MN; balancing authority MISO. Planned operation 2026-12.\nGenerator 1: 50 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1403,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Otter Tail Power","state":"ND","name":"Abercrombie Solar (Solar Photovoltaic, 295.1 MW)","type":"generation","voltage_kv":null,"location_ref":"Abercrombie Solar, Richland County, ND","lat":46.4277,"lng":-96.8259,"route":null,"cost_usd":null,"start_date":"2028-08-01","end_date":"2028-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1637. Plant 68339 Abercrombie Solar (Otter Tail Power Co), Richland County, ND; balancing authority MISO. Planned operation 2028-08.\nGenerator 1: 295.1 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":791,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Overnight Solar","state":"CA","name":"Overnight Solar (Batteries, Solar Photovoltaic, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Overnight Solar, San Bernardino County, CA","lat":35.016197,"lng":-117.357,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 631, 632. Plant 68932 Overnight Solar (Overnight Solar LLC), San Bernardino County, CA; balancing authority CISO. Planned operation 2027-01.\nGenerator OSBA: 150 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator OSPV: 150 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":710,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pacifico Bakersfield Driver","state":"CA","name":"Bakersfield Driver (Batteries, Solar Photovoltaic, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"Bakersfield Driver, Kern County, CA","lat":35.562181,"lng":-119.202,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 175, 176. Plant 70428 Bakersfield Driver (Pacifico Bakersfield Driver LLC), Kern County, CA; balancing authority CISO. Planned operation 2026-09.\nGenerator DRIVB: 0.3 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator DRIVS: 1.7 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":978,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pacificorp","state":"ID","name":"Arco Wind and Solar Project (Onshore Wind Turbine, 153 MW)","type":"generation","voltage_kv":null,"location_ref":"Arco Wind and Solar Project, Bonneville County, ID","lat":43.557,"lng":-112.4415,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1256. Plant 66651 Arco Wind and Solar Project (PacifiCorp), Bonneville County, ID; balancing authority PACE. Planned operation 2027-12.\nGenerator 37565: 153 MW Onshore Wind Turbine; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":979,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pacificorp","state":"ID","name":"Arco Wind and Solar Project (Onshore Wind Turbine, 206 MW)","type":"generation","voltage_kv":null,"location_ref":"Arco Wind and Solar Project, Bonneville County, ID","lat":43.557,"lng":-112.4415,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1762. Plant 66651 Arco Wind and Solar Project (PacifiCorp), Bonneville County, ID; balancing authority PACE. Planned operation 2028-12.\nGenerator C2-92: 206 MW Onshore Wind Turbine; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1656,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pacificorp","state":"OR","name":"OIT BESS (Batteries, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"OIT BESS, Klamath County, OR","lat":42.259366,"lng":-121.7864,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1282. Plant 67741 OIT BESS (PacifiCorp), Klamath County, OR; balancing authority PACW. Planned operation 2027-12.\nGenerator I: 2 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2017,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Padua 3","state":"TX","name":"Padua 3 (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Padua 3, Bexar County, TX","lat":29.325064,"lng":-98.32562,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 243. Plant 68914 Padua 3 (Padua 3), Bexar County, TX; balancing authority ERCO. Planned operation 2026-10.\nGenerator 12343: 200 MW Batteries; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2019,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Palo Duro Energy Center","state":"TX","name":"Palo Duro Energy Storage II (Batteries, 165.7 MW)","type":"generation","voltage_kv":null,"location_ref":"Palo Duro Energy Storage II, Ochiltree County, TX","lat":36.410697,"lng":-101.0149,"route":null,"cost_usd":null,"start_date":"2029-05-01","end_date":"2029-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1899. Plant 70441 Palo Duro Energy Storage II (Palo Duro Energy Center, LLC), Ochiltree County, TX; balancing authority SWPP. Planned operation 2029-05.\nGenerator PALO2: 165.7 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2018,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Palo Duro Energy Storage","state":"TX","name":"Palo Duro Energy Storage (Batteries, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Palo Duro Energy Storage, Ochiltree County, TX","lat":36.4106,"lng":-101.0102,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1164. Plant 70199 Palo Duro Energy Storage (Palo Duro Energy Storage, LLC), Ochiltree County, TX; balancing authority SWPP. Planned operation 2027-11.\nGenerator PALO1: 150 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1620,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Palomino Solar","state":"OH","name":"Palomino Solar (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Palomino Solar, Highland County, OH","lat":39.2158,"lng":-83.7771,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 917. Plant 63784 Palomino Solar (Palomino Solar, LLC), Highland County, OH; balancing authority PJM. Planned operation 2027-07.\nGenerator PLMNO: 200 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2020,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pamela Heights I Energy Center","state":"TX","name":"Pamela Heights I Energy Center (Batteries, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Pamela Heights I Energy Center, Harris County, TX","lat":29.645345,"lng":-95.45021,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 634. Plant 69393 Pamela Heights I Energy Center (Pamela Heights I Energy Center LLC), Harris County, TX; balancing authority ERCO. Planned operation 2027-01.\nGenerator PHIEC: 100 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1641,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Panhandle Solar","state":"OK","name":"Panhandle Solar (Solar Photovoltaic, 102 MW)","type":"generation","voltage_kv":null,"location_ref":"Panhandle Solar, Texas County, OK","lat":36.609029,"lng":-101.4743,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 581. Plant 69969 Panhandle Solar (Panhandle Solar, LLC), Texas County, OK; balancing authority SWPP. Planned operation 2026-12.\nGenerator PAS: 102 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":764,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Panoche Bess","state":"CA","name":"Iron BESS (Batteries, 59.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Iron BESS, Fresno County, CA","lat":36.652653,"lng":-120.5783,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 773. Plant 68924 Iron BESS (Panoche BESS LLC), Fresno County, CA; balancing authority CISO. Planned operation 2027-04.\nGenerator IROB: 59.5 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1075,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Panther Grove 2","state":"IL","name":"Panther Grove 2 (Onshore Wind Turbine, 472.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Panther Grove 2, Livingston County, IL","lat":40.815283,"lng":-88.86191,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1361. Plant 69690 Panther Grove 2 (Panther Grove 2 LLC), Livingston County, IL; balancing authority PJM. Planned operation 2027-12.\nGenerator PG2: 472.5 MW Onshore Wind Turbine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1076,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Panther Grove Wind","state":"IL","name":"Panther Grove Wind, LLC (Onshore Wind Turbine, 423 MW)","type":"generation","voltage_kv":null,"location_ref":"Panther Grove Wind, LLC, Woodford County, IL","lat":40.7129,"lng":-89.1706,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 446. Plant 63818 Panther Grove Wind, LLC (Panther Grove Wind, LLC), Woodford County, IL; balancing authority PJM. Planned operation 2026-12.\nGenerator 78787: 423 MW Onshore Wind Turbine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2253,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Parks Valley Energy","state":"WV","name":"Parks Valley Energy LLC (Batteries, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Parks Valley Energy LLC, Hampshire County, WV","lat":39.288816,"lng":-78.47481,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1286. Plant 67874 Parks Valley Energy LLC (Parks Valley Energy LLC), Hampshire County, WV; balancing authority PJM. Planned operation 2027-12.\nGenerator ENX32: 150 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1823,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Parliament Energy Holdings","state":"TX","name":"Banita Creek- Spindlepop Solar (Batteries, 302.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Banita Creek- Spindlepop Solar, Nacogdoches County, TX","lat":31.5552,"lng":-94.7919,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 752. Plant 65853 Banita Creek- Spindlepop Solar (Parliament Energy Holdings LLC), Nacogdoches County, TX; balancing authority ERCO. Planned operation 2027-04.\nGenerator MIDBS: 302.9 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1824,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Parliament Energy Holdings","state":"TX","name":"Banita Creek- Spindlepop Solar (Solar Photovoltaic, 371 MW)","type":"generation","voltage_kv":null,"location_ref":"Banita Creek- Spindlepop Solar, Nacogdoches County, TX","lat":31.5552,"lng":-94.7919,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1539. Plant 65853 Banita Creek- Spindlepop Solar (Parliament Energy Holdings LLC), Nacogdoches County, TX; balancing authority ERCO. Planned operation 2028-06.\nGenerator MIDPV: 371 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1941,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Parliament Energy Holdings","state":"TX","name":"Hollow Branch Creek (Solar Photovoltaic, 460 MW)","type":"generation","voltage_kv":null,"location_ref":"Hollow Branch Creek, Madison County, TX","lat":31.061726,"lng":-96.05606,"route":null,"cost_usd":null,"start_date":"2027-08-01","end_date":"2027-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 971. Plant 65851 Hollow Branch Creek (Parliament Energy Holdings LLC), Madison County, TX; balancing authority ERCO. Planned operation 2027-08.\nGenerator HB2PV: 460 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2066,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Parliament Energy Holdings","state":"TX","name":"Rowdy Creek Solar and BESS (Batteries, 350 MW)","type":"generation","voltage_kv":null,"location_ref":"Rowdy Creek Solar and BESS, Lamar County, TX","lat":33.75694,"lng":-95.6458,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 809. Plant 65854 Rowdy Creek Solar and BESS (Parliament Energy Holdings LLC), Lamar County, TX; balancing authority ERCO. Planned operation 2027-05.\nGenerator RDYBS: 350 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2067,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Parliament Energy Holdings","state":"TX","name":"Rowdy Creek Solar and BESS (Solar Photovoltaic, 455 MW)","type":"generation","voltage_kv":null,"location_ref":"Rowdy Creek Solar and BESS, Lamar County, TX","lat":33.75694,"lng":-95.6458,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1540. Plant 65854 Rowdy Creek Solar and BESS (Parliament Energy Holdings LLC), Lamar County, TX; balancing authority ERCO. Planned operation 2028-06.\nGenerator RDYPV: 455 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2100,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Parliament Energy Holdings","state":"TX","name":"Tehuacana Creek Solar (Batteries, 418 MW)","type":"generation","voltage_kv":null,"location_ref":"Tehuacana Creek Solar, Navarro County, TX","lat":31.914062,"lng":-96.41347,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 463. Plant 65855 Tehuacana Creek Solar (Parliament Energy Holdings LLC), Navarro County, TX; balancing authority ERCO. Planned operation 2026-12.\nGenerator TE1BS: 418 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2101,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Parliament Energy Holdings","state":"TX","name":"Tehuacana Creek Solar (Solar Photovoltaic, 644.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Tehuacana Creek Solar, Navarro County, TX","lat":31.914062,"lng":-96.41347,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 810. Plant 65855 Tehuacana Creek Solar (Parliament Energy Holdings LLC), Navarro County, TX; balancing authority ERCO. Planned operation 2027-05.\nGenerator TE1PV: 644.8 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":928,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pasco County - (fl)","state":"FL","name":"Pasco Cnty Solid Waste Resource Recovery (Municipal Solid Waste, 17 MW)","type":"generation","voltage_kv":null,"location_ref":"Pasco Cnty Solid Waste Resource Recovery, Pasco County, FL","lat":28.3681,"lng":-82.5583,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 749. Plant 50666 Pasco Cnty Solid Waste Resource Recovery (Pasco County - (FL)), Pasco County, FL; balancing authority FPC. Planned operation 2027-04.\nGenerator GEN2: 17 MW Municipal Solid Waste; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1035,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pattern Operators Lp","state":"IL","name":"Heritage Prairie Solar LLC (Solar Photovoltaic, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Heritage Prairie Solar LLC, Kankakee County, IL","lat":41.06713,"lng":-88.2497,"route":null,"cost_usd":null,"start_date":"2028-09-01","end_date":"2028-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1675. Plant 69763 Heritage Prairie Solar LLC (Pattern Operators LP), Kankakee County, IL; balancing authority PJM. Planned operation 2028-09.\nGenerator HPS: 300 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1043,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pattern Operators Lp","state":"IL","name":"Illinois Generation LLC (Onshore Wind Turbine, 616.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Illinois Generation LLC, Livingston County, IL","lat":41.06713,"lng":-88.2497,"route":null,"cost_usd":null,"start_date":"2028-04-01","end_date":"2028-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1510. Plant 69764 Illinois Generation LLC (Pattern Operators LP), Livingston County, IL; balancing authority PJM. Planned operation 2028-04.\nGenerator HPW: 616.5 MW Onshore Wind Turbine; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":943,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Peach Woodsolar","state":"GA","name":"Peach Wood Solar (Solar Photovoltaic, 261 MW)","type":"generation","voltage_kv":null,"location_ref":"Peach Wood Solar, Mitchell County, GA","lat":31.343419,"lng":-84.21269,"route":null,"cost_usd":null,"start_date":"2030-12-01","end_date":"2030-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2119. Plant 69635 Peach Wood Solar (Peach WoodSolar LLC), Mitchell County, GA; balancing authority SOCO. Planned operation 2030-12.\nGenerator 74964: 261 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2022,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pease River Solar","state":"TX","name":"Pease River Solar (Solar Photovoltaic, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Pease River Solar, Foard County, TX","lat":33.991957,"lng":-99.69277,"route":null,"cost_usd":null,"start_date":"2030-12-01","end_date":"2030-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2125. Plant 69644 Pease River Solar (Pease River Solar LLC), Foard County, TX; balancing authority ERCO. Planned operation 2030-12.\nGenerator 58441: 300 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":794,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pelicans Jaw Solar","state":"CA","name":"Pelicans Jaw Hybrid Solar (Batteries, Solar Photovoltaic, 678.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Pelicans Jaw Hybrid Solar, Kern County, CA","lat":35.765183,"lng":-119.7436,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 766, 767. Plant 68607 Pelicans Jaw Hybrid Solar (Pelicans Jaw Solar LLC), Kern County, CA; balancing authority CISO. Planned operation 2027-04.\nGenerator PJBS1: 238.5 MW Batteries; (TS) Construction complete, but not yet in commercial operation\nGenerator PLJW1: 440 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2026,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pepper Solar Farm","state":"TX","name":"Pepper Solar Farm (Solar Photovoltaic, 120 MW)","type":"generation","voltage_kv":null,"location_ref":"Pepper Solar Farm, McLennan County, TX","lat":31.678359,"lng":-97.04595,"route":null,"cost_usd":null,"start_date":"2027-08-01","end_date":"2027-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 975. Plant 68359 Pepper Solar Farm (Pepper Solar Farm, LLC), McLennan County, TX; balancing authority ERCO. Planned operation 2027-08.\nGenerator OCPSF: 120 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2116,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Permian Power I","state":"TX","name":"Vast Sands Power (Natural Gas Fired Combustion Turbine, 880 MW)","type":"generation","voltage_kv":null,"location_ref":"Vast Sands Power, Ward County, TX","lat":31.584096,"lng":-102.958,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 830, 831. Plant 69689 Vast Sands Power (Permian Power I LLC), Ward County, TX; balancing authority ERCO. Planned operation 2027-05.\nGenerator CT11: 440 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete\nGenerator CT12: 440 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1556,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pescara 1 Solar","state":"NY","name":"Pescara 1 (Solar Photovoltaic, 4.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Pescara 1, Orleans County, NY","lat":43.304517,"lng":-78.2196,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 155. Plant 70010 Pescara 1 (Pescara 1 Solar LLC), Orleans County, NY; balancing authority NYIS. Planned operation 2026-09.\nGenerator 167: 4.9 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1557,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pescara 2 Solar","state":"NY","name":"Pescara 2 (Solar Photovoltaic, 4.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Pescara 2, Orleans County, NY","lat":43.30713,"lng":-78.22121,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 156. Plant 70011 Pescara 2 (Pescara 2 Solar LLC), Orleans County, NY; balancing authority NYIS. Planned operation 2026-09.\nGenerator 168: 4.9 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1737,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pf Onsite Generation","state":"PA","name":"PF Onsite BESS (Batteries, 21 MW)","type":"generation","voltage_kv":null,"location_ref":"PF Onsite BESS, Luzerne County, PA","lat":40.918616,"lng":-76.07934,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 901. Plant 70240 PF Onsite BESS (PF Onsite Generation LLC), Luzerne County, PA; balancing authority PJM. Planned operation 2027-06.\nGenerator PFNON: 21 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2027,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Piedra Solar","state":"TX","name":"Piedra Solar (Solar Photovoltaic, 280 MW)","type":"generation","voltage_kv":null,"location_ref":"Piedra Solar, Freestone County, TX","lat":31.648989,"lng":-96.34517,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 536. Plant 69496 Piedra Solar (Piedra Solar, LLC), Freestone County, TX; balancing authority ERCO. Planned operation 2026-12.\nGenerator PDRA: 280 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2182,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pigeon Run Solar","state":"VA","name":"Pigeon Run Solar Project (Solar Photovoltaic, 60 MW)","type":"generation","voltage_kv":null,"location_ref":"Pigeon Run Solar Project, Campbell County, VA","lat":37.158473,"lng":-79.05564,"route":null,"cost_usd":null,"start_date":"2029-07-01","end_date":"2029-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1941. Plant 64767 Pigeon Run Solar Project (Pigeon Run Solar, LLC), Campbell County, VA; balancing authority PJM. Planned operation 2029-07.\nGenerator TC001: 60 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1621,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pike Island Hydropower","state":"OH","name":"Pike Island Hydroelectric Project (Conventional Hydroelectric, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"Pike Island Hydroelectric Project, Jefferson County, OH","lat":40.151,"lng":-80.70569,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1843, 1844. Plant 69702 Pike Island Hydroelectric Project (Pike Island Hydropower Corporation), Jefferson County, OH; balancing authority PJM. Planned operation 2029-01.\nGenerator PI-1: 10 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction\nGenerator PI-2: 10 MW Conventional Hydroelectric; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1074,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pike Solar","state":"IL","name":"PIKE Solar (Solar Photovoltaic, 18 MW)","type":"generation","voltage_kv":null,"location_ref":"PIKE Solar, Fayette County, IL","lat":38.9577,"lng":-89.169,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 420. Plant 70108 PIKE Solar (Pike Solar, LLC), Fayette County, IL; balancing authority MISO. Planned operation 2026-11.\nGenerator PIKE: 18 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2028,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pine Forest Solar I","state":"TX","name":"Pine Forest Solar I (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Pine Forest Solar I, Hopkins County, TX","lat":33.100779,"lng":-95.39229,"route":null,"cost_usd":null,"start_date":"2027-08-01","end_date":"2027-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 977. Plant 68906 Pine Forest Solar I (Pine Forest Solar I, LLC), Hopkins County, TX; balancing authority DOPD. Planned operation 2027-08.\nGenerator PFBA2: 200 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2029,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Piney Woods Solar","state":"TX","name":"Piney Woods Solar (Solar Photovoltaic, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Piney Woods Solar, Walker County, TX","lat":30.718683,"lng":-95.66965,"route":null,"cost_usd":null,"start_date":"2027-02-01","end_date":"2027-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 653. Plant 67995 Piney Woods Solar (Piney Woods Solar, LLC), Walker County, TX; balancing authority MISO. Planned operation 2027-02.\nGenerator PWS: 150 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1771,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pinopolis Bess","state":"SC","name":"Pinopolis BESS (Batteries, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Pinopolis BESS, Berkeley County, SC","lat":33.246764,"lng":-79.98517,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1059. Plant 70020 Pinopolis BESS (Pinopolis BESS LLC), Berkeley County, SC; balancing authority SC. Planned operation 2027-09.\nGenerator 1: 300 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":798,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pittsburg Rv & Boat Storage","state":"CA","name":"Pittsburg RV Solar (Solar Photovoltaic, 2.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Pittsburg RV Solar, Contra Costa County, CA","lat":38.01155,"lng":-121.8453,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 479. Plant 67770 Pittsburg RV Solar (Pittsburg RV & Boat Storage, LLC), Contra Costa County, CA; balancing authority CISO. Planned operation 2026-12.\nGenerator 30200: 2.8 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":799,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"CA","name":"Pivot Energy PPA 29 LLC (Batteries, Solar Photovoltaic, 2.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Pivot Energy PPA 29 LLC, Placer County, CA","lat":38.828466,"lng":-121.3049,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 417, 418. Plant 70101 Pivot Energy PPA 29 LLC (Pivot Energy), Placer County, CA; balancing authority CISO. Planned operation 2026-11.\nGenerator PA29B: 0.1 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator PPA29: 2.2 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":862,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"CO","name":"Pivot Solar 33 LLC (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Pivot Solar 33 LLC, Weld County, CO","lat":40.32508,"lng":-104.731,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 642. Plant 70102 Pivot Solar 33 LLC (Pivot Energy), Weld County, CO; balancing authority PSCO. Planned operation 2027-01.\nGenerator PS33: 5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":863,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"CO","name":"Pivot Solar 36 (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Pivot Solar 36, Weld County, CO","lat":40.346119,"lng":-104.7314,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 633. Plant 69035 Pivot Solar 36 (Pivot Energy), Weld County, CO; balancing authority WACM. Planned operation 2027-01.\nGenerator PI36: 5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":864,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"CO","name":"Pivot Solar 42 LLC (Solar Photovoltaic, 1.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Pivot Solar 42 LLC, Larimer County, CO","lat":40.692398,"lng":-104.9833,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 311. Plant 70335 Pivot Solar 42 LLC (Pivot Energy), Larimer County, CO; balancing authority PSCO. Planned operation 2026-10.\nGenerator PS42: 1.9 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":865,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"CO","name":"Pivot Solar 43 LLC (Solar Photovoltaic, 3.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Pivot Solar 43 LLC, Adams County, CO","lat":39.748549,"lng":-104.6673,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 163. Plant 70103 Pivot Solar 43 LLC (Pivot Energy), Adams County, CO; balancing authority PSCO. Planned operation 2026-09.\nGenerator PS43: 3.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":866,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"CO","name":"Pivot Solar 50 LLC (Solar Photovoltaic, 4 MW)","type":"generation","voltage_kv":null,"location_ref":"Pivot Solar 50 LLC, Weld County, CO","lat":40.3657,"lng":-104.6336,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 167. Plant 70201 Pivot Solar 50 LLC (Pivot Energy), Weld County, CO; balancing authority PSCO. Planned operation 2026-09.\nGenerator PS50: 4 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":867,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"CO","name":"Pivot Solar 53 LLC (Solar Photovoltaic, 4 MW)","type":"generation","voltage_kv":null,"location_ref":"Pivot Solar 53 LLC, Adams County, CO","lat":39.748549,"lng":-104.6673,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 419. Plant 70104 Pivot Solar 53 LLC (Pivot Energy), Adams County, CO; balancing authority PSCO. Planned operation 2026-11.\nGenerator PS53: 4 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":868,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"CO","name":"Pivot Solar 56 LLC (Solar Photovoltaic, 3.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Pivot Solar 56 LLC, Weld County, CO","lat":40.350547,"lng":-104.7226,"route":null,"cost_usd":null,"start_date":"2027-02-01","end_date":"2027-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 675. Plant 70202 Pivot Solar 56 LLC (Pivot Energy), Weld County, CO; balancing authority PSCO. Planned operation 2027-02.\nGenerator PS56: 3.6 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":869,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"CO","name":"Pivot Solar 57 LLC (Solar Photovoltaic, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"Pivot Solar 57 LLC, Mesa County, CO","lat":39.051557,"lng":-108.4522,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 169. Plant 70206 Pivot Solar 57 LLC (Pivot Energy), Mesa County, CO; balancing authority PSCO. Planned operation 2026-09.\nGenerator PS57: 2 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":870,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"CO","name":"Pivot Solar 58 LLC (Solar Photovoltaic, 4.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Pivot Solar 58 LLC, Weld County, CO","lat":40.474398,"lng":-104.623,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 425. Plant 70357 Pivot Solar 58 LLC (Pivot Energy), Weld County, CO; balancing authority PSCO. Planned operation 2026-11.\nGenerator PS58: 4.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":871,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"CO","name":"Pivot Solar 60 LLC (Solar Photovoltaic, 1.1 MW)","type":"generation","voltage_kv":null,"location_ref":"Pivot Solar 60 LLC, Weld County, CO","lat":40.474398,"lng":-104.623,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 304. Plant 70207 Pivot Solar 60 LLC (Pivot Energy), Weld County, CO; balancing authority PSCO. Planned operation 2026-10.\nGenerator PS60: 1.1 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":872,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"CO","name":"Pivot Solar 71 LLC (Solar Photovoltaic, 1.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Pivot Solar 71 LLC, Morgan County, CO","lat":40.267178,"lng":-103.6512,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 313. Plant 70337 Pivot Solar 71 LLC (Pivot Energy), Morgan County, CO; balancing authority PSCO. Planned operation 2026-10.\nGenerator PS71: 1.8 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":899,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"DE","name":"Chaberton Solar Crestone (Solar Photovoltaic, 4 MW)","type":"generation","voltage_kv":null,"location_ref":"Chaberton Solar Crestone, Kent County, DE","lat":38.946876,"lng":-75.57677,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 603. Plant 70374 Chaberton Solar Crestone (Pivot Energy), Kent County, DE; balancing authority PJM. Planned operation 2026-12.\nGenerator CSC52: 4 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":900,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"DE","name":"DEL022-30423B Thorogoods Rd, LLC (Solar Photovoltaic, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"DEL022-30423B Thorogoods Rd, LLC, Sussex County, DE","lat":38.569503,"lng":-75.26468,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 644. Plant 70196 DEL022-30423B Thorogoods Rd, LLC (Pivot Energy), Sussex County, DE; balancing authority PJM. Planned operation 2027-01.\nGenerator DEL22: 2 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":964,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"HI","name":"Kalaeloa Home Lands Solar (Solar Photovoltaic, 1.7 MW)","type":"generation","voltage_kv":null,"location_ref":"Kalaeloa Home Lands Solar, Honolulu County, HI","lat":21.310594,"lng":-158.0863,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 400. Plant 69766 Kalaeloa Home Lands Solar (Pivot Energy), Honolulu County, HI; balancing authority HECO. Planned operation 2026-11.\nGenerator KHLS: 1.7 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1005,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"IL","name":"Bureau Solar 2 LLC (Solar Photovoltaic, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Bureau Solar 2 LLC, Bureau County, IL","lat":41.463853,"lng":-89.46756,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 168. Plant 70205 Bureau Solar 2 LLC (Pivot Energy), Bureau County, IL; balancing authority MISO. Planned operation 2026-09.\nGenerator BURS2: 2.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1007,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"IL","name":"CF IL Solar Marigold Lane, Flora2 LLC (Solar Photovoltaic, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"CF IL Solar Marigold Lane, Flora2 LLC, Clay County, IL","lat":38.632489,"lng":-88.43829,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 422. Plant 70198 CF IL Solar Marigold Lane, Flora2 LLC (Pivot Energy), Clay County, IL; balancing authority MISO. Planned operation 2026-11.\nGenerator FLOR2: 2 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1014,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"IL","name":"Clinton Solar 5 (Solar Photovoltaic, 2.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Clinton Solar 5, Clinton County, IL","lat":38.595381,"lng":-89.18656,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 427. Plant 70375 Clinton Solar 5 (Pivot Energy), Clinton County, IL; balancing authority MISO. Planned operation 2026-11.\nGenerator CLIN5: 2.6 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1041,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"IL","name":"ILL060-Sangamon-Atchison (Solar Photovoltaic, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"ILL060-Sangamon-Atchison, Sangamon County, IL","lat":39.849909,"lng":-89.29994,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 103. Plant 69053 ILL060-Sangamon-Atchison (Pivot Energy), Sangamon County, IL; balancing authority MISO. Planned operation 2026-09.\nGenerator IL60: 2 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1079,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"IL","name":"Pivot Energy IL 52 (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Pivot Energy IL 52, McHenry County, IL","lat":42.329332,"lng":-88.41144,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 318. Plant 70376 Pivot Energy IL 52 (Pivot Energy), McHenry County, IL; balancing authority PJM. Planned operation 2026-10.\nGenerator IL52: 5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1080,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"IL","name":"Pivot Energy IL 55 LLC (Solar Photovoltaic, 3.1 MW)","type":"generation","voltage_kv":null,"location_ref":"Pivot Energy IL 55 LLC, McHenry County, IL","lat":42.339848,"lng":-88.50452,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 315. Plant 70339 Pivot Energy IL 55 LLC (Pivot Energy), McHenry County, IL; balancing authority PJM. Planned operation 2026-10.\nGenerator IL55B: 3.1 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1081,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"IL","name":"Pivot Energy IL 55b LLC (Solar Photovoltaic, 2.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Pivot Energy IL 55b LLC, McHenry County, IL","lat":42.3455,"lng":-88.50561,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 597. Plant 70334 Pivot Energy IL 55b LLC (Pivot Energy), McHenry County, IL; balancing authority PJM. Planned operation 2026-12.\nGenerator IL55B: 2.8 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1082,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"IL","name":"Pivot Energy IL 7 LLC (Solar Photovoltaic, 1.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Pivot Energy IL 7 LLC, Logan County, IL","lat":40.268856,"lng":-89.23746,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 162. Plant 70099 Pivot Energy IL 7 LLC (Pivot Energy), Logan County, IL; balancing authority MISO. Planned operation 2026-09.\nGenerator IL007: 1.4 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1083,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"IL","name":"Pivot Energy IL 70 LLC (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Pivot Energy IL 70 LLC, Boone County, IL","lat":42.227709,"lng":-88.8679,"route":null,"cost_usd":null,"start_date":"2027-02-01","end_date":"2027-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 674. Plant 70100 Pivot Energy IL 70 LLC (Pivot Energy), Boone County, IL; balancing authority PJM. Planned operation 2027-02.\nGenerator IL070: 5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1234,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"MD","name":"100a Swiss Dale Farm (Solar Photovoltaic, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"100a Swiss Dale Farm, Cecil County, MD","lat":39.661976,"lng":-76.05111,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 426. Plant 70373 100a Swiss Dale Farm (Pivot Energy), Cecil County, MD; balancing authority PJM. Planned operation 2026-11.\nGenerator SDF1A: 2 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1236,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"MD","name":"MDD109-NCBP BLDG 11-Manekin (Solar Photovoltaic, 2.4 MW)","type":"generation","voltage_kv":null,"location_ref":"MDD109-NCBP BLDG 11-Manekin, Prince Georges County, MD","lat":38.8739,"lng":-76.7342,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 102. Plant 69052 MDD109-NCBP BLDG 11-Manekin (Pivot Energy), Prince Georges County, MD; balancing authority PJM. Planned operation 2026-09.\nGenerator MD11: 2.4 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1237,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"MD","name":"NCBP ONE, LLC (Solar Photovoltaic, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"NCBP ONE, LLC, Prince Georges County, MD","lat":38.8698,"lng":-76.7394,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 312. Plant 70336 NCBP ONE, LLC (Pivot Energy), Prince Georges County, MD; balancing authority PJM. Planned operation 2026-10.\nGenerator NCBP1: 2.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1238,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"MD","name":"NCBP Seven (Solar Photovoltaic, 2.4 MW)","type":"generation","voltage_kv":null,"location_ref":"NCBP Seven, Prince Georges County, MD","lat":38.8692,"lng":-76.7368,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 401. Plant 69767 NCBP Seven (Pivot Energy), Prince Georges County, MD; balancing authority PJM. Planned operation 2026-11.\nGenerator NCBP7: 2.4 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1239,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"MD","name":"NCBP TEN, LLC (Solar Photovoltaic, 1.4 MW)","type":"generation","voltage_kv":null,"location_ref":"NCBP TEN, LLC, Prince Georges County, MD","lat":38.867,"lng":-76.7386,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 314. Plant 70338 NCBP TEN, LLC (Pivot Energy), Prince Georges County, MD; balancing authority PJM. Planned operation 2026-10.\nGenerator NCB10: 1.4 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1240,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"MD","name":"NCBP TWELVE, LLC (Solar Photovoltaic, 1.2 MW)","type":"generation","voltage_kv":null,"location_ref":"NCBP TWELVE, LLC, Prince Georges County, MD","lat":38.8713,"lng":-76.7339,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 104. Plant 69064 NCBP TWELVE, LLC (Pivot Energy), Prince Georges County, MD; balancing authority PJM. Planned operation 2026-09.\nGenerator NC12: 1.2 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1306,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pivot Energy","state":"MN","name":"Pivot Energy Minnesota Solar 2 (Solar Photovoltaic, 1 MW)","type":"generation","voltage_kv":null,"location_ref":"Pivot Energy Minnesota Solar 2, Kandiyohi County, MN","lat":44.935059,"lng":-95.19906,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 774. Plant 69034 Pivot Energy Minnesota Solar 2 (Pivot Energy), Kandiyohi County, MN; balancing authority MISO. Planned operation 2027-04.\nGenerator PMI2: 1 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":920,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Placid Solar","state":"FL","name":"Highland Solar South (Solar Photovoltaic, 74.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Highland Solar South, Highlands County, FL","lat":27.2664,"lng":-81.4082,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 23. Plant 64346 Highland Solar South (Placid Solar, LLC), Highlands County, FL; balancing authority FPC. Planned operation 2026-09.\nGenerator 9999: 74.9 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":919,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Placid Solar Ii","state":"FL","name":"Highland Solar North (Solar Photovoltaic, 74.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Highland Solar North, Highlands County, FL","lat":27.2821,"lng":-81.4256,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 806. Plant 64345 Highland Solar North (Placid Solar II, LLC), Highlands County, FL; balancing authority FPC. Planned operation 2027-05.\nGenerator 1112: 74.9 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":875,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Platte River Power Authority","state":"CO","name":"Rawhide (Natural Gas Fired Combustion Turbine, 223 MW)","type":"generation","voltage_kv":null,"location_ref":"Rawhide, Larimer County, CO","lat":40.860905,"lng":-105.0212,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1447, 1448, 1449, 1450, 1451. Plant 6761 Rawhide (Platte River Power Authority), Larimer County, CO; balancing authority PSCO. Planned operation 2028-03.\nGenerator G: 44.6 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator H: 44.6 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator LM3: 44.6 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator LM4: 44.6 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator LM5: 44.6 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2032,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pledger","state":"TX","name":"Pledger (Batteries, 9.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Pledger, Wharton County, TX","lat":29.187719,"lng":-95.91223,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 409. Plant 69904 Pledger (Pledger LLC), Wharton County, TX; balancing authority ERCO. Planned operation 2026-11.\nGenerator PLEDG: 9.5 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1161,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Plum Nellie Wind Farm","state":"KS","name":"Plum Nellie Wind Farm LLC (Onshore Wind Turbine, 201.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Plum Nellie Wind Farm LLC, Cloud County, KS","lat":39.376786,"lng":-97.55649,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1075. Plant 65948 Plum Nellie Wind Farm LLC (Plum Nellie Wind Farm LLC), Cloud County, KS; balancing authority SWPP. Planned operation 2027-10.\nGenerator PNW01: 201.6 MW Onshore Wind Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2184,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Powells Creek Farm Solar","state":"VA","name":"Powells Creek Solar - Hybrid (Batteries, 17.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Powells Creek Solar - Hybrid, Halifax County, VA","lat":36.55467,"lng":-79.0286,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 853. Plant 65305 Powells Creek Solar - Hybrid (Powells Creek Farm Solar, LLC), Halifax County, VA; balancing authority PJM. Planned operation 2027-06.\nGenerator BESS: 17.5 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2259,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Power of Wyoming","state":"WY","name":"Chokecherry and Sierra Madre Wind (Onshore Wind Turbine, 1693.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Chokecherry and Sierra Madre Wind, Carbon County, WY","lat":41.683056,"lng":-107.2,"route":null,"cost_usd":null,"start_date":"2031-12-01","end_date":"2031-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2295, 2296. Plant 58987 Chokecherry and Sierra Madre Wind (Power Company of Wyoming LLC), Carbon County, WY; balancing authority CISO. Planned operation 2031-12.\nGenerator I-A: 844.2 MW Onshore Wind Turbine; (U) Under construction, less than or equal to 50 percent complete\nGenerator I-B: 849.6 MW Onshore Wind Turbine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2260,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Power of Wyoming","state":"WY","name":"Chokecherry and Sierra Madre Wind (Onshore Wind Turbine, 1303.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Chokecherry and Sierra Madre Wind, Carbon County, WY","lat":41.683056,"lng":-107.2,"route":null,"cost_usd":null,"start_date":"2032-12-01","end_date":"2032-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2305. Plant 58987 Chokecherry and Sierra Madre Wind (Power Company of Wyoming LLC), Carbon County, WY; balancing authority CISO. Planned operation 2032-12.\nGenerator II-A: 1303.2 MW Onshore Wind Turbine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2261,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Power of Wyoming","state":"WY","name":"Chokecherry and Sierra Madre Wind (Onshore Wind Turbine, 553.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Chokecherry and Sierra Madre Wind, Carbon County, WY","lat":41.683056,"lng":-107.2,"route":null,"cost_usd":null,"start_date":"2033-12-01","end_date":"2033-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2308. Plant 58987 Chokecherry and Sierra Madre Wind (Power Company of Wyoming LLC), Carbon County, WY; balancing authority CISO. Planned operation 2033-12.\nGenerator II-B: 553.5 MW Onshore Wind Turbine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":629,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"PowerSouth","state":"AL","name":"Lowman Energy Center (Natural Gas Fired Combustion Turbine, 438 MW)","type":"generation","voltage_kv":null,"location_ref":"Lowman Energy Center, Washington County, AL","lat":31.488019,"lng":-87.91075,"route":null,"cost_usd":null,"start_date":"2029-11-01","end_date":"2029-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1991. Plant 56 Lowman Energy Center (PowerSouth Energy Cooperative), Washington County, AL; balancing authority SOCO. Planned operation 2029-11.\nGenerator LEC3: 438 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2799,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"PowerSouth","state":null,"name":"Gaskin - Southport 115 Kv Transmission Line, Construct","type":"transmission line","voltage_kv":115,"location_ref":"Gaskin - Southport (AL/FL)","lat":30.263,"lng":-85.547,"route":[[30.242,-85.468],[30.283,-85.625]],"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":31,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 31.\nIn-Service Year: 2027\nProject Name: PS: GASKIN - SOUTHPORT 115 KV TRANSMISSION LINE, CONSTRUCT\nDescription: Construct ~13.0 miles of new 115 kV transmission line from Gaskin switching station to Southport substation with 795 ACSR/AW at 100°C.\nSupporting Statement: Improve the reliability of Gulf Coast Electric's substations by providing a looped service feed.\nLocated: GASKIN = OSM substation 'Gaskin Substation' (FL); SOUTHPORT = OSM substation 'Southport Substation' (FL) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2847,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"PowerSouth","state":null,"name":"Bassett Creek - Tensaw 230 Kv Transmission Line (Lowman 230 Kv), Loop- In","type":"transmission line","voltage_kv":230,"location_ref":"Bassett Creek - Tensaw (AL/FL)","lat":30.659,"lng":-87.746,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":44,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 44.\nIn-Service Year: 2028\nProject Name: PS: BASSETT CREEK - TENSAW 230 KV TRANSMISSION LINE (LOWMAN 230 KV), LOOP- IN\nDescription: Loop in existing Bassett Creek - Tensaw 230 kV transmission line into Lowman 230 kV station as new tie lines between PS and SOCO. Requires the construction of ~7 miles of new 230 kV transmission line.\nSupporting Statement: Prevents thermal overloading under contingency after addition of new generation at Lowman.\nLocated: TENSAW ~ Baldwin County, AL (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2909,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"PowerSouth","state":null,"name":"Eliska Sw. - Freemanville Sw. 115 Kv Transmission Line, Construct","type":"transmission line","voltage_kv":115,"location_ref":"Eliska Sw. - Freemanville Sw. (AL/FL)","lat":31.325,"lng":-87.45,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":60,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 60.\nIn-Service Year: 2029\nProject Name: PS: ELISKA SW. - FREEMANVILLE SW. 115 KV TRANSMISSION LINE, CONSTRUCT\nDescription: Construct Eliska switching station on the Lowman - Belleville 115 kV transmission path and construct Freemanville switching station on the Atmore - Brewton 115 kV transmission path. Construct ~26 miles 115 kV transmission path between these two new stations.\nSupporting Statement: Improve loading and voltage support in the area under contingency.\nLocated: FREEMANVILLE SW. = OSM substation 'Freemanville Substation' (AL); ELISKA SW. ~ Monroe County, AL (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2910,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"PowerSouth","state":null,"name":"Union Springs 115 Kv Switching Station, Construct","type":"substation","voltage_kv":115,"location_ref":"Union Springs (AL/FL)","lat":32.133,"lng":-85.704,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":60,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 60.\nIn-Service Year: 2029\nProject Name: PS: UNION SPRINGS 115 KV SWITCHING STATION, CONSTRUCT\nDescription: Construct a new 115 kV switching station to sectionalize a ~54 mile transmission path with 5 delivery points.\nSupporting Statement: Reduce exposure and improve the reliability to the existing area delivery points.\nLocated: UNION SPRINGS = OSM substation 'Union Springs Substation' (AL)","reviewed":false,"approximate":false,"requires_review":false},{"id":758,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Premium Energy Holdings","state":"CA","name":"Haiwee Pumped Storage Project (Hydroelectric Pumped Storage, 1000 MW)","type":"generation","voltage_kv":null,"location_ref":"Haiwee Pumped Storage Project, Inyo County, CA","lat":36.233105,"lng":-117.9625,"route":null,"cost_usd":null,"start_date":"2028-07-01","end_date":"2028-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1599, 1600, 1601, 1602. Plant 66686 Haiwee Pumped Storage Project (Premium Energy Holdings), Inyo County, CA; balancing authority LDWP. Planned operation 2028-07.\nGenerator HL001: 250 MW Hydroelectric Pumped Storage; (P) Planned for installation, but regulatory approvals not initiated\nGenerator HL002: 250 MW Hydroelectric Pumped Storage; (P) Planned for installation, but regulatory approvals not initiated\nGenerator HL003: 250 MW Hydroelectric Pumped Storage; (P) Planned for installation, but regulatory approvals not initiated\nGenerator HL004: 250 MW Hydroelectric Pumped Storage; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":839,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Premium Energy Holdings","state":"CA","name":"Whale Rock Pumped Storage Hydro Project (Hydroelectric Pumped Storage, 600 MW)","type":"generation","voltage_kv":null,"location_ref":"Whale Rock Pumped Storage Hydro Project, San Luis Obispo County, CA","lat":35.454196,"lng":-120.8671,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 924, 925, 926. Plant 66685 Whale Rock Pumped Storage Hydro Project (Premium Energy Holdings), San Luis Obispo County, CA; balancing authority CISO. Planned operation 2027-07.\nGenerator WH001: 200 MW Hydroelectric Pumped Storage; (P) Planned for installation, but regulatory approvals not initiated\nGenerator WH002: 200 MW Hydroelectric Pumped Storage; (P) Planned for installation, but regulatory approvals not initiated\nGenerator WH003: 200 MW Hydroelectric Pumped Storage; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2145,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Premium Energy Holdings","state":"UT","name":"Intermountain Pumped Storage Project (Hydroelectric Pumped Storage, 1000 MW)","type":"generation","voltage_kv":null,"location_ref":"Intermountain Pumped Storage Project, Millard County, UT","lat":39.414705,"lng":-112.4404,"route":null,"cost_usd":null,"start_date":"2028-07-01","end_date":"2028-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1595, 1596, 1597, 1598. Plant 66684 Intermountain Pumped Storage Project (Premium Energy Holdings), Millard County, UT; balancing authority LDWP. Planned operation 2028-07.\nGenerator HL001: 250 MW Hydroelectric Pumped Storage; (P) Planned for installation, but regulatory approvals not initiated\nGenerator HL002: 250 MW Hydroelectric Pumped Storage; (P) Planned for installation, but regulatory approvals not initiated\nGenerator HL003: 250 MW Hydroelectric Pumped Storage; (P) Planned for installation, but regulatory approvals not initiated\nGenerator HL004: 250 MW Hydroelectric Pumped Storage; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":712,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"CA","name":"Bandini - SLLAX710 (Solar Photovoltaic, 1.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Bandini - SLLAX710, Los Angeles County, CA","lat":33.983566,"lng":-118.1348,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 92. Plant 68793 Bandini - SLLAX710 (Prologis Logistics Services Incorporated), Los Angeles County, CA; balancing authority CISO. Planned operation 2026-09.\nGenerator LA710: 1.3 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":731,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"CA","name":"Dominguez - SLLAX512 (Solar Photovoltaic, 1.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Dominguez - SLLAX512, Los Angeles County, CA","lat":33.84038,"lng":-118.2287,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 91. Plant 68790 Dominguez - SLLAX512 (Prologis Logistics Services Incorporated), Los Angeles County, CA; balancing authority CISO. Planned operation 2026-09.\nGenerator LA512: 1.3 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":745,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"CA","name":"Fordyce - SLLAX680 (Solar Photovoltaic, 1.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Fordyce - SLLAX680, Los Angeles County, CA","lat":33.8439,"lng":-118.2242,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 876. Plant 68792 Fordyce - SLLAX680 (Prologis Logistics Services Incorporated), Los Angeles County, CA; balancing authority CISO. Planned operation 2027-06.\nGenerator LA680: 1.3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":795,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"CA","name":"Perris DC 5 - sline015 (Solar Photovoltaic, 1.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Perris DC 5 - sline015, Riverside County, CA","lat":33.850185,"lng":-117.2322,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 161. Plant 70095 Perris DC 5 - sline015 (Prologis Logistics Services Incorporated), Riverside County, CA; balancing authority CISO. Planned operation 2026-09.\nGenerator IN015: 1.6 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":803,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"CA","name":"Redlands DC 9 - sline609 (Batteries, Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Redlands DC 9 - sline609, San Bernardino County, CA","lat":34.083141,"lng":-117.2035,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 413, 414. Plant 70012 Redlands DC 9 - sline609 (Prologis Logistics Services Incorporated), San Bernardino County, CA; balancing authority CISO. Planned operation 2026-11.\nGenerator BA609: 2.4 MW Batteries; (U) Under construction, less than or equal to 50 percent complete\nGenerator IN609: 2.6 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":810,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"CA","name":"San Leandro 10 - sleba702 (Solar Photovoltaic, 1 MW)","type":"generation","voltage_kv":null,"location_ref":"San Leandro 10 - sleba702, Alameda County, CA","lat":37.71422,"lng":-122.182,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 828. Plant 69609 San Leandro 10 - sleba702 (Prologis Logistics Services Incorporated), Alameda County, CA; balancing authority CISO. Planned operation 2027-05.\nGenerator EB702: 1 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":828,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"CA","name":"South Bay Dis Ctr 12 - SLLAX104 (Solar Photovoltaic, 1.2 MW)","type":"generation","voltage_kv":null,"location_ref":"South Bay Dis Ctr 12 - SLLAX104, Los Angeles County, CA","lat":33.842873,"lng":-118.2245,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 90. Plant 68789 South Bay Dis Ctr 12 - SLLAX104 (Prologis Logistics Services Incorporated), Los Angeles County, CA; balancing authority CISO. Planned operation 2026-09.\nGenerator LA104: 1.2 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":829,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"CA","name":"South Bay Dis Ctr 6-SLLAX680 (Solar Photovoltaic, 1.3 MW)","type":"generation","voltage_kv":null,"location_ref":"South Bay Dis Ctr 6-SLLAX680, Los Angeles County, CA","lat":33.8439,"lng":-118.2242,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 821. Plant 68236 South Bay Dis Ctr 6-SLLAX680 (Prologis Logistics Services Incorporated), Los Angeles County, CA; balancing authority CISO. Planned operation 2027-05.\nGenerator LA680: 1.3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":831,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"CA","name":"Stockton 1 - slcva801 (Solar Photovoltaic, 1 MW)","type":"generation","voltage_kv":null,"location_ref":"Stockton 1 - slcva801, San Joaquin County, CA","lat":37.93997,"lng":-121.2265,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 954. Plant 69785 Stockton 1 - slcva801 (Prologis Logistics Services Incorporated), San Joaquin County, CA; balancing authority CISO. Planned operation 2027-07.\nGenerator CV801: 1 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":832,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"CA","name":"Stockton 9 - slcva209 (Solar Photovoltaic, 1 MW)","type":"generation","voltage_kv":null,"location_ref":"Stockton 9 - slcva209, San Joaquin County, CA","lat":37.89233,"lng":-121.2667,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 637. Plant 69786 Stockton 9 - slcva209 (Prologis Logistics Services Incorporated), San Joaquin County, CA; balancing authority CISO. Planned operation 2027-01.\nGenerator CV209: 1 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":834,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"CA","name":"Torrance Dis Ctr 2 - SLLAX100 (Solar Photovoltaic, 1.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Torrance Dis Ctr 2 - SLLAX100, Los Angeles County, CA","lat":33.84516,"lng":-118.3164,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 149. Plant 69891 Torrance Dis Ctr 2 - SLLAX100 (Prologis Logistics Services Incorporated), Los Angeles County, CA; balancing authority CISO. Planned operation 2026-09.\nGenerator LA100: 1.4 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":984,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"IL","name":"Addison 11-SLCHI404 (Solar Photovoltaic, 1.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Addison 11-SLCHI404, DuPage County, IL","lat":41.930327,"lng":-88.04848,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 70. Plant 68118 Addison 11-SLCHI404 (Prologis Logistics Services Incorporated), DuPage County, IL; balancing authority PJM. Planned operation 2026-09.\nGenerator CH404: 1.6 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":990,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"IL","name":"Aurora 7-SLCHI307 (Solar Photovoltaic, 1.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Aurora 7-SLCHI307, Kane County, IL","lat":41.79698,"lng":-88.26809,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 756. Plant 68119 Aurora 7-SLCHI307 (Prologis Logistics Services Incorporated), Kane County, IL; balancing authority PJM. Planned operation 2027-04.\nGenerator CH307: 1.9 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":993,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"IL","name":"Bensenville 13-SLCHI513 (Solar Photovoltaic, 1.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Bensenville 13-SLCHI513, DuPage County, IL","lat":41.987884,"lng":-87.95258,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 219. Plant 68120 Bensenville 13-SLCHI513 (Prologis Logistics Services Incorporated), DuPage County, IL; balancing authority PJM. Planned operation 2026-10.\nGenerator CH513: 1.4 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":994,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"IL","name":"Bensenville 14-SLCHI414 (Solar Photovoltaic, 1.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Bensenville 14-SLCHI414, DuPage County, IL","lat":41.982829,"lng":-87.94589,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 757. Plant 68121 Bensenville 14-SLCHI414 (Prologis Logistics Services Incorporated), DuPage County, IL; balancing authority PJM. Planned operation 2027-04.\nGenerator CH414: 1.3 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":995,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"IL","name":"Bensenville 2-SLCHI526 (Solar Photovoltaic, 1.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Bensenville 2-SLCHI526, DuPage County, IL","lat":41.971289,"lng":-87.95462,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 220. Plant 68122 Bensenville 2-SLCHI526 (Prologis Logistics Services Incorporated), DuPage County, IL; balancing authority PJM. Planned operation 2026-10.\nGenerator CH526: 1.9 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":996,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"IL","name":"Bensenville Ind Park 10-SLCHI410 (Solar Photovoltaic, 1.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Bensenville Ind Park 10-SLCHI410, DuPage County, IL","lat":41.984507,"lng":-87.94587,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 619. Plant 68123 Bensenville Ind Park 10-SLCHI410 (Prologis Logistics Services Incorporated), DuPage County, IL; balancing authority PJM. Planned operation 2027-01.\nGenerator CH410: 1.2 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":997,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"IL","name":"Bensenville Ind Park 11 (Solar Photovoltaic, 1.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Bensenville Ind Park 11, DuPage County, IL","lat":41.986194,"lng":-87.94525,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 484. Plant 68124 Bensenville Ind Park 11 (Prologis Logistics Services Incorporated), DuPage County, IL; balancing authority PJM. Planned operation 2026-12.\nGenerator CH411: 1.2 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":998,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"IL","name":"Bensenville Ind Park 2-SLCHI402 (Solar Photovoltaic, 1.1 MW)","type":"generation","voltage_kv":null,"location_ref":"Bensenville Ind Park 2-SLCHI402, DuPage County, IL","lat":41.983957,"lng":-87.95383,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 620. Plant 68126 Bensenville Ind Park 2-SLCHI402 (Prologis Logistics Services Incorporated), DuPage County, IL; balancing authority PJM. Planned operation 2027-01.\nGenerator CH402: 1.1 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":999,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"IL","name":"Bensenville Ind Park 4-SLCHI424 (Solar Photovoltaic, 1.7 MW)","type":"generation","voltage_kv":null,"location_ref":"Bensenville Ind Park 4-SLCHI424, Cook County, IL","lat":41.983893,"lng":-87.95172,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 621. Plant 68127 Bensenville Ind Park 4-SLCHI424 (Prologis Logistics Services Incorporated), Cook County, IL; balancing authority PJM. Planned operation 2027-01.\nGenerator CH424: 1.7 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1011,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"IL","name":"Cicero 3-SLCHI603 (Solar Photovoltaic, 1.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Cicero 3-SLCHI603, Cook County, IL","lat":41.86464,"lng":-87.75757,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 931. Plant 68129 Cicero 3-SLCHI603 (Prologis Logistics Services Incorporated), Cook County, IL; balancing authority PJM. Planned operation 2027-07.\nGenerator CH603: 1.9 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1018,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"IL","name":"Des Plaines 11-SLCHI211 (Solar Photovoltaic, 1.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Des Plaines 11-SLCHI211, Cook County, IL","lat":42.015,"lng":-87.915,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 221. Plant 68130 Des Plaines 11-SLCHI211 (Prologis Logistics Services Incorporated), Cook County, IL; balancing authority PJM. Planned operation 2026-10.\nGenerator CH211: 1.6 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1022,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"IL","name":"Elk Grove 1-SLCHI701 (Solar Photovoltaic, 1.7 MW)","type":"generation","voltage_kv":null,"location_ref":"Elk Grove 1-SLCHI701, Cook County, IL","lat":42.010416,"lng":-87.958,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 222. Plant 68132 Elk Grove 1-SLCHI701 (Prologis Logistics Services Incorporated), Cook County, IL; balancing authority PJM. Planned operation 2026-10.\nGenerator CH701: 1.7 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1023,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"IL","name":"Elk Grove 51-SLCHI151 (Solar Photovoltaic, 1.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Elk Grove 51-SLCHI151, DuPage County, IL","lat":42.00096,"lng":-87.95782,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 705. Plant 68133 Elk Grove 51-SLCHI151 (Prologis Logistics Services Incorporated), DuPage County, IL; balancing authority PJM. Planned operation 2027-03.\nGenerator CH151: 1.4 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1028,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"IL","name":"Franklin Park 2-SLCHI802 (Solar Photovoltaic, 1.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Franklin Park 2-SLCHI802, Cook County, IL","lat":41.946509,"lng":-87.85944,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 485. Plant 68135 Franklin Park 2-SLCHI802 (Prologis Logistics Services Incorporated), Cook County, IL; balancing authority PJM. Planned operation 2026-12.\nGenerator CH802: 1.2 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1032,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"IL","name":"Glendale Heights 10-SLCHI910 (Solar Photovoltaic, 1.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Glendale Heights 10-SLCHI910, DuPage County, IL","lat":41.929422,"lng":-88.07008,"route":null,"cost_usd":null,"start_date":"2027-02-01","end_date":"2027-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 654. Plant 68137 Glendale Heights 10-SLCHI910 (Prologis Logistics Services Incorporated), DuPage County, IL; balancing authority PJM. Planned operation 2027-02.\nGenerator CH910: 1.3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1044,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"IL","name":"Internationale Ctr 11-SLCHI321 (Solar Photovoltaic, 1.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Internationale Ctr 11-SLCHI321, DuPage County, IL","lat":41.70053,"lng":-88.02744,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 758. Plant 68138 Internationale Ctr 11-SLCHI321 (Prologis Logistics Services Incorporated), DuPage County, IL; balancing authority PJM. Planned operation 2027-04.\nGenerator CH321: 1.8 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1055,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"IL","name":"McCook 2-SLCHI102 (Solar Photovoltaic, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"McCook 2-SLCHI102, Cook County, IL","lat":41.803083,"lng":-87.81935,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 223. Plant 68139 McCook 2-SLCHI102 (Prologis Logistics Services Incorporated), Cook County, IL; balancing authority PJM. Planned operation 2026-10.\nGenerator CH102: 2 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1058,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"IL","name":"Melrose Park 2-SLCHI547 (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Melrose Park 2-SLCHI547, Cook County, IL","lat":41.9809,"lng":-87.8633,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 622. Plant 68140 Melrose Park 2-SLCHI547 (Prologis Logistics Services Incorporated), Cook County, IL; balancing authority PJM. Planned operation 2027-01.\nGenerator CH547: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1066,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"IL","name":"Northlake 2-SLCHI302 (Solar Photovoltaic, 1.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Northlake 2-SLCHI302, Cook County, IL","lat":41.9118,"lng":-87.9081,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 352. Plant 68141 Northlake 2-SLCHI302 (Prologis Logistics Services Incorporated), Cook County, IL; balancing authority PJM. Planned operation 2026-11.\nGenerator CH302: 1.6 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1067,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"IL","name":"Northlake 3-SLCHI303 (Solar Photovoltaic, 1.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Northlake 3-SLCHI303, Cook County, IL","lat":41.918532,"lng":-87.9093,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 71. Plant 68142 Northlake 3-SLCHI303 (Prologis Logistics Services Incorporated), Cook County, IL; balancing authority PJM. Planned operation 2026-09.\nGenerator CH303: 1.6 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1068,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"IL","name":"Northlake 4-SLCHI304 (Solar Photovoltaic, 1.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Northlake 4-SLCHI304, Cook County, IL","lat":41.92302,"lng":-87.91646,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 486. Plant 68143 Northlake 4-SLCHI304 (Prologis Logistics Services Incorporated), Cook County, IL; balancing authority PJM. Planned operation 2026-12.\nGenerator CH304: 1.4 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1069,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"IL","name":"Northlake 5-SLCHI305 (Solar Photovoltaic, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Northlake 5-SLCHI305, Cook County, IL","lat":41.929004,"lng":-87.91716,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 759. Plant 68144 Northlake 5-SLCHI305 (Prologis Logistics Services Incorporated), Cook County, IL; balancing authority PJM. Planned operation 2027-04.\nGenerator CH305: 2.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1088,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"IL","name":"Romeoville 34 - SLCHI234 - BSCHI234 (Batteries, 0.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Romeoville 34 - SLCHI234 - BSCHI234, Will County, IL","lat":41.597,"lng":-88.11,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 820. Plant 68235 Romeoville 34 - SLCHI234 - BSCHI234 (Prologis Logistics Services Incorporated), Will County, IL; balancing authority PJM. Planned operation 2027-05.\nGenerator C34BB: 0.5 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1433,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated","state":"NJ","name":"Prologis - SLCNJ001 - Community Solar (Solar Photovoltaic, 3.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Prologis - SLCNJ001 - Community Solar, Middlesex County, NJ","lat":40.56877,"lng":-74.49457,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 164. Plant 70181 Prologis - SLCNJ001 - Community Solar (Prologis Logistics Services Incorporated), Middlesex County, NJ; balancing authority PJM. Planned operation 2026-09.\nGenerator CN001: 3.2 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1821,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prologis Logistics Services Incorporated Bess","state":"TX","name":"BESS TX Camarine - BSHOU001 (Batteries, 9.9 MW)","type":"generation","voltage_kv":null,"location_ref":"BESS TX Camarine - BSHOU001, Harris County, TX","lat":29.86648,"lng":-95.43066,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 381. Plant 69246 BESS TX Camarine - BSHOU001 (Prologis Logistics Services Incorporated BESS), Harris County, TX; balancing authority ERCO. Planned operation 2026-11.\nGenerator BSOU1: 9.9 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2039,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Prost Ess","state":"TX","name":"Prost ESS (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Prost ESS, Austin County, TX","lat":29.957853,"lng":-96.53331,"route":null,"cost_usd":null,"start_date":"2029-07-01","end_date":"2029-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1952. Plant 68360 Prost ESS (Prost ESS LLC), Austin County, TX; balancing authority ERCO. Planned operation 2029-07.\nGenerator PRESS: 200 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":843,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Public Service of Colorado","state":"CO","name":"Arroyo Solar (Solar Photovoltaic, 335 MW)","type":"generation","voltage_kv":null,"location_ref":"Arroyo Solar, Pueblo County, CO","lat":38.161657,"lng":-104.5488,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 247. Plant 69040 Arroyo Solar (Public Service Co of Colorado), Pueblo County, CO; balancing authority PSCO. Planned operation 2026-10.\nGenerator ARY1: 335 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":847,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Public Service of Colorado","state":"CO","name":"Cheyenne Ridge II (Onshore Wind Turbine, 438 MW)","type":"generation","voltage_kv":null,"location_ref":"Cheyenne Ridge II, Cheyenne County, CO","lat":38.997719,"lng":-102.3593,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 890. Plant 69873 Cheyenne Ridge II (Public Service Co of Colorado), Cheyenne County, CO; balancing authority PSCO. Planned operation 2027-06.\nGenerator CRW02: 438 MW Onshore Wind Turbine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":853,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Public Service of Colorado","state":"CO","name":"Fort St Vrain (Natural Gas Fired Combustion Turbine, 478 MW)","type":"generation","voltage_kv":null,"location_ref":"Fort St Vrain, Weld County, CO","lat":40.2461,"lng":-104.8742,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1191, 1192. Plant 6112 Fort St Vrain (Public Service Co of Colorado), Weld County, CO; balancing authority PSCO. Planned operation 2027-12.\nGenerator 7: 239 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete\nGenerator 8: 239 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":876,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Public Service of Colorado","state":"CO","name":"Singing Grass Wind (Onshore Wind Turbine, 603 MW)","type":"generation","voltage_kv":null,"location_ref":"Singing Grass Wind, Kit Carson County, CO","lat":39.201143,"lng":-102.8576,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1022. Plant 68982 Singing Grass Wind (Public Service Co of Colorado), Kit Carson County, CO; balancing authority PSCO. Planned operation 2027-09.\nGenerator SGG01: 603 MW Onshore Wind Turbine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":885,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Public Service of Colorado","state":"CO","name":"Waterton Solar I (Solar Photovoltaic, 4 MW)","type":"generation","voltage_kv":null,"location_ref":"Waterton Solar I, Douglas County, CO","lat":39.5,"lng":-105.07,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 117. Plant 69293 Waterton Solar I (Public Service Co of Colorado), Douglas County, CO; balancing authority PSCO. Planned operation 2026-09.\nGenerator WTS1: 4 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":886,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Public Service of Colorado","state":"CO","name":"Waterton Solar II (Solar Photovoltaic, 4 MW)","type":"generation","voltage_kv":null,"location_ref":"Waterton Solar II, Douglas County, CO","lat":39.5,"lng":-105.07,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 134. Plant 69620 Waterton Solar II (Public Service Co of Colorado), Douglas County, CO; balancing authority PSCO. Planned operation 2026-09.\nGenerator WTS2: 4 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1633,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Public Service of Oklahoma","state":"OK","name":"Comanche (OK) (Natural Gas Fired Combined Cycle, 1372.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Comanche (OK), Comanche County, OK","lat":34.5431,"lng":-98.3244,"route":null,"cost_usd":null,"start_date":"2029-09-01","end_date":"2029-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1966, 1967, 1968, 1969. Plant 8059 Comanche (OK) (Public Service Co of Oklahoma), Comanche County, OK; balancing authority SWPP. Planned operation 2029-09.\nGenerator 2G1: 408.8 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator 2S1: 277.6 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator 3G1: 408.8 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator 3S1: 277.6 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2210,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pud No 1 of Snohomish County - (wa)","state":"WA","name":"Arlington Battery Energy Storage System (Batteries, 25 MW)","type":"generation","voltage_kv":null,"location_ref":"Arlington Battery Energy Storage System, Snohomish County, WA","lat":48.15617,"lng":-122.1437,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 60. Plant 67669 Arlington Battery Energy Storage System (PUD No 1 of Snohomish County - (WA)), Snohomish County, WA; balancing authority BPAT. Planned operation 2026-09.\nGenerator ABESS: 25 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":894,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Pure Hedge","state":"CT","name":"Pure Hedge LLC (Batteries, Solar Photovoltaic, 90 MW)","type":"generation","voltage_kv":null,"location_ref":"Pure Hedge LLC, Windham County, CT","lat":41.712448,"lng":-71.82225,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1062, 1063. Plant 50736 Pure Hedge LLC (Pure Hedge LLC), Windham County, CT; balancing authority ISNE. Planned operation 2027-10.\nGenerator FSS13: 20 MW Batteries; (U) Under construction, less than or equal to 50 percent complete\nGenerator FSS17: 70 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":895,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Putnam Meadow Solar Station","state":"CT","name":"Putnam Meadow Solar Station (Solar Photovoltaic, 4 MW)","type":"generation","voltage_kv":null,"location_ref":"Putnam Meadow Solar Station, Windham County, CT","lat":41.902261,"lng":-71.91154,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 692. Plant 65710 Putnam Meadow Solar Station (Putnam Meadow Solar Station, LLC), Windham County, CT; balancing authority ISNE. Planned operation 2027-03.\nGenerator PTNM: 4 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":967,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Puuloa Energy","state":"HI","name":"Puuloa Energy (Other Waste Biomass, 103.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Puuloa Energy, Honolulu County, HI","lat":21.347833,"lng":-157.9506,"route":null,"cost_usd":null,"start_date":"2029-04-01","end_date":"2029-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1876, 1877, 1878, 1879, 1880, 1881, 1882, 1883, 1884, 1885, 1886. Plant 68284 Puuloa Energy (Puuloa Energy LLC), Honolulu County, HI; balancing authority HECO. Planned operation 2029-04.\nGenerator PE-1: 9.4 MW Other Waste Biomass; (P) Planned for installation, but regulatory approvals not initiated\nGenerator PE-10: 9.4 MW Other Waste Biomass; (P) Planned for installation, but regulatory approvals not initiated\nGenerator PE-11: 9.4 MW Other Waste Biomass; (P) Planned for installation, but regulatory approvals not initiated\nGenerator PE-2: 9.4 MW Other Waste Biomass; (P) Planned for installation, but regulatory approvals not initiated\nGenerator PE-3: 9.4 MW Other Waste Biomass; (P) Planned for installation, but regulatory approvals not initiated\nGenerator PE-4: 9.4 MW Other Waste Biomass; (P) Planned for installation, but regulatory approvals not initiated\nGenerator PE-5: 9.4 MW Other Waste Biomass; (P) Planned for installation, but regulatory approvals not initiated\nGenerator PE-6: 9.4 MW Other Waste Biomass; (P) Planned for installation, but regulatory approvals not initiated\nGenerator PE-7: 9.4 MW Other Waste Biomass; (P) Planned for installation, but regulatory approvals not initiated\nGenerator PE-8: 9.4 MW Other Waste Biomass; (P) Planned for installation, but regulatory approvals not initiated\nGenerator PE-9: 9.4 MW Other Waste Biomass; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":968,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Puuloa Solar","state":"HI","name":"Puuloa Solar (Batteries, Solar Photovoltaic, 12.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Puuloa Solar, Honolulu County, HI","lat":21.351522,"lng":-157.9269,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1143, 1144. Plant 68285 Puuloa Solar (Puuloa Solar LLC), Honolulu County, HI; balancing authority HECO. Planned operation 2027-11.\nGenerator PS-1: 6.4 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated\nGenerator PS-2: 6 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1388,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Quaker Creek Farm Solar","state":"NC","name":"Quaker Creek Farm Solar (Solar Photovoltaic, 34.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Quaker Creek Farm Solar, Alamance County, NC","lat":36.156688,"lng":-79.32292,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 616. Plant 67977 Quaker Creek Farm Solar (Quaker Creek Farm Solar, LLC), Alamance County, NC; balancing authority DUK. Planned operation 2027-01.\nGenerator QUACR: 34.9 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1772,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Quest Solar","state":"SC","name":"Quest Solar (Solar Photovoltaic, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"Quest Solar, Allendale County, SC","lat":32.976531,"lng":-81.22681,"route":null,"cost_usd":null,"start_date":"2028-11-01","end_date":"2028-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1710. Plant 62299 Quest Solar (Quest Solar), Allendale County, SC; balancing authority SCEG. Planned operation 2028-11.\nGenerator 66: 50 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":874,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Raceway Solar","state":"CO","name":"Raceway Solar - (CO) (Solar Photovoltaic, 7 MW)","type":"generation","voltage_kv":null,"location_ref":"Raceway Solar - (CO), Morgan County, CO","lat":40.262222,"lng":-103.8292,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 787. Plant 70119 Raceway Solar - (CO) (Raceway Solar, LLC), Morgan County, CO; balancing authority SWPP. Planned operation 2027-04.\nGenerator GEN1: 7 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2046,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Raven Storage","state":"TX","name":"Raven Storage (Batteries, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Raven Storage, Wharton County, TX","lat":29.575617,"lng":-96.08872,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 353. Plant 68149 Raven Storage (Raven Storage, LLC), Wharton County, TX; balancing authority ERCO. Planned operation 2026-11.\nGenerator RAVEB: 100 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2047,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ray Ranch Solar","state":"TX","name":"Ray Ranch Solar (Solar Photovoltaic, 255.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Ray Ranch Solar, Goliad County, TX","lat":28.628,"lng":-97.724,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 62. Plant 67837 Ray Ranch Solar (Ray Ranch Solar LLC), Goliad County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator RAYRS: 255.2 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":725,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Re Cobalt","state":"CA","name":"Cobalt (Solar Photovoltaic, 250 MW)","type":"generation","voltage_kv":null,"location_ref":"Cobalt, Riverside County, CA","lat":33.571,"lng":-118.1789,"route":null,"cost_usd":null,"start_date":"2027-08-01","end_date":"2027-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 989. Plant 70178 Cobalt (RE Cobalt LLC), Riverside County, CA; balancing authority CISO. Planned operation 2027-08.\nGenerator CBLT: 250 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1410,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Red Butte Wind","state":"ND","name":"Red Butte Wind (Onshore Wind Turbine, 202 MW)","type":"generation","voltage_kv":null,"location_ref":"Red Butte Wind, Morton County, ND","lat":47.063928,"lng":-101.4753,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1360. Plant 69659 Red Butte Wind (Red Butte Wind), Morton County, ND; balancing authority MISO. Planned operation 2027-12.\nGenerator RBW: 202 MW Onshore Wind Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2048,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Red Egret","state":"TX","name":"Red Egret (Batteries, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Red Egret, Galveston County, TX","lat":29.4229,"lng":-95.0049,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1102. Plant 69364 Red Egret (Red Egret, LLC), Galveston County, TX; balancing authority ERCO. Planned operation 2027-10.\nGenerator REDEG: 300 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":672,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Re Desert Bloom","state":"AZ","name":"Desert Bloom (Batteries, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Desert Bloom, Maricopa County, AZ","lat":33.70299,"lng":-112.3219,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 116. Plant 69290 Desert Bloom (RE Desert Bloom LLC), Maricopa County, AZ; balancing authority DOPD. Planned operation 2026-09.\nGenerator DSBLM: 150 MW Batteries; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1853,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Red River Clean Energy","state":"TX","name":"Cannibal Draw Solar and Storage (Batteries, Solar Photovoltaic, 248.1 MW)","type":"generation","voltage_kv":null,"location_ref":"Cannibal Draw Solar and Storage, Glasscock County, TX","lat":32.023861,"lng":-101.284,"route":null,"cost_usd":null,"start_date":"2028-04-01","end_date":"2028-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1507, 1508. Plant 68738 Cannibal Draw Solar and Storage (Red River Clean Energy), Glasscock County, TX; balancing authority ERCO. Planned operation 2028-04.\nGenerator CANBS: 98.6 MW Batteries; (T) Regulatory approvals received. Not under construction\nGenerator CANPV: 149.5 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1869,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Red River Clean Energy","state":"TX","name":"Chisme Solar and Storage (Batteries, Solar Photovoltaic, 293 MW)","type":"generation","voltage_kv":null,"location_ref":"Chisme Solar and Storage, Brown County, TX","lat":31.568929,"lng":-98.82195,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 814, 815. Plant 68078 Chisme Solar and Storage (Red River Clean Energy), Brown County, TX; balancing authority ERCO. Planned operation 2027-05.\nGenerator CHIBS: 146 MW Batteries; (U) Under construction, less than or equal to 50 percent complete\nGenerator CHIPV: 147 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1875,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Red River Clean Energy","state":"TX","name":"Concho Pearl Solar and Storage (Batteries, Solar Photovoltaic, 334.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Concho Pearl Solar and Storage, Concho County, TX","lat":31.465492,"lng":-99.93435,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1086, 1087. Plant 67956 Concho Pearl Solar and Storage (Red River Clean Energy), Concho County, TX; balancing authority ERCO. Planned operation 2027-10.\nGenerator CONBS: 162.4 MW Batteries; (T) Regulatory approvals received. Not under construction\nGenerator CONPV: 171.9 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1916,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Red River Clean Energy","state":"TX","name":"Gail Mountain Solar (Solar Photovoltaic, 244.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Gail Mountain Solar, Borden County, TX","lat":32.714612,"lng":-101.5274,"route":null,"cost_usd":null,"start_date":"2028-08-01","end_date":"2028-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1645. Plant 69506 Gail Mountain Solar (Red River Clean Energy), Borden County, TX; balancing authority ERCO. Planned operation 2028-08.\nGenerator GAIPV: 244.4 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2055,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Red River Clean Energy","state":"TX","name":"Resaca Oasis Storage (Batteries, 200.7 MW)","type":"generation","voltage_kv":null,"location_ref":"Resaca Oasis Storage, Cameron County, TX","lat":25.978783,"lng":-97.37263,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1025. Plant 69120 Resaca Oasis Storage (Red River Clean Energy), Cameron County, TX; balancing authority ERCO. Planned operation 2027-09.\nGenerator RESBS: 200.7 MW Batteries; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2114,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Red River Clean Energy","state":"TX","name":"Uva Creek Solar (Solar Photovoltaic, 301 MW)","type":"generation","voltage_kv":null,"location_ref":"Uva Creek Solar, Borden County, TX","lat":32.679762,"lng":-101.5044,"route":null,"cost_usd":null,"start_date":"2028-08-01","end_date":"2028-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1639. Plant 68739 Uva Creek Solar (Red River Clean Energy), Borden County, TX; balancing authority ERCO. Planned operation 2028-08.\nGenerator UVAPV: 301 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2051,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Regis Leakey","state":"TX","name":"Regis Leakey (Batteries, 9.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Regis Leakey, Real County, TX","lat":29.681012,"lng":-99.76172,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 530. Plant 69338 Regis Leakey (Regis Leakey LLC), Real County, TX; balancing authority ERCO. Planned operation 2026-12.\nGenerator LEAKY: 9.9 MW Batteries; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2052,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Regis Medina","state":"TX","name":"Regis Medina (Batteries, 9.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Regis Medina, Bandera County, TX","lat":29.807877,"lng":-99.25467,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 531. Plant 69340 Regis Medina (Regis Medina LLC), Bandera County, TX; balancing authority ERCO. Planned operation 2026-12.\nGenerator MEDIN: 9.9 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2054,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Renegade Renewables","state":"TX","name":"Renegade Solar Project (Dawn) (Solar Photovoltaic, 515 MW)","type":"generation","voltage_kv":null,"location_ref":"Renegade Solar Project (Dawn), Deaf Smith County, TX","lat":34.913,"lng":-102.2706,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1232. Plant 65310 Renegade Solar Project (Dawn) (Renegade Renewables, LLC), Deaf Smith County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator DAWN1: 515 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1078,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Repsol Renewables Na","state":"IL","name":"Pike Creek Wind (Onshore Wind Turbine, 202.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Pike Creek Wind, Logan County, IL","lat":40.059,"lng":-89.537,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1230. Plant 65049 Pike Creek Wind (Repsol Renewables NA), Logan County, IL; balancing authority MISO. Planned operation 2027-12.\nGenerator CPCW1: 202.5 MW Onshore Wind Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1471,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Repsol Renewables Na","state":"NV","name":"Robinson Solar (Batteries, Solar Photovoltaic, 600 MW)","type":"generation","voltage_kv":null,"location_ref":"Robinson Solar, White Pine County, NV","lat":39.298603,"lng":-115.2192,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2019, 2020. Plant 67819 Robinson Solar (Repsol Renewables NA), White Pine County, NV; balancing authority NEVP. Planned operation 2029-12.\nGenerator CRSB1: 300 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator CRSS1: 300 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1544,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Repsol Renewables Na","state":"NY","name":"Mill Point Solar (Solar Photovoltaic, 250 MW)","type":"generation","voltage_kv":null,"location_ref":"Mill Point Solar, Montgomery County, NY","lat":42.919098,"lng":-74.34116,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1751. Plant 64912 Mill Point Solar (Repsol Renewables NA), Montgomery County, NY; balancing authority NYIS. Planned operation 2028-12.\nGenerator CMPS1: 250 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1579,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Repsol Renewables Na","state":"NY","name":"South Ripley Solar (Batteries, Solar Photovoltaic, 290 MW)","type":"generation","voltage_kv":null,"location_ref":"South Ripley Solar, Chautauqua County, NY","lat":42.198116,"lng":-79.75789,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1228, 1229. Plant 64911 South Ripley Solar (Repsol Renewables NA), Chautauqua County, NY; balancing authority NYIS. Planned operation 2027-12.\nGenerator CSRB1: 20 MW Batteries; (L) Regulatory approvals pending. Not under construction\nGenerator CSRS1: 270 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1614,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Repsol Renewables Na","state":"OH","name":"Henry Solar (Solar Photovoltaic, 206 MW)","type":"generation","voltage_kv":null,"location_ref":"Henry Solar, Henry County, OH","lat":41.474421,"lng":-84.11271,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1794. Plant 68511 Henry Solar (Repsol Renewables NA), Henry County, OH; balancing authority PJM. Planned operation 2028-12.\nGenerator CHC1: 206 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1624,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Repsol Renewables Na","state":"OH","name":"Ritter Solar (Solar Photovoltaic, 199 MW)","type":"generation","voltage_kv":null,"location_ref":"Ritter Solar, Fulton County, OH","lat":41.694902,"lng":-84.31682,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1320. Plant 68510 Ritter Solar (Repsol Renewables NA), Fulton County, OH; balancing authority PJM. Planned operation 2027-12.\nGenerator CFC1: 199 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2024,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Repsol Renewables Na","state":"TX","name":"Pecan Prairie North Solar (Solar Photovoltaic, 324.1 MW)","type":"generation","voltage_kv":null,"location_ref":"Pecan Prairie North Solar, Leon County, TX","lat":31.13718,"lng":-96.26925,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 808. Plant 64999 Pecan Prairie North Solar (Repsol Renewables NA), Leon County, TX; balancing authority ERCO. Planned operation 2027-05.\nGenerator CPNS1: 324.1 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2025,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Repsol Renewables Na","state":"TX","name":"Pecan Prairie South Solar (Solar Photovoltaic, 132.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Pecan Prairie South Solar, Leon County, TX","lat":31.05001,"lng":-96.221,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 807. Plant 64981 Pecan Prairie South Solar (Repsol Renewables NA), Leon County, TX; balancing authority ERCO. Planned operation 2027-05.\nGenerator CPSS1: 132.9 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2268,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Repsol Renewables Na","state":"WY","name":"Rail Tie Wind (Onshore Wind Turbine, 504 MW)","type":"generation","voltage_kv":null,"location_ref":"Rail Tie Wind, Albany County, WY","lat":41.055833,"lng":-105.4942,"route":null,"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1910. Plant 64847 Rail Tie Wind (Repsol Renewables NA), Albany County, WY; balancing authority WACM. Planned operation 2029-06.\nGenerator CRTW1: 504 MW Onshore Wind Turbine; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1216,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rewild Renewables","state":"MA","name":"Clems Way Solar (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Clems Way Solar, Bristol County, MA","lat":41.732,"lng":-70.894,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 967. Plant 70401 Clems Way Solar (ReWild Renewables, LLC), Bristol County, MA; balancing authority ISNE. Planned operation 2027-07.\nGenerator CLEM: 5 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1217,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rewild Renewables","state":"MA","name":"Cushman Road Solar (Batteries, Solar Photovoltaic, 6 MW)","type":"generation","voltage_kv":null,"location_ref":"Cushman Road Solar, Plymouth County, MA","lat":41.732,"lng":-70.875,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 818, 819. Plant 68216 Cushman Road Solar (ReWild Renewables, LLC), Plymouth County, MA; balancing authority ISNE. Planned operation 2027-05.\nGenerator CUSES: 3 MW Batteries; (L) Regulatory approvals pending. Not under construction\nGenerator CUSPV: 3 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1219,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rewild Renewables","state":"MA","name":"Featherbed Lane South Solar (Batteries, Solar Photovoltaic, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"Featherbed Lane South Solar, Plymouth County, MA","lat":41.761,"lng":-70.896,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 710, 711. Plant 68217 Featherbed Lane South Solar (ReWild Renewables, LLC), Plymouth County, MA; balancing authority ISNE. Planned operation 2027-03.\nGenerator FEAES: 1 MW Batteries; (L) Regulatory approvals pending. Not under construction\nGenerator FEAPV: 1 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1223,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rewild Renewables","state":"MA","name":"Logging Swamp North (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Logging Swamp North, Plymouth County, MA","lat":41.775,"lng":-70.881,"route":null,"cost_usd":null,"start_date":"2027-08-01","end_date":"2027-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 994. Plant 70402 Logging Swamp North (ReWild Renewables, LLC), Plymouth County, MA; balancing authority ISNE. Planned operation 2027-08.\nGenerator LOGN: 5 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1224,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rewild Renewables","state":"MA","name":"Logging Swamp South (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Logging Swamp South, Plymouth County, MA","lat":41.774,"lng":-70.88,"route":null,"cost_usd":null,"start_date":"2027-08-01","end_date":"2027-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 995. Plant 70404 Logging Swamp South (ReWild Renewables, LLC), Plymouth County, MA; balancing authority ISNE. Planned operation 2027-08.\nGenerator LOGS: 5 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1226,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rewild Renewables","state":"MA","name":"Randall Lane Solar (Batteries, Solar Photovoltaic, 10 MW)","type":"generation","voltage_kv":null,"location_ref":"Randall Lane Solar, Plymouth County, MA","lat":41.663,"lng":-70.844,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 712, 713. Plant 68218 Randall Lane Solar (ReWild Renewables, LLC), Plymouth County, MA; balancing authority ISNE. Planned operation 2027-03.\nGenerator RANES: 5 MW Batteries; (L) Regulatory approvals pending. Not under construction\nGenerator RANPV: 5 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1833,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ric Development","state":"TX","name":"Blackcat BESS (Batteries, 200.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Blackcat BESS, Matagorda County, TX","lat":28.974879,"lng":-95.99499,"route":null,"cost_usd":null,"start_date":"2028-04-01","end_date":"2028-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1496. Plant 67558 Blackcat BESS (RIC Development, LLC), Matagorda County, TX; balancing authority ERCO. Planned operation 2028-04.\nGenerator RIC96: 200.6 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1851,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ric Development","state":"TX","name":"Callan Solar (Solar Photovoltaic, 90 MW)","type":"generation","voltage_kv":null,"location_ref":"Callan Solar, McCulloch County, TX","lat":30.990928,"lng":-99.60118,"route":null,"cost_usd":null,"start_date":"2028-04-01","end_date":"2028-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1497. Plant 67561 Callan Solar (RIC Development, LLC), McCulloch County, TX; balancing authority ERCO. Planned operation 2028-04.\nGenerator RIC93: 90 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1868,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ric Development","state":"TX","name":"Chimney Rock BESS (Batteries, 156 MW)","type":"generation","voltage_kv":null,"location_ref":"Chimney Rock BESS, Taylor County, TX","lat":32.387494,"lng":-99.84846,"route":null,"cost_usd":null,"start_date":"2028-04-01","end_date":"2028-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1505. Plant 68667 Chimney Rock BESS (RIC Development, LLC), Taylor County, TX; balancing authority ERCO. Planned operation 2028-04.\nGenerator RIC89: 156 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1872,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ric Development","state":"TX","name":"Coke BESS (Batteries, 220 MW)","type":"generation","voltage_kv":null,"location_ref":"Coke BESS, Coke County, TX","lat":31.862499,"lng":-100.7638,"route":null,"cost_usd":null,"start_date":"2028-04-01","end_date":"2028-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1506. Plant 68668 Coke BESS (RIC Development, LLC), Coke County, TX; balancing authority ERCO. Planned operation 2028-04.\nGenerator RIC90: 220 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1895,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ric Development","state":"TX","name":"Dunlay Solar (Solar Photovoltaic, 180.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Dunlay Solar, Medina County, TX","lat":29.314674,"lng":-99.09725,"route":null,"cost_usd":null,"start_date":"2030-05-01","end_date":"2030-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2059. Plant 67559 Dunlay Solar (RIC Development, LLC), Medina County, TX; balancing authority ERCO. Planned operation 2030-05.\nGenerator RIC95: 180.4 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1900,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ric Development","state":"TX","name":"Edens Solar (Solar Photovoltaic, 70 MW)","type":"generation","voltage_kv":null,"location_ref":"Edens Solar, Hill County, TX","lat":32.063132,"lng":-97.11104,"route":null,"cost_usd":null,"start_date":"2028-09-01","end_date":"2028-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1664. Plant 67560 Edens Solar (RIC Development, LLC), Hill County, TX; balancing authority ERCO. Planned operation 2028-09.\nGenerator RIC94: 70 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1946,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ric Development","state":"TX","name":"Houston County BESS (Batteries, 125 MW)","type":"generation","voltage_kv":null,"location_ref":"Houston County BESS, Houston County, TX","lat":31.239009,"lng":-95.57699,"route":null,"cost_usd":null,"start_date":"2029-04-01","end_date":"2029-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1891. Plant 68671 Houston County BESS (RIC Development, LLC), Houston County, TX; balancing authority ERCO. Planned operation 2029-04.\nGenerator RIC91: 125 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2078,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ric Development","state":"TX","name":"Serrano BESS (Batteries, 185.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Serrano BESS, Maverick County, TX","lat":28.837905,"lng":-100.5487,"route":null,"cost_usd":null,"start_date":"2028-04-01","end_date":"2028-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1495. Plant 67556 Serrano BESS (RIC Development, LLC), Maverick County, TX; balancing authority ERCO. Planned operation 2028-04.\nGenerator RIC97: 185.6 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2087,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ric Development","state":"TX","name":"Stonewall BESS (Batteries, 135 MW)","type":"generation","voltage_kv":null,"location_ref":"Stonewall BESS, Stonewall County, TX","lat":33.2466,"lng":-100.3982,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2031. Plant 68666 Stonewall BESS (RIC Development, LLC), Stonewall County, TX; balancing authority ERCO. Planned operation 2029-12.\nGenerator RIC88: 135 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2088,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ric Development","state":"TX","name":"Stonewall Solar (Solar Photovoltaic, 60.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Stonewall Solar, Stonewall County, TX","lat":33.174177,"lng":-100.2308,"route":null,"cost_usd":null,"start_date":"2028-04-01","end_date":"2028-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1498. Plant 67562 Stonewall Solar (RIC Development, LLC), Stonewall County, TX; balancing authority ERCO. Planned operation 2028-04.\nGenerator RIC92: 60.2 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2089,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ric Development","state":"TX","name":"Summerhill BESS (Batteries, 143 MW)","type":"generation","voltage_kv":null,"location_ref":"Summerhill BESS, Taylor County, TX","lat":32.51289,"lng":-99.79563,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1795. Plant 68665 Summerhill BESS (RIC Development, LLC), Taylor County, TX; balancing authority ERCO. Planned operation 2028-12.\nGenerator RIC87: 143 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2136,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ric Development","state":"TX","name":"Zephyr Storage (Batteries, 185.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Zephyr Storage, Brown County, TX","lat":31.707049,"lng":-98.85746,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1460. Plant 67555 Zephyr Storage (RIC Development, LLC), Brown County, TX; balancing authority ERCO. Planned operation 2028-03.\nGenerator RIC98: 185.6 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1562,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rich Road Solar Energy Center","state":"NY","name":"Rich Road Solar Energy Center (Solar Photovoltaic, 240 MW)","type":"generation","voltage_kv":null,"location_ref":"Rich Road Solar Energy Center, St Lawrence County, NY","lat":44.567518,"lng":-75.19654,"route":null,"cost_usd":null,"start_date":"2028-05-01","end_date":"2028-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1525. Plant 68264 Rich Road Solar Energy Center (Rich Road Solar Energy Center), St Lawrence County, NY; balancing authority NYIS. Planned operation 2028-05.\nGenerator 12345: 240 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":906,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rifle Range Road Solar","state":"DE","name":"Rifle Range Road Solar (Solar Photovoltaic, 4 MW)","type":"generation","voltage_kv":null,"location_ref":"Rifle Range Road Solar, Sussex County, DE","lat":38.725699,"lng":-75.57144,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 487. Plant 68196 Rifle Range Road Solar (Rifle Range Road Solar, LLC), Sussex County, DE; balancing authority PJM. Planned operation 2026-12.\nGenerator RIFPV: 4 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2056,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rio Lago Solar","state":"TX","name":"Rio Lago Solar (Solar Photovoltaic, 123 MW)","type":"generation","voltage_kv":null,"location_ref":"Rio Lago Solar, Bandera County, TX","lat":29.756134,"lng":-99.09524,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 72. Plant 68155 Rio Lago Solar (Rio Lago Solar, LLC), Bandera County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator RIOLA: 123 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2057,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rising Star Solar","state":"TX","name":"Rising Star Solar (Solar Photovoltaic, 500 MW)","type":"generation","voltage_kv":null,"location_ref":"Rising Star Solar, Starr County, TX","lat":26.382105,"lng":-98.61544,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1810. Plant 69584 Rising Star Solar (Rising Star Solar, LLC), Starr County, TX; balancing authority ERCO. Planned operation 2028-12.\nGenerator 3572: 500 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2189,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Riverstone Solar","state":"VA","name":"Riverstone Solar (Solar Photovoltaic, 149.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Riverstone Solar, Buckingham County, VA","lat":37.72839,"lng":-78.45188,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1092. Plant 68194 Riverstone Solar (Riverstone Solar, LLC), Buckingham County, VA; balancing authority PJM. Planned operation 2027-10.\nGenerator RIVER: 149.5 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":805,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Roadhouse Energy Storage","state":"CA","name":"Roadhouse Energy Center (Batteries, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Roadhouse Energy Center, San Bernardino County, CA","lat":34.0065,"lng":-117.5696,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1407. Plant 70238 Roadhouse Energy Center (Roadhouse Energy Storage), San Bernardino County, CA; balancing authority CISO. Planned operation 2027-12.\nGenerator RDHS: 300 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1472,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Roccasecca Bess","state":"NV","name":"Roccasecca BESS LLC (Batteries, 126.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Roccasecca BESS LLC, Clark County, NV","lat":35.83,"lng":-115.0128,"route":null,"cost_usd":null,"start_date":"2027-02-01","end_date":"2027-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 670. Plant 69965 Roccasecca BESS LLC (Roccasecca BESS LLC), Clark County, NV; balancing authority CISO. Planned operation 2027-02.\nGenerator RS: 126.5 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":975,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rock Creek Solar","state":"IA","name":"Rock Creek Solar (Solar Photovoltaic, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Rock Creek Solar, Clinton County, IA","lat":41.771603,"lng":-90.35751,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 271. Plant 69540 Rock Creek Solar (Rock Creek Solar LLC), Clinton County, IA; balancing authority MISO. Planned operation 2026-10.\nGenerator RCS01: 150 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2060,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rock Rose Energy Storage","state":"TX","name":"Rock Rose Energy Storage (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Rock Rose Energy Storage, Fort Bend County, TX","lat":29.395241,"lng":-95.73535,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 701. Plant 67249 Rock Rose Energy Storage (Rock Rose Energy Storage LLC), Fort Bend County, TX; balancing authority ERCO. Planned operation 2027-03.\nGenerator RRES: 200 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2190,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rocky Forge Wind","state":"VA","name":"Rocky Forge Wind (Onshore Wind Turbine, 78 MW)","type":"generation","voltage_kv":null,"location_ref":"Rocky Forge Wind, Botetourt County, VA","lat":37.710827,"lng":-79.7196,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 73. Plant 68197 Rocky Forge Wind (Rocky Forge Wind, LLC), Botetourt County, VA; balancing authority PJM. Planned operation 2026-09.\nGenerator ROCKY: 78 MW Onshore Wind Turbine; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2150,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rodatherm Energy","state":"UT","name":"Rodatherm Milford 1 (Geothermal, 1.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Rodatherm Milford 1, Beaver County, UT","lat":38.572873,"lng":-112.9786,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1427. Plant 68044 Rodatherm Milford 1 (Rodatherm Energy Corporation), Beaver County, UT; balancing authority PACE. Planned operation 2028-01.\nGenerator RODA1: 1.8 MW Geothermal; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1565,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rolling Upland Wind Farm","state":"NY","name":"Rolling Upland Wind Farm LLC (Onshore Wind Turbine, 71.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Rolling Upland Wind Farm LLC, Madison County, NY","lat":42.524607,"lng":-75.27744,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2001. Plant 62262 Rolling Upland Wind Farm LLC (Rolling Upland Wind Farm LLC), Madison County, NY; balancing authority NYIS. Planned operation 2029-12.\nGenerator GEN1: 71.4 MW Onshore Wind Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1775,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rollins Solar","state":"SC","name":"Rollins Solar (Solar Photovoltaic, 74.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Rollins Solar, Darlington County, SC","lat":34.353572,"lng":-80.01618,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1119. Plant 62295 Rollins Solar (Rollins Solar), Darlington County, SC; balancing authority CPLE. Planned operation 2027-11.\nGenerator 67: 74.9 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":686,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Romero Energy Center","state":"AZ","name":"Romero Energy Center (Batteries, 225 MW)","type":"generation","voltage_kv":null,"location_ref":"Romero Energy Center, Maricopa County, AZ","lat":33.509114,"lng":-113.008,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 899. Plant 70193 Romero Energy Center (Romero Energy Center, LLC), Maricopa County, AZ; balancing authority AZPS. Planned operation 2027-06.\nGenerator REC01: 225 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":687,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Romero Energy Center Ii","state":"AZ","name":"Romero Energy Center II, LLC (Batteries, 225 MW)","type":"generation","voltage_kv":null,"location_ref":"Romero Energy Center II, LLC, Maricopa County, AZ","lat":33.509114,"lng":-113.008,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1577. Plant 70194 Romero Energy Center II, LLC (Romero Energy Center II, LLC), Maricopa County, AZ; balancing authority AZPS. Planned operation 2028-06.\nGenerator REC02: 225 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":701,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Roscoe Boulevard Operating","state":"CA","name":"AB Van Nuys (Solar Photovoltaic, 1.6 MW)","type":"generation","voltage_kv":null,"location_ref":"AB Van Nuys, Los Angeles County, CA","lat":34.220959,"lng":-118.4768,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1358. Plant 69242 AB Van Nuys (Roscoe Boulevard Operating, LLC), Los Angeles County, CA; balancing authority LDWP. Planned operation 2027-12.\nGenerator PV1: 1.6 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1776,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ross Solar","state":"SC","name":"Ross Solar (Solar Photovoltaic, 74.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Ross Solar, Darlington County, SC","lat":34.444756,"lng":-79.85173,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1120. Plant 62296 Ross Solar (Ross Solar), Darlington County, SC; balancing authority CPLE. Planned operation 2027-11.\nGenerator 68: 74.9 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2219,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Royal Slope Solar","state":"WA","name":"Royal Slope (Batteries, Solar Photovoltaic, 520 MW)","type":"generation","voltage_kv":null,"location_ref":"Royal Slope, Grant County, WA","lat":46.883147,"lng":-119.9207,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1115, 1116. Plant 70419 Royal Slope (Royal Slope Solar LLC), Grant County, WA; balancing authority BPAT. Planned operation 2027-10.\nGenerator RSBA: 260 MW Batteries; (T) Regulatory approvals received. Not under construction\nGenerator RSPV: 260 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1643,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Roy Solar","state":"OK","name":"Roy Solar (Solar Photovoltaic, 258 MW)","type":"generation","voltage_kv":null,"location_ref":"Roy Solar, Stephens County, OK","lat":34.309919,"lng":-96.77935,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1412. Plant 70407 Roy Solar (Roy Solar, LLC), Stephens County, OK; balancing authority SPA. Planned operation 2027-12.\nGenerator RSS: 258 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":702,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rpca Solar 8","state":"CA","name":"Althea Avenue Solar (Solar Photovoltaic, 3.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Althea Avenue Solar, Fresno County, CA","lat":36.893121,"lng":-120.6569,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 518. Plant 69137 Althea Avenue Solar (RPCA Solar 8, LLC), Fresno County, CA; balancing authority CISO. Planned operation 2026-12.\nGenerator ALP2: 3.9 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":763,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rpca Storage 1","state":"CA","name":"Industrial Parkway Storage (Batteries, 9.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Industrial Parkway Storage, Santa Barbara County, CA","lat":34.907345,"lng":-120.4465,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 34. Plant 65897 Industrial Parkway Storage (RPCA Storage 1, LLC), Santa Barbara County, CA; balancing authority CISO. Planned operation 2026-09.\nGenerator INPKY: 9.8 MW Batteries; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1880,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rpc Merchant","state":"TX","name":"Coyanosa Gas (Natural Gas Internal Combustion Engine, 10 MW)","type":"generation","voltage_kv":null,"location_ref":"Coyanosa Gas, Pecos County, TX","lat":31.275177,"lng":-103.1126,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 523, 524, 525, 526. Plant 69268 Coyanosa Gas (RPC Merchant, LLC), Pecos County, TX; balancing authority ERCO. Planned operation 2026-12.\nGenerator COYA1: 2.5 MW Natural Gas Internal Combustion Engine; (U) Under construction, less than or equal to 50 percent complete\nGenerator COYA2: 2.5 MW Natural Gas Internal Combustion Engine; (U) Under construction, less than or equal to 50 percent complete\nGenerator COYA3: 2.5 MW Natural Gas Internal Combustion Engine; (U) Under construction, less than or equal to 50 percent complete\nGenerator COYA4: 2.5 MW Natural Gas Internal Combustion Engine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2083,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rpc Merchant","state":"TX","name":"Staghorn Gas (Natural Gas Internal Combustion Engine, 9.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Staghorn Gas, Ward County, TX","lat":31.457838,"lng":-103.0847,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 257, 258, 259. Plant 69271 Staghorn Gas (RPC Merchant, LLC), Ward County, TX; balancing authority ERCO. Planned operation 2026-10.\nGenerator STAG1: 3.3 MW Natural Gas Internal Combustion Engine; (TS) Construction complete, but not yet in commercial operation\nGenerator STAG2: 3.3 MW Natural Gas Internal Combustion Engine; (TS) Construction complete, but not yet in commercial operation\nGenerator STAG3: 3.3 MW Natural Gas Internal Combustion Engine; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1644,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rumble Solar","state":"OK","name":"Rumble Solar (Solar Photovoltaic, 250 MW)","type":"generation","voltage_kv":null,"location_ref":"Rumble Solar, Grady County, OK","lat":35.338721,"lng":-97.98901,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 298. Plant 69968 Rumble Solar (Rumble Solar, LLC), Grady County, OK; balancing authority SWPP. Planned operation 2026-10.\nGenerator RUS: 250 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2068,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rush Ess","state":"TX","name":"Rush ESS (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Rush ESS, Bexar County, TX","lat":29.307639,"lng":-98.29673,"route":null,"cost_usd":null,"start_date":"2031-12-01","end_date":"2031-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2300. Plant 68361 Rush ESS (Rush ESS LLC), Bexar County, TX; balancing authority ERCO. Planned operation 2031-12.\nGenerator RUESS: 200 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1645,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rush Springs Solar","state":"OK","name":"Rush Springs Solar (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Rush Springs Solar, Stephens County, OK","lat":34.469189,"lng":-97.89441,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 316. Plant 70344 Rush Springs Solar (Rush Springs Solar, LLC), Stephens County, OK; balancing authority SWPP. Planned operation 2026-10.\nGenerator RSPV: 200 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":797,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Russell Pacific","state":"CA","name":"Pistachio Road 1726-WD (Solar Photovoltaic, 4.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Pistachio Road 1726-WD, Kern County, CA","lat":35.70789,"lng":-119.8917,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 61. Plant 67749 Pistachio Road 1726-WD (Russell Pacific LLC), Kern County, CA; balancing authority CISO. Planned operation 2026-09.\nGenerator TWISS: 4.8 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1008,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rwe Clean Energy","state":"IL","name":"Casey Fork Solar, LLC (Solar Photovoltaic, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Casey Fork Solar, LLC, Jefferson County, IL","lat":38.452,"lng":-88.876,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 274. Plant 69578 Casey Fork Solar, LLC (RWE Clean Energy), Jefferson County, IL; balancing authority MISO. Planned operation 2026-10.\nGenerator CFSPV: 150 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1149,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rwe Clean Energy","state":"IN","name":"Sculpin Solar (Solar Photovoltaic, 180 MW)","type":"generation","voltage_kv":null,"location_ref":"Sculpin Solar, DeKalb County, IN","lat":41.364556,"lng":-84.84381,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1758. Plant 66238 Sculpin Solar (RWE Clean Energy), DeKalb County, IN; balancing authority PJM. Planned operation 2028-12.\nGenerator 1SPS: 180 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1412,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rwe Clean Energy","state":"NE","name":"Burt County Wind (Onshore Wind Turbine, 75 MW)","type":"generation","voltage_kv":null,"location_ref":"Burt County Wind, Burt County, NE","lat":41.886,"lng":-96.345,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 916. Plant 61511 Burt County Wind (RWE Clean Energy), Burt County, NE; balancing authority SWPP. Planned operation 2027-07.\nGenerator BCNE: 75 MW Onshore Wind Turbine; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1631,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rwe Clean Energy","state":"OH","name":"Union Ridge Solar (Solar Photovoltaic, 108 MW)","type":"generation","voltage_kv":null,"location_ref":"Union Ridge Solar, Montgomery County, OH","lat":39.984126,"lng":-82.6413,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 202. Plant 65338 Union Ridge Solar (RWE Clean Energy), Montgomery County, OH; balancing authority PJM. Planned operation 2026-10.\nGenerator UNIS1: 108 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1830,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rwe Clean Energy","state":"TX","name":"Big Star Solar, LLC (Hybrid) (Batteries, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"Big Star Solar, LLC (Hybrid), Bastrop County, TX","lat":29.894053,"lng":-97.27054,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 201. Plant 64202 Big Star Solar, LLC (Hybrid) (RWE Clean Energy), Bastrop County, TX; balancing authority ERCO. Planned operation 2026-10.\nGenerator BGSTB: 80 MW Batteries; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1882,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rwe Clean Energy","state":"TX","name":"Crowned Heron 2 - Storage, LLC (Batteries, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Crowned Heron 2 - Storage, LLC, Fort Bend County, TX","lat":29.482673,"lng":-95.61996,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 233. Plant 68500 Crowned Heron 2 - Storage, LLC (RWE Clean Energy), Fort Bend County, TX; balancing authority ERCO. Planned operation 2026-10.\nGenerator CWH2: 150 MW Batteries; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1943,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rwe Clean Energy","state":"TX","name":"Honey Mesquite Wind, LLC (Onshore Wind Turbine, 180.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Honey Mesquite Wind, LLC, Sterling County, TX","lat":32.030383,"lng":-101.1672,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 548. Plant 69579 Honey Mesquite Wind, LLC (RWE Clean Energy), Sterling County, TX; balancing authority ERCO. Planned operation 2026-12.\nGenerator HMWT: 180.5 MW Onshore Wind Turbine; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2086,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rwe Clean Energy","state":"TX","name":"Stoneridge Solar, LLC (Batteries, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Stoneridge Solar, LLC, Milam County, TX","lat":30.569447,"lng":-97.11043,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 516. Plant 69027 Stoneridge Solar, LLC (RWE Clean Energy), Milam County, TX; balancing authority ERCO. Planned operation 2026-12.\nGenerator SSBA: 100 MW Batteries; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2115,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rwe Clean Energy","state":"TX","name":"Uvalde Solar 2 (Solar Photovoltaic, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Uvalde Solar 2, Uvalde County, TX","lat":29.225768,"lng":-99.69913,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1247. Plant 66309 Uvalde Solar 2 (RWE Clean Energy), Uvalde County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator UVPV2: 300 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2132,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rwe Clean Energy","state":"TX","name":"Yellow Cat Wind, LLC (Onshore Wind Turbine, 270 MW)","type":"generation","voltage_kv":null,"location_ref":"Yellow Cat Wind, LLC, Navarro County, TX","lat":32.07,"lng":-96.83,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 550. Plant 69588 Yellow Cat Wind, LLC (RWE Clean Energy), Navarro County, TX; balancing authority ERCO. Planned operation 2026-12.\nGenerator YCWT: 270 MW Onshore Wind Turbine; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2197,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rwe Clean Energy","state":"VA","name":"Switchgrass Solar, LLC (Solar Photovoltaic, 70 MW)","type":"generation","voltage_kv":null,"location_ref":"Switchgrass Solar, LLC, Suffolk City County, VA","lat":36.676484,"lng":-76.58588,"route":null,"cost_usd":null,"start_date":"2028-10-01","end_date":"2028-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1687. Plant 66124 Switchgrass Solar, LLC (RWE Clean Energy), Suffolk City County, VA; balancing authority PJM. Planned operation 2028-10.\nGenerator SSPV: 70 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2069,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Ryan Storage","state":"TX","name":"Ryan Storage (Batteries, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"Ryan Storage, Coryell County, TX","lat":31.53576,"lng":-97.79874,"route":null,"cost_usd":null,"start_date":"2027-02-01","end_date":"2027-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 666. Plant 69770 Ryan Storage (Ryan Storage LLC), Coryell County, TX; balancing authority ERCO. Planned operation 2027-02.\nGenerator BRS: 50 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1196,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"LA","name":"Overton Hydroelectric Project (Conventional Hydroelectric, 16.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Overton Hydroelectric Project, Rapides County, LA","lat":31.185978,"lng":-92.29309,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1536, 1537. Plant 62391 Overton Hydroelectric Project (Rye Development), Rapides County, LA; balancing authority MISO. Planned operation 2028-06.\nGenerator NA1: 8.1 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated\nGenerator NA2: 8.1 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1197,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"LA","name":"Overton Hydroelectric Project (Conventional Hydroelectric, 16.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Overton Hydroelectric Project, Rapides County, LA","lat":31.185978,"lng":-92.29309,"route":null,"cost_usd":null,"start_date":"2028-07-01","end_date":"2028-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1584, 1585. Plant 62391 Overton Hydroelectric Project (Rye Development), Rapides County, LA; balancing authority MISO. Planned operation 2028-07.\nGenerator NA3: 8.1 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated\nGenerator NA4: 8.1 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1198,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"LA","name":"Overton Hydroelectric Project (Conventional Hydroelectric, 16.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Overton Hydroelectric Project, Rapides County, LA","lat":31.185978,"lng":-92.29309,"route":null,"cost_usd":null,"start_date":"2028-08-01","end_date":"2028-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1628, 1629. Plant 62391 Overton Hydroelectric Project (Rye Development), Rapides County, LA; balancing authority MISO. Planned operation 2028-08.\nGenerator NA5: 8.1 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated\nGenerator NA6: 8.1 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1330,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"MS","name":"Arkabutla Lake Hydroelectric Project (Conventional Hydroelectric, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Arkabutla Lake Hydroelectric Project, DeSoto County, MS","lat":34.757926,"lng":-90.12569,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1538. Plant 62402 Arkabutla Lake Hydroelectric Project (Rye Development), DeSoto County, MS; balancing authority TVA. Planned operation 2028-06.\nGenerator NA1: 2.5 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1331,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"MS","name":"Arkabutla Lake Hydroelectric Project (Conventional Hydroelectric, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Arkabutla Lake Hydroelectric Project, DeSoto County, MS","lat":34.757926,"lng":-90.12569,"route":null,"cost_usd":null,"start_date":"2028-07-01","end_date":"2028-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1586. Plant 62402 Arkabutla Lake Hydroelectric Project (Rye Development), DeSoto County, MS; balancing authority TVA. Planned operation 2028-07.\nGenerator NA2: 2.5 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1334,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"MS","name":"Enid Lake Hydroelectric Project (Conventional Hydroelectric, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Enid Lake Hydroelectric Project, Panola County, MS","lat":34.158065,"lng":-89.90553,"route":null,"cost_usd":null,"start_date":"2028-10-01","end_date":"2028-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1681. Plant 62432 Enid Lake Hydroelectric Project (Rye Development), Panola County, MS; balancing authority TVA. Planned operation 2028-10.\nGenerator NA1: 2.5 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1335,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"MS","name":"Enid Lake Hydroelectric Project (Conventional Hydroelectric, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Enid Lake Hydroelectric Project, Panola County, MS","lat":34.158065,"lng":-89.90553,"route":null,"cost_usd":null,"start_date":"2028-11-01","end_date":"2028-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1717. Plant 62432 Enid Lake Hydroelectric Project (Rye Development), Panola County, MS; balancing authority TVA. Planned operation 2028-11.\nGenerator NA2: 2.5 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1339,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"MS","name":"Grenada Lake Hydroelectric Project (Conventional Hydroelectric, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Grenada Lake Hydroelectric Project, Grenada County, MS","lat":33.808842,"lng":-89.77246,"route":null,"cost_usd":null,"start_date":"2028-04-01","end_date":"2028-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1493. Plant 62430 Grenada Lake Hydroelectric Project (Rye Development), Grenada County, MS; balancing authority TVA. Planned operation 2028-04.\nGenerator NA1: 5 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1340,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"MS","name":"Grenada Lake Hydroelectric Project (Conventional Hydroelectric, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Grenada Lake Hydroelectric Project, Grenada County, MS","lat":33.808842,"lng":-89.77246,"route":null,"cost_usd":null,"start_date":"2028-05-01","end_date":"2028-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1514. Plant 62430 Grenada Lake Hydroelectric Project (Rye Development), Grenada County, MS; balancing authority TVA. Planned operation 2028-05.\nGenerator NA2: 5 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1351,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"MS","name":"Sardis Lake Hydroelectric Project (Conventional Hydroelectric, 7.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Sardis Lake Hydroelectric Project, Panola County, MS","lat":34.399125,"lng":-89.77246,"route":null,"cost_usd":null,"start_date":"2028-10-01","end_date":"2028-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1680. Plant 62425 Sardis Lake Hydroelectric Project (Rye Development), Panola County, MS; balancing authority TVA. Planned operation 2028-10.\nGenerator NA1: 7.5 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1352,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"MS","name":"Sardis Lake Hydroelectric Project (Conventional Hydroelectric, 7.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Sardis Lake Hydroelectric Project, Panola County, MS","lat":34.399125,"lng":-89.77246,"route":null,"cost_usd":null,"start_date":"2028-11-01","end_date":"2028-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1716. Plant 62425 Sardis Lake Hydroelectric Project (Rye Development), Panola County, MS; balancing authority TVA. Planned operation 2028-11.\nGenerator NA2: 7.5 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1668,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"PA","name":"Allegheny L&D2 Hydroelectric Project (Conventional Hydroelectric, 4.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Allegheny L&D2 Hydroelectric Project, Allegheny County, PA","lat":40.89444,"lng":-79.91361,"route":null,"cost_usd":null,"start_date":"2030-11-01","end_date":"2030-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2096. Plant 62401 Allegheny L&D2 Hydroelectric Project (Rye Development), Allegheny County, PA; balancing authority PJM. Planned operation 2030-11.\nGenerator NA1: 4.5 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1669,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"PA","name":"Allegheny L&D2 Hydroelectric Project (Conventional Hydroelectric, 4.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Allegheny L&D2 Hydroelectric Project, Allegheny County, PA","lat":40.89444,"lng":-79.91361,"route":null,"cost_usd":null,"start_date":"2030-12-01","end_date":"2030-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2103. Plant 62401 Allegheny L&D2 Hydroelectric Project (Rye Development), Allegheny County, PA; balancing authority PJM. Planned operation 2030-12.\nGenerator NA2: 4.5 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1690,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"PA","name":"Emsworth BC Hydroelectric Project (Conventional Hydroelectric, 6 MW)","type":"generation","voltage_kv":null,"location_ref":"Emsworth BC Hydroelectric Project, Allegheny County, PA","lat":40.50083,"lng":-80.10306,"route":null,"cost_usd":null,"start_date":"2030-11-01","end_date":"2030-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2098. Plant 62434 Emsworth BC Hydroelectric Project (Rye Development), Allegheny County, PA; balancing authority PJM. Planned operation 2030-11.\nGenerator NA1: 6 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1691,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"PA","name":"Emsworth BC Hydroelectric Project (Conventional Hydroelectric, 12.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Emsworth BC Hydroelectric Project, Allegheny County, PA","lat":40.50083,"lng":-80.10306,"route":null,"cost_usd":null,"start_date":"2030-12-01","end_date":"2030-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2105, 2106. Plant 62434 Emsworth BC Hydroelectric Project (Rye Development), Allegheny County, PA; balancing authority PJM. Planned operation 2030-12.\nGenerator NA2: 6 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated\nGenerator NA3: 6.8 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1692,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"PA","name":"Emsworth L&D Hydroelectric Project (Conventional Hydroelectric, 6.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Emsworth L&D Hydroelectric Project, Allegheny County, PA","lat":40.50305,"lng":-80.08944,"route":null,"cost_usd":null,"start_date":"2030-10-01","end_date":"2030-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2086. Plant 62433 Emsworth L&D Hydroelectric Project (Rye Development), Allegheny County, PA; balancing authority PJM. Planned operation 2030-10.\nGenerator NA1: 6.8 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1693,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"PA","name":"Emsworth L&D Hydroelectric Project (Conventional Hydroelectric, 6.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Emsworth L&D Hydroelectric Project, Allegheny County, PA","lat":40.50305,"lng":-80.08944,"route":null,"cost_usd":null,"start_date":"2030-11-01","end_date":"2030-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2097. Plant 62433 Emsworth L&D Hydroelectric Project (Rye Development), Allegheny County, PA; balancing authority PJM. Planned operation 2030-11.\nGenerator NA2: 6.8 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1694,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"PA","name":"Emsworth L&D Hydroelectric Project (Conventional Hydroelectric, 6.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Emsworth L&D Hydroelectric Project, Allegheny County, PA","lat":40.50305,"lng":-80.08944,"route":null,"cost_usd":null,"start_date":"2030-12-01","end_date":"2030-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2104. Plant 62433 Emsworth L&D Hydroelectric Project (Rye Development), Allegheny County, PA; balancing authority PJM. Planned operation 2030-12.\nGenerator NA3: 6.8 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1697,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"PA","name":"Grays Landing L&D Hydroelectric Project (Conventional Hydroelectric, 6 MW)","type":"generation","voltage_kv":null,"location_ref":"Grays Landing L&D Hydroelectric Project, Greene County, PA","lat":39.823738,"lng":-79.92302,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1535. Plant 62388 Grays Landing L&D Hydroelectric Project (Rye Development), Greene County, PA; balancing authority PJM. Planned operation 2028-06.\nGenerator NA1: 6 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1698,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"PA","name":"Grays Landing L&D Hydroelectric Project (Conventional Hydroelectric, 6 MW)","type":"generation","voltage_kv":null,"location_ref":"Grays Landing L&D Hydroelectric Project, Greene County, PA","lat":39.823738,"lng":-79.92302,"route":null,"cost_usd":null,"start_date":"2028-07-01","end_date":"2028-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1583. Plant 62388 Grays Landing L&D Hydroelectric Project (Rye Development), Greene County, PA; balancing authority PJM. Planned operation 2028-07.\nGenerator NA2: 6 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1718,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"PA","name":"Maxwell L&D Hydroelectric Project (Conventional Hydroelectric, 6 MW)","type":"generation","voltage_kv":null,"location_ref":"Maxwell L&D Hydroelectric Project, Fayette County, PA","lat":40.002401,"lng":-79.95883,"route":null,"cost_usd":null,"start_date":"2028-11-01","end_date":"2028-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1713. Plant 62385 Maxwell L&D Hydroelectric Project (Rye Development), Fayette County, PA; balancing authority PJM. Planned operation 2028-11.\nGenerator NA1: 6 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1719,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"PA","name":"Maxwell L&D Hydroelectric Project (Conventional Hydroelectric, 6 MW)","type":"generation","voltage_kv":null,"location_ref":"Maxwell L&D Hydroelectric Project, Fayette County, PA","lat":40.002401,"lng":-79.95883,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1740. Plant 62385 Maxwell L&D Hydroelectric Project (Rye Development), Fayette County, PA; balancing authority PJM. Planned operation 2028-12.\nGenerator NA2: 6 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1722,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"PA","name":"Monongahela L&D4 Hydroelectric Project (Conventional Hydroelectric, 6 MW)","type":"generation","voltage_kv":null,"location_ref":"Monongahela L&D4 Hydroelectric Project, Washington County, PA","lat":40.145943,"lng":-79.90095,"route":null,"cost_usd":null,"start_date":"2028-10-01","end_date":"2028-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1679. Plant 62404 Monongahela L&D4 Hydroelectric Project (Rye Development), Washington County, PA; balancing authority PJM. Planned operation 2028-10.\nGenerator NA1: 6 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1723,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"PA","name":"Monongahela L&D4 Hydroelectric Project (Conventional Hydroelectric, 6 MW)","type":"generation","voltage_kv":null,"location_ref":"Monongahela L&D4 Hydroelectric Project, Washington County, PA","lat":40.145943,"lng":-79.90095,"route":null,"cost_usd":null,"start_date":"2028-11-01","end_date":"2028-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1715. Plant 62404 Monongahela L&D4 Hydroelectric Project (Rye Development), Washington County, PA; balancing authority PJM. Planned operation 2028-11.\nGenerator NA2: 6 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1727,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"PA","name":"Montgomery L&D Hydroelectric Project (Conventional Hydroelectric, 6.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Montgomery L&D Hydroelectric Project, Beaver County, PA","lat":40.652478,"lng":-80.38687,"route":null,"cost_usd":null,"start_date":"2028-10-01","end_date":"2028-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1678. Plant 62400 Montgomery L&D Hydroelectric Project (Rye Development), Beaver County, PA; balancing authority PJM. Planned operation 2028-10.\nGenerator NA1: 6.8 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1728,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"PA","name":"Montgomery L&D Hydroelectric Project (Conventional Hydroelectric, 6.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Montgomery L&D Hydroelectric Project, Beaver County, PA","lat":40.652478,"lng":-80.38687,"route":null,"cost_usd":null,"start_date":"2028-11-01","end_date":"2028-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1714. Plant 62400 Montgomery L&D Hydroelectric Project (Rye Development), Beaver County, PA; balancing authority PJM. Planned operation 2028-11.\nGenerator NA2: 6.8 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1729,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"PA","name":"Montgomery L&D Hydroelectric Project (Conventional Hydroelectric, 6.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Montgomery L&D Hydroelectric Project, Beaver County, PA","lat":40.652478,"lng":-80.38687,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1741. Plant 62400 Montgomery L&D Hydroelectric Project (Rye Development), Beaver County, PA; balancing authority PJM. Planned operation 2028-12.\nGenerator NA3: 6.8 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1741,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"PA","name":"Point Marion L&D Hydroelectric Project (Conventional Hydroelectric, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Point Marion L&D Hydroelectric Project, Fayette County, PA","lat":39.726855,"lng":-79.91013,"route":null,"cost_usd":null,"start_date":"2028-11-01","end_date":"2028-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1712. Plant 62384 Point Marion L&D Hydroelectric Project (Rye Development), Fayette County, PA; balancing authority PJM. Planned operation 2028-11.\nGenerator NA1: 2.5 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1742,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"PA","name":"Point Marion L&D Hydroelectric Project (Conventional Hydroelectric, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Point Marion L&D Hydroelectric Project, Fayette County, PA","lat":39.726855,"lng":-79.91013,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1739. Plant 62384 Point Marion L&D Hydroelectric Project (Rye Development), Fayette County, PA; balancing authority PJM. Planned operation 2028-12.\nGenerator NA2: 2.5 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2248,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"WV","name":"Morgantown L&D Hydroelectric Project (Conventional Hydroelectric, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Morgantown L&D Hydroelectric Project, Monongalia County, WV","lat":39.619589,"lng":-79.96811,"route":null,"cost_usd":null,"start_date":"2028-08-01","end_date":"2028-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1627. Plant 62387 Morgantown L&D Hydroelectric Project (Rye Development), Monongalia County, WV; balancing authority PJM. Planned operation 2028-08.\nGenerator NA1: 2.5 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2249,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"WV","name":"Morgantown L&D Hydroelectric Project (Conventional Hydroelectric, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Morgantown L&D Hydroelectric Project, Monongalia County, WV","lat":39.619589,"lng":-79.96811,"route":null,"cost_usd":null,"start_date":"2028-09-01","end_date":"2028-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1660. Plant 62387 Morgantown L&D Hydroelectric Project (Rye Development), Monongalia County, WV; balancing authority PJM. Planned operation 2028-09.\nGenerator NA2: 2.5 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2251,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"WV","name":"Opekiska L&D Hydroelectric Project (Conventional Hydroelectric, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Opekiska L&D Hydroelectric Project, Monongalia County, WV","lat":39.564917,"lng":-80.05114,"route":null,"cost_usd":null,"start_date":"2028-08-01","end_date":"2028-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1626. Plant 62386 Opekiska L&D Hydroelectric Project (Rye Development), Monongalia County, WV; balancing authority PJM. Planned operation 2028-08.\nGenerator NA1: 3 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2252,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Rye Development","state":"WV","name":"Opekiska L&D Hydroelectric Project (Conventional Hydroelectric, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Opekiska L&D Hydroelectric Project, Monongalia County, WV","lat":39.564917,"lng":-80.05114,"route":null,"cost_usd":null,"start_date":"2028-09-01","end_date":"2028-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1659. Plant 62386 Opekiska L&D Hydroelectric Project (Rye Development), Monongalia County, WV; balancing authority PJM. Planned operation 2028-09.\nGenerator NA2: 3 MW Conventional Hydroelectric; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":809,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sacramento Valley Energy Center","state":"CA","name":"Sacramento Valley Energy Center, LLC (Batteries, Solar Photovoltaic, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Sacramento Valley Energy Center, LLC, Sacramento County, CA","lat":38.57147,"lng":-121.1845,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2012, 2013. Plant 65808 Sacramento Valley Energy Center, LLC (Sacramento Valley Energy Center, LLC), Sacramento County, CA; balancing authority BANC. Planned operation 2029-12.\nGenerator BSVEC: 100 MW Batteries; (U) Under construction, less than or equal to 50 percent complete\nGenerator SVEC: 200 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1457,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Saddle Butte Energy Farmington","state":"NM","name":"Westside - (NM) (Natural Gas Internal Combustion Engine, 16 MW)","type":"generation","voltage_kv":null,"location_ref":"Westside - (NM), San Juan County, NM","lat":36.752288,"lng":-108.3148,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 740. Plant 70261 Westside - (NM) (Saddle Butte Energy Farmington, LLC), San Juan County, NM; balancing authority SWPP. Planned operation 2027-03.\nGenerator WS01: 16 MW Natural Gas Internal Combustion Engine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1458,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Saddle Butte Energy Farmington","state":"NM","name":"Westside - (NM) (Natural Gas Internal Combustion Engine, 24 MW)","type":"generation","voltage_kv":null,"location_ref":"Westside - (NM), San Juan County, NM","lat":36.752288,"lng":-108.3148,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1433. Plant 70261 Westside - (NM) (Saddle Butte Energy Farmington, LLC), San Juan County, NM; balancing authority SWPP. Planned operation 2028-01.\nGenerator WS02: 24 MW Natural Gas Internal Combustion Engine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1459,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Saddle Butte Energy Farmington","state":"NM","name":"Westside - (NM) (Natural Gas Internal Combustion Engine, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"Westside - (NM), San Juan County, NM","lat":36.752288,"lng":-108.3148,"route":null,"cost_usd":null,"start_date":"2028-05-01","end_date":"2028-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1533. Plant 70261 Westside - (NM) (Saddle Butte Energy Farmington, LLC), San Juan County, NM; balancing authority SWPP. Planned operation 2028-05.\nGenerator WS03: 20 MW Natural Gas Internal Combustion Engine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1625,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Salt City Solar","state":"OH","name":"Salt City Solar Project - Hybrid (Batteries, 12.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Salt City Solar Project - Hybrid, Ross County, OH","lat":39.41473,"lng":-82.96285,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 851. Plant 65302 Salt City Solar Project - Hybrid (Salt City Solar LLC), Ross County, OH; balancing authority PJM. Planned operation 2027-06.\nGenerator BESS: 12.5 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":671,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Salt River Project","state":"AZ","name":"Coolidge Generation Station (Natural Gas Fired Combustion Turbine, 297 MW)","type":"generation","voltage_kv":null,"location_ref":"Coolidge Generation Station, Pinal County, AZ","lat":32.917399,"lng":-111.5033,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 908, 909, 910, 911, 912, 913. Plant 56948 Coolidge Generation Station (Salt River Project), Pinal County, AZ; balancing authority SRP. Planned operation 2027-07.\nGenerator COE19: 49.5 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete\nGenerator COE20: 49.5 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete\nGenerator COE21: 49.5 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete\nGenerator COE22: 49.5 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete\nGenerator COE23: 49.5 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete\nGenerator COE24: 49.5 MW Natural Gas Fired Combustion Turbine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":938,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Samsung C&t Renewables","state":"GA","name":"Conez Solar, LLC (Solar Photovoltaic, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Conez Solar, LLC, Emanuel County, GA","lat":32.458353,"lng":-82.39457,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 857. Plant 66671 Conez Solar, LLC (Samsung C&T Renewables, LLC), Emanuel County, GA; balancing authority SOCO. Planned operation 2027-06.\nGenerator CONEZ: 150 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1623,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Samsung C&t Renewables","state":"OH","name":"Richwood Solar and Storage (Batteries, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"Richwood Solar and Storage, Union County, OH","lat":40.353175,"lng":-83.33117,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1773. Plant 68019 Richwood Solar and Storage (Samsung C&T Renewables, LLC), Union County, OH; balancing authority PJM. Planned operation 2028-12.\nGenerator RICBA: 50 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1628,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Samsung C&t Renewables","state":"OH","name":"Stark Solar, LLC (Solar Photovoltaic, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Stark Solar, LLC, Stark County, OH","lat":40.852661,"lng":-81.15701,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 699. Plant 66672 Stark Solar, LLC (Samsung C&T Renewables, LLC), Stark County, OH; balancing authority PJM. Planned operation 2027-03.\nGenerator AG239: 150 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1850,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Samsung C&t Renewables","state":"TX","name":"Cairos Solar and Storage (Batteries, Solar Photovoltaic, 230.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Cairos Solar and Storage, Kinney County, TX","lat":29.269974,"lng":-100.1975,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 861, 862. Plant 67581 Cairos Solar and Storage (Samsung C&T Renewables, LLC), Kinney County, TX; balancing authority ERCO. Planned operation 2027-06.\nGenerator CIRSA: 153.3 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated\nGenerator CIRSB: 77.3 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1864,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Samsung C&t Renewables","state":"TX","name":"Champaign BESS, LLC (Batteries, 202.7 MW)","type":"generation","voltage_kv":null,"location_ref":"Champaign BESS, LLC, Glasscock County, TX","lat":31.871567,"lng":-101.7384,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 867. Plant 67917 Champaign BESS, LLC (Samsung C&T Renewables, LLC), Glasscock County, TX; balancing authority ERCO. Planned operation 2027-06.\nGenerator CHMPN: 202.7 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1890,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Samsung C&t Renewables","state":"TX","name":"Dios BESS, LLC (Batteries, 201.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Dios BESS, LLC, Jackson County, TX","lat":29.012998,"lng":-96.5051,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 703. Plant 67918 Dios BESS, LLC (Samsung C&T Renewables, LLC), Jackson County, TX; balancing authority ERCO. Planned operation 2027-03.\nGenerator DIOS: 201.6 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1891,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Samsung C&t Renewables","state":"TX","name":"Dolce BESS, LLC (Batteries, 101.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Dolce BESS, LLC, Mitchell County, TX","lat":32.484063,"lng":-100.9018,"route":null,"cost_usd":null,"start_date":"2028-04-01","end_date":"2028-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1499. Plant 67919 Dolce BESS, LLC (Samsung C&T Renewables, LLC), Mitchell County, TX; balancing authority ERCO. Planned operation 2028-04.\nGenerator DOLCE: 101.4 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2242,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Samsung C&t Renewables","state":"WI","name":"Ursa Solar, LLC (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Ursa Solar, LLC, Columbia County, WI","lat":43.504285,"lng":-89.11314,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 855. Plant 65964 Ursa Solar, LLC (Samsung C&T Renewables, LLC), Columbia County, WI; balancing authority MISO. Planned operation 2027-06.\nGenerator URSA: 200 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":952,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sandersville Solar","state":"GA","name":"Sandersville Solar (Solar Photovoltaic, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"Sandersville Solar, Washington County, GA","lat":32.987105,"lng":-82.75254,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1088. Plant 67988 Sandersville Solar (Sandersville Solar, LLC), Washington County, GA; balancing authority SOCO. Planned operation 2027-10.\nGenerator PGR28: 50 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":802,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"San Diego County Water Auth","state":"CA","name":"Rancho Penasquitos (Conventional Hydroelectric, 4.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Rancho Penasquitos, San Diego County, CA","lat":32.93695,"lng":-117.1137,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 191. Plant 56615 Rancho Penasquitos (San Diego County Water Auth), San Diego County, CA; balancing authority CISO. Planned operation 2026-10.\nGenerator G200: 4.3 MW Conventional Hydroelectric; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1248,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sanford Ess","state":"ME","name":"Sanford ESS, LLC (Batteries, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Sanford ESS, LLC, York County, ME","lat":43.407648,"lng":-70.71209,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1223. Plant 64615 Sanford ESS, LLC (Sanford ESS, LLC), York County, ME; balancing authority ISNE. Planned operation 2027-12.\nGenerator 1: 5 MW Batteries; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":747,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"San Gabriel Project","state":"CA","name":"Gabriel (Batteries, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"Gabriel, Los Angeles County, CA","lat":34.11,"lng":-117.97,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 779. Plant 69509 Gabriel (San Gabriel Project LLC), Los Angeles County, CA; balancing authority CISO. Planned operation 2027-04.\nGenerator 1: 400 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1449,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Santa Teresa Solar","state":"NM","name":"Santa Teresa Solar (Batteries, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Santa Teresa Solar, Dona Ana County, NM","lat":31.805525,"lng":-106.6989,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 95. Plant 68866 Santa Teresa Solar (Santa Teresa Solar), Dona Ana County, NM; balancing authority EPE. Planned operation 2026-09.\nGenerator SAN: 150 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":808,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Se Athos Ii","state":"CA","name":"SE Athos II, LLC (Batteries, 402.3 MW)","type":"generation","voltage_kv":null,"location_ref":"SE Athos II, LLC, Riverside County, CA","lat":33.751283,"lng":-115.355,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 612, 613, 614. Plant 64290 SE Athos II, LLC (SE Athos II, LLC), Riverside County, CA; balancing authority CISO. Planned operation 2027-01.\nGenerator ATH1N: 100 MW Batteries; (U) Under construction, less than or equal to 50 percent complete\nGenerator ATH1S: 102.3 MW Batteries; (U) Under construction, less than or equal to 50 percent complete\nGenerator ATHB2: 200 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":690,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Selma Energy Center","state":"AZ","name":"Selma Energy Center (Batteries, Solar Photovoltaic, 275 MW)","type":"generation","voltage_kv":null,"location_ref":"Selma Energy Center, Pinal County, AZ","lat":32.849821,"lng":-111.5251,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1403, 1404. Plant 70218 Selma Energy Center (Selma Energy Center, LLC), Pinal County, AZ; balancing authority DOPD. Planned operation 2027-12.\nGenerator SEL1B: 150 MW Batteries; (U) Under construction, less than or equal to 50 percent complete\nGenerator SEL1S: 125 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2070,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sgt Hoskins Solar Project","state":"TX","name":"SGT Hoskins Solar Project Hybrid (Batteries, Solar Photovoltaic, 306.2 MW)","type":"generation","voltage_kv":null,"location_ref":"SGT Hoskins Solar Project Hybrid, Lamar County, TX","lat":33.63124,"lng":-95.33785,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1275, 1276. Plant 67341 SGT Hoskins Solar Project Hybrid (SGT Hoskins Solar Project, LLC), Lamar County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator NOSES: 102.1 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator NOSPV: 204.1 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":932,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Shady Hills Energy Center","state":"FL","name":"Shady Hills Combined Cycle Facility (Natural Gas Fired Combined Cycle, 612 MW)","type":"generation","voltage_kv":null,"location_ref":"Shady Hills Combined Cycle Facility, Pasco County, FL","lat":28.366667,"lng":-82.55833,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 334. Plant 63802 Shady Hills Combined Cycle Facility (Shady Hills Energy Center, LLC), Pasco County, FL; balancing authority FPC. Planned operation 2026-11.\nGenerator G001: 612 MW Natural Gas Fired Combined Cycle; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1577,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Shepherd's Run Solar","state":"NY","name":"Shepherd's Run Solar (Solar Photovoltaic, 42 MW)","type":"generation","voltage_kv":null,"location_ref":"Shepherd's Run Solar, Columbia County, NY","lat":42.16141,"lng":-73.57453,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1129. Plant 64188 Shepherd's Run Solar (Shepherd's Run Solar), Columbia County, NY; balancing authority NYIS. Planned operation 2027-11.\nGenerator PV: 42 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1779,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Shining Sun Solar","state":"SC","name":"Shining Sun Solar (Solar Photovoltaic, 74 MW)","type":"generation","voltage_kv":null,"location_ref":"Shining Sun Solar, Orangeburg County, SC","lat":33.5425,"lng":-80.57219,"route":null,"cost_usd":null,"start_date":"2028-11-01","end_date":"2028-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1711. Plant 62309 Shining Sun Solar (Shining Sun Solar), Orangeburg County, SC; balancing authority SC. Planned operation 2028-11.\nGenerator 73: 74 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1780,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Shorthorn Solar","state":"SC","name":"Shorthorn Solar (Solar Photovoltaic, 60 MW)","type":"generation","voltage_kv":null,"location_ref":"Shorthorn Solar, Lee County, SC","lat":34.246975,"lng":-80.15782,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1121. Plant 62310 Shorthorn Solar (Shorthorn Solar), Lee County, SC; balancing authority CPLE. Planned operation 2027-11.\nGenerator 74: 60 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1327,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Show Me State Solar","state":"MO","name":"Show Me State Solar (Solar Photovoltaic, 250 MW)","type":"generation","voltage_kv":null,"location_ref":"Show Me State Solar, Callaway County, MO","lat":38.958702,"lng":-91.94479,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 228. Plant 68325 Show Me State Solar (Show Me State Solar, LLC), Callaway County, MO; balancing authority MISO. Planned operation 2026-10.\nGenerator SMS: 250 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":691,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sierra Luna Energy Storage","state":"AZ","name":"Sierra Luna Energy Storage (Batteries, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Sierra Luna Energy Storage, Maricopa County, AZ","lat":33.408834,"lng":-112.3042,"route":null,"cost_usd":null,"start_date":"2030-12-01","end_date":"2030-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2265. Plant 70236 Sierra Luna Energy Storage (Sierra Luna Energy Storage LLC), Maricopa County, AZ; balancing authority SRP. Planned operation 2030-12.\nGenerator SLRN1: 150 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1474,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sierra Pacific Power","state":"NV","name":"Sierra Solar Hybrid (Solar Photovoltaic, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"Sierra Solar Hybrid, Churchill County, NV","lat":39.8536,"lng":-119.0394,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 480. Plant 67978 Sierra Solar Hybrid (Sierra Pacific Power Co), Churchill County, NV; balancing authority NEVP. Planned operation 2026-12.\nGenerator SSPV1: 400 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":692,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sierra Solar","state":"AZ","name":"Sierra Solar (Solar Photovoltaic, 25 MW)","type":"generation","voltage_kv":null,"location_ref":"Sierra Solar, Mohave County, AZ","lat":35.129649,"lng":-114.0803,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 893. Plant 70049 Sierra Solar (Sierra Solar LLC), Mohave County, AZ; balancing authority WALC. Planned operation 2027-06.\nGenerator NUCPV: 25 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":976,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Silver Queen Wind Farm","state":"IA","name":"Silver Queen Wind Farm (Onshore Wind Turbine, 252 MW)","type":"generation","voltage_kv":null,"location_ref":"Silver Queen Wind Farm, Crawford County, IA","lat":42.002397,"lng":-95.1316,"route":null,"cost_usd":null,"start_date":"2028-10-01","end_date":"2028-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1683. Plant 64835 Silver Queen Wind Farm (Silver Queen Wind Farm, LLC), Crawford County, IA; balancing authority SWPP. Planned operation 2028-10.\nGenerator NA: 252 MW Onshore Wind Turbine; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1209,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Singer Solar","state":"LA","name":"Singer Solar (Solar Photovoltaic, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Singer Solar, Beauregard County, LA","lat":30.694644,"lng":-93.33381,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 721. Plant 69299 Singer Solar (Singer Solar, LLC), Beauregard County, LA; balancing authority MISO. Planned operation 2027-03.\nGenerator 4519: 300 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1567,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sl Ashville","state":"NY","name":"SL Ashville (Solar Photovoltaic, 3.8 MW)","type":"generation","voltage_kv":null,"location_ref":"SL Ashville, Chautauqua County, NY","lat":42.071667,"lng":-79.41167,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 384. Plant 69275 SL Ashville (SL Ashville, LLC), Chautauqua County, NY; balancing authority NYIS. Planned operation 2026-11.\nGenerator 23210: 3.8 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1568,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sl Ashville 2","state":"NY","name":"SL Ashville 2 (Solar Photovoltaic, 4.3 MW)","type":"generation","voltage_kv":null,"location_ref":"SL Ashville 2, Chautauqua County, NY","lat":42.071667,"lng":-79.41167,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 385. Plant 69276 SL Ashville 2 (SL Ashville 2, LLC), Chautauqua County, NY; balancing authority NYIS. Planned operation 2026-11.\nGenerator 23219: 4.3 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1569,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sl Brockport","state":"NY","name":"SL Brockport (Solar Photovoltaic, 4.3 MW)","type":"generation","voltage_kv":null,"location_ref":"SL Brockport, Monroe County, NY","lat":43.201111,"lng":-77.89806,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 392. Plant 69473 SL Brockport (SL Brockport, LLC), Monroe County, NY; balancing authority NYIS. Planned operation 2026-11.\nGenerator 23211: 4.3 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1570,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sl Dunkirk","state":"NY","name":"SL Dunkirk (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"SL Dunkirk, Chautauqua County, NY","lat":42.463685,"lng":-79.34316,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 399. Plant 69756 SL Dunkirk (SL Dunkirk, LLC), Chautauqua County, NY; balancing authority NYIS. Planned operation 2026-11.\nGenerator 23212: 5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2073,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sl Energy Power Plant I","state":"TX","name":"Sandow Lakes Energy Station (Natural Gas Fired Combined Cycle, 645 MW)","type":"generation","voltage_kv":null,"location_ref":"Sandow Lakes Energy Station, Lee County, TX","lat":30.419441,"lng":-97.19124,"route":null,"cost_usd":null,"start_date":"2028-10-01","end_date":"2028-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1696. Plant 68504 Sandow Lakes Energy Station (SL Energy Power Plant I, LLC), Lee County, TX; balancing authority ERCO. Planned operation 2028-10.\nGenerator SLES1: 645 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2074,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sl Energy Power Plant I","state":"TX","name":"Sandow Lakes Energy Station (Natural Gas Fired Combined Cycle, 645 MW)","type":"generation","voltage_kv":null,"location_ref":"Sandow Lakes Energy Station, Lee County, TX","lat":30.419441,"lng":-97.19124,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1793. Plant 68504 Sandow Lakes Energy Station (SL Energy Power Plant I, LLC), Lee County, TX; balancing authority ERCO. Planned operation 2028-12.\nGenerator SLES2: 645 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1571,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sl Pembroke","state":"NY","name":"SL Pembroke (Solar Photovoltaic, 4 MW)","type":"generation","voltage_kv":null,"location_ref":"SL Pembroke, Genesee County, NY","lat":43.028056,"lng":-78.45694,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 386. Plant 69309 SL Pembroke (SL Pembroke, LLC), Genesee County, NY; balancing authority NYIS. Planned operation 2026-11.\nGenerator 23215: 4 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1572,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sl Pembroke 2","state":"NY","name":"SL Pembroke 2 (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"SL Pembroke 2, Genesee County, NY","lat":43.028056,"lng":-78.45694,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 387. Plant 69310 SL Pembroke 2 (SL Pembroke 2, LLC), Genesee County, NY; balancing authority NYIS. Planned operation 2026-11.\nGenerator 23220: 5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1574,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sl Portland Community","state":"NY","name":"SL Portland Community, LLC (Solar Photovoltaic, 3.5 MW)","type":"generation","voltage_kv":null,"location_ref":"SL Portland Community, LLC, Chautauqua County, NY","lat":42.383832,"lng":-79.4718,"route":null,"cost_usd":null,"start_date":"2027-02-01","end_date":"2027-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 672. Plant 70018 SL Portland Community, LLC (SL Portland Community, LLC), Chautauqua County, NY; balancing authority NYIS. Planned operation 2027-02.\nGenerator 23216: 3.5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1573,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sl Portland Community 2","state":"NY","name":"SL Portland Community 2, LLC (Solar Photovoltaic, 3.8 MW)","type":"generation","voltage_kv":null,"location_ref":"SL Portland Community 2, LLC, Chautauqua County, NY","lat":42.37773,"lng":-79.45972,"route":null,"cost_usd":null,"start_date":"2027-02-01","end_date":"2027-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 673. Plant 70019 SL Portland Community 2, LLC (SL Portland Community 2, LLC), Chautauqua County, NY; balancing authority NYIS. Planned operation 2027-02.\nGenerator 23221: 3.8 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1108,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Snapdragon Solar","state":"IL","name":"Snapdragon Solar, LLC (Solar Photovoltaic, 28 MW)","type":"generation","voltage_kv":null,"location_ref":"Snapdragon Solar, LLC, Perry County, IL","lat":38.1703,"lng":-89.5532,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 587. Plant 70090 Snapdragon Solar, LLC (Snapdragon Solar, LLC), Perry County, IL; balancing authority MISO. Planned operation 2026-12.\nGenerator SNPDR: 28 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1115,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Solamerica Energy / Stephenson County Il S1","state":"IL","name":"Stephenson County IL S1 (Solar Photovoltaic, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"Stephenson County IL S1, Stephenson County, IL","lat":42.304234,"lng":-89.58015,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 174. Plant 70393 Stephenson County IL S1 (SolAmerica Energy / Stephenson County IL S1, LLC), Stephenson County, IL; balancing authority PJM. Planned operation 2026-09.\nGenerator S1: 2 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1229,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Solar Carver 1","state":"MA","name":"Solar Carver 1 Hybrid (Batteries, Solar Photovoltaic, 4 MW)","type":"generation","voltage_kv":null,"location_ref":"Solar Carver 1 Hybrid, Plymouth County, MA","lat":41.824474,"lng":-70.75292,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 197, 198. Plant 63541 Solar Carver 1 Hybrid (Solar Carver 1, LLC), Plymouth County, MA; balancing authority ISNE. Planned operation 2026-10.\nGenerator BCRV1: 2 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator SCRV1: 2 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1230,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Solar Carver 3","state":"MA","name":"Solar Carver 3 Hybrid (Batteries, Solar Photovoltaic, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"Solar Carver 3 Hybrid, Plymouth County, MA","lat":41.84206,"lng":-70.7699,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 195, 196. Plant 63506 Solar Carver 3 Hybrid (Solar Carver 3, LLC), Plymouth County, MA; balancing authority ISNE. Planned operation 2026-10.\nGenerator BCRV3: 1 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator SCRV3: 1 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1460,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Solariant Capital","state":"NM","name":"Wildcat Solar Power Plant LLC (Batteries, Solar Photovoltaic, 140 MW)","type":"generation","voltage_kv":null,"location_ref":"Wildcat Solar Power Plant LLC, McKinley County, NM","lat":35.580453,"lng":-108.9023,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1749, 1750. Plant 64849 Wildcat Solar Power Plant LLC (Solariant Capital, LLC), McKinley County, NM; balancing authority PNM. Planned operation 2028-12.\nGenerator ATMWS: 50 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator WILDC: 90 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":824,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Solar Star 3","state":"CA","name":"Solar Star 3 (Solar Photovoltaic, 24 MW)","type":"generation","voltage_kv":null,"location_ref":"Solar Star 3, Kern County, CA","lat":34.84166,"lng":-118.4551,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 74. Plant 68240 Solar Star 3 (Solar Star 3, LLC), Kern County, CA; balancing authority CISO. Planned operation 2026-09.\nGenerator SS3PV: 24 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":825,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Solar Star 3","state":"CA","name":"Solar Star 3 (Batteries, 23 MW)","type":"generation","voltage_kv":null,"location_ref":"Solar Star 3, Kern County, CA","lat":34.84166,"lng":-118.4551,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 355. Plant 68240 Solar Star 3 (Solar Star 3, LLC), Kern County, CA; balancing authority CISO. Planned operation 2026-11.\nGenerator SS3BT: 23 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":826,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Solar Star 4","state":"CA","name":"Solar Star 4 (Solar Photovoltaic, 24 MW)","type":"generation","voltage_kv":null,"location_ref":"Solar Star 4, Kern County, CA","lat":34.84166,"lng":-118.4551,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 225. Plant 68241 Solar Star 4 (Solar Star 4, LLC), Kern County, CA; balancing authority CISO. Planned operation 2026-10.\nGenerator SS4PV: 24 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":827,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Solar Star 4","state":"CA","name":"Solar Star 4 (Batteries, 23 MW)","type":"generation","voltage_kv":null,"location_ref":"Solar Star 4, Kern County, CA","lat":34.84166,"lng":-118.4551,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 356. Plant 68241 Solar Star 4 (Solar Star 4, LLC), Kern County, CA; balancing authority CISO. Planned operation 2026-11.\nGenerator SS4BT: 23 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2081,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Solex Ridge","state":"TX","name":"Solex Ridge Solar (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Solex Ridge Solar, Henderson County, TX","lat":32.169946,"lng":-95.5803,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1346. Plant 68903 Solex Ridge Solar (Solex Ridge, LLC), Henderson County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator MUSPV: 100 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1651,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Solriver Capital","state":"OR","name":"Canyonville Solar LLC (CSG) (Solar Photovoltaic, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Canyonville Solar LLC (CSG), Douglas County, OR","lat":42.956886,"lng":-123.2618,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1248. Plant 66340 Canyonville Solar LLC (CSG) (SolRiver Capital LLC), Douglas County, OR; balancing authority PACW. Planned operation 2027-12.\nGenerator PV1: 2.5 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1773,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Solriver Capital","state":"SC","name":"Rhubarb One SC (Solar Photovoltaic, 9.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Rhubarb One SC, Marion County, SC","lat":34.151111,"lng":-79.41,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 845. Plant 59596 Rhubarb One SC (SolRiver Capital LLC), Marion County, SC; balancing authority CPLE. Planned operation 2027-06.\nGenerator PV1: 9.6 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2003,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sol Systems","state":"TX","name":"Nightfall Solar (Solar Photovoltaic, 180 MW)","type":"generation","voltage_kv":null,"location_ref":"Nightfall Solar, Uvalde County, TX","lat":29.259299,"lng":-99.72513,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 522. Plant 69245 Nightfall Solar (Sol Systems), Uvalde County, TX; balancing authority ERCO. Planned operation 2026-12.\nGenerator NTFL: 180 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1227,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Somerset Energy Storage","state":"MA","name":"Salt Cod BESS (Batteries, 168 MW)","type":"generation","voltage_kv":null,"location_ref":"Salt Cod BESS, Bristol County, MA","lat":41.73722,"lng":-71.1489,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1814. Plant 69722 Salt Cod BESS (Somerset Energy Storage, LLC), Bristol County, MA; balancing authority ISNE. Planned operation 2028-12.\nGenerator BESS1: 168 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1781,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"South Carolina Public Service Authority","state":"SC","name":"Winyah (Petroleum Liquids, 114 MW)","type":"generation","voltage_kv":null,"location_ref":"Winyah, Georgetown County, SC","lat":33.33184,"lng":-79.35724,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1193, 1194. Plant 6249 Winyah (South Carolina Public Service Authority), Georgetown County, SC; balancing authority SC. Planned operation 2027-12.\nGenerator 5: 57 MW Petroleum Liquids; (P) Planned for installation, but regulatory approvals not initiated\nGenerator 6: 57 MW Petroleum Liquids; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":705,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Southern California Edison","state":"CA","name":"Anode (Springville) BESS (Batteries, 225 MW)","type":"generation","voltage_kv":null,"location_ref":"Anode (Springville) BESS, Tulare County, CA","lat":36.107903,"lng":-118.9409,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 461, 462. Plant 65458 Anode (Springville) BESS (Southern California Edison Co), Tulare County, CA; balancing authority CISO. Planned operation 2026-12.\nGenerator ANOD1: 112.5 MW Batteries; (TS) Construction complete, but not yet in commercial operation\nGenerator ANOD2: 112.5 MW Batteries; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2800,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Anniston - Bynum 115 Kv Tl Upgrade","type":"transmission line","voltage_kv":115,"location_ref":"Anniston - Bynum (GA/AL/MS/FL)","lat":33.71,"lng":-85.843,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":31,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 31.\nIn-Service Year: 2027\nProject Name: SOCO: ANNISTON - BYNUM 115 KV TL UPGRADE\nDescription: Upgrade 6.5 miles from Coldwater – Anniston from 1351 ACSS 54/19 170°C to 200°C.\nSupporting Statement: The Anniston - Bynum 115 kV transmission line overloads under contingency.\nLocated: ANNISTON = OSM substation 'Anniston Substation' (AL); BYNUM ~ Calhoun County, AL (county centre) (nearest of 3) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2801,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Athena - East Watkinsville 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Athena - East Watkinsville (GA/AL/MS/FL)","lat":33.918,"lng":-83.365,"route":[[33.976,-83.346],[33.861,-83.385]],"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":32,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 32.\nIn-Service Year: 2027\nProject Name: SOCO: ATHENA - EAST WATKINSVILLE 115 KV REBUILD\nDescription: Rebuild approximately 8.47 miles of the Athena - East Watkinsville 115 kV line with 100°C ACSR 1033 conductor.\nSupporting Statement: The Athena - East Watkinsville 115 kV line overloads under contingency.\nLocated: ATHENA = OSM substation 'Athena Substation' (GA); EAST WATKINSVILLE = OSM substation 'East Watkinsville Substation' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2802,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Autaugaville - East Pelham New 230 Kv Transmission Line","type":"transmission line","voltage_kv":230,"location_ref":"Autaugaville - East Pelham (GA/AL/MS/FL)","lat":32.832,"lng":-86.635,"route":[[32.383,-86.575],[33.28,-86.695]],"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":32,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 32.\nIn-Service Year: 2027\nProject Name: SOCO: AUTAUGAVILLE - EAST PELHAM NEW 230 KV TRANSMISSION LINE\nDescription: Construct ~75 miles new 230 kV transmission line bundled 795 ACSS at 200°C from Autaugaville TS to East Pelham TS.\nSupporting Statement: The Bessemer – South Bessemer 230 kV transmission line overloads under contingency. Reduces multiple 230 kV line loadings and provides additional operational and maintenance flexibility, which increases reliability.\nLocated: AUTAUGAVILLE = OSM substation 'Autaugaville 230kV Substation' (AL); EAST PELHAM = OSM substation 'East Pelham Substation' (AL) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2803,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Bessemer – South Bessemer 115 Kv Tl Reconductor - Phase 1","type":"transmission line","voltage_kv":115,"location_ref":"Bessemer - South Bessemer (GA/AL/MS/FL)","lat":33.321,"lng":-87.013,"route":[[33.422,-86.963],[33.22,-87.063]],"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":32,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 32.\nIn-Service Year: 2027\nProject Name: SOCO: BESSEMER – SOUTH BESSEMER 115 KV TL RECONDUCTOR - PHASE 1\nDescription: Reconductor ~2 miles of 115 kV transmission line from South Bessemer TS to Bessemer TS from 397 ACSR at 100°C to 795 ACSS 26/7 at 200°C.\nSupporting Statement: The Bessemer - South Bessemer 115 kV transmission line overloads under contingency.\nLocated: BESSEMER = OSM substation 'Bessemer Substation' (AL); SOUTH BESSEMER = OSM substation 'South Bessemer Substation' (AL) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2804,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Big Shanty 500 Kv Breaker","type":"substation","voltage_kv":500,"location_ref":"Big Shanty (GA/AL/MS/FL)","lat":33.994,"lng":-84.569,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":32,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 32.\nIn-Service Year: 2027\nProject Name: SOCO: BIG SHANTY 500 KV BREAKER\nDescription: Install a 500 kV breaker at Big Shanty substation.\nSupporting Statement: The 500/230 kV transformer at Big Shanty overloads under a contigency.\nLocated: BIG SHANTY = OSM substation 'Big Shanty Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":2805,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Broadway - Echeconnee 115 Kv Line Reconductor","type":"transmission line","voltage_kv":115,"location_ref":"Broadway - Echeconnee (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":33,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 33.\nIn-Service Year: 2027\nProject Name: SOCO: BROADWAY - ECHECONNEE 115 KV LINE RECONDUCTOR\nDescription: Reconductor Griffin Rd to Echeconnee segment (approximately 4.9 miles) of the Broadway - Echeconnee 115 kV line with 210°C 636 ACCR conductor. Replace the limiting jumper with 1590 AAC.\nSupporting Statement: The Broadway - Echeconnee 115 kV line overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2806,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Doyle - Lg&E Monroe 230 Kv - Jacks Creek Loop In","type":"transmission line","voltage_kv":230,"location_ref":"Doyle - E Monroe (GA/AL/MS/FL)","lat":33.838,"lng":-83.699,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":33,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 33.\nIn-Service Year: 2027\nProject Name: SOCO: DOYLE - LG&E MONROE 230 KV - JACKS CREEK LOOP IN\nDescription: Loop in and out the new Jack's Creek 230 kV switching station into the Doyle - LG&E Monroe 230 kV line.\nSupporting Statement: Contingencies of 230 kV transmission lines in the area causes several 230 kV lines to overload.\nLocated: DOYLE = OSM substation 'Doyle Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":2807,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"East Point - Union City230 Kv Fiber Installation","type":"transmission line","voltage_kv":230,"location_ref":"East Point - Union City230 Kv Fiber Installation (GA/AL/MS/FL)","lat":33.675,"lng":-84.462,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":33,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 33.\nIn-Service Year: 2027\nProject Name: SOCO: EAST POINT - UNION CITY230 KV FIBER INSTALLATION\nDescription: Install Fiber on the East Point - Union City 230 kV (Black & White) lines.\nSupporting Statement: This project adds protection to the transmission system in the area to increase coordination.\nLocated: EAST POINT = OSM substation 'East Point 12kV Switching Station' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":2808,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Ellenwood Area Network Improvements","type":"substation","voltage_kv":115,"location_ref":"Ellenwood (GA/AL/MS/FL)","lat":33.609,"lng":-84.302,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":33,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 33.\nIn-Service Year: 2027\nProject Name: SOCO: ELLENWOOD AREA NETWORK IMPROVEMENTS\nDescription: Rebuild the Austin Drive - Morrow 115 kV line with 200°C 1351 ACSS Martin and upgrade limiting elements at the Austin Drive substation.\nSupporting Statement: The Austin Drive - Morrow 115 kV line overloads under contingency.\nLocated: ELLENWOOD = OSM substation 'Ellenwood Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":2809,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Enterprise Ts – Pinckard #2 115 Kv Tl Reconductor","type":"transmission line","voltage_kv":115,"location_ref":"Enterprise Ts - Pinckard #2 (GA/AL/MS/FL)","lat":31.348,"lng":-85.785,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":34,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 34.\nIn-Service Year: 2027\nProject Name: SOCO: ENTERPRISE TS – PINCKARD #2 115 KV TL RECONDUCTOR\nDescription: Reconductor ~7.5 miles of 266 ACSR at 100°C of the Enterprise to Daleville DS to 795 ACSR 26/7 at 100°C\nSupporting Statement: The Enterprise - Pinckard #2 115 kV transmission line overloads under contingency.\nLocated: PINCKARD #2 = OSM substation 'Pinckard Substation' (AL); ENTERPRISE TS ~ Coffee County, AL (county centre) (nearest of 8) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2810,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Grady 115 Kv Breaker Replacements","type":"substation","voltage_kv":115,"location_ref":"Grady (GA/AL/MS/FL)","lat":30.576,"lng":-85.031,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":34,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 34.\nIn-Service Year: 2027\nProject Name: SOCO: GRADY 115 KV BREAKER REPLACEMENTS\nDescription: The breaker duty margin will become negative for two 115 kV breakers at Grady. Replace them with 115 kV higher rated breakers.\nSupporting Statement: This project is needed to increase breaker duty margins at Grady substation to comply with NERC TPL-001-05, Section 2.3.\nLocated: GRADY = OSM substation 'Grady Substation' (FL)","reviewed":false,"approximate":false,"requires_review":false},{"id":2811,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Arkwright - Lloyd Shoals 115 Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Arkwright - Lloyd Shoals (GA/AL/MS/FL)","lat":33.065,"lng":-83.768,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":34,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 34.\nIn-Service Year: 2027\nProject Name: SOCO: GRID: ARKWRIGHT - LLOYD SHOALS 115 KV LINE REBUILD\nDescription: Rebuild the Arkwright - Lloyd Shoals 115 kV line with 100°C 795 ACSR conductor.\nSupporting Statement: The Arkwright - Lloyd Shoals 115 kV line overloads under contingency.\nLocated: LLOYD SHOALS = OSM plant 'Lloyd Shoals Dam' (GA); ARKWRIGHT ~ Bibb County, GA (county centre) (nearest of 2) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2812,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Gullatt Road Transmission Improvements","type":"substation","voltage_kv":115,"location_ref":"Gullatt Road (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":35,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 35.\nIn-Service Year: 2027\nProject Name: SOCO: GULLATT ROAD TRANSMISSION IMPROVEMENTS\nDescription: Rebuild the Morrow - Yates Common 115 kV line from Line Creek to the new Gullatt Road station. Rebuild the Line Creek - Fairburn #2 115 kV line from Line Creek to the new Gullatt Road station. Remove the Owens Corning Tap Connection on the Morrow - Yates Common 115 kV line and rebuild the line from North Coweta to Str 1. Build new line section from Str 1 to the new Gullatt Road station. All rebuilds will be done with 200°C 1351 ACSS Martin.\nSupporting Statement: Thie project addresses multiple 115 kV overloads.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2813,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Hill View & Grassy Hollow 230 Kv Sub","type":"substation","voltage_kv":230,"location_ref":"Hill View - Grassy Hollow (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":35,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 35.\nIn-Service Year: 2027\nProject Name: SOCO: HILL VIEW & GRASSY HOLLOW 230 KV SUB\nDescription: Build two 230 kV switching stations (Hill View and Grassy Hollow) looping into the Cartersville - McGrau Ford 230 kV line. Build two new 230 kV lines: Cass Pine - Great Valley and Great Valley - Grassy Hollow with 200°C 1351 ACSS Martin.\nSupporting Statement: The transmission network upgrades increases reliability and supports economic development in the area.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2814,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Hills Bridge 230 Kv Statcom Addition","type":"substation","voltage_kv":230,"location_ref":"Hills Bridge (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":35,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 35.\nIn-Service Year: 2027\nProject Name: SOCO: HILLS BRIDGE 230 KV STATCOM ADDITION\nDescription: Install a STATCOM connected to the 230 kV bus at Hills Bridge substation.\nSupporting Statement: Fast acting reactive power compensation is needed to enhance voltage stability and power quality in the area.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2815,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Jesup - Offerman 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Jesup - Offerman (GA/AL/MS/FL)","lat":31.513,"lng":-82.035,"route":[[31.603,-81.925],[31.423,-82.144]],"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":36,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 36.\nIn-Service Year: 2027\nProject Name: SOCO: JESUP - OFFERMAN 115 KV REBUILD\nDescription: Rebuild approximately 20 miles of the Jesup - Offerman 115 kV line with 100°C 795 ACSR Drake conductor.\nSupporting Statement: The Jesup - Offerman 115 kV transmission line overloads under contingency.\nLocated: JESUP = OSM substation 'Jesup Substation' (GA); OFFERMAN = OSM substation 'Offerman Substation' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2816,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Jonesboro - Morrow 115 Kv Relay Protection Upgrade","type":"transmission line","voltage_kv":115,"location_ref":"Jonesboro - Morrow (GA/AL/MS/FL)","lat":33.57,"lng":-84.322,"route":[[33.606,-84.333],[33.535,-84.312]],"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":36,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 36.\nIn-Service Year: 2027\nProject Name: SOCO: JONESBORO - MORROW 115 KV RELAY PROTECTION UPGRADE\nDescription: Upgrade the Jonesboro - Morrow 115 kV line relay protection schemes to accelerate clearing time.\nSupporting Statement: This project will need to be completed by the need date to comply with NERC TPL-001- 05.\nLocated: MORROW = OSM substation 'Morrow Substation' (GA); JONESBORO = OSM substation 'Jonesboro Substation' (GA), nearest of 2 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2817,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Lawrenceville - Winder Primary 230 Kv Line Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Lawrenceville - Winder Primary (GA/AL/MS/FL)","lat":33.979,"lng":-83.873,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":36,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 36.\nIn-Service Year: 2027\nProject Name: SOCO: LAWRENCEVILLE - WINDER PRIMARY 230 KV LINE REBUILD\nDescription: Rebuild the entire Lawrenceville - Winder Primary 230 kV line, approximately 15.4 miles, using 200°C 1351 ACSS Martin conductor.\nSupporting Statement: The Lawrenceville - Winder Primary 230 kV line will overload under contingency.\nLocated: WINDER PRIMARY = OSM 'Winder Primary Substation' (GA); LAWRENCEVILLE ~ centre of 3 nearby same-named OSM substations (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2818,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Line Creek 115 Kv Breaker Replacements","type":"transmission line","voltage_kv":115,"location_ref":"Line Creek (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":36,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 36.\nIn-Service Year: 2027\nProject Name: SOCO: LINE CREEK 115 KV BREAKER REPLACEMENTS\nDescription: At Line Creek, the breaker duty margin will become negative starting on 06/01/2027 for the two 115 kV breakers. Replace them with 115 kV higher rated breakers.\nSupporting Statement: This project is needed to increase breaker duty margins at Line Creek substation to comply with NERC TPL-001-05, Section 2.3.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2819,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Meridian Hwy 80 South 230 Kv Switching Station","type":"substation","voltage_kv":230,"location_ref":"Meridian Hwy 80 South (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":37,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 37.\nIn-Service Year: 2027\nProject Name: SOCO: MERIDIAN HWY 80 SOUTH 230 KV SWITCHING STATION\nDescription: Construct new 230 kV Switching Station in the Meridian Area.\nSupporting Statement: This project addresses multiple thermal overloads that occur under contingency and supports economic development in the area.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2820,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Meridian Northeast To Lauderdale East 230 Kv Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Meridian Northeast - Lauderdale East (GA/AL/MS/FL)","lat":32.415,"lng":-88.677,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":37,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 37.\nIn-Service Year: 2027\nProject Name: SOCO: MERIDIAN NORTHEAST TO LAUDERDALE EAST 230 KV REBUILD\nDescription: Rebuild the 6.47 mile, Meridian Northeast - Lauderdale East 230 kV transmission line with 1351 ACSS at 200°C.\nSupporting Statement: Line overloads under contingency.\nLocated: MERIDIAN NORTHEAST = OSM substation 'Meridian Northeast Substation' (MS)","reviewed":false,"approximate":true,"requires_review":false},{"id":2821,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Meridian Substation 230 Kv Tl To Loop-In","type":"transmission line","voltage_kv":230,"location_ref":"Meridian (GA/AL/MS/FL)","lat":32.404,"lng":-88.66,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":37,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 37.\nIn-Service Year: 2027\nProject Name: SOCO: MERIDIAN SUBSTATION 230 KV TL TO LOOP-IN\nDescription: Construct ~7.6 mile loop in with 1351 ACSS at 200°C to new 230 kV substation.\nSupporting Statement: This project addresses multiple thermal overloads that occur under contingency and supports economic development in the area.\nLocated: MERIDIAN ~ Lauderdale County, MS (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2822,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Morrow - Yates Common 115 Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Morrow - Yates Common (GA/AL/MS/FL)","lat":33.534,"lng":-84.618,"route":[[33.606,-84.333],[33.462,-84.904]],"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":37,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 37.\nIn-Service Year: 2027\nProject Name: SOCO: MORROW - YATES COMMON 115 KV LINE REBUILD\nDescription: Rebuild a section (approximately 5.1 mies) of the Morrow - Yates Common 115 kV line with 200°C 1351.0 ACSS Martin.\nSupporting Statement: Line sections on the Morrow - Yates 115 kV line overload under contingency.\nLocated: MORROW = OSM substation 'Morrow Substation' (GA); YATES COMMON = OSM substation 'Yates Common Substation' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2823,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Oliver Dam & Bull Creek 115 Kv Protection Relay Upgrade","type":"transmission line","voltage_kv":115,"location_ref":"Oliver Dam - Bull Creek (GA/AL/MS/FL)","lat":32.517,"lng":-84.995,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":38,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 38.\nIn-Service Year: 2027\nProject Name: SOCO: OLIVER DAM & BULL CREEK 115 KV PROTECTION RELAY UPGRADE\nDescription: At Bull Creek and Oliver Dam 115 kV substations, replace the protection on the Fortson 115 kV line with standard SEL - 421 / 311C1 DCUB panel, capable of providing 7 cycle clearing time or less. Install line traps and associated carrier equipment.\nSupporting Statement: This project upgrades relay protections at Bull Creek and Oliver Dam substations to improve reliability in the system.\nLocated: OLIVER DAM = OSM substation 'Oliver Dam Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":2824,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Possum Branch - Yates Common 115Kv Rebuild (Yates To Clem)","type":"transmission line","voltage_kv":115,"location_ref":"Possum Branch - Yates Common (GA/AL/MS/FL)","lat":33.462,"lng":-84.904,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":38,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 38.\nIn-Service Year: 2027\nProject Name: SOCO: POSSUM BRANCH - YATES COMMON 115KV REBUILD (YATES TO CLEM)\nDescription: Rebuild approximately 11 mile section of the Possum Branch - Yates 115 kV line with 200°C 1334 T13 ACCR Martin or 200°C 1351.0 ACSS conductor and replace limiting elements along the line with a higher rating.\nSupporting Statement: The Possum Branch - Yates 115 kV line overloads under contingency.\nLocated: YATES COMMON = OSM substation 'Yates Common Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":2825,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Remove Limiting Elements On 115 Kv At Lloyd Shoals","type":"substation","voltage_kv":115,"location_ref":"115 Kv At Lloyd Shoals (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":38,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 38.\nIn-Service Year: 2027\nProject Name: SOCO: REMOVE LIMITING ELEMENTS ON 115 KV AT LLOYD SHOALS\nDescription: Upgrade limiting elements at Lloyd Shoals 115 kV substation to be a higher rating.\nSupporting Statement: Limiting elements exceed their thermal rating under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2826,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Sandersville #1 - Wadley Primary 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Sandersville #1 - Wadley Primary (GA/AL/MS/FL)","lat":32.941,"lng":-82.609,"route":[[32.998,-82.802],[32.885,-82.416]],"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":38,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 38.\nIn-Service Year: 2027\nProject Name: SOCO: SANDERSVILLE #1 - WADLEY PRIMARY 115 KV REBUILD\nDescription: Rebuild approximately 24.3 miles of the Sandersville #1 - Wadley Primary 115 kV line with 100°C 1351 ACSR Drake conductor. Replace limiting elements in substations along the line.\nSupporting Statement: The Sandersville # 1 - Wadley Primary 115 kV line overloads under contingency.\nLocated: SANDERSVILLE #1 = OSM substation 'Sandersville Substation #1' (GA); WADLEY PRIMARY = OSM substation 'Wadley Substation' (GA), nearest of 3 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2827,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Goshen (Sav) - Kraft 115 Kv Line Partial Rebuild - Phase 1","type":"transmission line","voltage_kv":115,"location_ref":"Goshen (Sav) - Kraft (GA/AL/MS/FL)","lat":32.199,"lng":-81.178,"route":[[32.148,-81.146],[32.249,-81.209]],"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":39,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 39.\nIn-Service Year: 2027\nProject Name: SOCO: SAV: GOSHEN (SAV) - KRAFT 115 KV LINE PARTIAL REBUILD - PHASE 1\nDescription: Rebuild a portion (approximately 3.48 miles) of Goshen - Kraft 115 kV line from 100°C 795 ACSR Drake to 200°C 1351 ACSS Martin.\nSupporting Statement: The Goshen - Kraft 115 kV line overloads under contingency.\nLocated: KRAFT = OSM substation 'Kraft Substation' (GA); GOSHEN (SAV) = OSM substation 'Goshen Substation' (GA), nearest of 3 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2828,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Shugart Farms Area Improvement","type":"substation","voltage_kv":230,"location_ref":"Shugart Farms (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":39,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 39.\nIn-Service Year: 2027\nProject Name: SOCO: SHUGART FARMS AREA IMPROVEMENT\nDescription: Rebuild the Line Creek 230 kV substation. Reconnect existing 230 kV lines and build two short lines from Line Creek to Shugart Farms (0.3 miles each) with 100°C 1351 ACSR Martin conductor.\nSupporting Statement: The transmission network upgrades increase reliability and supports economic development in the area.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2829,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"South Macon 115 Kv Buses 1 & 2 Replacement","type":"substation","voltage_kv":115,"location_ref":"South Macon (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":39,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 39.\nIn-Service Year: 2027\nProject Name: SOCO: SOUTH MACON 115 KV BUSES 1 & 2 REPLACEMENT\nDescription: Replace the 115 kV buses 1 and 2 at South Macon with (2) 1590 AAC. Replace the limiting elements on the station with a higher rating.\nSupporting Statement: The 230/115 kV auto transformers at South Macon overload under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2830,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Stanton Sp - Thumbs Up 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Stanton Sp - Thumbs Up (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":39,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 39.\nIn-Service Year: 2027\nProject Name: SOCO: STANTON SP - THUMBS UP 115 KV REBUILD\nDescription: Rebuild a portion of Stanton Sp - Thumbs Up 115 kV line with 100°C 1351 ASCR.\nSupporting Statement: The Stanton Sp - Thumbs up 115 kV line overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2831,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Summer Lake - Villa Rica 230 Kv Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Summer Lake - Villa Rica (GA/AL/MS/FL)","lat":33.741,"lng":-84.855,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":40,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 40.\nIn-Service Year: 2027\nProject Name: SOCO: SUMMER LAKE - VILLA RICA 230 KV REBUILD\nDescription: Rebuild the 2.5 miles portion of the Summer Lake - Villa Rica 230 kV line with bundled 200°C 1351 ACSS Martin.\nSupporting Statement: The Summer Lake - Villa Rica 230 kV line overloads under contingency.\nLocated: VILLA RICA = OSM substation 'Villa Rica Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":2832,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Thurlow Dam – Union Springs 115 Kv Tl Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Thurlow Dam - Union Springs (GA/AL/MS/FL)","lat":32.119,"lng":-85.718,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":40,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 40.\nIn-Service Year: 2027\nProject Name: SOCO: THURLOW DAM – UNION SPRINGS 115 KV TL REBUILD\nDescription: Rebuild approximately 31.5 miles of 397 ACSR at 75°C from Thurlow Dam to Union Springs to 795 ACSS @ 200°C.\nSupporting Statement: The Thurlow Dam - Union Springs 115 kV transmission line overloads under contingency.\nLocated: UNION SPRINGS = OSM substation 'Union Springs Substation' (AL)","reviewed":false,"approximate":true,"requires_review":false},{"id":2833,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Tomochichi 500/230 Kv Area Solution","type":"substation","voltage_kv":500,"location_ref":"Tomochichi (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":40,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 40.\nIn-Service Year: 2027\nProject Name: SOCO: TOMOCHICHI 500/230 KV AREA SOLUTION\nDescription: Build the new Tomochichi 500/230 kV switching station splitting the Ohara - Scherer 500 kV line. Build two new 230 kV lines from the new Tomochichi substation to the new Towaliga River 230 kV substation using 200°C 1351 ACSS Martin conductor.\nSupporting Statement: The transmission network upgrades increase reliability and supports economic development in the area.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2834,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Tomochichi Substation Statcom Additions","type":"substation","voltage_kv":230,"location_ref":"Tomochichi (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":40,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 40.\nIn-Service Year: 2027\nProject Name: SOCO: TOMOCHICHI SUBSTATION STATCOM ADDITIONS\nDescription: Install a STATCOM connected to the 230 kV at Tomochichi substation.\nSupporting Statement: Fast acting reactive power compensation is needed to enhance voltage stability and power quality in the area.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2848,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Acipco Ts – Boyles 230 Kv Tl New Transmission Line","type":"transmission line","voltage_kv":230,"location_ref":"Acipco Ts - Boyles (GA/AL/MS/FL)","lat":33.556,"lng":-86.817,"route":[[33.546,-86.83],[33.566,-86.804]],"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":44,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 44.\nIn-Service Year: 2028\nProject Name: SOCO: ACIPCO TS – BOYLES 230 KV TL NEW TRANSMISSION LINE\nDescription: Construct ~6 miles of 1351 54/19 ACSR at 100°C from ACIPCO TS to Boyles TS.\nSupporting Statement: The Boyles - Miller 230 kV transmission line overloads under contingency. Also provides additional operational and maintenance flexibility, which increases reliability.\nLocated: ACIPCO TS = OSM substation 'Acipco Substation' (AL); BOYLES = OSM substation 'Boyles Substation' (AL) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2849,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Advanced Power Flow Controllers At East Villa Rica Switching Station","type":"substation","voltage_kv":230,"location_ref":"Advanced Power Flow Controllers At East Villa Rica (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":44,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 44.\nIn-Service Year: 2028\nProject Name: SOCO: ADVANCED POWER FLOW CONTROLLERS AT EAST VILLA RICA SWITCHING STATION\nDescription: Install Advanced Power Flow Controllers at the new East Villa Rica Switching Station on the Douglasville - Villa Rica 230 kV and Summer Lake - Villa Rica 230 kV lines.\nSupporting Statement: The project addresses multiple thermal overloads that occur under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2850,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Anniston - Hammond 230 Kv Tl Reactor","type":"transmission line","voltage_kv":230,"location_ref":"Anniston - Hammond (GA/AL/MS/FL)","lat":33.65,"lng":-85.858,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":44,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 44.\nIn-Service Year: 2028\nProject Name: SOCO: ANNISTON - HAMMOND 230 KV TL REACTOR\nDescription: Install a 3% reactor at Hammond along the Anniston - Hammond 230 kV TL.\nSupporting Statement: The Anniston - Hammond 230 kV transmission line overloads under contingency.\nLocated: ANNISTON = OSM substation 'Anniston Substation' (AL)","reviewed":false,"approximate":true,"requires_review":false},{"id":2851,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Barry - Ellicott 230 Kv Series Reactors","type":"substation","voltage_kv":230,"location_ref":"Barry - Ellicott (GA/AL/MS/FL)","lat":31.0,"lng":-88.021,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":45,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 45.\nIn-Service Year: 2028\nProject Name: SOCO: BARRY - ELLICOTT 230 KV SERIES REACTORS\nDescription: New Series Reactors on the Barry - Ellicott 230 kV TL needed to address short circuit constraints and also create short circuit margin. Potential Tap sizes of 0.5% or 1.0% Reactors\nSupporting Statement: The project addresses short circuit constraints.\nLocated: BARRY = OSM substation 'Barry Substation' (AL); ELLICOTT = OSM substation 'Ellicott Substation' (AL) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2852,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Bartletts Ferry - Backwater Tap 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Bartletts Ferry - Backwater Tap (GA/AL/MS/FL)","lat":32.661,"lng":-85.092,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":45,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 45.\nIn-Service Year: 2028\nProject Name: SOCO: BARTLETTS FERRY - BACKWATER TAP 115 KV REBUILD\nDescription: Rebuild the 1.27 miles of the Bartlett's Ferry - Backwater Tap section of the Bartletts Ferry - West Point (APC) 115 kV line with 200°C 1351 AAC conductor. Replace switch with higher rated switch.\nSupporting Statement: A multiple contingency event causes the Bartletts Ferry - West Point (APC) 115 kV line to overload.\nLocated: BARTLETTS FERRY = OSM substation 'Bartletts Ferry Dam Substation' (AL)","reviewed":false,"approximate":true,"requires_review":false},{"id":2853,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Bartletts Ferry - West Point 115 Kv Tl Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Bartletts Ferry - West Point (GA/AL/MS/FL)","lat":32.772,"lng":-85.129,"route":[[32.661,-85.092],[32.883,-85.166]],"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":45,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 45.\nIn-Service Year: 2028\nProject Name: SOCO: BARTLETTS FERRY - WEST POINT 115 KV TL REBUILD\nDescription: Rebuild ~2.42 miles of 115 kV TL from Back Water Tap – Bartletts Ferry Dam from 636 26/7 ACSR 100°C to 1351 54/19 ACSS 200°C.\nSupporting Statement: The Bartletts Ferry - West Point Dam 115 kV TL overloads under contingency.\nLocated: BARTLETTS FERRY = OSM substation 'Bartletts Ferry Dam Substation' (AL); WEST POINT = OSM substation 'West Point Substation' (GA), nearest of 3 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2854,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Bowen Series Reactor Installation","type":"substation","voltage_kv":500,"location_ref":"Bowen Series (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":45,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 45.\nIn-Service Year: 2028\nProject Name: SOCO: BOWEN SERIES REACTOR INSTALLATION\nDescription: Install new series reactors on the low side of the 500/230 kV auto transformer.\nSupporting Statement: This project supports new generation interconnection in the area.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2855,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Bremen - Crooked Creek 115 Kv Tl Reconductor","type":"transmission line","voltage_kv":115,"location_ref":"Bremen - Crooked Creek (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":46,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 46.\nIn-Service Year: 2028\nProject Name: SOCO: BREMEN - CROOKED CREEK 115 KV TL RECONDUCTOR\nDescription: Reconductor ~29.5 miles of 397 30/7 ACSR 100°C to 1351 ACSS 200°C from Crooked Creek TS to Indian Creek Metering Station.\nSupporting Statement: The Bremen - Crooked Creek 115 kV transmission line overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2856,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Cartersville - Emerson 230 Kv Line Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Cartersville - Emerson (GA/AL/MS/FL)","lat":34.21,"lng":-84.825,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":46,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 46.\nIn-Service Year: 2028\nProject Name: SOCO: CARTERSVILLE - EMERSON 230 KV LINE REBUILD\nDescription: Rebuild 5.3 miles of the Cartersville to Emerson 230 kV line with (2) 200°C 1351 ACSS Martin and replace limiting line elements.\nSupporting Statement: The Cartersville - Emerson 230 kV line overloads under contingency.\nLocated: CARTERSVILLE = OSM substation 'Cartersville Primary Substation' (GA); EMERSON ~ Bartow County, GA (county centre) (nearest of 2) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2857,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Centre - Hammond 115 Kv Tl Reactor","type":"transmission line","voltage_kv":115,"location_ref":"Centre - Hammond (GA/AL/MS/FL)","lat":34.162,"lng":-85.658,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":46,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 46.\nIn-Service Year: 2028\nProject Name: SOCO: CENTRE - HAMMOND 115 KV TL REACTOR\nDescription: Install a 2% reactor at Hammond along the Centre - Hammond 115 kV TL.\nSupporting Statement: The Centre - Hammond 115 kV transmission line overloads under contingency.\nLocated: CENTRE = OSM substation 'Centre Substation' (AL)","reviewed":false,"approximate":true,"requires_review":false},{"id":2858,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Construct New 230 Kv Line From Lauderdale West - Plant Sweatt","type":"transmission line","voltage_kv":230,"location_ref":"New (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":46,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 46.\nIn-Service Year: 2028\nProject Name: SOCO: CONSTRUCT NEW 230 KV LINE FROM LAUDERDALE WEST - PLANT SWEATT\nDescription: Construct new 10 mile, Lauderdale West - Plant Sweatt 230 kV line with 1351 ACSS at 200°C.\nSupporting Statement: Alleviates loading on the Lauderdale West to Enterprise 230 kV TL.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2859,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Corn Crib - Lagrange 115 Kv Reconductor","type":"transmission line","voltage_kv":115,"location_ref":"Corn Crib - Lagrange (GA/AL/MS/FL)","lat":33.024,"lng":-85.016,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":47,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 47.\nIn-Service Year: 2028\nProject Name: SOCO: CORN CRIB - LAGRANGE 115 KV RECONDUCTOR\nDescription: Reconductor a section of the Corn Crib - LaGrange 115 kV line with 397 ACSS 200°C conductor. Replace limiting elements at Corn Crib.\nSupporting Statement: A multiple contingency event causes a section of the Corn Crib - LaGrange 115 kV line to overload.\nLocated: LAGRANGE = OSM substation 'LaGrange Primary Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":2860,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Deer Creek 500/230 Kv Substation","type":"substation","voltage_kv":500,"location_ref":"Deer Creek (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":47,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 47.\nIn-Service Year: 2028\nProject Name: SOCO: DEER CREEK 500/230 KV SUBSTATION\nDescription: Build a 500/230 kV station splitting the Bonaire Primary - Scherer 500 kV line. Install two 500/230 kV auto transformers and build 2 bundled 200°C 1351 ACSS Martin 230 kV lines from Deer Creek to Little Deer Creek substations.\nSupporting Statement: This project provides operational and maintenance flexibility, which increases reliability and supports economic development in the area.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2861,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Dyer Road - East Roanoke 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Dyer Road - East Roanoke (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":47,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 47.\nIn-Service Year: 2028\nProject Name: SOCO: DYER ROAD - EAST ROANOKE 115 KV REBUILD\nDescription: Rebuild 20.7 miles from Dyer Road to Wansley tap on the Dyer Road - East Roanoke (APC) 115 kV line with advanced Everglades C7 conductor.\nSupporting Statement: Dyer Road - East Roanoke (APC) 115 kV line overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2862,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"East Villa Rica 230 Kv Switching Station","type":"substation","voltage_kv":230,"location_ref":"East Villa Rica (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":47,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 47.\nIn-Service Year: 2028\nProject Name: SOCO: EAST VILLA RICA 230 KV SWITCHING STATION\nDescription: Build a 230 kV substation along the right of way of the (3) 230 kV lines switching station east of Villa Rica.\nSupporting Statement: The transmission network upgrades increase reliability and supports economic development in the area.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2863,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Eutaw - Greene County 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Eutaw - Greene County (GA/AL/MS/FL)","lat":32.722,"lng":-87.827,"route":[[32.603,-87.782],[32.84,-87.872]],"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":48,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 48.\nIn-Service Year: 2028\nProject Name: SOCO: EUTAW - GREENE COUNTY 115 KV REBUILD\nDescription: Rebuild ~28 miles of 115 kV TL from Eutaw TS to Greene County SP from 397 ACSR 26/7 at 100°C to 795 ACSS 26/7 at 200°C.\nSupporting Statement: The Eutaw - Greene County 115 kV transmission line overloads under contingency.\nLocated: GREENE COUNTY = OSM substation 'Greene County Station' (AL); EUTAW = OSM substation 'Eutaw Substation' (AL), nearest of 2 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2864,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"First Avenue - North Columbus 115 Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"First Avenue - North Columbus (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":48,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 48.\nIn-Service Year: 2028\nProject Name: SOCO: FIRST AVENUE - NORTH COLUMBUS 115 KV LINE REBUILD\nDescription: Rebuild 0.9 mile of the North Columbus - First Avenue 115 kV line with 200°C 1351 ACSS conductor. The First Ave - Goat Rock 115 kV line will be reconductored with 1351 ACSS 200°C due to common structures with North Columbus-First Ave 115 kV lines.\nSupporting Statement: The North Columbus - First Avenue 115 kV line overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2865,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Fitzgerald - Pitts 115 Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Fitzgerald - Pitts (GA/AL/MS/FL)","lat":31.846,"lng":-83.365,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":48,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 48.\nIn-Service Year: 2028\nProject Name: SOCO: FITZGERALD - PITTS 115 KV LINE REBUILD\nDescription: Rebuild Pitts to Whittle segment of the Fitzgerald - Pitts 115 kV line with 200°C 1351 ACSS conductor and reconductor the Whittle to HWY 233 segment with 100°C 762 ACSR conductor.\nSupporting Statement: The Fitzgerald - Pitts 115 kV line overloads under contingency.\nLocated: FITZGERALD = OSM substation 'Fitzgerald Substation' (GA); PITTS ~ Wilcox County, GA (county centre) (nearest of 3) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2866,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Gaston - Bynum 230 Kv Tl Upgrade","type":"transmission line","voltage_kv":230,"location_ref":"Gaston - Bynum (GA/AL/MS/FL)","lat":33.508,"lng":-86.143,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":48,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 48.\nIn-Service Year: 2028\nProject Name: SOCO: GASTON - BYNUM 230 KV TL UPGRADE\nDescription: Upgrade ~38.5 miles of the Gaston - Bynum 230 kV TL from 1033 45/7 ACSR @ 100⁰C to 1033 45/7 ACSR @ 125⁰C\nSupporting Statement: The Bynum - Gaston 230 kV transmission line overloads under contingency.\nLocated: GASTON = OSM substation 'Gaston Substation' (AL); BYNUM ~ Calhoun County, AL (county centre) (nearest of 3) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2867,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Gordon 115 Kv Overstressed Breaker Replacement","type":"substation","voltage_kv":115,"location_ref":"Gordon (GA/AL/MS/FL)","lat":32.882,"lng":-83.317,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":49,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 49.\nIn-Service Year: 2028\nProject Name: SOCO: GORDON 115 KV OVERSTRESSED BREAKER REPLACEMENT\nDescription: The breaker duty margin will become negative starting on 05/15/2028 for the two 115 kV breakers. Replace them with 115 kV higher rated breakers.\nSupporting Statement: This project is needed to increase breaker duty margins at Gordon substation to comply with NERC TPL-001-05, Section 2.3.\nLocated: GORDON = OSM substation 'Gordon Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":2868,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Hammond Reactors","type":"substation","voltage_kv":115,"location_ref":"Hammond Reactors (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":49,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 49.\nIn-Service Year: 2028\nProject Name: SOCO: HAMMOND REACTORS\nDescription: Install a 2% reactor at Hammond on the 115 kV bus for the Hammond - Weiss Dam 115kV line\nSupporting Statement: The Anniston (APC) - Hammond 230 kV line overloads under contingency\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2869,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Hampton Area 115 To 230 Kv Line Conversions","type":"transmission line","voltage_kv":230,"location_ref":"Hampton (GA/AL/MS/FL)","lat":33.453,"lng":-84.154,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":49,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 49.\nIn-Service Year: 2028\nProject Name: SOCO: HAMPTON AREA 115 TO 230 KV LINE CONVERSIONS\nDescription: Convert Hampton – Ohara 115 kV and Jonesboro – Ohara 115 kV to create a new Jonesboro – Hampton 230 kV line. Convert Hampton – South Griffin 115 kV to 230 kV operation. Loop in Jonesboro - Ohara 115 kV through Bonanza so it is not radial. Install a new 230/115 kV auto at Jonesboro.\nSupporting Statement: The project will address multiple thermal overloads that occur under contingency.\nLocated: HAMPTON ~ Henry County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2870,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Line Creek Terminal Equipment Replacement","type":"transmission line","voltage_kv":230,"location_ref":"Line Creek (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":49,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 49.\nIn-Service Year: 2028\nProject Name: SOCO: LINE CREEK TERMINAL EQUIPMENT REPLACEMENT\nDescription: At Line Creek, upgrade terminal equipment on the Line Creek - Yates 230 kV, Line Creek - Union City 230 kV, and Line Creek - Morrow 230 kV lines with higher rated equipment.\nSupporting Statement: Multiple lines at Line Creek overload under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2871,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Lloyd Shoals - Porterdale Primary 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Lloyd Shoals - Porterdale Primary (GA/AL/MS/FL)","lat":33.437,"lng":-83.846,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":50,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 50.\nIn-Service Year: 2028\nProject Name: SOCO: LLOYD SHOALS - PORTERDALE PRIMARY 115 KV REBUILD\nDescription: Rebuild a portion (approximately 15.8 miles) of the Lloyd Shoals - Porterdale Primary 115 kV line with 200°C 1351 ACSS Martin.\nSupporting Statement: The Lloyd Shoals - Porterdale Primary 115 kV line overloads under contingency.\nLocated: LLOYD SHOALS = OSM plant 'Lloyd Shoals Dam' (GA); PORTERDALE PRIMARY ~ Newton County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2872,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Martin Dam - Crooked Creek #1 115 Kv Tl","type":"transmission line","voltage_kv":115,"location_ref":"Martin Dam - Crooked Creek #1 (GA/AL/MS/FL)","lat":34.554,"lng":-83.291,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":50,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 50.\nIn-Service Year: 2028\nProject Name: SOCO: MARTIN DAM - CROOKED CREEK #1 115 KV TL\nDescription: Upgrade 16 miles of the Martin Dam - Crooked Creek #1 TL from Martin Dam - Dadeville to 397 30/7 ACSR at 125°C\nSupporting Statement: The Martin Dam - Crooked Creek (1) 115 kV transmission line overloads under contingency.\nLocated: MARTIN DAM ~ Stephens County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2873,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Martin Dam - Crooked Creek #2 115 Kv Tl","type":"transmission line","voltage_kv":115,"location_ref":"Martin Dam - Crooked Creek #2 (GA/AL/MS/FL)","lat":34.554,"lng":-83.291,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":50,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 50.\nIn-Service Year: 2028\nProject Name: SOCO: MARTIN DAM - CROOKED CREEK #2 115 KV TL\nDescription: Upgrade 16 miles of the Martin Dam - Crooked Creek #2 TL from Martin Dam - Dadeville to 397 30/7 ACSR at 125°C.\nSupporting Statement: The Martin Dam - Crooked Creek (2) 115 kV transmission line overloads under contingency.\nLocated: MARTIN DAM ~ Stephens County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2874,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Mcintosh 230 Kv Breaker Control Relay Upgrades","type":"substation","voltage_kv":230,"location_ref":"Mcintosh (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":50,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 50.\nIn-Service Year: 2028\nProject Name: SOCO: MCINTOSH 230 KV BREAKER CONTROL RELAY UPGRADES\nDescription: Replace existing (20) 230 kV breaker control relays with (20) high speed breaker control relays at McIntosh 230 kV breaker and a half bus.\nSupporting Statement: Protection analysis identified the project modifications are required due to the interconnection of the Proposed Generating Facility.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2875,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Meridian Substation 230 Kv Line To Loop-In","type":"transmission line","voltage_kv":230,"location_ref":"Meridian (GA/AL/MS/FL)","lat":32.404,"lng":-88.66,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":51,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 51.\nIn-Service Year: 2028\nProject Name: SOCO: MERIDIAN SUBSTATION 230 KV LINE TO LOOP-IN\nDescription: Construct 7.2 mile, 1351 ACSS at 200°C loop in new 230 kV substation.\nSupporting Statement: This project addresses multiple thermal overloads that occur under contingency and supports economic development in the area.\nLocated: MERIDIAN ~ Lauderdale County, MS (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2876,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Miller Sp 500 Kv Breaker","type":"substation","voltage_kv":500,"location_ref":"Miller Sp (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":51,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 51.\nIn-Service Year: 2028\nProject Name: SOCO: MILLER SP 500 KV BREAKER\nDescription: Install 500 kV breaker at Miller SP.\nSupporting Statement: This project addresses multiple thermal overloads that occur under contingency. This project provides additional operational and maintenance flexibility, which increases reliability.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2877,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Ohara 115 Kv Targeted Equipment Replacement","type":"substation","voltage_kv":115,"location_ref":"Ohara (GA/AL/MS/FL)","lat":33.482,"lng":-84.367,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":51,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 51.\nIn-Service Year: 2028\nProject Name: SOCO: OHARA 115 KV TARGETED EQUIPMENT REPLACEMENT\nDescription: The breaker duty margin will become negative starting on 06/01/2030 for one 115 kV breaker. Replace it with 115 kV higher rated breaker.\nSupporting Statement: This project is needed to increase breaker duty margins at Ohara substation to comply with NERC TPL-001-05, Section 2.3.\nLocated: OHARA = OSM substation 'O'Hara Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":2878,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Pittman Road - West Point Dam (Usa) 115 Kv Reconductor","type":"transmission line","voltage_kv":115,"location_ref":"Pittman Road - West Point Dam (Usa) (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":51,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 51.\nIn-Service Year: 2028\nProject Name: SOCO: PITTMAN ROAD - WEST POINT DAM (USA) 115 KV RECONDUCTOR\nDescription: Reconductor the Pittman Road - West Point Dam (USA) 115 kV line with 336 ACSS 200°C conductor. Replace AAC 750 jumper at Pittman Road 115 kV with 1590 AAC.\nSupporting Statement: The Pittman Road - West Point Dam (USA) 115 kV line overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2879,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Plant Yates 230 Kv Breaker And Half Station","type":"substation","voltage_kv":230,"location_ref":"Plant Yates (GA/AL/MS/FL)","lat":33.461,"lng":-84.897,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":52,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 52.\nIn-Service Year: 2028\nProject Name: SOCO: PLANT YATES 230 KV BREAKER AND HALF STATION\nDescription: Rebuild the Yates 6 & 7 substation to a breaker and a half configuration.\nSupporting Statement: Yates 6 & 7 needs to be rebuilt to facilitate new generation.\nLocated: PLANT YATES = OSM substation 'Yates Switchyard' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":2880,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Rainbow Drive Area Capacitor","type":"substation","voltage_kv":115,"location_ref":"Rainbow Drive (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":52,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 52.\nIn-Service Year: 2028\nProject Name: SOCO: RAINBOW DRIVE AREA CAPACITOR\nDescription: Install a 115 kV capacitor bank at Ellenwood substation.\nSupporting Statement: The Rainbow Drive area experiences voltage issues under a contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2881,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Remove Limiting Elements On Bank A At Morrow","type":"substation","voltage_kv":115,"location_ref":"Bank A At Morrow (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":52,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 52.\nIn-Service Year: 2028\nProject Name: SOCO: REMOVE LIMITING ELEMENTS ON BANK A AT MORROW\nDescription: Upgrade limiting 115 kV switch at Morrow to a higher rating.\nSupporting Statement: Switch exceeds its thermal rating under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2882,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Coleman - Dean Forest 115 Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Coleman - Dean Forest (GA/AL/MS/FL)","lat":32.096,"lng":-81.208,"route":[[32.084,-81.189],[32.108,-81.227]],"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":52,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 52.\nIn-Service Year: 2028\nProject Name: SOCO: SAV: COLEMAN - DEAN FOREST 115 KV LINE REBUILD\nDescription: Rebuild the entire Coleman - Dean Forest 115 kV line, approximately 6.7 miles of 100°C 477 Hawk with 200°C 1351 ACSS Martin. At Chatham County, upgrade jumpers and bus. At Dean Forest, remove limiting elements by upgrading jumpers. Rebuild approximately 1.7 miles of the Coleman – Meldrim line section due to common structures.\nSupporting Statement: The Coleman - Dean Forest 115 kV line overloads under contingency.\nLocated: DEAN FOREST = OSM substation 'Dean Forest Substation' (GA); COLEMAN = OSM substation 'Coleman Substation' (GA), nearest of 2 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2883,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Goshen (Sav) - Mcintosh 115 Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Goshen (Sav) - Mcintosh (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":53,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 53.\nIn-Service Year: 2028\nProject Name: SOCO: SAV: GOSHEN (SAV) - MCINTOSH 115 KV LINE REBUILD\nDescription: Rebuild the Goshen (Savannah) - Georgia Pacific (Rincon) section, approximately 6.7 miles, of the Goshen (Sav) - McIntosh 115 kV line using 200°C 1351 ACSS conductor.\nSupporting Statement: The Goshen (Sav) - McIntosh 115 kV line overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2884,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Rice Hope New Auto Transformer 230/115 Kv","type":"substation","voltage_kv":230,"location_ref":"Rice Hope (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":53,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 53.\nIn-Service Year: 2028\nProject Name: SOCO: SAV: RICE HOPE NEW AUTO TRANSFORMER 230/115 KV\nDescription: Install a new 230/115 kV auto transformer at Rice Hope and loop in the Crossgate - McIntosh 230 kV line.\nSupporting Statement: This project will address multiple thermal overloads that occur under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2885,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Thurlow Dam - Pin Oaks 115 Kv Tl Reconductor","type":"transmission line","voltage_kv":115,"location_ref":"Thurlow Dam - Pin Oaks (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":53,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 53.\nIn-Service Year: 2028\nProject Name: SOCO: THURLOW DAM - PIN OAKS 115 KV TL RECONDUCTOR\nDescription: Reconductor approximately 21 miles of 397 ACSR at 100°C from Thurlow Dam to Pin Oaks to 795 ACSS at 200°C.\nSupporting Statement: The Thurlow Dam - Notasulga 115 kV transmission line overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2886,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Union City - Line Creek - Yates 230 Kv Lines Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Union City (GA/AL/MS/FL)","lat":33.79,"lng":-84.468,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":53,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 53.\nIn-Service Year: 2028\nProject Name: SOCO: UNION CITY - LINE CREEK - YATES 230 KV LINES REBUILD\nDescription: Rebuild the entire Union City - Line Creek - Yates 230 kV lines (approximately 23.4 miles) with bundled 200°C 1351 ACSS Martin. Upgrade limiting elements at substations along the line.\nSupporting Statement: The Line Creek - Union City 230 kV and Line Creek - Yates 230 kV lines overload under contingency.\nLocated: UNION CITY ~ Fulton County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2887,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Villa Rica Upgrades","type":"substation","voltage_kv":500,"location_ref":"Villa Rica (GA/AL/MS/FL)","lat":33.741,"lng":-84.855,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":54,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 54.\nIn-Service Year: 2028\nProject Name: SOCO: VILLA RICA UPGRADES\nDescription: Add a new 500/230 kV auto transformer at Villa Rica and loop in and out the Bowen - Union City 500 kV line into Villa Rica. Reconfigure the 230 kV side of the substation.\nSupporting Statement: The transmission network upgrades increase reliability and supports economic development in the area.\nLocated: VILLA RICA = OSM substation 'Villa Rica Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":2888,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"West Mcintosh Replacement Of 230 Kv Low Side Breakers","type":"substation","voltage_kv":230,"location_ref":"West Mcintosh Replacement Of (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":54,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 54.\nIn-Service Year: 2028\nProject Name: SOCO: WEST MCINTOSH REPLACEMENT OF 230 KV LOW SIDE BREAKERS\nDescription: Replace (2) 230 kV LS breakers at West Mcintosh with new with higher rated breakers.\nSupporting Statement: Protection analysis identified the project modifications are required due to the interconnection of the proposed generating facility.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2911,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Anniston - Bynum 115 Kv Tl Reactor","type":"transmission line","voltage_kv":115,"location_ref":"Anniston - Bynum (GA/AL/MS/FL)","lat":33.71,"lng":-85.843,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":60,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 60.\nIn-Service Year: 2029\nProject Name: SOCO: ANNISTON - BYNUM 115 KV TL REACTOR\nDescription: Install a 2 percent reactor along the Anniston - Bynum 115 kV TL.\nSupporting Statement: The Anniston - Bynum 115 kV transmission line overloads under contingency.\nLocated: ANNISTON = OSM substation 'Anniston Substation' (AL); BYNUM ~ Calhoun County, AL (county centre) (nearest of 3) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2912,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Ashley Park 500 Kv Breakers Installation","type":"substation","voltage_kv":500,"location_ref":"Ashley Park (GA/AL/MS/FL)","lat":33.413,"lng":-84.494,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":60,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 60.\nIn-Service Year: 2029\nProject Name: SOCO: ASHLEY PARK 500 KV BREAKERS INSTALLATION\nDescription: At Ashley Park, install three new 500 kV breakers and associated equipment to accomodate for the new Wansley and Villa Rica lines.\nSupporting Statement: This project addresses thermal overloads that occur under contingency.\nLocated: ASHLEY PARK ~ Fayette County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2913,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Ashley Park-Wansley 500 Kv Line","type":"transmission line","voltage_kv":500,"location_ref":"Ashley Park - Wansley (GA/AL/MS/FL)","lat":33.412,"lng":-84.762,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":61,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 61.\nIn-Service Year: 2029\nProject Name: SOCO: ASHLEY PARK-WANSLEY 500 KV LINE\nDescription: Construct an approximately 35 mile 500 kV line from Ashley Park to Wansley with 100°C (3) 1113 Bluejay ACSR.\nSupporting Statement: This project addresses thermal overloads that occur under contingency.\nLocated: WANSLEY = OSM substation 'Wansley Substation' (GA); ASHLEY PARK ~ Fayette County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2914,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Atkinson - Northwest 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Atkinson - Northwest (GA/AL/MS/FL)","lat":31.297,"lng":-82.878,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":61,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 61.\nIn-Service Year: 2029\nProject Name: SOCO: ATKINSON - NORTHWEST 115 KV REBUILD\nDescription: Rebuild 1.2 miles of the Atkinson - Northwest 115 kV line with 200°C 1351 ACSS Martin.\nSupporting Statement: The Atkinson - Northwest 115 kV line overloads under a contingency.\nLocated: ATKINSON ~ Atkinson County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2915,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Bassett Creek - Tensaw Loop-In","type":"transmission line","voltage_kv":230,"location_ref":"Bassett Creek - Tensaw Loop (GA/AL/MS/FL)","lat":30.659,"lng":-87.746,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":61,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 61.\nIn-Service Year: 2029\nProject Name: SOCO: BASSETT CREEK - TENSAW LOOP-IN\nDescription: Loop the existing Bassett Creek - Tensaw 230 kV TL into the PowerSouth Lowman substation.\nSupporting Statement: The Barry - CAES 115 kV transmission line and the Bucks - Ellicott 230 kV transmission line overload under contingency. This loop-in alleviates those overloads.\nLocated: TENSAW LOOP ~ Baldwin County, AL (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2916,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Big Tazewell - Farley 500 Kv Tl","type":"transmission line","voltage_kv":500,"location_ref":"Big Tazewell - Farley (GA/AL/MS/FL)","lat":31.224,"lng":-85.116,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":61,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 61.\nIn-Service Year: 2029\nProject Name: SOCO: BIG TAZEWELL - FARLEY 500 kV TL\nDescription: Construct a new 500 kV line from Farley (APC) to Big Tazewell substation. Construct a 5 breaker 500 kV ring bus to loop in the Blacksmith - Talbot 500 kV line, terminate the new Big Tazewell - Farley 500 kV and Talbot #2 - Tazewell 500 kV lines. Install a 500/230 kV auto transformer to connect to the existing 230 kV switchyard.\nSupporting Statement: This project addresses multiple thermal overloads that ocurr under contingency.\nLocated: FARLEY = OSM substation 'Farley Substation' (AL)","reviewed":false,"approximate":true,"requires_review":false},{"id":2917,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Boulevard - Virginia Avenue 230 Kv Line Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Boulevard - Virginia Avenue (GA/AL/MS/FL)","lat":32.041,"lng":-81.144,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":62,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 62.\nIn-Service Year: 2029\nProject Name: SOCO: BOULEVARD - VIRGINIA AVENUE 230 KV LINE REBUILD\nDescription: Rebuild 0.94 miles of the Boulevard - Virginia Avenue 230 kV line with 200°C 1351 ACSS Martin. Replace the limiting elements on the line.\nSupporting Statement: The Boulevard - Virginia Avenue 230 kV line overloads under a multiple contingency event.\nLocated: BOULEVARD = OSM substation 'Boulevard Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":2918,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Buzzard Roost - Factory Shoals 230 Kv New Line","type":"transmission line","voltage_kv":230,"location_ref":"Buzzard Roost - Factory Shoals (GA/AL/MS/FL)","lat":34.703,"lng":-87.801,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":62,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 62.\nIn-Service Year: 2029\nProject Name: SOCO: BUZZARD ROOST - FACTORY SHOALS 230 KV NEW LINE\nDescription: Build 2 miles of new 230 kV line from Buzzard Roost to Factory Shoals with 200°C 1351 ACSS Martin.\nSupporting Statement: The Douglasvile - Groover Lake 115 kV line overloads under contingency.\nLocated: BUZZARD ROOST ~ Colbert County, AL (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2919,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Calvert - West Mcintosh 230 Kv Reconductor","type":"transmission line","voltage_kv":230,"location_ref":"Calvert - West Mcintosh (GA/AL/MS/FL)","lat":31.181,"lng":-88.05,"route":[[31.102,-88.049],[31.259,-88.051]],"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":62,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 62.\nIn-Service Year: 2029\nProject Name: SOCO: CALVERT - WEST MCINTOSH 230 KV RECONDUCTOR\nDescription: Reconductor 12 miles of the Calvert - West McIntosh 230 kV line from 1351 54/19 ACSR at 100°C to Katmai ACCS C7 at 180°C advanced conductor.\nSupporting Statement: The Calvert – West McIntosh 230 kV transmission line overloads under contingency.\nLocated: CALVERT = OSM substation 'Calvert Substation' (AL); WEST MCINTOSH = OSM substation 'West McIntosh Substation' (AL), nearest of 2 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2920,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Centre - Hammond 115 Kv Tl Reconductor","type":"transmission line","voltage_kv":115,"location_ref":"Centre - Hammond (GA/AL/MS/FL)","lat":34.162,"lng":-85.658,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":62,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 62.\nIn-Service Year: 2029\nProject Name: SOCO: CENTRE - HAMMOND 115 KV TL RECONDUCTOR\nDescription: Reconductor ~15 miles of the Centre - Hammond 115 kV TL from 397.5 ACSR 26/7 at 100°C to 795 ACSS 26/7 at 200°C.\nSupporting Statement: The Centre - Hammond 115 kV transmission line overloads under contingency.\nLocated: CENTRE = OSM substation 'Centre Substation' (AL)","reviewed":false,"approximate":true,"requires_review":false},{"id":2921,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Conyers - Klondike 230 Kv Second Line","type":"transmission line","voltage_kv":230,"location_ref":"Conyers - Klondike (GA/AL/MS/FL)","lat":33.645,"lng":-84.075,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":63,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 63.\nIn-Service Year: 2029\nProject Name: SOCO: CONYERS - KLONDIKE 230 KV SECOND LINE\nDescription: Build a new 7.2 mile line from Conyers to Klondike with 200°C (2) 1351 ACSS Martin conductor. Build one new 230 kV breaker terminal at Conyers and one new 230 kV terminal at Klondike.\nSupporting Statement: The Sigman Rd - Cornish Mountain 115 kV line overloads under contingency.\nLocated: KLONDIKE = OSM substation 'Klondike Substation' (GA); CONYERS ~ Rockdale County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2922,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"County Line Rd Ts Reactor Project","type":"transmission line","voltage_kv":230,"location_ref":"County (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":63,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 63.\nIn-Service Year: 2029\nProject Name: SOCO: COUNTY LINE RD TS REACTOR PROJECT\nDescription: Install a new 2% series reactor on the County Line - Gaston 230 kV TL.\nSupporting Statement: The County Line - Gaston 230 kV transmission line overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2923,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Demopolis - Selma 115 Kv Tl Reconductor/Upgrade","type":"transmission line","voltage_kv":115,"location_ref":"Demopolis - Selma (GA/AL/MS/FL)","lat":32.468,"lng":-87.431,"route":[[32.515,-87.794],[32.422,-87.068]],"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":63,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 63.\nIn-Service Year: 2029\nProject Name: SOCO: DEMOPOLIS - SELMA 115 KV TL RECONDUCTOR/UPGRADE\nDescription: Reconductor ~5 miles of 115 kV from Demopolis to Sonat (Gallion), then upgrade 7.3 miles from Sonat (Gallion) to Faunsdale TS.\nSupporting Statement: The Demopolis - Selma 115 kV transmission line overloads under contingency.\nLocated: DEMOPOLIS = OSM substation 'Demopolis Substation' (AL); SELMA = OSM substation 'Selma Substation' (AL) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2924,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"East Point - Morrow 115 Kv Limiting Elements Replacement","type":"transmission line","voltage_kv":115,"location_ref":"East Point - Morrow (GA/AL/MS/FL)","lat":33.641,"lng":-84.398,"route":[[33.675,-84.462],[33.606,-84.333]],"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":63,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 63.\nIn-Service Year: 2029\nProject Name: SOCO: EAST POINT - MORROW 115 KV LIMITING ELEMENTS REPLACEMENT\nDescription: Remove limiting elements at the substation terminals for the East Point - Morrow 115 kV lines. This involves upgrading associated switches and jumpers with higher rating equipment.\nSupporting Statement: The East Point - Morrow 115 kV line overloads under contingency.\nLocated: EAST POINT = OSM substation 'East Point 12kV Switching Station' (GA); MORROW = OSM substation 'Morrow Substation' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2925,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Gadsden - Gulf States Steel 115 Kv Tl (Phase 1)","type":"transmission line","voltage_kv":115,"location_ref":"Gadsden - Gulf States Steel (GA/AL/MS/FL)","lat":34.014,"lng":-85.973,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":64,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 64.\nIn-Service Year: 2029\nProject Name: SOCO: GADSDEN - GULF STATES STEEL 115 KV TL (PHASE 1)\nDescription: Reconductor approximately 2.5 miles 397 26/7 ACSR to 795 ACSR 26/7 from Gulf States Steel to Morgan’s Crossroads.\nSupporting Statement: Provides additional operational and maintenance flexibility which then increases reliability. In addition, associated with replacing aging equipment at Gulf States Steel DS.\nLocated: GADSDEN = OSM substation 'Gadsden Substation' (AL)","reviewed":false,"approximate":true,"requires_review":false},{"id":2926,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Gaston - Bynum 230 Kv Reactor","type":"substation","voltage_kv":230,"location_ref":"Gaston - Bynum (GA/AL/MS/FL)","lat":33.508,"lng":-86.143,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":64,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 64.\nIn-Service Year: 2029\nProject Name: SOCO: GASTON - BYNUM 230 kV REACTOR\nDescription: Install a reactor along the Gaston - Bynum 230 kV TL.\nSupporting Statement: A reactor is needed to mitigate high loadings and overloads on the line under contingencies.\nLocated: GASTON = OSM substation 'Gaston Substation' (AL); BYNUM ~ Calhoun County, AL (county centre) (nearest of 3) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2927,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Goat Rock Reactors Installation","type":"substation","voltage_kv":230,"location_ref":"Goat Rock Reactors Installation (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":64,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 64.\nIn-Service Year: 2029\nProject Name: SOCO: GOAT ROCK REACTORS INSTALLATION\nDescription: Install 1% series reactors on the Fortson - Goat Rock (Black) 230 kV and Fortson - Goat Rock (White) 230 kV.\nSupporting Statement: The Fortson - Goat Rock (Black & White) 230 kV lines overload under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2928,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Grady - Morrow (White) 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Grady - Morrow (White) (GA/AL/MS/FL)","lat":30.576,"lng":-85.031,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":64,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 64.\nIn-Service Year: 2029\nProject Name: SOCO: GRADY - MORROW (WHITE) 115 KV REBUILD\nDescription: Rebuild line sections with 200°C 1351 ACSS Martin and replace other limiting elements.\nSupporting Statement: The Grady - Morrow (White) 115 kV line overloads under contingency.\nLocated: GRADY = OSM substation 'Grady Substation' (FL)","reviewed":false,"approximate":true,"requires_review":false},{"id":2929,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Greene County - North Selma 230 Kv Upgrade","type":"transmission line","voltage_kv":230,"location_ref":"Greene County - North Selma (GA/AL/MS/FL)","lat":32.52,"lng":-87.409,"route":[[32.603,-87.782],[32.437,-87.036]],"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":65,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 65.\nIn-Service Year: 2029\nProject Name: SOCO: GREENE COUNTY - NORTH SELMA 230 KV UPGRADE\nDescription: Upgrade ~48 miles of 1033 45/7 ACSR 100°C to 110°C.\nSupporting Statement: The Greene County - North Selma 230 kV transmission line overloads under contingency.\nLocated: GREENE COUNTY = OSM substation 'Greene County Station' (AL); NORTH SELMA = OSM substation 'North Selma Substation' (AL), nearest of 2 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2930,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Offerman-Thalmann (Black) 230 Kv","type":"transmission line","voltage_kv":230,"location_ref":"Offerman - Thalmann (Black) (GA/AL/MS/FL)","lat":31.358,"lng":-81.912,"route":[[31.423,-82.144],[31.293,-81.681]],"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":65,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 65.\nIn-Service Year: 2029\nProject Name: SOCO: GRID: OFFERMAN-THALMANN (BLACK) 230 KV\nDescription: Rebuild the Offerman - Thalmann (Black) 230 kV line using 200°C 1351 ACSS conductor.\nSupporting Statement: The Offerman - Thalmann (Black) 230 kV line overloads under contingency.\nLocated: OFFERMAN = OSM substation 'Offerman Substation' (GA); THALMANN (BLACK) = OSM substation 'Thalmann Substation' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2931,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Offerman - Thalmann (White) 230 Kv","type":"transmission line","voltage_kv":230,"location_ref":"Offerman - Thalmann (White) (GA/AL/MS/FL)","lat":31.358,"lng":-81.912,"route":[[31.423,-82.144],[31.293,-81.681]],"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":65,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 65.\nIn-Service Year: 2029\nProject Name: SOCO: GRID: OFFERMAN - THALMANN (WHITE) 230 KV\nDescription: Rebuild the Offerman - Thalmann (White) 230 kV line using 200°C 1351 ACSS conductor.\nSupporting Statement: The Offerman - Thalmann (White) 230 kV line overloads under contingency.\nLocated: OFFERMAN = OSM substation 'Offerman Substation' (GA); THALMANN (WHITE) = OSM substation 'Thalmann Substation' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2932,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Hickory Level - Post Rd 115 Kv Rebuild (Phase 1)","type":"transmission line","voltage_kv":115,"location_ref":"Hickory Level - Post Rd (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":65,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 65.\nIn-Service Year: 2029\nProject Name: SOCO: HICKORY LEVEL - POST RD 115 KV REBUILD (PHASE 1)\nDescription: Rebuild the 1.15 mile portion from Hickory Level to South Villa Rica J with 200°C 1351 ACSS Martin.\nSupporting Statement: The Hickory Level - Post Rd 115 kV line overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2933,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Holt Street - Carter Hill Rd Reconductor","type":"transmission line","voltage_kv":null,"location_ref":"Holt Street - Carter Hill Rd (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":66,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 66.\nIn-Service Year: 2029\nProject Name: SOCO: HOLT STREET - CARTER HILL RD RECONDUCTOR\nDescription: Reconductor 1.81 miles of 397 ACSR 18/1 at 100⁰C to 795 ACSR 45/7 ACSR at 100⁰C from Holt Street - Carter Hill Rd.\nSupporting Statement: Provides additional operational and maintenance flexibility, which increases reliability.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2934,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Hurricane Creek 115/230 Kv Autobank","type":"substation","voltage_kv":115,"location_ref":"Hurricane Creek (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":66,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 66.\nIn-Service Year: 2029\nProject Name: SOCO: HURRICANE CREEK 115/230 KV AUTOBANK\nDescription: Replace Hurricane Creek 230/115 kV autobank with one rated 400 MVA and convert 230 kV straight bus to a ring.\nSupporting Statement: The project addresses overloads under contingency and provides operational resiliency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2935,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Jackson Shoals - Logan Martin 115 Kv Tl Upgrade","type":"transmission line","voltage_kv":115,"location_ref":"Jackson Shoals - Logan Martin (GA/AL/MS/FL)","lat":33.426,"lng":-86.338,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":66,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 66.\nIn-Service Year: 2029\nProject Name: SOCO: JACKSON SHOALS - LOGAN MARTIN 115 kV TL UPGRADE\nDescription: Upgrade ~18 miles of 115 kV TL from 795 ACSR 26/7 at 100°C to 795 ACSR 26/7 at 125°C.\nSupporting Statement: The Jackson Shoals - Logan Martin 115 kV TL overloads under contingency.\nLocated: LOGAN MARTIN = OSM substation 'Logan Martin Substation' (AL)","reviewed":false,"approximate":true,"requires_review":false},{"id":2936,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Jackson Shoals - Logan Martin Dam 115 Kv Tl Upgrade","type":"transmission line","voltage_kv":115,"location_ref":"Jackson Shoals - Logan Martin Dam (GA/AL/MS/FL)","lat":33.426,"lng":-86.338,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":66,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 66.\nIn-Service Year: 2029\nProject Name: SOCO: JACKSON SHOALS - LOGAN MARTIN DAM 115 KV TL UPGRADE\nDescription: Upgrade ~18 miles of 115 kV TL from 795 ACSR 26/7 at 100°C to 795 ACSR 26/7 at 125°C.\nSupporting Statement: The Jackson Shoals - Logan Martin Dam 115 kV TL overloads under contingency.\nLocated: LOGAN MARTIN DAM = OSM substation 'Logan Martin Substation' (AL)","reviewed":false,"approximate":true,"requires_review":false},{"id":2937,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Kettle Creek Primary - Pine Grove Primary 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Kettle Creek Primary - Pine Grove Primary (GA/AL/MS/FL)","lat":33.552,"lng":-82.25,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":67,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 67.\nIn-Service Year: 2029\nProject Name: SOCO: KETTLE CREEK PRIMARY - PINE GROVE PRIMARY 115 KV REBUILD\nDescription: Rebuild approximately 38.04 miles of the Kettle Creek - Pine Grove Primary 115 kV line using 200°C 1351 ACSS conductor.\nSupporting Statement: The Kettle Creek - Pine Grove 115 kV line overloads under contingency.\nLocated: KETTLE CREEK PRIMARY ~ Columbia County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2938,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Martin Dam - Pear Tree 115 Kv Tl Reconductor","type":"transmission line","voltage_kv":115,"location_ref":"Martin Dam - Pear Tree (GA/AL/MS/FL)","lat":34.554,"lng":-83.291,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":67,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 67.\nIn-Service Year: 2029\nProject Name: SOCO: MARTIN DAM - PEAR TREE 115 KV TL RECONDUCTOR\nDescription: Reconductor 20.5 miles of 115 kV TL from Martin Dam to Pear Tree from 397 ACSR 26/7 at 100⁰C to 795 ACSS 26/7 at 200⁰C.\nSupporting Statement: The Martin Dam - Pear Tree 115 kV transmission line overloads under contingency.\nLocated: MARTIN DAM ~ Stephens County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2939,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Mcever Road - Shoal Creek 115Kv Partial Rebuild - Segment 1","type":"transmission line","voltage_kv":115,"location_ref":"Mcever Road - Shoal Creek (GA/AL/MS/FL)","lat":34.273,"lng":-83.874,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":67,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 67.\nIn-Service Year: 2029\nProject Name: SOCO: MCEVER ROAD - SHOAL CREEK 115KV PARTIAL REBUILD - SEGMENT 1\nDescription: Rebuild approximately 3.05 miles of the McEver Road - Shoal Creek 115 kV line with 200°C 1351 ACSS conductor.\nSupporting Statement: The McEver Road - Shoal Creek 115 kV line overloads under contingency.\nLocated: MCEVER ROAD = OSM substation 'McEver Road Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":2940,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Meridian Northeast To Lauderdale West 230 Kv Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Meridian Northeast - Lauderdale West (GA/AL/MS/FL)","lat":32.415,"lng":-88.677,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":67,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 67.\nIn-Service Year: 2029\nProject Name: SOCO: MERIDIAN NORTHEAST TO LAUDERDALE WEST 230 KV REBUILD\nDescription: Rebuild the 6.11 mile, Meridian Northeast - Lauderdale West 230 kV transmission line with 1351 ACSS at 200°C.\nSupporting Statement: Line overloads under contingency.\nLocated: MERIDIAN NORTHEAST = OSM substation 'Meridian Northeast Substation' (MS)","reviewed":false,"approximate":true,"requires_review":false},{"id":2941,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Morrow 115 Kv Breaker Replacements","type":"substation","voltage_kv":115,"location_ref":"Morrow (GA/AL/MS/FL)","lat":33.606,"lng":-84.333,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":68,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 68.\nIn-Service Year: 2029\nProject Name: SOCO: MORROW 115 KV BREAKER REPLACEMENTS\nDescription: At Morrow, the breaker duty margin will become negative starting on 06/01/2029 for one 115 kV breaker. Replace the breaker with a higher rated breaker.\nSupporting Statement: This project is needed to increase breaker duty margins at Morrow substation to comply with NERC TPL-001-05, Section 2.3.\nLocated: MORROW = OSM substation 'Morrow Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":2942,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Moss Point East – Pascagoula Bayou Casotte 115 Kv Transmission Line","type":"transmission line","voltage_kv":115,"location_ref":"Moss Point East - Pascagoula Bayou Casotte (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":68,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 68.\nIn-Service Year: 2029\nProject Name: SOCO: MOSS POINT EAST – PASCAGOULA BAYOU CASOTTE 115 KV TRANSMISSION LINE\nDescription: Construct approximately 2.7 miles of new 1033.5 ACSR 115 kV transmission line at 100°C from Moss Point East and connect into the existing BP Amoco to Pascagoula Bayou Cassotte 115 kV transmission line.\nSupporting Statement: The Moss Point East to Pascagoula MS Chemical 115 kV transmission line overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2943,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Norcross - North Druid Hills 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Norcross - North Druid Hills (GA/AL/MS/FL)","lat":33.852,"lng":-84.22,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":68,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 68.\nIn-Service Year: 2029\nProject Name: SOCO: NORCROSS - NORTH DRUID HILLS 115 KV REBUILD\nDescription: Rebuild approximately 3.9 miles of the Norcross - North Druid Hills 115 kV line with 200°C 1351 ACSS Martin conductor.\nSupporting Statement: The Norcross - North Druid Hills 115 kV line overloads under contingency.\nLocated: NORCROSS = OSM substation 'Norcross Substation' (GA); NORTH DRUID HILLS ~ DeKalb County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2944,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Opp - South Enterprise 230 Kv Tl Reconductor","type":"transmission line","voltage_kv":230,"location_ref":"Opp - South Enterprise (GA/AL/MS/FL)","lat":31.268,"lng":-86.063,"route":[[31.25,-85.851],[31.286,-86.275]],"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":68,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 68.\nIn-Service Year: 2029\nProject Name: SOCO: OPP - SOUTH ENTERPRISE 230 KV TL RECONDUCTOR\nDescription: Reconductor ~25 miles of the Opp - South Enterprise 230 kV TL from 795 ACSR 26/7 at 125°C to 1351.5 ACSS 54/19 at 200°C.\nSupporting Statement: The Opp - South Enterprise 230 kV transmission line overloads under contingency.\nLocated: SOUTH ENTERPRISE = OSM substation 'South Enterprise Substation' (AL); OPP = OSM substation 'Opp Switching Station' (AL), nearest of 2 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2945,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Replace Hurricane Creek 230/115 Kv Autobank","type":"substation","voltage_kv":230,"location_ref":"Hurricane Creek (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":69,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 69.\nIn-Service Year: 2029\nProject Name: SOCO: REPLACE HURRICANE CREEK 230/115 KV AUTOBANK\nDescription: Replace the Hurricane Creek 230/115 kV auto bank.\nSupporting Statement: Transformer overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2946,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Boulevard - Magnolia - Truman Parkway 115 Kv Rebuilds","type":"transmission line","voltage_kv":115,"location_ref":"Boulevard - Magnolia - Truman Parkway (GA/AL/MS/FL)","lat":32.032,"lng":-81.115,"route":[[32.041,-81.144],[32.023,-81.086]],"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":69,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 69.\nIn-Service Year: 2029\nProject Name: SOCO: SAV: BOULEVARD - MAGNOLIA - TRUMAN PARKWAY 115 KV REBUILDS\nDescription: Rebuild 3 miles of the Magnolia - Truman Parkway 115 kV from 75°C 927 ACAR to 200°C 1351 ACSS Martin conductor or higher rated conductor. Upgrade switches at Magnolia substation to a higher rating switches and jumpers at Truman Parkway. Rebuild the entire Boulevard to Magnolia 115 kV line, approximately 4.56 miles of 100°C 795 ACSR Drake, using 200°C 1351 ACSS Martin or higher rated conductor. At Magnolia, replace a switch with a higher rating.\nSupporting Statement: The Magnolia - Truman Parkway 115 kV and Boulevard - Magnolia 115 kV lines overload under contingency.\nLocated: BOULEVARD = OSM substation 'Boulevard Substation' (GA); MAGNOLIA = OSM substation 'Magnolia Substation' (GA) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2947,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Coleman - Meldrim 115 Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Coleman - Meldrim (GA/AL/MS/FL)","lat":32.132,"lng":-81.297,"route":[[32.155,-81.368],[32.108,-81.227]],"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":69,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 69.\nIn-Service Year: 2029\nProject Name: SOCO: SAV: COLEMAN - MELDRIM 115 KV LINE REBUILD\nDescription: Rebuild the Coleman - Meldrim 115 kV line from Four Lakes - Structure 76A, approximately 8.1 miles of 477 ACSR Hawk, using 200°C 1351 ACSS Martin. Upgrade Quacco Rd Switches to a higher rating.\nSupporting Statement: The Coleman - Meldrim 115 kV line overloads under contingency.\nLocated: MELDRIM = OSM substation 'Meldrim Substation' (GA); COLEMAN = OSM substation 'Coleman Substation' (GA), nearest of 2 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2948,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Dean Forest - Little Ogeechee 230 Kv Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Dean Forest - Little Ogeechee (GA/AL/MS/FL)","lat":32.046,"lng":-81.221,"route":[[32.084,-81.189],[32.007,-81.253]],"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":70,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 70.\nIn-Service Year: 2029\nProject Name: SOCO: SAV: DEAN FOREST - LITTLE OGEECHEE 230 KV REBUILD\nDescription: Rebuild the entire line from Little Ogeechee - Salt Creek and Salt Creek - Dean Forest, approximately 8 miles, using 200°C 1351 ACSS Martin. Upgrade jumpers at the Little Ogeechee terminal.\nSupporting Statement: The Dean Forest - Little Ogeechee 230 kV line overloads under contingency.\nLocated: DEAN FOREST = OSM substation 'Dean Forest Substation' (GA); LITTLE OGEECHEE = OSM substation 'Little Ogeechee Substation' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2949,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Little Ogeechee 230/115 Kv Bank Replacement","type":"substation","voltage_kv":230,"location_ref":"Little Ogeechee (GA/AL/MS/FL)","lat":32.007,"lng":-81.253,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":70,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 70.\nIn-Service Year: 2029\nProject Name: SOCO: SAV: LITTLE OGEECHEE 230/115 KV BANK REPLACEMENT\nDescription: Replace SATX 230/115 kV auto transformer.\nSupporting Statement: The SATX 230/115 kV auto transformer overloads under contingency.\nLocated: LITTLE OGEECHEE = OSM substation 'Little Ogeechee Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":2950,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"South Tuscaloosa - 31St Avenue 115 Kv Tl Reconductor","type":"transmission line","voltage_kv":115,"location_ref":"South Tuscaloosa - 31St Avenue (GA/AL/MS/FL)","lat":33.17,"lng":-87.518,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":70,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 70.\nIn-Service Year: 2029\nProject Name: SOCO: SOUTH TUSCALOOSA - 31ST AVENUE 115 KV TL RECONDUCTOR\nDescription: Reconductor ~ 6.3 miles of 795 ACSR with Southwire C7 973 ACCS 20/7 at 180°C.\nSupporting Statement: The South Tuscaloosa - 31st Avenue 115 kV transmission line overloads under contingency.\nLocated: SOUTH TUSCALOOSA = OSM substation 'South Tuscaloosa Substation' (AL)","reviewed":false,"approximate":true,"requires_review":false},{"id":2951,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Tenaska Breaker Replacements","type":"substation","voltage_kv":500,"location_ref":"Tenaska (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":70,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 70.\nIn-Service Year: 2029\nProject Name: SOCO: TENASKA BREAKER REPLACEMENTS\nDescription: The breaker duty margin will become negative starting on 10/01/2029 for five 500 kV breakers. Replace the breakers with 500 kV higher rated breakers.\nSupporting Statement: This project is needed to increase breaker duty margins at Tenaska substation to comply with NERC TPL-001-05, Section 2.3.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2952,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Thomaston 230 Kv Network Area Improvement","type":"substation","voltage_kv":230,"location_ref":"Thomaston (GA/AL/MS/FL)","lat":32.924,"lng":-84.29,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":71,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 71.\nIn-Service Year: 2029\nProject Name: SOCO: THOMASTON 230 KV NETWORK AREA IMPROVEMENT\nDescription: Rebuild the radial Thomaston - Butler 115 kV line to 230 kV network operation. Build new 230 kV breaker and a half switching station to replace end of life equipment. Make all necessary upgrades and accommodations at the substation along the line.\nSupporting Statement: Line conversion increases capacity in the Butler area and ability to move increase solar generation from the South to the North. A new 230 kV breaker and a half switching station provides better reliability and replaces end of life equipment.\nLocated: THOMASTON ~ centre of 2 nearby same-named OSM substations","reviewed":false,"approximate":true,"requires_review":false},{"id":2953,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Virginia Avenue - Wabash Avenue 230 Kv Line Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Virginia Avenue - Wabash Avenue (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":71,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 71.\nIn-Service Year: 2029\nProject Name: SOCO: VIRGINIA AVENUE - WABASH AVENUE 230 KV LINE REBUILD\nDescription: Rebuild 1.5 miles of the Virginia Avenue - Wabash Avenue 230 kV line with 200°C 1351 ACSS Martin conductors. Replace the limiting elements on the line.\nSupporting Statement: The Virginia Avenue - Wabash Avenue 230 kV line overloads under a multiple contingency event.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2954,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Wansley Overstressed Breaker Replacements","type":"substation","voltage_kv":500,"location_ref":"Wansley (GA/AL/MS/FL)","lat":33.411,"lng":-85.031,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":71,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 71.\nIn-Service Year: 2029\nProject Name: SOCO: WANSLEY OVERSTRESSED BREAKER REPLACEMENTS\nDescription: The breaker duty margin will become negative starting on 06/01/2029 for ten 500 kV breakers. Replace them with 500 kV higher rated breakers.\nSupporting Statement: This project is needed to increase breaker duty margins at Wansley substation to comply with NERC TPL-001-05, Section 2.3.\nLocated: WANSLEY = OSM substation 'Wansley Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":2955,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Wansley Overstressed Breaker Replacements","type":"substation","voltage_kv":500,"location_ref":"Wansley (GA/AL/MS/FL)","lat":33.411,"lng":-85.031,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":71,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 71.\nIn-Service Year: 2029\nProject Name: SOCO: WANSLEY OVERSTRESSED BREAKER REPLACEMENTS\nDescription: The breaker duty margin will become negative starting on 06/01/2029 for six 500 kV breakers. Replace them with 500 kV higher rated breakers.\nSupporting Statement: This project is needed to increase breaker duty margins at Wansley substation to comply with NERC TPL-001-05, Section 2.3.\nLocated: WANSLEY = OSM substation 'Wansley Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":2956,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"West Mcintosh Autobank 115 Kv Switch Upgrades","type":"substation","voltage_kv":115,"location_ref":"West Mcintosh (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":72,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 72.\nIn-Service Year: 2029\nProject Name: SOCO: WEST MCINTOSH AUTOBANK 115 KV SWITCH UPGRADES\nDescription: Upgrade three 115 kV 2000A switches to 3000A.\nSupporting Statement: Equipment reaches full rating under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2957,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Wiggins Switching Station - Hurricane Creek 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Wiggins (GA/AL/MS/FL)","lat":30.86,"lng":-89.19,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":72,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 72.\nIn-Service Year: 2029\nProject Name: SOCO: WIGGINS SWITCHING STATION - HURRICANE CREEK 115 KV REBUILD\nDescription: Rebuild the 8.75 mile Wiggins Switching Station - Hurricane Creek 115 kV line with 1033 ACSR at 100°C.\nSupporting Statement: Line overloads under contingency.\nLocated: WIGGINS = OSM substation 'Wiggins Switching Station' (MS)","reviewed":false,"approximate":false,"requires_review":false},{"id":2976,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Attalla - Gulf States Steel 115 Kv Tl Upgrade","type":"transmission line","voltage_kv":115,"location_ref":"Attalla - Gulf States Steel (GA/AL/MS/FL)","lat":34.048,"lng":-86.034,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":77,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 77.\nIn-Service Year: 2030\nProject Name: SOCO: ATTALLA - GULF STATES STEEL 115 KV TL UPGRADE\nDescription: Upgrade ~2.5 miles of 115 kV TL from Gulf States Steel to Attalla.\nSupporting Statement: The Attalla - Gulf States Steel 115 kV transmission line overloads under contingency.\nLocated: ATTALLA ~ Etowah County, AL (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2977,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Bainbridge Transmission: East River Road, East Bainbridge","type":"substation","voltage_kv":115,"location_ref":"Bainbridge (GA/AL/MS/FL)","lat":30.913,"lng":-84.567,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":77,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 77.\nIn-Service Year: 2030\nProject Name: SOCO: BAINBRIDGE TRANSMISSION: EAST RIVER ROAD, EAST BAINBRIDGE\nDescription: This project will construct a new 115 kV breaker and a half substation.\nSupporting Statement: This project is part of an overall reconfiguration of the Bainbridge area to improve the distribution reliability, transmission security and operational flexibility.\nLocated: BAINBRIDGE = OSM substation 'Bainbridge Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":2978,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Bassett Creek - Sunny South 115 Kv Tl Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Bassett Creek - Sunny South (GA/AL/MS/FL)","lat":31.99,"lng":-87.305,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":78,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 78.\nIn-Service Year: 2030\nProject Name: SOCO: BASSETT CREEK - SUNNY SOUTH 115 KV TL REBUILD\nDescription: Rebuild ~16 miles of 115 kV 397 ACSR at 100°C to 795 ACSS at 200°C from Bassett Creek - Sunny South SS.\nSupporting Statement: The Bassett Creek - Sunny South 115 kV TL overloads under contingency. Also provides additional operational and maintenance flexibility, which increases reliability.\nLocated: SUNNY SOUTH ~ Wilcox County, AL (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2979,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Bassett Creek - Thomasville 115 Kv Tl Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Bassett Creek - Thomasville (GA/AL/MS/FL)","lat":30.909,"lng":-84.005,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":78,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 78.\nIn-Service Year: 2030\nProject Name: SOCO: BASSETT CREEK - THOMASVILLE 115 KV TL REBUILD\nDescription: Rebuild 1.2 miles of 115 kV 795 ACSR at 100°C and 10.4 miles of 397 ACSR at 125°C to 795 ACSS at 200°C from Bassett Creek - Thomasville TS.\nSupporting Statement: The Bassett Creek - Thomasville 115 kV TL overloads under contingency. Also provides additional operational and maintenance flexibility, which increases reliability.\nLocated: THOMASVILLE = OSM substation 'Thomasville Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":2980,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Bessemer – South Bessemer 115 Kv Tl Reconductor (Phase 2)","type":"transmission line","voltage_kv":115,"location_ref":"Bessemer - South Bessemer (GA/AL/MS/FL)","lat":33.321,"lng":-87.013,"route":[[33.422,-86.963],[33.22,-87.063]],"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":78,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 78.\nIn-Service Year: 2030\nProject Name: SOCO: BESSEMER – SOUTH BESSEMER 115 KV TL RECONDUCTOR (PHASE 2)\nDescription: Reconductor ~13 miles of 115 kV TL from South Bessemer TS to Bessemer TS from 795 ACSR at 100°C to 795 ACSS 26/7 at 200°C.\nSupporting Statement: The Bessemer - South Bessemer 115 kV transmission line overloads under contingency.\nLocated: BESSEMER = OSM substation 'Bessemer Substation' (AL); SOUTH BESSEMER = OSM substation 'South Bessemer Substation' (AL) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2981,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Bessemer - South Bessemer 230 Kv Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Bessemer - South Bessemer (GA/AL/MS/FL)","lat":33.321,"lng":-87.013,"route":[[33.422,-86.963],[33.22,-87.063]],"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":78,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 78.\nIn-Service Year: 2030\nProject Name: SOCO: BESSEMER - SOUTH BESSEMER 230 KV REBUILD\nDescription: Rebuild ~15 miles of 230 kV TL from Bessemer TS - South Bessemer TS from 1033 ACSR 45/7 to 1351 54/19 ACSS 200°C.\nSupporting Statement: The Bessemer - South Bessemer 230 kV transmission line overloads under contingency.\nLocated: BESSEMER = OSM substation 'Bessemer Substation' (AL); SOUTH BESSEMER = OSM substation 'South Bessemer Substation' (AL) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2982,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Bowen - Judy Mountain 230 Kv Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Bowen - Judy Mountain (GA/AL/MS/FL)","lat":34.122,"lng":-84.922,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":79,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 79.\nIn-Service Year: 2030\nProject Name: SOCO: BOWEN - JUDY MOUNTAIN 230 KV REBUILD\nDescription: Rebuild Bowen - Judy Mountain 230 kV line with 200°C (2) 1351 ACSS Martin conductor.\nSupporting Statement: This project is needed for generation interconnection.\nLocated: BOWEN = OSM substation 'Bowen Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":2983,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Bowen - Brandon Farm Rd 230 Kv Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Bowen - Brandon Farm Rd (GA/AL/MS/FL)","lat":34.122,"lng":-84.922,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":79,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 79.\nIn-Service Year: 2030\nProject Name: SOCO: BOWEN - BRANDON FARM RD 230 KV REBUILD\nDescription: Rebuild 0.05 miles of section with (3) Bundled 100°C Bluejay ACSR 1113 on the Bowen - Pegamore 230 kV line and replace limiting elements\nSupporting Statement: The Bowen - Brandon Farm Road 230 kV line overloads under contingency.\nLocated: BOWEN = OSM substation 'Bowen Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":2984,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Broadway - Echeconnee 115 Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Broadway - Echeconnee (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":79,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 79.\nIn-Service Year: 2030\nProject Name: SOCO: BROADWAY - ECHECONNEE 115 KV LINE REBUILD\nDescription: Rebuild the Griffin Rd to Broadway section of the Broadway - Echeconnee 115 kV line (approximately 11.5 miles) with 200°C 1351 ACSS conductor.\nSupporting Statement: The Broadway - Echeconnee 115 kV line overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2985,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Broadway - South Macon 115 Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Broadway - South Macon (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":79,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 79.\nIn-Service Year: 2030\nProject Name: SOCO: BROADWAY - SOUTH MACON 115 KV LINE REBUILD\nDescription: Rebuild the Broadway - South Macon 115 kV line (approximately 2 miles) with 200°C 1351 ACSS conductor. Replace limiting elements along the line.\nSupporting Statement: The Broadway - South Macon 115 kV line overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2986,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Buzzard Roost - Tributary 230 Kv Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Buzzard Roost - Tributary (GA/AL/MS/FL)","lat":34.703,"lng":-87.801,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":80,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 80.\nIn-Service Year: 2030\nProject Name: SOCO: BUZZARD ROOST - TRIBUTARY 230 KV REBUILD\nDescription: Rebuild the 2.8 miles Tributary - Thornton Road 230 kV line with 200°C 1351 ACSS Martin.\nSupporting Statement: The Tributary - Thornton Road line overloads under contingency.\nLocated: BUZZARD ROOST ~ Colbert County, AL (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2987,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Cavender Drive - Wansley 500 Kv Line","type":"transmission line","voltage_kv":500,"location_ref":"Cavender Drive - Wansley (GA/AL/MS/FL)","lat":33.411,"lng":-85.031,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":80,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 80.\nIn-Service Year: 2030\nProject Name: SOCO: CAVENDER DRIVE - WANSLEY 500 KV LINE\nDescription: Build a new 37 mile 500 kV line from Cavender Drive to Wansley with (3) 100°C Bluejay 1113 ACSR. Make accomodations at the substations for the line termination.\nSupporting Statement: The new 500 kV line mitigates multiple thermal overloads due to contingencies in the area.\nLocated: WANSLEY = OSM substation 'Wansley Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":2988,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Cornelia - Tallulah Lodge 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Cornelia - Tallulah Lodge (GA/AL/MS/FL)","lat":34.634,"lng":-83.526,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":80,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 80.\nIn-Service Year: 2030\nProject Name: SOCO: CORNELIA - TALLULAH LODGE 115 KV REBUILD\nDescription: Rebuild approximately 9.7 miles of the Cornelia - Tallulah Lodge 115 kV line with 200°C 795 ACSS conductor.\nSupporting Statement: The Cornelia - Tallulah Lodge 115 kV line overloads under contingency.\nLocated: CORNELIA ~ Habersham County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2989,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"East Point - Tributary 230 Kv Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"East Point - Tributary (GA/AL/MS/FL)","lat":33.688,"lng":-84.615,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":80,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 80.\nIn-Service Year: 2030\nProject Name: SOCO: EAST POINT - TRIBUTARY 230 KV REBUILD\nDescription: Rebuild the 4.2 mile section from Cavender Drive to Marietta 25 with bundled 200°C 1351 ACSS conductor on the East Point - Tributary 230 kV line.\nSupporting Statement: The East Point - Tributary 230 kV line overloads under a contingency.\nLocated: EAST POINT = OSM substation 'East Point 12kV Switching Station' (GA); TRIBUTARY ~ Douglas County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2990,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"East Point 230 Kv Breaker Replacements","type":"substation","voltage_kv":230,"location_ref":"East Point (GA/AL/MS/FL)","lat":33.675,"lng":-84.462,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":81,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 81.\nIn-Service Year: 2030\nProject Name: SOCO: EAST POINT 230 KV BREAKER REPLACEMENTS\nDescription: At East Point, the breaker duty margin will become negative starting on 06/01/2030 for one 230 kV breaker. Replace it with 230 kV higher rated breaker.\nSupporting Statement: This project is needed to increase breaker duty margins at East Point substation to comply with NERC TPL-001-05, Section 2.3.\nLocated: EAST POINT = OSM substation 'East Point 12kV Switching Station' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":2991,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"East Point 230 Kv Switch Replacement","type":"substation","voltage_kv":230,"location_ref":"East Point (GA/AL/MS/FL)","lat":33.675,"lng":-84.462,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":81,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 81.\nIn-Service Year: 2030\nProject Name: SOCO: EAST POINT 230 KV SWITCH REPLACEMENT\nDescription: Replace the switches and jumpers associated with the East Point - Tributary 230 kV line with higher rated equipment.\nSupporting Statement: Terminal equipment exceeds its thermal rating under contingency.\nLocated: EAST POINT = OSM substation 'East Point 12kV Switching Station' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":2992,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Echeconnee - Wellston 115 Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Echeconnee - Wellston (GA/AL/MS/FL)","lat":32.458,"lng":-83.662,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":81,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 81.\nIn-Service Year: 2030\nProject Name: SOCO: ECHECONNEE - WELLSTON 115 KV LINE REBUILD\nDescription: Rebuild approximately 1.5 miles of the North Warner Robins - South Warner Robins segment of the Echeconnee - Wellston 115 kV line with 200°C 1351 ACSS conductor and the limiting elements along the line with higher ratings. Replace the bus and jumper at North Warner Robins with (2) 1590 AAC.\nSupporting Statement: The Echeconnee - Wellston 115 kV line overloads under contingency.\nLocated: WELLSTON ~ Houston County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":2993,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Gainesville #2 - Mcever Road 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Gainesville #2 - Mcever Road (GA/AL/MS/FL)","lat":34.268,"lng":-83.842,"route":[[34.273,-83.874],[34.263,-83.81]],"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":81,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 81.\nIn-Service Year: 2030\nProject Name: SOCO: GAINESVILLE #2 - MCEVER ROAD 115 KV REBUILD\nDescription: Rebuild approximately 5.3 miles of the Gainesville #2 - McEver Rd 115 kV line with 200°C 1351 ACSS conductor.\nSupporting Statement: The Gainesville #2 - McEver Rd 115 kV line overloads under contingency.\nLocated: MCEVER ROAD = OSM substation 'McEver Road Substation' (GA); GAINESVILLE #2 = OSM substation 'Gainesville Substation #2' (GA), nearest of 2 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2994,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Glenwood Springs - Lake Oconee 115 Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Glenwood Springs - Lake Oconee (GA/AL/MS/FL)","lat":33.46,"lng":-83.247,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":82,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 82.\nIn-Service Year: 2030\nProject Name: SOCO: GLENWOOD SPRINGS - LAKE OCONEE 115 KV LINE REBUILD\nDescription: Rebuild the Glenwood Springs - Putnam Sawmill Jun - North Eatonton Junction section of the line with 200°C 1351 ACSS conductor.\nSupporting Statement: The Glenwood Springs - Lake Oconee 115 kV line overloads under base case conditions.\nLocated: LAKE OCONEE = OSM substation 'Lake Oconee Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":2995,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Glenwood Springs 115 Kv Cap Bank","type":"substation","voltage_kv":115,"location_ref":"Glenwood Springs (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":82,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 82.\nIn-Service Year: 2030\nProject Name: SOCO: GLENWOOD SPRINGS 115 KV CAP BANK\nDescription: Install a 115 kV capacitor bank at Glenwood Springs substation.\nSupporting Statement: Low bus voltage issues were identified on several 115 kV buses due to a contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2996,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Goldens Creek - Warrenton Primary 230 Kv Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Goldens Creek - Warrenton Primary (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":82,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 82.\nIn-Service Year: 2030\nProject Name: SOCO: GOLDENS CREEK - WARRENTON PRIMARY 230 KV REBUILD\nDescription: Rebuild appoximately 0.34 miles of the Goldens Creek - Warrenton Primary 230 kV line with 200°C 1351 ACSS Martin.\nSupporting Statement: The Goldens Creek - Warrenton Primary 230 kV line overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":2997,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Gordon-Sandersville #1 115 Kv Line Rebuild (Deepstep - Sand #6)","type":"transmission line","voltage_kv":115,"location_ref":"Gordon - Sandersville #1 (GA/AL/MS/FL)","lat":32.94,"lng":-83.059,"route":[[32.882,-83.317],[32.998,-82.802]],"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":82,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 82.\nIn-Service Year: 2030\nProject Name: SOCO: GORDON-SANDERSVILLE #1 115 KV LINE REBUILD (DEEPSTEP - SAND #6)\nDescription: Rebuild 10.49 miles of the Deepstep - Robins Spring, Robins Spring - Kaolin J, and Kaolin J - Sandersville #6 line sections of the Gordon - Sandersville #1 115 kV line with 100°C ACSR 795 conductor.\nSupporting Statement: The Gordon - Sandersville #1 115 kV line overloads under contingency.\nLocated: GORDON = OSM substation 'Gordon Substation' (GA); SANDERSVILLE #1 = OSM substation 'Sandersville Substation #1' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":2998,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Hurricane Creek – Wiggins Switching Station 115 Kv Tl","type":"transmission line","voltage_kv":115,"location_ref":"Hurricane Creek - Wiggins (GA/AL/MS/FL)","lat":31.045,"lng":-89.506,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":83,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 83.\nIn-Service Year: 2030\nProject Name: SOCO: HURRICANE CREEK – WIGGINS SWITCHING STATION 115 KV TL\nDescription: Rebuild 8.7 mile Hurricane Creek - Wiggins Switching Station 115 kV line with 1033 ACSR at 100°C operation (or equivalent).\nSupporting Statement: The project addresses overloads under contingency.\nLocated: WIGGINS = OSM substation 'Wiggins Switching Station' (MS); HURRICANE CREEK ~ Marion County, MS (county centre) (nearest of 2) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":2999,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Ipo Breaker Upgrades At Line Creek 230 Kv","type":"transmission line","voltage_kv":230,"location_ref":"Ipo (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":83,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 83.\nIn-Service Year: 2030\nProject Name: SOCO: IPO BREAKER UPGRADES AT LINE CREEK 230 KV\nDescription: Replace breakers at Line Creek with IPO (Independent Pole Operated) breakers.\nSupporting Statement: This project is needed to increase breaker duty margins at Line Creek substation to comply with NERC TPL-001-05, Section 2.3.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3000,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Jefferson Road - Winder Primary 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Jefferson Road - Winder Primary (GA/AL/MS/FL)","lat":33.986,"lng":-83.666,"route":[[33.978,-83.579],[33.995,-83.753]],"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":83,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 83.\nIn-Service Year: 2030\nProject Name: SOCO: JEFFERSON ROAD - WINDER PRIMARY 115 KV REBUILD\nDescription: Rebuild approximately 11 miles of the Jefferson Road - Winder Primary 115 kV line with 200°C 1351 ACSS Martin conductor.\nSupporting Statement: The Jefferson Road - Winder Primary 115 kV line overloads under contingency.\nLocated: JEFFERSON ROAD = OSM substation 'Jefferson Rd Substation' (GA); WINDER PRIMARY = OSM substation 'Winder Primary Substation' (GA), nearest of 2 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3001,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Kia Motors - Pittman Rd 115 Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Kia Motors - Pittman Rd (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":83,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 83.\nIn-Service Year: 2030\nProject Name: SOCO: KIA MOTORS - PITTMAN RD 115 KV LINE REBUILD\nDescription: Rebuild a section of Kia Motors - Pittman Rd 115 kV line with 200°C 1351 ACSS conductor.\nSupporting Statement: Kia Motors - Pittman Rd 115 kV line overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3002,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Lawrenceville - Winder Primary 115 Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Lawrenceville - Winder Primary (GA/AL/MS/FL)","lat":33.979,"lng":-83.873,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":84,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 84.\nIn-Service Year: 2030\nProject Name: SOCO: LAWRENCEVILLE - WINDER PRIMARY 115 KV LINE REBUILD\nDescription: Rebuild approximately 1.2 miles of the Lawrenceville - Winder 115 kV line with 200°C 795 ACSS conductor.\nSupporting Statement: The Lawrenceville - Winder Primary 115 kV transmission line overloads under contingency.\nLocated: WINDER PRIMARY = OSM 'Winder Primary Substation' (GA); LAWRENCEVILLE ~ centre of 3 nearby same-named OSM substations (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3003,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Leeds Ts – Moody Ss 115 Kv Transmission Line Reconductor","type":"transmission line","voltage_kv":115,"location_ref":"Leeds Ts - Moody Ss (GA/AL/MS/FL)","lat":33.547,"lng":-86.55,"route":[[33.524,-86.58],[33.57,-86.521]],"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":84,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 84.\nIn-Service Year: 2030\nProject Name: SOCO: LEEDS TS – MOODY SS 115 KV TRANSMISSION LINE RECONDUCTOR\nDescription: Leeds – Moody 115 kV TL: Reconductor ~5 miles of 795 45/7 ACSR at 100°C with 1033.5 45/7 ACSS at 200°C.\nSupporting Statement: The Leeds - Moody 115 kV transmission line overloads under contingency.\nLocated: LEEDS TS = OSM substation 'Leeds Substation' (AL); MOODY SS = OSM substation 'Moody Substation' (AL) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3004,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Loch Five - S. Bessemmer 500 Kv Tl","type":"transmission line","voltage_kv":500,"location_ref":"Loch Five - S. Bessemmer (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":84,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 84.\nIn-Service Year: 2030\nProject Name: SOCO: LOCH FIVE - S. BESSEMMER 500 KV TL\nDescription: Construct ~63 miles of new 500 kV TL of bundled (3) 1033.5 ACSR 45/7 at 100°C from Lock Five Substation to S. Bessemer. Construct a new 500/230 kV Bank and 500 kV switchyard named Lock Five near Green County Substation. Expand S. Bessemer TS 500 kV yard to accommodate the new line terminal.\nSupporting Statement: This project alleviates several system constraints in the 230 kV network while providing increased operational flexibility.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3005,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Martin Dam - North Auburn 115 Kv Tl Reconductor","type":"transmission line","voltage_kv":115,"location_ref":"Martin Dam - North Auburn (GA/AL/MS/FL)","lat":34.554,"lng":-83.291,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":84,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 84.\nIn-Service Year: 2030\nProject Name: SOCO: MARTIN DAM - NORTH AUBURN 115 KV TL RECONDUCTOR\nDescription: Reconductor ~27 miles of 115 kV TL from Martin Dam to North Auburn from 397 ACSR 26/7 at 100⁰C to 795 ACSS 26/7 at 200⁰C.\nSupporting Statement: The Martin Dam - North Auburn 115 kV transmission line overloads under contingency.\nLocated: MARTIN DAM ~ Stephens County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":3006,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"North Georgia Network Upgrades","type":"substation","voltage_kv":115,"location_ref":"North Georgia (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":85,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 85.\nIn-Service Year: 2030\nProject Name: SOCO: NORTH GEORGIA NETWORK UPGRADES\nDescription: Construct approximately 7 miles of 115 kV line with minimum 170°C 1351 ACSS conductor on the North Jackson - Lawrence Smith 46 kV ROW that is to be retired.\nSupporting Statement: The future Banks Crossing - Pond Fork 115 kV line overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3007,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Plant Watson – Landon #2 115 Kv Tl","type":"transmission line","voltage_kv":115,"location_ref":"Plant Watson - Landon #2 (GA/AL/MS/FL)","lat":30.428,"lng":-89.056,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":85,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 85.\nIn-Service Year: 2030\nProject Name: SOCO: PLANT WATSON – LANDON #2 115 kV TL\nDescription: Rebuild 5.04 mile 115 kV line with 1351 ACSR (or 795 ACSS at 160°C) at Landon: Replace 1033 ACSR strain bus.\nSupporting Statement: The project addresses overloads under contingency.\nLocated: PLANT WATSON = OSM substation 'Plant Watson Substation' (MS); LANDON #2 ~ Harrison County, MS (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3008,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Switch Way 230 Kv Breaker Replacements","type":"substation","voltage_kv":230,"location_ref":"Switch Way (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":85,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 85.\nIn-Service Year: 2030\nProject Name: SOCO: SWITCH WAY 230 KV BREAKER REPLACEMENTS\nDescription: The breaker duty margin will become negative starting on 10/01/2029 for two 230 kV breakers at Switch Way. Replace them with 230 kV higher rated breakers.\nSupporting Statement: This project is needed to increase breaker duty margins at Switch Way substation to comply with NERC TPL-001-05, Section 2.3.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3009,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Tallulah Lodge - Toccoa 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Tallulah Lodge - Toccoa (GA/AL/MS/FL)","lat":34.581,"lng":-83.353,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":85,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 85.\nIn-Service Year: 2030\nProject Name: SOCO: TALLULAH LODGE - TOCCOA 115 KV REBUILD\nDescription: Rebuild the entire Tallulah Lodge - Toccoa 115 kV line with 100°C 795 ACSR conductor, approximately 10.3 miles. Replace limiting elements in substations along the line.\nSupporting Statement: The Tallulah Lodge - Toccoa 115 kV line overloads under contingency.\nLocated: TOCCOA = OSM substation 'Toccoa Primary Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":3010,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Warthen 500 Kv Substation Reconfiguration","type":"substation","voltage_kv":500,"location_ref":"Warthen (GA/AL/MS/FL)","lat":33.12,"lng":-82.859,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":86,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 86.\nIn-Service Year: 2030\nProject Name: SOCO: WARTHEN 500 KV SUBSTATION RECONFIGURATION\nDescription: Reconfigure the Warthen 500 kV substation from ring bus to breaker and half.\nSupporting Statement: This project resolves multiple thermal overloads under contingency.\nLocated: WARTHEN = OSM substation 'Warthen Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":3018,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Anniston - Crooked Creek 115 Kv Tl Reconductor","type":"transmission line","voltage_kv":115,"location_ref":"Anniston - Crooked Creek (GA/AL/MS/FL)","lat":33.65,"lng":-85.858,"route":null,"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":88,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 88.\nIn-Service Year: 2031\nProject Name: SOCO: ANNISTON - CROOKED CREEK 115 KV TL RECONDUCTOR\nDescription: Reconductor ~28 miles of 397 30/7 ACSR to 795 26/7 ACSR from Golden Springs DS to Crooked Creek TS.\nSupporting Statement: Provides additional operational and maintenance flexibility, which increases reliability. In addition, the line is being reconductored due to the age and condition of the structures and conductor.\nLocated: ANNISTON = OSM substation 'Anniston Substation' (AL)","reviewed":false,"approximate":true,"requires_review":false},{"id":3019,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Barnesville Area 115 Kv Network Solution","type":"substation","voltage_kv":115,"location_ref":"Barnesville (GA/AL/MS/FL)","lat":33.044,"lng":-84.177,"route":null,"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":88,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 88.\nIn-Service Year: 2031\nProject Name: SOCO: BARNESVILLE AREA 115 KV NETWORK SOLUTION\nDescription: On the Lloyd Shoals - S. Griffin 115 kV line, replace copper conductor between Forsyth #2 - Stokes Store Rd (8.2 miles) and make it normally closed & add a breaker to network. Also replace copper conductor between Stokes Store Rd - Jackson (8.7 miles). On the Barnesville Primary - S. Griffin 115 kV line, replace jumpers and conductors from Barnesville Pri - N. Zebulon - Upper Pike - Griffin #3 (18.2 miles).\nSupporting Statement: The project will address multiple thermal overlaods that occur under multiple contingencies\nLocated: BARNESVILLE ~ centre of 2 nearby same-named OSM substations","reviewed":false,"approximate":true,"requires_review":false},{"id":3020,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Bay Creek - Conyers 230 Kv Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Bay Creek - Conyers (GA/AL/MS/FL)","lat":33.76,"lng":-83.954,"route":null,"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":89,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 89.\nIn-Service Year: 2031\nProject Name: SOCO: BAY CREEK - CONYERS 230 KV REBUILD\nDescription: Rebuild the Rockdale to Bay Creek segment (approximately 15.29 miles) of the Bay Creek - Conyers 230 kV line using 200°C 1351 ACSS Martin conductor.\nSupporting Statement: The Bay Creek - Conyers 230 kV line will overload under certain contingencies.\nLocated: BAY CREEK = OSM substation 'Bay Creek Substation' (GA); CONYERS ~ Rockdale County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3021,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Bowen #10 500/230 Kv Autobank Replacement","type":"substation","voltage_kv":500,"location_ref":"Bowen #10 (GA/AL/MS/FL)","lat":34.122,"lng":-84.922,"route":null,"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":89,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 89.\nIn-Service Year: 2031\nProject Name: SOCO: BOWEN #10 500/230 KV AUTOBANK REPLACEMENT\nDescription: Replace the existing Bowen #10 500/230 kV auto transformer with a higher rated 500/230 kV auto transformer. Replace associated bus work and jumpers that are limiting elements to the new auto transformer.\nSupporting Statement: The Bowen #10 500/230 kV auto transformer overloads under contingency.\nLocated: BOWEN #10 = OSM substation 'Bowen Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":3022,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Ellicott Substation Expansion Project","type":"substation","voltage_kv":230,"location_ref":"Ellicott (GA/AL/MS/FL)","lat":30.996,"lng":-88.032,"route":null,"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":89,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 89.\nIn-Service Year: 2031\nProject Name: SOCO: ELLICOTT SUBSTATION EXPANSION PROJECT\nDescription: - Add 6 new 230kV terminals at Ellicott SS. Ellicott SS to become Ellicott TS. - Add new 115kV station with breaker and a half configuration to support (13) – 115 kV line terminations, to include a new 230/115 kV autobank. - Barry SP: Reconfigure substation and replace structures.\nSupporting Statement: Upgrade existing and construct new transmission facilities to provide additional operational and maintenance flexibility, which increases reliability.\nLocated: ELLICOTT = OSM substation 'Ellicott Substation' (AL)","reviewed":false,"approximate":false,"requires_review":false},{"id":3023,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Hatch - Wadley 500 Kv Line Strategic Project","type":"transmission line","voltage_kv":500,"location_ref":"Hatch - Wadley (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":90,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 90.\nIn-Service Year: 2031\nProject Name: SOCO: HATCH - WADLEY 500 KV LINE STRATEGIC PROJECT\nDescription: Construct a new 500 kV line from Hatch - Wadley Primary with (3) 100°C 1113 ACSR conductor.\nSupporting Statement: The construction of the new Hatch - Wadley Primary 500 kV Line aims to address the increasing penetration of renewable generation plants and economic development in the area.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3024,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Hickory Level - Post Rd 115 Kv Rebuild (Phase 2)","type":"transmission line","voltage_kv":115,"location_ref":"Hickory Level - Post Rd (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":90,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 90.\nIn-Service Year: 2031\nProject Name: SOCO: HICKORY LEVEL - POST RD 115 KV REBUILD (PHASE 2)\nDescription: Rebuild 4.5 miles from Post Road to S Villa Rica junction with 200°C 1351 ACSS Martin.\nSupporting Statement: The Hickory Level - Post Rd 115 kV line overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3025,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Hope Hull Area 115 Kv Solution","type":"substation","voltage_kv":115,"location_ref":"Hope Hull (GA/AL/MS/FL)","lat":32.203,"lng":-86.204,"route":null,"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":90,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 90.\nIn-Service Year: 2031\nProject Name: SOCO: HOPE HULL AREA 115 KV SOLUTION\nDescription: Reconductor approximately 2.7 miles of 397 ACSR from Hope Hull Tap to Hyundai PT with 795 ACSS at 200°C.\nSupporting Statement: Provides additional operational and maintenance flexibility, which increases reliability.\nLocated: HOPE HULL ~ Montgomery County, AL (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":3026,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Pell City Area Solution","type":"substation","voltage_kv":115,"location_ref":"Pell City (GA/AL/MS/FL)","lat":33.719,"lng":-86.311,"route":null,"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":90,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 90.\nIn-Service Year: 2031\nProject Name: SOCO: PELL CITY AREA SOLUTION\nDescription: Construct new Pell City SS and new approximately 12 mile 115 kV TL from Pell City SS – Jackson Shoals TS utilizing 795 26/7 ACSR at 100°C. Convert East Pell City DS and 25th Street DS to 115 kV.\nSupporting Statement: Low voltage and thermal constraints in the area under contingency. This project provides additional operational and maintenance flexibility, which increases reliability.\nLocated: PELL CITY ~ St. Clair County, AL (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":3027,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Pittman Rd - West Point (Apc) 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Pittman Rd - West Point (Apc) (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":91,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 91.\nIn-Service Year: 2031\nProject Name: SOCO: PITTMAN RD - WEST POINT (APC) 115 KV REBUILD\nDescription: Rebuild Pittman Road - West Point (APC) 115 kV line with 200°C 1351 ACSS conductor. Replace the bus and associated jumpers at West Point #2 with higher rated buswork and jumpers.\nSupporting Statement: The Pittman Road - West Point (APC) 115 kV line overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3028,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Goshen (Sav) - Kraft 115 Kv Line Partial Rebuild (Phase 2)","type":"transmission line","voltage_kv":115,"location_ref":"Goshen (Sav) - Kraft (GA/AL/MS/FL)","lat":32.199,"lng":-81.178,"route":[[32.148,-81.146],[32.249,-81.209]],"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":91,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 91.\nIn-Service Year: 2031\nProject Name: SOCO: SAV: GOSHEN (SAV) - KRAFT 115 KV LINE PARTIAL REBUILD (PHASE 2)\nDescription: Rebuild 3.04 miles of Goshen - Kraft 115 kV line from Goshen - Rice Hope from 100°C 795 ACSR Drake to 200°C 1351 ACSS Martin.\nSupporting Statement: The Dyer Road - South Coweta 115 kV line overloads under contingency.\nLocated: KRAFT = OSM substation 'Kraft Substation' (GA); GOSHEN (SAV) = OSM substation 'Goshen Substation' (GA), nearest of 3 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3030,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Adamsville - East Point Resag And Limiting Elements Replacement","type":"transmission line","voltage_kv":230,"location_ref":"Adamsville - East Point Resag And (GA/AL/MS/FL)","lat":33.602,"lng":-86.956,"route":null,"cost_usd":null,"start_date":"2032-01-01","end_date":"2032-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":92,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 92.\nIn-Service Year: 2032\nProject Name: SOCO: ADAMSVILLE - EAST POINT RESAG AND LIMITING ELEMENTS REPLACEMENT\nDescription: Resag the Adamsville - East Point 230 kV line to 100°C operation. Remove limiting elements at East Point by replacing Vendor Rated adaptor and switches with higher rated equipment.\nSupporting Statement: The Adamsville - East Point 230 kV transmission line overloads under contingency.\nLocated: ADAMSVILLE = OSM substation 'Adamsville Substation' (AL)","reviewed":false,"approximate":true,"requires_review":false},{"id":3031,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Alberta City - Holt 115 Kv Tl","type":"transmission line","voltage_kv":115,"location_ref":"Alberta City - Holt (GA/AL/MS/FL)","lat":33.221,"lng":-87.488,"route":[[33.208,-87.504],[33.234,-87.472]],"cost_usd":null,"start_date":"2032-01-01","end_date":"2032-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":92,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 92.\nIn-Service Year: 2032\nProject Name: SOCO: ALBERTA CITY - HOLT 115 KV TL\nDescription: Reconductor ~4 miles of 795 ACSR at 100°C to 795 ACSS at 200°C.\nSupporting Statement: Provides additional operational and maintenance flexibility, which increases reliability.\nLocated: ALBERTA CITY = OSM substation 'Alberta City Substation' (AL); HOLT = OSM substation 'Holt Substation' (AL), nearest of 3 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3032,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Atkinson - Northside Drive 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Atkinson - Northside Drive (GA/AL/MS/FL)","lat":32.359,"lng":-90.279,"route":null,"cost_usd":null,"start_date":"2032-01-01","end_date":"2032-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":92,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 92.\nIn-Service Year: 2032\nProject Name: SOCO: ATKINSON - NORTHSIDE DRIVE 115 KV REBUILD\nDescription: Rebuild a portion of the Atkinson - Northside 115 kV line, approximately 3.2 miles from Atkinson to Chattahoochee with 200°C 1351 ACSS Martin.\nSupporting Statement: The Atkinson - Northside 115 kV line overloads under a contingency.\nLocated: NORTHSIDE DRIVE = OSM substation 'Northside Drive Substation' (MS)","reviewed":false,"approximate":true,"requires_review":false},{"id":3033,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Flomaton 230/115 Kv Autobank","type":"substation","voltage_kv":230,"location_ref":"Flomaton (GA/AL/MS/FL)","lat":31.011,"lng":-87.288,"route":null,"cost_usd":null,"start_date":"2032-01-01","end_date":"2032-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":92,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 92.\nIn-Service Year: 2032\nProject Name: SOCO: FLOMATON 230/115 KV AUTOBANK\nDescription: Install new Flomaton 230/115 kV Autobank.\nSupporting Statement: Provides additional operational and maintenance flexibility, which increases reliability.\nLocated: FLOMATON = OSM substation 'Flomaton Substation' (AL)","reviewed":false,"approximate":false,"requires_review":false},{"id":3034,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Judy Mountain - Rome 115 Kv Line Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Judy Mountain - Rome (GA/AL/MS/FL)","lat":34.264,"lng":-85.214,"route":null,"cost_usd":null,"start_date":"2032-01-01","end_date":"2032-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":93,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 93.\nIn-Service Year: 2032\nProject Name: SOCO: JUDY MOUNTAIN - ROME 115 KV LINE REBUILD\nDescription: Rebuild the 4.9 mile Judy Mountain - Rome 115 kV Line with 200°C 1351 ACSS Martin. Replace limiting elements along the line.\nSupporting Statement: The Judy Mountain - Rome 115 kV line overloads under contingency.\nLocated: ROME ~ Floyd County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":3035,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Union Springs - Pinckard 115 Kv Tl (Phase 1)","type":"transmission line","voltage_kv":115,"location_ref":"Union Springs - Pinckard (GA/AL/MS/FL)","lat":31.706,"lng":-85.649,"route":[[32.119,-85.718],[31.294,-85.58]],"cost_usd":null,"start_date":"2032-01-01","end_date":"2032-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":93,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 93.\nIn-Service Year: 2032\nProject Name: SOCO: UNION SPRINGS - PINCKARD 115 KV TL (PHASE 1)\nDescription: Rebuild approximately 10.6 miles of 397 ACSR of the Pinckard – Ewell SS 115 kV TL from 397 ACSR at 49°C to 795 ACSS at 200°C. Reconductor approximately 50 miles of 397 ACSR at 49°C Union Springs – Ewell 115 kV TL to 795 ACSS at 200°C.\nSupporting Statement: The Union Springs - Pinckard 115 kV TL overloads under contingency.\nLocated: UNION SPRINGS = OSM substation 'Union Springs Substation' (AL); PINCKARD = OSM substation 'Pinckard Substation' (AL) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3040,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Bay Creek - Conyers 230 Kv Limiting Element Replacement","type":"transmission line","voltage_kv":230,"location_ref":"Bay Creek - Conyers (GA/AL/MS/FL)","lat":33.76,"lng":-83.954,"route":null,"cost_usd":null,"start_date":"2033-01-01","end_date":"2033-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":94,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 94.\nIn-Service Year: 2033\nProject Name: SOCO: BAY CREEK - CONYERS 230 KV LIMITING ELEMENT REPLACEMENT\nDescription: Replace equipment such as jumpers, switches, and traps at the Bay Creek, Rockdale, and Conyers substations with higher rating equipments.\nSupporting Statement: Beginning in 2033, the Rockdale - Bay Creek section of the Bay Creek - Conyers 230 kV line will overload under certain contingencies.\nLocated: BAY CREEK = OSM substation 'Bay Creek Substation' (GA); CONYERS ~ Rockdale County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3041,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"East Point - Mountain View 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"East Point - Mountain View (GA/AL/MS/FL)","lat":33.613,"lng":-84.437,"route":null,"cost_usd":null,"start_date":"2033-01-01","end_date":"2033-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":94,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 94.\nIn-Service Year: 2033\nProject Name: SOCO: EAST POINT - MOUNTAIN VIEW 115 KV REBUILD\nDescription: Rebuild a portion of the East Point - Mountain View 115 kV line, approximately 2.4 miles of 100°C 397.5 ACSR between East Point - College Park # 3 Junction using 200°C 1351 ACSS Martin.\nSupporting Statement: The East Point - Mountain View 115 kV line overloads under contingency.\nLocated: EAST POINT = OSM substation 'East Point 12kV Switching Station' (GA); MOUNTAIN VIEW ~ Clayton County, GA (county centre) (nearest of 3) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3042,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Mcever Road - Shoal Creek 115 Kv Partial Rebuild - Segment 2","type":"transmission line","voltage_kv":115,"location_ref":"Mcever Road - Shoal Creek (GA/AL/MS/FL)","lat":34.273,"lng":-83.874,"route":null,"cost_usd":null,"start_date":"2033-01-01","end_date":"2033-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":95,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 95.\nIn-Service Year: 2033\nProject Name: SOCO: MCEVER ROAD - SHOAL CREEK 115 KV PARTIAL REBUILD - SEGMENT 2\nDescription: Rebuild approximately 2.9 miles of the McEver Road - Shoal Creek 115 kV line, using 200°C 1351 ACSS conductor.\nSupporting Statement: The McEver Road - Shoal Creek 115 kV line overloads under contingency.\nLocated: MCEVER ROAD = OSM substation 'McEver Road Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":3043,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Mcgrau Ford - Middle Fork 500 Kv Line Project","type":"transmission line","voltage_kv":500,"location_ref":"Mcgrau Ford - Middle Fork (GA/AL/MS/FL)","lat":34.326,"lng":-84.337,"route":null,"cost_usd":null,"start_date":"2033-01-01","end_date":"2033-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":95,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 95.\nIn-Service Year: 2033\nProject Name: SOCO: MCGRAU FORD - MIDDLE FORK 500 KV LINE PROJECT\nDescription: Construct a new 500 kV line from McGrau Ford to Middle Fork with (3) 100°C 1113 ACSR conductor.\nSupporting Statement: This is a strategic project to address multiple area compliance constraints, support economic development in north Georgia, and to transport the expected generation addtions in Northeast Georgia.\nLocated: MCGRAU FORD = OSM substation 'McGrau Ford Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":3044,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Pine Grove Primary - West Valdosta 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Pine Grove Primary - West Valdosta (GA/AL/MS/FL)","lat":30.858,"lng":-83.248,"route":null,"cost_usd":null,"start_date":"2033-01-01","end_date":"2033-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":95,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 95.\nIn-Service Year: 2033\nProject Name: SOCO: PINE GROVE PRIMARY - WEST VALDOSTA 115 KV REBUILD\nDescription: Rebuild approximately 3.7 miles of the Pine Grove Primary - West Valdosta 115 kV transmission line with 200°C 795 ACSS Drake.\nSupporting Statement: The Pine Grove - West Valdosta 115 kV line overloads under contingency.\nLocated: PINE GROVE PRIMARY = OSM 'Pine Grove Primary Substation' (GA); WEST VALDOSTA ~ Lowndes County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3045,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Meldrim 230/115 Kv Bank D Replacement","type":"substation","voltage_kv":230,"location_ref":"Meldrim (GA/AL/MS/FL)","lat":32.155,"lng":-81.368,"route":null,"cost_usd":null,"start_date":"2033-01-01","end_date":"2033-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":95,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 95.\nIn-Service Year: 2033\nProject Name: SOCO: SAV: MELDRIM 230/115 KV BANK D REPLACEMENT\nDescription: Replace Meldrim 230/115 kV auto transformer\nSupporting Statement: The Meldrim 230/115 kV auto transformer overloads under contingency.\nLocated: MELDRIM = OSM substation 'Meldrim Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":3046,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Winder Primary 230 Kv Breaker Installation","type":"substation","voltage_kv":230,"location_ref":"Winder Primary (GA/AL/MS/FL)","lat":34.01,"lng":-83.755,"route":null,"cost_usd":null,"start_date":"2033-01-01","end_date":"2033-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":96,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 96.\nIn-Service Year: 2033\nProject Name: SOCO: WINDER PRIMARY 230 KV BREAKER INSTALLATION\nDescription: Install a 230 kV breaker at the Winder Primary substation.\nSupporting Statement: The Bay Creek - LGE Monroe 230 kV line overloads under contingency.\nLocated: WINDER PRIMARY ~ centre of 2 nearby same-named OSM substations","reviewed":false,"approximate":true,"requires_review":false},{"id":3048,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Alex City Area Solution","type":"substation","voltage_kv":115,"location_ref":"Alex City (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2034-01-01","end_date":"2034-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":96,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 96.\nIn-Service Year: 2034\nProject Name: SOCO: ALEX CITY AREA SOLUTION\nDescription: Construct new West Alex City 115 kV SS. Construct new West Dadeville TS networking Alex City, Crooked Creek – Martin Dam No. 2, and Thweatt. Reconductor approximately 4.52 miles from new West Alex City SS to City of Alex City #3 with 795 45/7 ACSR at 100°C.\nSupporting Statement: Provides additional operational and maintenance flexibility, which increases reliability.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3049,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Aliceville - Stansel 115 Kv Transmission Line","type":"transmission line","voltage_kv":115,"location_ref":"Aliceville - Stansel (GA/AL/MS/FL)","lat":33.225,"lng":-88.103,"route":[[33.322,-88.043],[33.129,-88.164]],"cost_usd":null,"start_date":"2034-01-01","end_date":"2034-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":96,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 96.\nIn-Service Year: 2034\nProject Name: SOCO: ALICEVILLE - STANSEL 115 KV TRANSMISSION LINE\nDescription: Construct a new approximately 17-mile 115 kV TL from Aliceville TS to Stansel TS with 795 ACSR 26/7 ACSR at 100°C.\nSupporting Statement: Provides additional operational and maintenance flexibility, which increases reliability.\nLocated: STANSEL = OSM substation 'Stansel Substation' (AL); ALICEVILLE = OSM substation 'Aliceville Substation' (AL), nearest of 2 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3050,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Bellamy - Epes 115 Kv Tl Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Bellamy - Epes (GA/AL/MS/FL)","lat":32.597,"lng":-88.2,"route":null,"cost_usd":null,"start_date":"2034-01-01","end_date":"2034-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":97,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 97.\nIn-Service Year: 2034\nProject Name: SOCO: BELLAMY - EPES 115 KV TL REBUILD\nDescription: Rebuild ~21 miles of 4/0 ACSR and 397 ACSR at 100°C from Bellamy SS to Epes SS to 795 ACSS at 200⁰C.\nSupporting Statement: The Bellamy - Epes 115 kV transmission line overloads under contingency. Also provides additional operational and maintenance flexibility, which increases reliability.\nLocated: BELLAMY ~ Sumter County, AL (county centre); EPES ~ Sumter County, AL (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3051,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Bessemer – East Pelham 230 Kv Tl Upgrade","type":"transmission line","voltage_kv":230,"location_ref":"Bessemer - East Pelham (GA/AL/MS/FL)","lat":33.351,"lng":-86.829,"route":[[33.422,-86.963],[33.28,-86.695]],"cost_usd":null,"start_date":"2034-01-01","end_date":"2034-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":97,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 97.\nIn-Service Year: 2034\nProject Name: SOCO: BESSEMER – EAST PELHAM 230 KV TL UPGRADE\nDescription: Upgrade ~14.9 miles of 1033 45/7 ACSR from 75°C to 100°C from Bessemer TS to East Pelham TS.\nSupporting Statement: Provides additional operational and maintenance flexibility, which increases reliability.\nLocated: BESSEMER = OSM substation 'Bessemer Substation' (AL); EAST PELHAM = OSM substation 'East Pelham Substation' (AL) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3052,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Bull Sluice - Powers Ferry 230 Kv Line Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"Bull Sluice - Powers Ferry (GA/AL/MS/FL)","lat":33.967,"lng":-84.379,"route":null,"cost_usd":null,"start_date":"2034-01-01","end_date":"2034-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":97,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 97.\nIn-Service Year: 2034\nProject Name: SOCO: BULL SLUICE - POWERS FERRY 230 KV LINE REBUILD\nDescription: Rebuild approx. 1.65 miles of line using 200°C 1351 ACSS Martin conductor. Replace jumpers and OHGW.\nSupporting Statement: The Bull Sluice – Powers Ferry 230 kV transmission line overloads under contingency.\nLocated: BULL SLUICE = OSM substation 'Bull Sluice Substation' (GA)","reviewed":false,"approximate":true,"requires_review":false},{"id":3053,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Demopolis Ts – Cemex 115 Kv Transmission Line","type":"transmission line","voltage_kv":115,"location_ref":"Demopolis Ts - Cemex (GA/AL/MS/FL)","lat":32.515,"lng":-87.794,"route":null,"cost_usd":null,"start_date":"2034-01-01","end_date":"2034-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":97,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 97.\nIn-Service Year: 2034\nProject Name: SOCO: DEMOPOLIS TS – CEMEX 115 KV TRANSMISSION LINE\nDescription: Construct ~1 mile of 115 kV TL from Demopolis to Cemex Tap using 795 ACSR 100°C.\nSupporting Statement: Provides additional operational and maintenance flexibility, which increases reliability.\nLocated: DEMOPOLIS TS = OSM substation 'Demopolis Substation' (AL)","reviewed":false,"approximate":true,"requires_review":false},{"id":3054,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Gorgas - Miller 230 Kv Tl Upgrade","type":"transmission line","voltage_kv":230,"location_ref":"Gorgas - Miller (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2034-01-01","end_date":"2034-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":98,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 98.\nIn-Service Year: 2034\nProject Name: SOCO: GORGAS - MILLER 230 KV TL UPGRADE\nDescription: Upgrade ~16 miles of 1351 54/19 ACSR at 100° to 125°C from Gorgas SP to Miller SP.\nSupporting Statement: The Miller - Gorgas 230 kV transmission line overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3055,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Holly Springs Primary - Nelson 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Holly Springs Primary - Nelson (GA/AL/MS/FL)","lat":34.289,"lng":-84.453,"route":[[34.383,-84.37],[34.195,-84.535]],"cost_usd":null,"start_date":"2034-01-01","end_date":"2034-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":98,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 98.\nIn-Service Year: 2034\nProject Name: SOCO: HOLLY SPRINGS PRIMARY - NELSON 115 KV REBUILD\nDescription: Rebuild 8.1 miles of the Holly Springs - Nelson 115 kV line with 200°C 1351.0 ACSS Martin.\nSupporting Statement: The Holly Springs Primary - Nelson 115 kV line overloads under contingency.\nLocated: NELSON = OSM substation 'Nelson Substation' (GA); HOLLY SPRINGS PRIMARY = OSM substation 'Holly Springs Substation' (GA), nearest of 2 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3056,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Lock Five - Autaugaville New 230 Kv Line","type":"transmission line","voltage_kv":230,"location_ref":"Lock Five - Autaugaville (GA/AL/MS/FL)","lat":32.568,"lng":-87.099,"route":null,"cost_usd":null,"start_date":"2034-01-01","end_date":"2034-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":98,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 98.\nIn-Service Year: 2034\nProject Name: SOCO: LOCK FIVE - AUTAUGAVILLE NEW 230 KV LINE\nDescription: Construct ~75 miles of new 230 kV TL of bundled (2) 1351 ACSR or equivalent (at 500 kV construction specifications) from Lock Five to Autaugaville. Note: this project was formerly planned as Greene County - South Billingsley New 230 kV TL.\nSupporting Statement: The Lock Five - South Bessemer 500 kV TL addresses constraints.\nLocated: AUTAUGAVILLE = OSM substation 'Autaugaville 230kV Substation' (AL); LOCK FIVE ~ Hale County, AL (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3057,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Mobile Area Networking – 3Rd Path","type":"substation","voltage_kv":115,"location_ref":"Mobile (GA/AL/MS/FL)","lat":30.685,"lng":-88.197,"route":null,"cost_usd":null,"start_date":"2034-01-01","end_date":"2034-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":98,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 98.\nIn-Service Year: 2034\nProject Name: SOCO: MOBILE AREA NETWORKING – 3RD PATH\nDescription: Construct new Dawes SS at Dawes Tap on the Big Creek – N. Theodore 115 kV TL.\nSupporting Statement: Provides additional operational and maintenance flexibility, which increases reliability.\nLocated: MOBILE ~ Mobile County, AL (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":3058,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Moundville Solution","type":"substation","voltage_kv":115,"location_ref":"Moundville (GA/AL/MS/FL)","lat":32.952,"lng":-87.555,"route":null,"cost_usd":null,"start_date":"2034-01-01","end_date":"2034-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":99,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 99.\nIn-Service Year: 2034\nProject Name: SOCO: MOUNDVILLE SOLUTION\nDescription: Construct a new 6-mile, 115 kV TL, 795, 26/7 ACSS at 200°C from Moundville TS to a new 3-way switch near structure 7 between Colonial Pipe (Moundville) and Westervelt Co, new terminal at Moundville TS, install 1-way switch near Structure 41.\nSupporting Statement: Provides additional operational and maintenance flexibility, which increases reliability.\nLocated: MOUNDVILLE = OSM substation 'Moundville Substation' (AL)","reviewed":false,"approximate":false,"requires_review":false},{"id":3059,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"North Theodore Area Solution","type":"substation","voltage_kv":115,"location_ref":"North Theodore (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2034-01-01","end_date":"2034-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":99,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 99.\nIn-Service Year: 2034\nProject Name: SOCO: NORTH THEODORE AREA SOLUTION\nDescription: - Reconductor ~0.9 miles of the Hollinger’s Island – Holcim 115 kV TL to 795 ACSR at 100°C. - Construct New SS near Multistate Environmental Response Trust (Formerly Known as Tronox LLC). - Construct ~5.3 miles of 795 ACSR at 100°C 115 kV TL from N. Theodore – Praxair Tap. - Install new 115 kV terminal at N. Theodore TS.\nSupporting Statement: Provides additional operational and maintenance flexibility, which increases reliability.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3060,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Rocky Ridge Radial 115 Kv Tl Reconductor","type":"transmission line","voltage_kv":115,"location_ref":"Rocky Ridge Radial (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2034-01-01","end_date":"2034-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":99,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 99.\nIn-Service Year: 2034\nProject Name: SOCO: ROCKY RIDGE RADIAL 115 KV TL RECONDUCTOR\nDescription: Reconductor ~0.5 miles of 115 kV TL from Rocky Ridge Tap to Rocky Ridge DS from 4/0 ACSR at 50°C to 795 ACSR 26/7 at 100°C.\nSupporting Statement: Line overloads under contingency.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3062,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Decatur - Scottdale 115 Kv Line Jumper Replacement","type":"transmission line","voltage_kv":115,"location_ref":"Decatur - Scottdale (GA/AL/MS/FL)","lat":34.598,"lng":-86.959,"route":null,"cost_usd":null,"start_date":"2035-01-01","end_date":"2035-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":100,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 100.\nIn-Service Year: 2035\nProject Name: SOCO: DECATUR - SCOTTDALE 115 KV LINE JUMPER REPLACEMENT\nDescription: Replace the limiting jumper along the Decatur - Scottdale 115 kV line with 1590.0 AAC Coreopsis jumper.\nSupporting Statement: The Decatur - Scottdale 115 kV line overloads under a contingency.\nLocated: DECATUR = OSM substation 'Decatur Substation' (AL)","reviewed":false,"approximate":true,"requires_review":false},{"id":3063,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"East Point - Morrow 115 Kv Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"East Point - Morrow (GA/AL/MS/FL)","lat":33.641,"lng":-84.398,"route":[[33.675,-84.462],[33.606,-84.333]],"cost_usd":null,"start_date":"2035-01-01","end_date":"2035-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":100,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 100.\nIn-Service Year: 2035\nProject Name: SOCO: EAST POINT - MORROW 115 KV REBUILD\nDescription: Rebuild a 3 mile section from East Point to College Point Tap and Morrow to Forrest Park with 200°C 1351 ACSS Martin on the East Point - Morrow 115 kV line. Rebuild portions of shared structures with the East Point - Mountain View and Mountain View - Morrow lines. Also replace limiting elements on the line.\nSupporting Statement: The East Point - Morrow 115 kV line overloads under contingency.\nLocated: EAST POINT = OSM substation 'East Point 12kV Switching Station' (GA); MORROW = OSM substation 'Morrow Substation' (GA) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3064,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"East Point - Union City (White) 230 Kv Rebuild","type":"transmission line","voltage_kv":230,"location_ref":"East Point - Union City (White) (GA/AL/MS/FL)","lat":33.733,"lng":-84.465,"route":null,"cost_usd":null,"start_date":"2035-01-01","end_date":"2035-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":100,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 100.\nIn-Service Year: 2035\nProject Name: SOCO: EAST POINT - UNION CITY (WHITE) 230 KV REBUILD\nDescription: Rebuild a section of the East Point - Union City 230 kV line with 200°C 1351 ACSS conductor. Replace limiting elements along the line.\nSupporting Statement: The East Point - Union City 230 kV line overloads under contingency.\nLocated: EAST POINT = OSM substation 'East Point 12kV Switching Station' (GA); UNION CITY (WHITE) ~ Fulton County, GA (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3065,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Gadsden - Gulf States Steel 115 Kv Tl (Phase 2)","type":"transmission line","voltage_kv":115,"location_ref":"Gadsden - Gulf States Steel (GA/AL/MS/FL)","lat":34.014,"lng":-85.973,"route":null,"cost_usd":null,"start_date":"2035-01-01","end_date":"2035-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":101,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 101.\nIn-Service Year: 2035\nProject Name: SOCO: GADSDEN - GULF STATES STEEL 115 KV TL (PHASE 2)\nDescription: Replace Gulf States Steel DS with a new 5-terminal, 4-breaker 115kV ring bus (West Gadsden SS) across the street from the existing substation.\nSupporting Statement: Bus at Gulf States Steel DS becomes a limiting factor upon completion of the reconductor in Phase 1.\nLocated: GADSDEN = OSM substation 'Gadsden Substation' (AL)","reviewed":false,"approximate":true,"requires_review":false},{"id":3066,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Gadsden - Gulf States Steel 115 Kv Tl (Phase 3)","type":"transmission line","voltage_kv":115,"location_ref":"Gadsden - Gulf States Steel (GA/AL/MS/FL)","lat":34.014,"lng":-85.973,"route":null,"cost_usd":null,"start_date":"2035-01-01","end_date":"2035-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":101,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 101.\nIn-Service Year: 2035\nProject Name: SOCO: GADSDEN - GULF STATES STEEL 115 KV TL (PHASE 3)\nDescription: Modify Linde Gadsden CU due to retirement of Gulf States Steel DS.\nSupporting Statement: Modify Linde Gadsden CU due to retirement of Gulf States Steel DS.\nLocated: GADSDEN = OSM substation 'Gadsden Substation' (AL)","reviewed":false,"approximate":true,"requires_review":false},{"id":3067,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Greenville Area Solution","type":"substation","voltage_kv":230,"location_ref":"Greenville (GA/AL/MS/FL)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2035-01-01","end_date":"2035-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":101,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 101.\nIn-Service Year: 2035\nProject Name: SOCO: GREENVILLE AREA SOLUTION\nDescription: Construct a 230 kV ring bus at Greenville TS.\nSupporting Statement: This project provides additional operational and maintenance flexibility, which increases reliability.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3068,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Madison Park - Mount Meigs Ds 115 Kv Tl Reconductor","type":"transmission line","voltage_kv":115,"location_ref":"Madison Park - Mount Meigs Ds (GA/AL/MS/FL)","lat":32.424,"lng":-86.202,"route":null,"cost_usd":null,"start_date":"2035-01-01","end_date":"2035-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":101,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 101.\nIn-Service Year: 2035\nProject Name: SOCO: MADISON PARK - MOUNT MEIGS DS 115 KV TL RECONDUCTOR\nDescription: Reconductor ~0.5 miles of 115 kV TL from Auburn University (Montgomery) to McLemore DS from 795 26/7 ACSR at 100⁰C to 1351 54/19 ACSR at 100⁰C.\nSupporting Statement: This project provides additional operational and maintenance flexibility, which increases reliability.\nLocated: MADISON PARK = OSM substation 'Madison Park Substation' (AL)","reviewed":false,"approximate":true,"requires_review":false},{"id":3069,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Meldrim New 230/115 Kv Autotransformer","type":"substation","voltage_kv":230,"location_ref":"Meldrim (GA/AL/MS/FL)","lat":32.155,"lng":-81.368,"route":null,"cost_usd":null,"start_date":"2035-01-01","end_date":"2035-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":102,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 102.\nIn-Service Year: 2035\nProject Name: SOCO: SAV: MELDRIM NEW 230/115 KV AUTOTRANSFORMER\nDescription: Install a second 230/115 kV auto transformer at Meldrim with associated station equipment.\nSupporting Statement: The Meldrim 230/115 kV auto transformer overloads under contingency.\nLocated: MELDRIM = OSM substation 'Meldrim Substation' (GA)","reviewed":false,"approximate":false,"requires_review":false},{"id":3070,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"Southern Company","state":null,"name":"Union Springs - Pinckard 115 Kv Tl (Phase 2)","type":"transmission line","voltage_kv":115,"location_ref":"Union Springs - Pinckard (GA/AL/MS/FL)","lat":31.706,"lng":-85.649,"route":[[32.119,-85.718],[31.294,-85.58]],"cost_usd":null,"start_date":"2035-01-01","end_date":"2035-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":102,"raw_excerpt":"SERTP SOUTHERN Balancing Authority Area, page 102.\nIn-Service Year: 2035\nProject Name: SOCO: UNION SPRINGS - PINCKARD 115 KV TL (PHASE 2)\nDescription: Reconductor ~50 miles of 397 ACSR at 50°C Union Springs – Ewell 115 kV TL to 795 ACSS at 200°C.\nSupporting Statement: The Union Springs - Pinckard 115 kV TL overloads under contingency.\nLocated: UNION SPRINGS = OSM substation 'Union Springs Substation' (AL); PINCKARD = OSM substation 'Pinckard Substation' (AL) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":1993,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Southern Power","state":"TX","name":"Millers Branch Solar (Solar Photovoltaic, 132 MW)","type":"generation","voltage_kv":null,"location_ref":"Millers Branch Solar, Haskell County, TX","lat":33.22132,"lng":-99.58652,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 517. Plant 69101 Millers Branch Solar (Southern Power Co), Haskell County, TX; balancing authority ERCO. Planned operation 2026-12.\nGenerator MLB03: 132 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":818,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"South Fowler Avenue Solar Project 2023","state":"CA","name":"Sanger USD - Sanger West HS (Batteries, Solar Photovoltaic, 1.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Sanger USD - Sanger West HS, Fresno County, CA","lat":36.709291,"lng":-119.6814,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 284, 285. Plant 69713 Sanger USD - Sanger West HS (South Fowler Avenue Solar Project 2023, LLC), Fresno County, CA; balancing authority CISO. Planned operation 2026-10.\nGenerator 9985B: 0.5 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator 9985C: 0.9 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":877,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"South Platte Solar","state":"CO","name":"South Platte Solar (Solar Photovoltaic, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"South Platte Solar, Morgan County, CO","lat":40.194947,"lng":-103.7088,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1383. Plant 69972 South Platte Solar (South Platte Solar), Morgan County, CO; balancing authority PSCO. Planned operation 2027-12.\nGenerator SP150: 150 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":878,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"South Platte Storage","state":"CO","name":"South Platte Storage (Batteries, 250 MW)","type":"generation","voltage_kv":null,"location_ref":"South Platte Storage, Morgan County, CO","lat":40.12,"lng":-103.42,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 894. Plant 70053 South Platte Storage (South Platte Storage, LLC), Morgan County, CO; balancing authority PSCO. Planned operation 2027-06.\nGenerator SP250: 250 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1249,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"South Portland Ess","state":"ME","name":"South Portland ESS, LLC (Batteries, 10 MW)","type":"generation","voltage_kv":null,"location_ref":"South Portland ESS, LLC, Cumberland County, ME","lat":43.622939,"lng":-70.33098,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1224. Plant 64616 South Portland ESS, LLC (South Portland ESS, LLC), Cumberland County, ME; balancing authority ISNE. Planned operation 2027-12.\nGenerator 1: 10 MW Batteries; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1052,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"South Springfield Avenue Ii Solar Project 2022","state":"IL","name":"Lowe's - 1440 - Rockford, IL RDC (POI 2) (Solar Photovoltaic, 2.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Lowe's - 1440 - Rockford, IL RDC (POI 2), Winnebago County, IL","lat":42.239075,"lng":-89.13187,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 237. Plant 68572 Lowe's - 1440 - Rockford, IL RDC (POI 2) (South Springfield Avenue II Solar Project 2022, LLC), Winnebago County, IL; balancing authority MISO. Planned operation 2026-10.\nGenerator 7824: 2.3 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1051,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"South Springfield Avenue Solar Project 2022","state":"IL","name":"Lowe's - 1440 - Rockford, IL RDC (POI 1) (Solar Photovoltaic, 2.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Lowe's - 1440 - Rockford, IL RDC (POI 1), Winnebago County, IL","lat":42.239075,"lng":-89.13187,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 236. Plant 68571 Lowe's - 1440 - Rockford, IL RDC (POI 1) (South Springfield Avenue Solar Project 2022, LLC), Winnebago County, IL; balancing authority MISO. Planned operation 2026-10.\nGenerator 7481: 2.3 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1927,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Southwestern Electric Power","state":"TX","name":"Hallsville (Natural Gas Fired Combustion Turbine, 450 MW)","type":"generation","voltage_kv":null,"location_ref":"Hallsville, Harrison County, TX","lat":32.4607,"lng":-94.4852,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1318, 1319. Plant 68417 Hallsville (Southwestern Electric Power Co), Harrison County, TX; balancing authority SWPP. Planned operation 2027-12.\nGenerator 1: 225 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator 2: 225 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1439,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Southwestern Public Service","state":"NM","name":"Cunningham Solar II (Solar Photovoltaic, 196 MW)","type":"generation","voltage_kv":null,"location_ref":"Cunningham Solar II, Lea County, NM","lat":32.786412,"lng":-103.3507,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 789. Plant 70259 Cunningham Solar II (Southwestern Public Service Co), Lea County, NM; balancing authority SWPP. Planned operation 2027-04.\nGenerator CHCS2: 196 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":879,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Spindle Battery","state":"CO","name":"Spindle BESS (Batteries, 199 MW)","type":"generation","voltage_kv":null,"location_ref":"Spindle BESS, Weld County, CO","lat":40.092401,"lng":-104.9012,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 576. Plant 69946 Spindle BESS (Spindle Battery LLC), Weld County, CO; balancing authority PSCO. Planned operation 2026-12.\nGenerator SBA: 199 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":811,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sppm Operating","state":"CA","name":"San Pedro Public Market (SPPM) (Solar Photovoltaic, 1.2 MW)","type":"generation","voltage_kv":null,"location_ref":"San Pedro Public Market (SPPM), Los Angeles County, CA","lat":33.731297,"lng":-118.2795,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 882. Plant 69211 San Pedro Public Market (SPPM) (SPPM Operating, LLC), Los Angeles County, CA; balancing authority LDWP. Planned operation 2027-06.\nGenerator PV1: 1.2 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1627,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Springwater Solar","state":"OH","name":"Springwater Solar, LLC (Solar Photovoltaic, 155 MW)","type":"generation","voltage_kv":null,"location_ref":"Springwater Solar, LLC, Madison County, OH","lat":39.82972,"lng":-83.2498,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 753. Plant 65900 Springwater Solar, LLC (Springwater Solar, LLC), Madison County, OH; balancing authority PJM. Planned operation 2027-04.\nGenerator SPRIN: 155 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":946,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Bacon","state":"GA","name":"SR Bacon (Solar Photovoltaic, 85 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Bacon, Bacon County, GA","lat":31.511392,"lng":-82.33683,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 488. Plant 68226 SR Bacon (SR Bacon, LLC), Bacon County, GA; balancing authority SOCO. Planned operation 2026-12.\nGenerator BACON: 85 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":947,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Bacon Ii","state":"GA","name":"SR Bacon II (Solar Photovoltaic, 115 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Bacon II, Bacon County, GA","lat":31.511392,"lng":-82.33683,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1322. Plant 68553 SR Bacon II (SR Bacon II, LLC), Bacon County, GA; balancing authority SOCO. Planned operation 2027-12.\nGenerator BACN2: 115 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":948,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Bacon Iii","state":"GA","name":"SR Bacon III (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Bacon III, Bacon County, GA","lat":31.511392,"lng":-82.33683,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1323. Plant 68554 SR Bacon III (SR Bacon III, LLC), Bacon County, GA; balancing authority SOCO. Planned operation 2027-12.\nGenerator BACN3: 100 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":630,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Bear Creek","state":"AL","name":"SR Bear Creek (Solar Photovoltaic, 4.5 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Bear Creek, Marion County, AL","lat":34.275559,"lng":-87.70564,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1306. Plant 68243 SR Bear Creek (SR Bear Creek, LLC), Marion County, AL; balancing authority SOCO. Planned operation 2027-12.\nGenerator BEAR: 4.5 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":648,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Cherry Valley","state":"AR","name":"SR Cherry Valley (Solar Photovoltaic, 4.8 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Cherry Valley, Cross County, AR","lat":35.372893,"lng":-90.7708,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 69. Plant 68097 SR Cherry Valley (SR Cherry Valley, LLC), Cross County, AR; balancing authority MISO. Planned operation 2026-09.\nGenerator CHERR: 4.8 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1791,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Copeland","state":"TN","name":"SR Copeland (Solar Photovoltaic, 110 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Copeland, Cumberland County, TN","lat":36.035453,"lng":-85.10991,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1298. Plant 68099 SR Copeland (SR Copeland, LLC), Cumberland County, TN; balancing authority TVA. Planned operation 2027-12.\nGenerator COPE: 110 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1777,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Cordova","state":"SC","name":"SR Cordova (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Cordova, Orangeburg County, SC","lat":33.45963,"lng":-80.88897,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1324. Plant 68555 SR Cordova (SR Cordova, LLC), Orangeburg County, SC; balancing authority SCEG. Planned operation 2027-12.\nGenerator CORDV: 100 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1792,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Denmark","state":"TN","name":"SR Denmark (Solar Photovoltaic, 42 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Denmark, Madison County, TN","lat":35.563633,"lng":-88.93254,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 489. Plant 68229 SR Denmark (SR Denmark, LLC), Madison County, TN; balancing authority TVA. Planned operation 2026-12.\nGenerator DEMRK: 42 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":649,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Des Arc","state":"AR","name":"SR Des Arc (Solar Photovoltaic, 4.8 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Des Arc, Prairie County, AR","lat":34.977439,"lng":-91.52516,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 490. Plant 68230 SR Des Arc (SR Des Arc, LLC), Prairie County, AR; balancing authority MISO. Planned operation 2026-12.\nGenerator DESAR: 4.8 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1793,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Durhamville","state":"TN","name":"SR Durhamville (Solar Photovoltaic, 66 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Durhamville, Haywood County, TN","lat":35.626611,"lng":-89.46162,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1325. Plant 68556 SR Durhamville (SR Durhamville, LLC), Haywood County, TN; balancing authority TVA. Planned operation 2027-12.\nGenerator DURHM: 66 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":650,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Forrest City","state":"AR","name":"SR Forrest City (Solar Photovoltaic, 4.8 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Forrest City, St Francis County, AR","lat":34.984256,"lng":-90.78602,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1326. Plant 68557 SR Forrest City (SR Forrest City, LLC), St Francis County, AR; balancing authority MISO. Planned operation 2027-12.\nGenerator FORRC: 4.8 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1778,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Georgetown","state":"SC","name":"SR Georgetown (Solar Photovoltaic, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Georgetown, Georgetown County, SC","lat":33.333354,"lng":-79.51325,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 491. Plant 68247 SR Georgetown (SR Georgetown. LLC), Georgetown County, SC; balancing authority DUK. Planned operation 2026-12.\nGenerator GRGTN: 50 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":631,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Hope Hull","state":"AL","name":"SR Hope Hull (Solar Photovoltaic, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Hope Hull, Montgomery County, AL","lat":32.2555,"lng":-86.3194,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1299. Plant 68104 SR Hope Hull (SR Hope Hull, LLC), Montgomery County, AL; balancing authority SOCO. Planned operation 2027-12.\nGenerator HPHUL: 80 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1184,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Horus","state":"KY","name":"SR Horus (Solar Photovoltaic, 79.7 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Horus, Simpson County, KY","lat":36.661,"lng":-86.534,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1016. Plant 68249 SR Horus (SR Horus, LLC), Simpson County, KY; balancing authority TVA. Planned operation 2027-09.\nGenerator METTR: 79.7 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1347,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Jasper","state":"MS","name":"SR Jasper (Solar Photovoltaic, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Jasper, Jasper County, MS","lat":32.048427,"lng":-88.94419,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2025. Plant 68105 SR Jasper (SR Jasper, LLC), Jasper County, MS; balancing authority SOCO. Planned operation 2029-12.\nGenerator JASP: 150 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":632,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Lott","state":"AL","name":"SR Lott (Solar Photovoltaic, 8.3 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Lott, Mobile County, AL","lat":30.940181,"lng":-88.29926,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1327. Plant 68558 SR Lott (SR Lott, LLC), Mobile County, AL; balancing authority SOCO. Planned operation 2027-12.\nGenerator LOTT: 8.3 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1348,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Magnolia","state":"MS","name":"SR Magnolia (Solar Photovoltaic, 160 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Magnolia, Monroe County, MS","lat":33.856467,"lng":-88.67488,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 874. Plant 68559 SR Magnolia (SR Magnolia, LLC), Monroe County, MS; balancing authority TVA. Planned operation 2027-06.\nGenerator MAGNA: 160 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":633,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Marion Junction","state":"AL","name":"SR Marion Junction (Solar Photovoltaic, 15 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Marion Junction, Dallas County, AL","lat":32.418685,"lng":-87.36171,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1328. Plant 68560 SR Marion Junction (SR Marion Junction, LLC), Dallas County, AL; balancing authority TVA. Planned operation 2027-12.\nGenerator MARJT: 15 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1349,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Marshall","state":"MS","name":"SR Marshall, LLC (Solar Photovoltaic, 4.8 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Marshall, LLC, Marshall County, MS","lat":34.959526,"lng":-89.58856,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 471. Plant 67134 SR Marshall, LLC (SR Marshall, LLC), Marshall County, MS; balancing authority TVA. Planned operation 2026-12.\nGenerator MARSH: 4.8 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1794,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Middleton","state":"TN","name":"SR Middleton (Solar Photovoltaic, 55 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Middleton, Hardeman County, TN","lat":35.176939,"lng":-88.87867,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 933. Plant 68561 SR Middleton (SR Middleton, LLC), Hardeman County, TN; balancing authority TVA. Planned operation 2027-07.\nGenerator MIDDN: 55 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1795,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Milan","state":"TN","name":"SR Milan (Solar Photovoltaic, 2.8 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Milan, Gibson County, TN","lat":35.945285,"lng":-88.75989,"route":null,"cost_usd":null,"start_date":"2028-07-01","end_date":"2028-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1606. Plant 68110 SR Milan (SR Milan, LLC), Gibson County, TN; balancing authority TVA. Planned operation 2028-07.\nGenerator MILAN: 2.8 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1350,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Mount Pleasant","state":"MS","name":"SR Mount Pleasant (Solar Photovoltaic, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Mount Pleasant, Marshall County, MS","lat":34.951675,"lng":-89.58282,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1329. Plant 68562 SR Mount Pleasant (SR Mount Pleasant, LLC), Marshall County, MS; balancing authority TVA. Planned operation 2027-12.\nGenerator MTPLT: 50 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":949,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Norwood","state":"GA","name":"SR Norwood (Solar Photovoltaic, 107 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Norwood, Warren County, GA","lat":33.435993,"lng":-82.76361,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1330. Plant 68563 SR Norwood (SR Norwood, LLC), Warren County, GA; balancing authority TVA. Planned operation 2027-12.\nGenerator NORWD: 107 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1796,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Puryear","state":"TN","name":"SR Puryear (Solar Photovoltaic, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Puryear, Henry County, TN","lat":36.449856,"lng":-88.30107,"route":null,"cost_usd":null,"start_date":"2027-08-01","end_date":"2027-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 976. Plant 68564 SR Puryear (SR Puryear, LLC), Henry County, TN; balancing authority TVA. Planned operation 2027-08.\nGenerator PURYR: 50 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2220,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Quincy Valley","state":"WA","name":"SR Quincy Valley (Solar Photovoltaic, 130 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Quincy Valley, Grant County, WA","lat":47.27998,"lng":-119.7046,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 492. Plant 68252 SR Quincy Valley (SR Quincy Valley, LLC), Grant County, WA; balancing authority GCPD. Planned operation 2026-12.\nGenerator QUVAL: 130 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":950,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Rochelle I","state":"GA","name":"SR Rochelle I (Solar Photovoltaic, 90 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Rochelle I, Wilcox County, GA","lat":31.923234,"lng":-83.45427,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 493. Plant 68253 SR Rochelle I (SR Rochelle I, LLC), Wilcox County, GA; balancing authority SOCO. Planned operation 2026-12.\nGenerator ROCH1: 90 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":951,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Rochelle Ii","state":"GA","name":"SR Rochelle II (Solar Photovoltaic, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Rochelle II, Wilcox County, GA","lat":32.030665,"lng":-83.506,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1331. Plant 68565 SR Rochelle II (SR Rochelle II, LLC), Wilcox County, GA; balancing authority TVA. Planned operation 2027-12.\nGenerator ROCH2: 50 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1797,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Shelby","state":"TN","name":"SR Shelby (Solar Photovoltaic, 9.8 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Shelby, Shelby County, TN","lat":35.353292,"lng":-89.81498,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1307. Plant 68255 SR Shelby (SR Shelby, LLC), Shelby County, TN; balancing authority TVA. Planned operation 2027-12.\nGenerator SHELB: 9.8 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1798,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Shelby Ii","state":"TN","name":"SR Shelby II, LLC (Solar Photovoltaic, 6 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Shelby II, LLC, Shelby County, TN","lat":35.353646,"lng":-89.8109,"route":null,"cost_usd":null,"start_date":"2028-02-01","end_date":"2028-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1445. Plant 69867 SR Shelby II, LLC (SR Shelby II, LLC), Shelby County, TN; balancing authority TVA. Planned operation 2028-02.\nGenerator SHEII: 6 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":634,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Sipsey","state":"AL","name":"SR Sipsey (Solar Photovoltaic, 10 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Sipsey, Fayette County, AL","lat":33.694556,"lng":-87.81805,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1332. Plant 68566 SR Sipsey (SR Sipsey, LLC), Fayette County, AL; balancing authority TVA. Planned operation 2027-12.\nGenerator SIPSY: 10 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1205,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr South Bastrop","state":"LA","name":"SR South Bastrop (Solar Photovoltaic, 4.8 MW)","type":"generation","voltage_kv":null,"location_ref":"SR South Bastrop, Morehouse County, LA","lat":32.747456,"lng":-91.91091,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 494. Plant 68256 SR South Bastrop (SR South Bastrop, LLC), Morehouse County, LA; balancing authority MISO. Planned operation 2026-12.\nGenerator SBAST: 4.8 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1206,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Sunset","state":"LA","name":"SR Sunset (Solar Photovoltaic, 4.3 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Sunset, St Landry County, LA","lat":30.421588,"lng":-92.07507,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1333. Plant 68567 SR Sunset (SR Sunset, LLC), St Landry County, LA; balancing authority MISO. Planned operation 2027-12.\nGenerator SUNST: 4.3 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1799,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Tullahoma","state":"TN","name":"SR Tullahoma (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Tullahoma, Moore County, TN","lat":35.360002,"lng":-86.27532,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 765. Plant 68568 SR Tullahoma (SR Tullahoma, LLC), Moore County, TN; balancing authority TVA. Planned operation 2027-04.\nGenerator TULLA: 200 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":651,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Ulm","state":"AR","name":"SR Ulm (Solar Photovoltaic, 4.8 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Ulm, Prairie County, AR","lat":34.577902,"lng":-91.45184,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1334. Plant 68569 SR Ulm (SR Ulm, LLC), Prairie County, AR; balancing authority MISO. Planned operation 2027-12.\nGenerator ULM: 4.8 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":652,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr West Helena","state":"AR","name":"SR West Helena (Solar Photovoltaic, 4.8 MW)","type":"generation","voltage_kv":null,"location_ref":"SR West Helena, Phillips County, AR","lat":34.552639,"lng":-90.68421,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1335. Plant 68570 SR West Helena (SR West Helena, LLC), Phillips County, AR; balancing authority MISO. Planned operation 2027-12.\nGenerator WHELN: 4.8 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1207,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sr Winnsboro","state":"LA","name":"SR Winnsboro (Solar Photovoltaic, 4.8 MW)","type":"generation","voltage_kv":null,"location_ref":"SR Winnsboro, Franklin County, LA","lat":32.159745,"lng":-91.67586,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 495. Plant 68257 SR Winnsboro (SR Winnsboro, LLC), Franklin County, LA; balancing authority MISO. Planned operation 2026-12.\nGenerator WINN: 4.8 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":907,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Standard Solar","state":"DE","name":"Sunrise Magnolia DE (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Sunrise Magnolia DE, Kent County, DE","lat":39.071366,"lng":-75.49303,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 723. Plant 69560 Sunrise Magnolia DE (Standard Solar), Kent County, DE; balancing authority PJM. Planned operation 2027-03.\nGenerator MAGNO: 3 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":982,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Standard Solar","state":"IL","name":"AC IL - Lockport East (Solar Photovoltaic, 3.1 MW)","type":"generation","voltage_kv":null,"location_ref":"AC IL - Lockport East, Will County, IL","lat":41.6044,"lng":-88.0603,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 305. Plant 70227 AC IL - Lockport East (Standard Solar), Will County, IL; balancing authority PJM. Planned operation 2026-10.\nGenerator LOCKE: 3.1 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":983,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Standard Solar","state":"IL","name":"AC IL - Lockport West (Solar Photovoltaic, 3.4 MW)","type":"generation","voltage_kv":null,"location_ref":"AC IL - Lockport West, Will County, IL","lat":41.5944,"lng":-88.0624,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 306. Plant 70228 AC IL - Lockport West (Standard Solar), Will County, IL; balancing authority PJM. Planned operation 2026-10.\nGenerator LOCKW: 3.4 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1062,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Standard Solar","state":"IL","name":"NL IL 2700 East (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"NL IL 2700 East, Livingston County, IL","lat":41.050261,"lng":-88.42827,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 423. Plant 70294 NL IL 2700 East (Standard Solar), Livingston County, IL; balancing authority PJM. Planned operation 2026-11.\nGenerator EAST: 5 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1063,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Standard Solar","state":"IL","name":"NL IL Braceville (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"NL IL Braceville, Grundy County, IL","lat":41.230511,"lng":-88.25037,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 323. Plant 70440 NL IL Braceville (Standard Solar), Grundy County, IL; balancing authority PJM. Planned operation 2026-10.\nGenerator BRACE: 5 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1064,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Standard Solar","state":"IL","name":"NL IL Lake (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"NL IL Lake, Lake County, IL","lat":42.464881,"lng":-87.88974,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 592. Plant 70295 NL IL Lake (Standard Solar), Lake County, IL; balancing authority PJM. Planned operation 2026-12.\nGenerator LAKE: 5 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1070,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Standard Solar","state":"IL","name":"OER IL - Groundhog (Solar Photovoltaic, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"OER IL - Groundhog, McHenry County, IL","lat":42.282505,"lng":-88.38802,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 157. Plant 70046 OER IL - Groundhog (Standard Solar), McHenry County, IL; balancing authority PJM. Planned operation 2026-09.\nGenerator GNDHG: 2 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1294,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Standard Solar","state":"MN","name":"Enterprise MN - Fitzthum (Solar Photovoltaic, 1 MW)","type":"generation","voltage_kv":null,"location_ref":"Enterprise MN - Fitzthum, Stearns County, MN","lat":45.644581,"lng":-94.22744,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 261. Plant 69305 Enterprise MN - Fitzthum (Standard Solar), Stearns County, MN; balancing authority MISO. Planned operation 2026-10.\nGenerator FITZH: 1 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1425,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Standard Solar","state":"NJ","name":"BPL NJ - Belmont (Solar Photovoltaic, 1.8 MW)","type":"generation","voltage_kv":null,"location_ref":"BPL NJ - Belmont, Somerset County, NJ","lat":40.530503,"lng":-74.54493,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 129. Plant 69554 BPL NJ - Belmont (Standard Solar), Somerset County, NJ; balancing authority PJM. Planned operation 2026-09.\nGenerator BELMO: 1.8 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1426,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Standard Solar","state":"NJ","name":"BPL NJ - Union Distribution Center (Solar Photovoltaic, 1.5 MW)","type":"generation","voltage_kv":null,"location_ref":"BPL NJ - Union Distribution Center, Union County, NJ","lat":40.6834,"lng":-74.2422,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 141. Plant 69791 BPL NJ - Union Distribution Center (Standard Solar), Union County, NJ; balancing authority PJM. Planned operation 2026-09.\nGenerator NJUDC: 1.5 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1429,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Standard Solar","state":"NJ","name":"Elizabeth Metropolitan Logistics Center (Solar Photovoltaic, 1.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Elizabeth Metropolitan Logistics Center, Union County, NJ","lat":40.68403,"lng":-74.20623,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 140. Plant 69790 Elizabeth Metropolitan Logistics Center (Standard Solar), Union County, NJ; balancing authority PJM. Planned operation 2026-09.\nGenerator EZMLC: 1.2 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1446,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Standard Solar","state":"NM","name":"Pluma - SLT Grant (Solar Photovoltaic, 4.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Pluma - SLT Grant, Grant County, NM","lat":32.762349,"lng":-108.1793,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 273. Plant 69558 Pluma - SLT Grant (Standard Solar), Grant County, NM; balancing authority PNM. Planned operation 2026-10.\nGenerator GRANT: 4.8 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1547,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Standard Solar","state":"NY","name":"NL NY- Pulaski (Batteries, Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"NL NY- Pulaski, Orange County, NY","lat":41.334309,"lng":-74.40401,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 131, 132. Plant 69592 NL NY- Pulaski (Standard Solar), Orange County, NY; balancing authority NYIS. Planned operation 2026-09.\nGenerator PSKBS: 2.5 MW Batteries; (TS) Construction complete, but not yet in commercial operation\nGenerator PSKPV: 2.5 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1450,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Star Light Energy Center","state":"NM","name":"Star Light Energy Center (Batteries, Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Star Light Energy Center, Valencia County, NM","lat":34.739572,"lng":-106.7928,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 537, 538. Plant 69497 Star Light Energy Center (Star Light Energy Center), Valencia County, NM; balancing authority PNM. Planned operation 2026-12.\nGenerator SLB: 100 MW Batteries; (U) Under construction, less than or equal to 50 percent complete\nGenerator SLS: 100 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1417,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Steele Flats Energy Storage","state":"NE","name":"Steele Flats Energy Storage (Batteries, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"Steele Flats Energy Storage, Jefferson County, NE","lat":40.051306,"lng":-96.95178,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 598. Plant 70345 Steele Flats Energy Storage (Steele Flats Energy Storage, LLC), Jefferson County, NE; balancing authority SWPP. Planned operation 2026-12.\nGenerator SFES: 50 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1114,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Steger Road Solar 1","state":"IL","name":"Steger (Solar Photovoltaic, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"Steger, Cook County, IL","lat":41.4701,"lng":-87.5793,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 165. Plant 70182 Steger (Steger Road Solar 1 LLC), Cook County, IL; balancing authority PJM. Planned operation 2026-09.\nGenerator PV1: 2 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":830,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Stellar Renewable Power","state":"CA","name":"Stellar Wright BESS (Batteries, 84.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Stellar Wright BESS, Merced County, CA","lat":37.007998,"lng":-120.9637,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 291. Plant 69925 Stellar Wright BESS (Stellar Renewable Power), Merced County, CA; balancing authority CISO. Planned operation 2026-10.\nGenerator SWBA1: 84.8 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1177,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Stellar Renewable Power","state":"KY","name":"Henderson County Solar (Solar Photovoltaic, 51.1 MW)","type":"generation","voltage_kv":null,"location_ref":"Henderson County Solar, Henderson County, KY","lat":37.799412,"lng":-87.62325,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1038. Plant 69793 Henderson County Solar (Stellar Renewable Power), Henderson County, KY; balancing authority MISO. Planned operation 2027-09.\nGenerator HEPV1: 51.1 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1745,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Stony Creek Solar","state":"PA","name":"Stony Creek Solar (Solar Photovoltaic, 15 MW)","type":"generation","voltage_kv":null,"location_ref":"Stony Creek Solar, Somerset County, PA","lat":40.222386,"lng":-78.8812,"route":null,"cost_usd":null,"start_date":"2028-10-01","end_date":"2028-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1691. Plant 67879 Stony Creek Solar (Stony Creek Solar, LLC), Somerset County, PA; balancing authority PJM. Planned operation 2028-10.\nGenerator ENX26: 15 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":991,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Strata Clean Energy","state":"IL","name":"Austin Creek Solar (Solar Photovoltaic, 140 MW)","type":"generation","voltage_kv":null,"location_ref":"Austin Creek Solar, Adams County, IL","lat":39.790103,"lng":-91.31508,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1006. Plant 66703 Austin Creek Solar (Strata Clean Energy), Adams County, IL; balancing authority MISO. Planned operation 2027-09.\nGenerator 11103: 140 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1084,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Strata Clean Energy","state":"IL","name":"Prairie Oak Solar (Solar Photovoltaic, 250 MW)","type":"generation","voltage_kv":null,"location_ref":"Prairie Oak Solar, Shelby County, IL","lat":39.542799,"lng":-89.03153,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1008. Plant 66707 Prairie Oak Solar (Strata Clean Energy), Shelby County, IL; balancing authority MISO. Planned operation 2027-09.\nGenerator 11102: 250 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1144,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Strata Clean Energy","state":"IN","name":"Patoka Solar (Solar Photovoltaic, 250 MW)","type":"generation","voltage_kv":null,"location_ref":"Patoka Solar, Posey County, IN","lat":38.14033,"lng":-87.77567,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1007. Plant 66706 Patoka Solar (Strata Clean Energy), Posey County, IN; balancing authority MISO. Planned operation 2027-09.\nGenerator 11101: 250 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1746,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Strinestown Solar","state":"PA","name":"Strinestown Solar (Solar Photovoltaic, 79.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Strinestown Solar, York County, PA","lat":40.090105,"lng":-76.73955,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1349. Plant 68969 Strinestown Solar (Strinestown Solar, LLC), York County, PA; balancing authority PJM. Planned operation 2027-12.\nGenerator ENX39: 79.6 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2090,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sun Angel Ess","state":"TX","name":"Sun Angel ESS (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Sun Angel ESS, Angelina County, TX","lat":31.345947,"lng":-94.66785,"route":null,"cost_usd":null,"start_date":"2028-07-01","end_date":"2028-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1609. Plant 68362 Sun Angel ESS (Sun Angel ESS LLC), Angelina County, TX; balancing authority ERCO. Planned operation 2028-07.\nGenerator SABS1: 200 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1584,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Suneast Manchester Solar","state":"NY","name":"SunEast Manchester Solar Project (Solar Photovoltaic, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"SunEast Manchester Solar Project, Ontario County, NY","lat":42.958318,"lng":-77.19503,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 847. Plant 64037 SunEast Manchester Solar Project (SunEast Manchester Solar LLC), Ontario County, NY; balancing authority NYIS. Planned operation 2027-06.\nGenerator Q#913: 20 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1585,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Suneast Skyline Solar","state":"NY","name":"SunEast Skyline Solar Project (Solar Photovoltaic, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"SunEast Skyline Solar Project, Oneida County, NY","lat":43.063069,"lng":-75.45195,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 846. Plant 62816 SunEast Skyline Solar Project (SunEast Skyline Solar LLC), Oneida County, NY; balancing authority NYIS. Planned operation 2027-06.\nGenerator Q670: 20 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2195,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sunnybrook Farm Solar","state":"VA","name":"Sunnybrook Solar Project - Hybrid (Batteries, 12.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Sunnybrook Solar Project - Hybrid, Halifax County, VA","lat":36.798717,"lng":-78.83961,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 854. Plant 65307 Sunnybrook Solar Project - Hybrid (Sunnybrook Farm Solar, LLC), Halifax County, VA; balancing authority PJM. Planned operation 2027-06.\nGenerator SUNB: 12.5 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1808,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sunraycer Assets I","state":"TX","name":"Albatross Solar, LLC (Batteries, Solar Photovoltaic, 151.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Albatross Solar, LLC, McLennan County, TX","lat":31.484342,"lng":-97.42239,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1263, 1264. Plant 66894 Albatross Solar, LLC (Sunraycer Assets I LLC), McLennan County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator ALBBA: 50.4 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator ALBPV: 101 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1896,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sunraycer Assets I","state":"TX","name":"Eagle Springs Hybrid (Batteries, Solar Photovoltaic, 165.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Eagle Springs Hybrid, Delta County, TX","lat":33.433264,"lng":-95.57444,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 464, 465. Plant 66341 Eagle Springs Hybrid (Sunraycer Assets I LLC), Delta County, TX; balancing authority ERCO. Planned operation 2026-12.\nGenerator EGSB: 55.1 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator EGSS: 110.1 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1979,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sunraycer Assets I","state":"TX","name":"Lupinus Solar 1, LLC (Batteries, Solar Photovoltaic, 248 MW)","type":"generation","voltage_kv":null,"location_ref":"Lupinus Solar 1, LLC, Franklin County, TX","lat":30.303385,"lng":-95.25692,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1009, 1010. Plant 66895 Lupinus Solar 1, LLC (Sunraycer Assets I LLC), Franklin County, TX; balancing authority ERCO. Planned operation 2027-09.\nGenerator LP1BA: 83 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator LP1PV: 165 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1980,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sunraycer Assets I","state":"TX","name":"Lupinus Solar 2, LLC (Batteries, Solar Photovoltaic, 366.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Lupinus Solar 2, LLC, Franklin County, TX","lat":30.303385,"lng":-95.25692,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1265, 1266. Plant 66896 Lupinus Solar 2, LLC (Sunraycer Assets I LLC), Franklin County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator LP2BA: 122.9 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator LP2PV: 244 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1981,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sunraycer Assets I","state":"TX","name":"Lupinus Storage 3 (Batteries, 50.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Lupinus Storage 3, Franklin County, TX","lat":33.3015,"lng":-95.2548,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 863. Plant 67674 Lupinus Storage 3 (Sunraycer Assets I LLC), Franklin County, TX; balancing authority ERCO. Planned operation 2027-06.\nGenerator LUPE3: 50.9 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2082,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sunraycer Assets I","state":"TX","name":"Staccato BESS (Batteries, 200.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Staccato BESS, Fayette County, TX","lat":30.053062,"lng":-96.92122,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 785. Plant 70021 Staccato BESS (Sunraycer Assets I LLC), Fayette County, TX; balancing authority ERCO. Planned operation 2027-04.\nGenerator STACB: 200.5 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2194,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sun Ridge Solar","state":"VA","name":"Sun Ridge Solar (Solar Photovoltaic, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"Sun Ridge Solar, Rockingham County, VA","lat":38.314898,"lng":-78.74463,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 344. Plant 67215 Sun Ridge Solar (Sun Ridge Solar, LLC), Rockingham County, VA; balancing authority PJM. Planned operation 2026-11.\nGenerator ENX25: 50 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2091,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sunshiner Ess","state":"TX","name":"SunShiner ESS (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"SunShiner ESS, Zavala County, TX","lat":28.937123,"lng":-99.83407,"route":null,"cost_usd":null,"start_date":"2029-07-01","end_date":"2029-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1953. Plant 68363 SunShiner ESS (SunShiner ESS LLC), Zavala County, TX; balancing authority ERCO. Planned operation 2029-07.\nGenerator SSESS: 200 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1663,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sunstone Solar","state":"OR","name":"Sunstone Solar (Batteries, Solar Photovoltaic, 2400 MW)","type":"generation","voltage_kv":null,"location_ref":"Sunstone Solar, Morrow County, OR","lat":45.605916,"lng":-119.563,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1316, 1317. Plant 68396 Sunstone Solar (Sunstone Solar, LLC), Morrow County, OR; balancing authority BPAT. Planned operation 2027-12.\nGenerator PGB45: 1200 MW Batteries; (L) Regulatory approvals pending. Not under construction\nGenerator PGR45: 1200 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1090,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sv Csg Angelly 1","state":"IL","name":"SV CSG Angelly 1 (Solar Photovoltaic, 3.6 MW)","type":"generation","voltage_kv":null,"location_ref":"SV CSG Angelly 1, Saline County, IL","lat":37.7164,"lng":-88.5303,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 404. Plant 69811 SV CSG Angelly 1 (SV CSG Angelly 1, LLC), Saline County, IL; balancing authority MISO. Planned operation 2026-11.\nGenerator ANGEL: 3.6 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1091,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sv Csg Bloomington","state":"IL","name":"SV CSG Bloomington (Batteries, Solar Photovoltaic, 10 MW)","type":"generation","voltage_kv":null,"location_ref":"SV CSG Bloomington, McLean County, IL","lat":40.465889,"lng":-89.03208,"route":null,"cost_usd":null,"start_date":"2027-08-01","end_date":"2027-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 986, 987. Plant 69949 SV CSG Bloomington (SV CSG Bloomington, LLC), McLean County, IL; balancing authority MISO. Planned operation 2027-08.\nGenerator BLOMB: 5 MW Batteries; (T) Regulatory approvals received. Not under construction\nGenerator BLOOM: 5 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1092,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sv Csg Brownstown 1","state":"IL","name":"SV CSG Brownstown 1 (Solar Photovoltaic, 1 MW)","type":"generation","voltage_kv":null,"location_ref":"SV CSG Brownstown 1, Fayette County, IL","lat":38.971573,"lng":-89.01849,"route":null,"cost_usd":null,"start_date":"2027-02-01","end_date":"2027-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 667. Plant 69812 SV CSG Brownstown 1 (SV CSG Brownstown 1, LLC), Fayette County, IL; balancing authority MISO. Planned operation 2027-02.\nGenerator BROWN: 1 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1093,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sv Csg Corbell","state":"IL","name":"SV CSG Corbell (Solar Photovoltaic, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"SV CSG Corbell, Williamson County, IL","lat":37.758343,"lng":-89.05748,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 368. Plant 68933 SV CSG Corbell (SV CSG Corbell, LLC), Williamson County, IL; balancing authority MISO. Planned operation 2026-11.\nGenerator CORB: 2 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1094,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sv Csg Diel 1","state":"IL","name":"SV CSG Diel 1 (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"SV CSG Diel 1, Richland County, IL","lat":38.70762,"lng":-88.22238,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 519. Plant 69159 SV CSG Diel 1 (SV CSG Diel 1, LLC), Richland County, IL; balancing authority MISO. Planned operation 2026-12.\nGenerator DIEL: 5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1095,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sv Csg East St Louis","state":"IL","name":"SV CSG East St Louis (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"SV CSG East St Louis, St Clair County, IL","lat":38.6056,"lng":-90.0705,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 512. Plant 68934 SV CSG East St Louis (SV CSG East St Louis LLC), St Clair County, IL; balancing authority MISO. Planned operation 2026-12.\nGenerator EAST1: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1096,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sv Csg Kingston Solar 1","state":"IL","name":"SV CSG Kingston Solar 1 (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"SV CSG Kingston Solar 1, DeKalb County, IL","lat":42.0971,"lng":-88.7318,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 558. Plant 69815 SV CSG Kingston Solar 1 (SV CSG Kingston Solar 1, LLC), DeKalb County, IL; balancing authority PJM. Planned operation 2026-12.\nGenerator KINGS: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1097,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sv Csg Mahomet","state":"IL","name":"SV CSG Mahomet (Solar Photovoltaic, 3.5 MW)","type":"generation","voltage_kv":null,"location_ref":"SV CSG Mahomet, Champaign County, IL","lat":40.193189,"lng":-88.37984,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1053. Plant 69810 SV CSG Mahomet (SV CSG Mahomet, LLC), Champaign County, IL; balancing authority MISO. Planned operation 2027-09.\nGenerator MAHOM: 3.5 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1098,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sv Csg Manteno","state":"IL","name":"SV CSG Manteno (Batteries, Solar Photovoltaic, 10 MW)","type":"generation","voltage_kv":null,"location_ref":"SV CSG Manteno, Kankakee County, IL","lat":41.221257,"lng":-87.88186,"route":null,"cost_usd":null,"start_date":"2027-08-01","end_date":"2027-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 984, 985. Plant 69948 SV CSG Manteno (SV CSG Manteno, LLC), Kankakee County, IL; balancing authority PJM. Planned operation 2027-08.\nGenerator MANTB: 5 MW Batteries; (T) Regulatory approvals received. Not under construction\nGenerator MANTO: 5 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1099,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sv Csg Naplate","state":"IL","name":"SV CSG Naplate (Solar Photovoltaic, 3.9 MW)","type":"generation","voltage_kv":null,"location_ref":"SV CSG Naplate, LaSalle County, IL","lat":41.332158,"lng":-88.88482,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 370. Plant 68936 SV CSG Naplate (SV CSG Naplate, LLC), LaSalle County, IL; balancing authority MISO. Planned operation 2026-11.\nGenerator NAP1: 3.9 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1100,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sv Csg North Creek 1","state":"IL","name":"SV CSG North Creek 1 (Solar Photovoltaic, 2.1 MW)","type":"generation","voltage_kv":null,"location_ref":"SV CSG North Creek 1, Livingston County, IL","lat":40.916213,"lng":-88.60821,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 889. Plant 69818 SV CSG North Creek 1 (SV CSG North Creek 1, LLC), Livingston County, IL; balancing authority PJM. Planned operation 2027-06.\nGenerator NCREK: 2.1 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1101,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sv Csg Ottawa 1","state":"IL","name":"SV CSG Ottawa 1 (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"SV CSG Ottawa 1, LaSalle County, IL","lat":41.340799,"lng":-88.77689,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1026. Plant 69160 SV CSG Ottawa 1 (SV CSG Ottawa 1 LLC), LaSalle County, IL; balancing authority MISO. Planned operation 2027-09.\nGenerator OTTA1: 3 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1102,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sv Csg Reeder Solar","state":"IL","name":"SV CSG Reeder Solar (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"SV CSG Reeder Solar, Knox County, IL","lat":40.92886,"lng":-90.49347,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 880. Plant 69158 SV CSG Reeder Solar (SV CSG Reeder Solar, LLC), Knox County, IL; balancing authority MISO. Planned operation 2027-06.\nGenerator REEDR: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1103,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sv Csg Roxana 1","state":"IL","name":"SV CSG Roxana 1 (Solar Photovoltaic, 2.5 MW)","type":"generation","voltage_kv":null,"location_ref":"SV CSG Roxana 1, Madison County, IL","lat":38.836055,"lng":-90.03685,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 369. Plant 68935 SV CSG Roxana 1 (SV CSG Roxana 1 LLC), Madison County, IL; balancing authority MISO. Planned operation 2026-11.\nGenerator ROX1: 2.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1104,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sv Csg South Roxana","state":"IL","name":"SV CSG South Roxana (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"SV CSG South Roxana, Madison County, IL","lat":38.811582,"lng":-90.0515,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1054. Plant 69821 SV CSG South Roxana (SV CSG South Roxana, LLC), Madison County, IL; balancing authority MISO. Planned operation 2027-09.\nGenerator SROX: 5 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1105,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sv Csg St Anne 1","state":"IL","name":"SV CSG St Anne 1 (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"SV CSG St Anne 1, Kankakee County, IL","lat":41.041,"lng":-87.6999,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 955. Plant 69817 SV CSG St Anne 1 (SV CSG St Anne 1, LLC), Kankakee County, IL; balancing authority PJM. Planned operation 2027-07.\nGenerator SANNE: 5 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1106,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sv Csg Sun Trust Solar","state":"IL","name":"SV CSG Sun Trust Solar (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"SV CSG Sun Trust Solar, Kane County, IL","lat":42.0969,"lng":-88.3865,"route":null,"cost_usd":null,"start_date":"2027-02-01","end_date":"2027-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 668. Plant 69814 SV CSG Sun Trust Solar (SV CSG Sun Trust Solar, LLC), Kane County, IL; balancing authority PJM. Planned operation 2027-02.\nGenerator SUNSO: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1107,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sv Csg Wilson School Solar","state":"IL","name":"SV CSG Wilson School Solar (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"SV CSG Wilson School Solar, Kane County, IL","lat":42.053991,"lng":-88.35269,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 781. Plant 69816 SV CSG Wilson School Solar (SV CSG Wilson School Solar, LLC), Kane County, IL; balancing authority PJM. Planned operation 2027-04.\nGenerator WILSN: 5 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2094,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Swenson Solar","state":"TX","name":"Swenson Solar (Solar Photovoltaic, 600 MW)","type":"generation","voltage_kv":null,"location_ref":"Swenson Solar, Stonewall County, TX","lat":32.985403,"lng":-100.0292,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 421. Plant 70135 Swenson Solar (Swenson Solar LLC), Stonewall County, TX; balancing authority ERCO. Planned operation 2026-11.\nGenerator SWNSN: 600 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1117,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Switchgrass Plains Solar","state":"IL","name":"Switchgrass Plains Solar, LLC (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Switchgrass Plains Solar, LLC, Fayette County, IL","lat":39.172414,"lng":-89.05787,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 552. Plant 69594 Switchgrass Plains Solar, LLC (Switchgrass Plains Solar, LLC), Fayette County, IL; balancing authority MISO. Planned operation 2026-12.\nGenerator SPS: 100 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2096,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Sypert Branch Solar","state":"TX","name":"Sypert Branch Solar (Solar Photovoltaic, 293.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Sypert Branch Solar, Milam County, TX","lat":30.877895,"lng":-97.1944,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 108. Plant 69150 Sypert Branch Solar (Sypert Branch Solar LLC), Milam County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator SYPRT: 293.9 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":910,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Tampa Electric","state":"FL","name":"Brewster Solar (Solar Photovoltaic, 40 MW)","type":"generation","voltage_kv":null,"location_ref":"Brewster Solar, Polk County, FL","lat":27.74188,"lng":-81.96187,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 541. Plant 69522 Brewster Solar (Tampa Electric Co), Polk County, FL; balancing authority TEC. Planned operation 2026-12.\nGenerator 1: 40 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":922,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Tampa Electric","state":"FL","name":"Keene Branch Solar (Solar Photovoltaic, 74.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Keene Branch Solar, Hillsborough County, FL","lat":27.658706,"lng":-82.2657,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 533. Plant 69461 Keene Branch Solar (Tampa Electric Co), Hillsborough County, FL; balancing authority TEC. Planned operation 2026-12.\nGenerator 1: 74.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":925,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Tampa Electric","state":"FL","name":"Mattaniah Solar (Solar Photovoltaic, 52 MW)","type":"generation","voltage_kv":null,"location_ref":"Mattaniah Solar, Polk County, FL","lat":27.893214,"lng":-82.04614,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 542. Plant 69523 Mattaniah Solar (Tampa Electric Co), Polk County, FL; balancing authority TEC. Planned operation 2026-12.\nGenerator 1: 52 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":927,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Tampa Electric","state":"FL","name":"Pace Road Battery Storage (Batteries, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"Pace Road Battery Storage, Polk County, FL","lat":28.136235,"lng":-81.82978,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1114. Plant 70395 Pace Road Battery Storage (Tampa Electric Co), Polk County, FL; balancing authority TEC. Planned operation 2027-10.\nGenerator BESS1: 20 MW Batteries; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1589,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Tbe Montgomery","state":"NY","name":"TBE-Montgomery LLC (Other Waste Biomass, 21 MW)","type":"generation","voltage_kv":null,"location_ref":"TBE-Montgomery LLC, Orange County, NY","lat":41.4885,"lng":-74.2262,"route":null,"cost_usd":null,"start_date":"2039-12-01","end_date":"2039-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2313, 2314. Plant 57472 TBE-Montgomery LLC (TBE Montgomery LLC), Orange County, NY; balancing authority NYIS. Planned operation 2039-12.\nGenerator CTG: 12 MW Other Waste Biomass; (U) Under construction, less than or equal to 50 percent complete\nGenerator STG: 9 MW Other Waste Biomass; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1151,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Templeton Wind Energy Center","state":"IN","name":"Templeton Wind (Onshore Wind Turbine, 200.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Templeton Wind, Benton County, IN","lat":40.519676,"lng":-87.15039,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 869. Plant 68179 Templeton Wind (Templeton Wind Energy Center, LLC), Benton County, IN; balancing authority MISO. Planned operation 2027-06.\nGenerator TEMPW: 200.2 MW Onshore Wind Turbine; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1116,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Terraform Power Operating","state":"IL","name":"Steward Creek Solar Phase 1 (Solar Photovoltaic, 1200 MW)","type":"generation","voltage_kv":null,"location_ref":"Steward Creek Solar Phase 1, Lee County, IL","lat":41.814343,"lng":-88.98988,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2009. Plant 65301 Steward Creek Solar Phase 1 (TerraForm Power Operating, LLC), Lee County, IL; balancing authority PJM. Planned operation 2029-12.\nGenerator SC1: 1200 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2154,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Terraform Power Operating","state":"VA","name":"Bealeton Solar (Solar Photovoltaic, 14.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Bealeton Solar, Fauquier County, VA","lat":38.555832,"lng":-77.77828,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 739. Plant 70203 Bealeton Solar (TerraForm Power Operating, LLC), Fauquier County, VA; balancing authority PJM. Planned operation 2027-03.\nGenerator GEN1: 14.2 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":812,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Terra-gen Operating -hybrid","state":"CA","name":"Sanborn Hybrid 3 (Solar Photovoltaic, 55 MW)","type":"generation","voltage_kv":null,"location_ref":"Sanborn Hybrid 3, Kern County, CA","lat":34.996,"lng":-118.114,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 297. Plant 69956 Sanborn Hybrid 3 (Terra-Gen Operating Co-Hybrid), Kern County, CA; balancing authority CISO. Planned operation 2026-10.\nGenerator S8: 55 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":813,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Terra-gen Operating -hybrid","state":"CA","name":"Sanborn Hybrid 3 (Batteries, Solar Photovoltaic, 523 MW)","type":"generation","voltage_kv":null,"location_ref":"Sanborn Hybrid 3, Kern County, CA","lat":34.996,"lng":-118.114,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 578, 579, 580. Plant 69956 Sanborn Hybrid 3 (Terra-Gen Operating Co-Hybrid), Kern County, CA; balancing authority CISO. Planned operation 2026-12.\nGenerator S10BS: 210 MW Batteries; (U) Under construction, less than or equal to 50 percent complete\nGenerator S10PV: 210 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete\nGenerator S9: 103 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":746,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Tesla","state":"CA","name":"Fremont CA AutoFactory (Solar Photovoltaic, 3.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Fremont CA AutoFactory, Alameda County, CA","lat":37.49254,"lng":-121.9446,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 456, 457, 458, 459. Plant 65072 Fremont CA AutoFactory (Tesla Inc.), Alameda County, CA; balancing authority CISO. Planned operation 2026-12.\nGenerator GA3: 1.5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete\nGenerator GVSRS: 0.5 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete\nGenerator STAMP: 1.4 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation\nGenerator VSRS: 0.4 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1235,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Tesla","state":"MD","name":"City of Bowie (Solar Photovoltaic, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"City of Bowie, Prince Georges County, MD","lat":38.904641,"lng":-76.68877,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 460. Plant 65130 City of Bowie (Tesla Inc.), Prince Georges County, MD; balancing authority PJM. Planned operation 2026-12.\nGenerator PV2: 2 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1477,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Tesla","state":"NV","name":"Tesla Reno GigaFactory (Solar Photovoltaic, 1 MW)","type":"generation","voltage_kv":null,"location_ref":"Tesla Reno GigaFactory, Storey County, NV","lat":39.539511,"lng":-119.4392,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 447. Plant 64098 Tesla Reno GigaFactory (Tesla Inc.), Storey County, NV; balancing authority NEVP. Planned operation 2026-12.\nGenerator 3: 1 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1819,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Tesla","state":"TX","name":"Austin TX GigaFactory (Solar Photovoltaic, 2.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Austin TX GigaFactory, Travis County, TX","lat":30.22021,"lng":-97.61968,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 455. Plant 65070 Austin TX GigaFactory (Tesla Inc.), Travis County, TX; balancing authority ERCO. Planned operation 2026-12.\nGenerator A04: 2.3 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1863,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Texas A&m Utilities & Energy Services","state":"TX","name":"Central Utility Plant - Texas A&M (Natural Gas Fired Combined Cycle, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Central Utility Plant - Texas A&M, Brazos County, TX","lat":30.617778,"lng":-96.34333,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1200. Plant 58151 Central Utility Plant - Texas A&M (Texas A&M, Utilities & Energy Services), Brazos County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator STG03: 5 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2103,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Tex-bar Ess","state":"TX","name":"Tex-Bar ESS (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Tex-Bar ESS, Madison County, TX","lat":30.930573,"lng":-96.03037,"route":null,"cost_usd":null,"start_date":"2029-07-01","end_date":"2029-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1954. Plant 68364 Tex-Bar ESS (Tex-Bar ESS LLC), Madison County, TX; balancing authority ERCO. Planned operation 2029-07.\nGenerator TBESS: 200 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2264,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Tge Wyoming 225","state":"WY","name":"Cowboy Solar II (Batteries, Solar Photovoltaic, 565 MW)","type":"generation","voltage_kv":null,"location_ref":"Cowboy Solar II, Laramie County, WY","lat":41.032968,"lng":-104.3816,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1353, 1354. Plant 69189 Cowboy Solar II (TGE Wyoming 225, LLC), Laramie County, WY; balancing authority WACM. Planned operation 2027-12.\nGenerator C2BS: 200 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator C2PV: 365 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1250,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Three Rivers Solar Power","state":"ME","name":"Three Rivers Solar Power, LLC (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Three Rivers Solar Power, LLC, Hancock County, ME","lat":44.711644,"lng":-68.11,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 445. Plant 63386 Three Rivers Solar Power, LLC (Three Rivers Solar Power, LLC), Hancock County, ME; balancing authority ISNE. Planned operation 2026-12.\nGenerator 3RIVS: 100 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2105,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Three W Solar","state":"TX","name":"Three W Solar (Solar Photovoltaic, 110.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Three W Solar, Hill County, TX","lat":32.032404,"lng":-97.21424,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 260. Plant 69283 Three W Solar (Three W Solar LLC), Hill County, TX; balancing authority ERCO. Planned operation 2026-10.\nGenerator TWPV1: 110.9 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2106,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Throckmorton Wind","state":"TX","name":"Throckmorton Wind (Onshore Wind Turbine, 225.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Throckmorton Wind, Haskell County, TX","lat":33.213466,"lng":-99.47612,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 473. Plant 67356 Throckmorton Wind (Throckmorton Wind, LLC), Haskell County, TX; balancing authority ERCO. Planned operation 2026-12.\nGenerator 6794: 225.6 MW Onshore Wind Turbine; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":694,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Thsi Bn","state":"AZ","name":"THREE SISTERS Solar Generation and BESS (Batteries, Solar Photovoltaic, 600 MW)","type":"generation","voltage_kv":null,"location_ref":"THREE SISTERS Solar Generation and BESS, Pinal County, AZ","lat":32.053732,"lng":-109.823,"route":null,"cost_usd":null,"start_date":"2029-04-01","end_date":"2029-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1887, 1888. Plant 68298 THREE SISTERS Solar Generation and BESS (THSI bn, LLC), Pinal County, AZ; balancing authority AZPS. Planned operation 2029-04.\nGenerator THSI1: 300 MW Batteries; (L) Regulatory approvals pending. Not under construction\nGenerator THSI2: 300 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":882,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Thunder Wolf Ii","state":"CO","name":"Thunder Wolf II, LLC (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Thunder Wolf II, LLC, Pueblo County, CO","lat":38.94808,"lng":-104.2357,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1411. Plant 70341 Thunder Wolf II, LLC (Thunder Wolf II, LLC), Pueblo County, CO; balancing authority WACM. Planned operation 2027-12.\nGenerator TW200: 200 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2107,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Tidwell Prairie Iia","state":"TX","name":"Tidwell Prairie II (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Tidwell Prairie II, Robertson County, TX","lat":31.103064,"lng":-96.66494,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 229. Plant 68425 Tidwell Prairie II (Tidwell Prairie IIA LLC), Robertson County, TX; balancing authority ERCO. Planned operation 2026-10.\nGenerator TWPII: 200 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1225,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Tja 540r Main St Acushnet","state":"MA","name":"MA Acushnet 540R Main St (Batteries, Solar Photovoltaic, 6 MW)","type":"generation","voltage_kv":null,"location_ref":"MA Acushnet 540R Main St, Bristol County, MA","lat":41.702987,"lng":-70.8888,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 696, 697. Plant 66513 MA Acushnet 540R Main St (TJA 540R Main St. Acushnet, LLC), Bristol County, MA; balancing authority ISNE. Planned operation 2027-03.\nGenerator 18229: 4 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction\nGenerator B8229: 2 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1251,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Topsham Meadow Solar Station","state":"ME","name":"Topsham Meadow Solar Station (Solar Photovoltaic, 17.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Topsham Meadow Solar Station, Sagadahoc County, ME","lat":43.975183,"lng":-70.0113,"route":null,"cost_usd":null,"start_date":"2028-10-01","end_date":"2028-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1685. Plant 65369 Topsham Meadow Solar Station (Topsham Meadow Solar Station LLC), Sagadahoc County, ME; balancing authority ISNE. Planned operation 2028-10.\nGenerator TMSS: 17.2 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":697,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Torch Operating","state":"AZ","name":"Winchester Solar I, LLC (Batteries, Solar Photovoltaic, 175.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Winchester Solar I, LLC, Cochise County, AZ","lat":32.186372,"lng":-109.9531,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 746, 747. Plant 70405 Winchester Solar I, LLC (Torch Operating Company, LLC), Cochise County, AZ; balancing authority TEPC. Planned operation 2027-03.\nGenerator BA-1: 87.8 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator PV-1: 87.8 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":698,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Torch Operating","state":"AZ","name":"Winchester Solar II, LLC (Batteries, Solar Photovoltaic, 175.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Winchester Solar II, LLC, Cochise County, AZ","lat":32.207126,"lng":-109.9435,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 839, 840. Plant 70406 Winchester Solar II, LLC (Torch Operating Company, LLC), Cochise County, AZ; balancing authority WALC. Planned operation 2027-05.\nGenerator BA-2: 87.8 MW Batteries; (V) Under construction, more than 50 percent complete\nGenerator PV-2: 87.8 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2111,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Torrecillas Energy Storage","state":"TX","name":"Torrecillas Energy Storage (Batteries, 9.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Torrecillas Energy Storage, Webb County, TX","lat":27.618936,"lng":-98.83924,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 545. Plant 69534 Torrecillas Energy Storage (Torrecillas Energy Storage, LLC), Webb County, TX; balancing authority ERCO. Planned operation 2026-12.\nGenerator TOR_B: 9.9 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":836,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Tracy Renewable Energy","state":"CA","name":"Tracy Renewable Power Plant (Other Waste Biomass, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Tracy Renewable Power Plant, San Joaquin County, CA","lat":37.77158,"lng":-121.4251,"route":null,"cost_usd":null,"start_date":"2027-02-01","end_date":"2027-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 655. Plant 68855 Tracy Renewable Power Plant (Tracy Renewable Energy, LLC), San Joaquin County, CA; balancing authority CISO. Planned operation 2027-02.\nGenerator TRP01: 5 MW Other Waste Biomass; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2097,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Trex Us Red Holly","state":"TX","name":"TREX US Red Holly (Batteries, Solar Photovoltaic, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"TREX US Red Holly, Lynn County, TX","lat":32.952,"lng":-101.737,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1214, 1215. Plant 63202 TREX US Red Holly (TREX US Red Holly LLC), Lynn County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator 701: 250 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction\nGenerator 701-S: 50 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2123,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Tri Global Energy","state":"TX","name":"Water Valley Wind Energy (Onshore Wind Turbine, 180 MW)","type":"generation","voltage_kv":null,"location_ref":"Water Valley Wind Energy, Tom Green County, TX","lat":31.611223,"lng":-100.8133,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1210. Plant 62846 Water Valley Wind Energy (Tri Global Energy, LLC), Tom Green County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator WWE1: 180 MW Onshore Wind Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1360,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Triple Oak Power","state":"MT","name":"Jawbone Wind Project (Onshore Wind Turbine, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"Jawbone Wind Project, Wheatland County, MT","lat":46.508056,"lng":-109.7278,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2000. Plant 58175 Jawbone Wind Project (Triple Oak Power LLC), Wheatland County, MT; balancing authority NWMT. Planned operation 2029-12.\nGenerator JWPI: 80 MW Onshore Wind Turbine; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2113,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Triune Solar","state":"TX","name":"Triune Solar (Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Triune Solar, Trinity County, TX","lat":30.996927,"lng":-95.12384,"route":null,"cost_usd":null,"start_date":"2030-12-01","end_date":"2030-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2122. Plant 69639 Triune Solar (Triune Solar LLC), Trinity County, TX; balancing authority MISO. Planned operation 2030-12.\nGenerator 16777: 100 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1664,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Tual Bn","state":"OR","name":"Tualatin Battery Energy Storage System (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Tualatin Battery Energy Storage System, Washington County, OR","lat":45.0,"lng":-122.0,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1310. Plant 68299 Tualatin Battery Energy Storage System (TUAL bn, LLC), Washington County, OR; balancing authority PGE. Planned operation 2027-12.\nGenerator TUAL: 200 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1286,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Tupper Lake","state":"MI","name":"Tupper Lake Wind (Onshore Wind Turbine, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Tupper Lake Wind, Ionia County, MI","lat":42.829,"lng":-85.138,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2032. Plant 68843 Tupper Lake Wind (Tupper Lake), Ionia County, MI; balancing authority MISO. Planned operation 2029-12.\nGenerator TLCP: 200 MW Onshore Wind Turbine; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1252,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Turner Meadow Solar Station","state":"ME","name":"Turner Meadow Solar Station (Solar Photovoltaic, 19.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Turner Meadow Solar Station, Androscoggin County, ME","lat":44.229478,"lng":-70.28027,"route":null,"cost_usd":null,"start_date":"2027-09-01","end_date":"2027-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1000. Plant 65709 Turner Meadow Solar Station (Turner Meadow Solar Station, LLC), Androscoggin County, ME; balancing authority ISNE. Planned operation 2027-09.\nGenerator TRNR: 19.8 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1665,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Tutuilla Solar","state":"OR","name":"Tutuilla Solar (Solar Photovoltaic, 1.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Tutuilla Solar, Umatilla County, OR","lat":45.63153,"lng":-119.685,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 432. Plant 70451 Tutuilla Solar (Tutuilla Solar, LLC), Umatilla County, OR; balancing authority PACW. Planned operation 2026-11.\nGenerator OCS24: 1.6 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":628,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"TVA","state":"AL","name":"Lawrence County Solar (Solar Photovoltaic, 193 MW)","type":"generation","voltage_kv":null,"location_ref":"Lawrence County Solar, Lawrence County, AL","lat":34.63928,"lng":-87.25098,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1273. Plant 67233 Lawrence County Solar (Tennessee Valley Authority), Lawrence County, AL; balancing authority TVA. Planned operation 2027-12.\nGenerator SOL1: 193 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1343,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"TVA","state":"MS","name":"New Caledonia (Natural Gas Fired Combustion Turbine, 504 MW)","type":"generation","voltage_kv":null,"location_ref":"New Caledonia, Lowndes County, MS","lat":33.649272,"lng":-88.3146,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1800, 1801, 1802, 1803, 1804, 1805. Plant 69147 New Caledonia (Tennessee Valley Authority), Lowndes County, MS; balancing authority TVA. Planned operation 2028-12.\nGenerator G1: 84 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator G2: 84 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator G3: 84 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator G4: 84 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator G5: 84 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator G6: 84 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1787,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"TVA","state":"TN","name":"Cumberland (TN) (Natural Gas Fired Combined Cycle, 777.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Cumberland (TN), Stewart County, TN","lat":36.3903,"lng":-87.6539,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1837, 1838. Plant 3399 Cumberland (TN) (Tennessee Valley Authority), Stewart County, TN; balancing authority TVA. Planned operation 2029-01.\nGenerator CTG2: 454.8 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator STG2: 323 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1788,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"TVA","state":"TN","name":"Cumberland (TN) (Natural Gas Fired Combined Cycle, 777.8 MW)","type":"generation","voltage_kv":null,"location_ref":"Cumberland (TN), Stewart County, TN","lat":36.3903,"lng":-87.6539,"route":null,"cost_usd":null,"start_date":"2034-12-01","end_date":"2034-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2311, 2312. Plant 3399 Cumberland (TN) (Tennessee Valley Authority), Stewart County, TN; balancing authority TVA. Planned operation 2034-12.\nGenerator CTG1: 454.8 MW Natural Gas Fired Combined Cycle; (U) Under construction, less than or equal to 50 percent complete\nGenerator STG1: 323 MW Natural Gas Fired Combined Cycle; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1789,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"TVA","state":"TN","name":"Kingston (Natural Gas Fired Combined Cycle, Natural Gas Fired Combustion Turbine, 1830.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Kingston, Roane County, TN","lat":35.8992,"lng":-84.5194,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1169, 1170, 1171, 1172, 1173, 1174, 1175, 1176, 1177, 1178, 1179, 1180, 1181, 1182, 1183, 1184, 1185, 1186. Plant 3407 Kingston (Tennessee Valley Authority), Roane County, TN; balancing authority TVA. Planned operation 2027-12.\nGenerator CTG1: 454.8 MW Natural Gas Fired Combined Cycle; (P) Planned for installation, but regulatory approvals not initiated\nGenerator G1: 65.8 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator G10: 65.8 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator G11: 65.8 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator G12: 65.8 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator G13: 65.8 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator G14: 65.8 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator G15: 65.8 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator G16: 65.8 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator G2: 65.8 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator G3: 65.8 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator G4: 65.8 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator G5: 65.8 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator G6: 65.8 MW Natural Gas Fired Combustion Turbine","reviewed":false,"approximate":false,"requires_review":false},{"id":1800,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"TVA","state":"TN","name":"Vonore Battery Energy Storage System (Batteries, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"Vonore Battery Energy Storage System, Monroe County, TN","lat":35.61543,"lng":-84.27489,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 453. Plant 64255 Vonore Battery Energy Storage System (Tennessee Valley Authority), Monroe County, TN; balancing authority TVA. Planned operation 2026-12.\nGenerator VBESS: 20 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":3071,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Bull Run 500 Kv Synchronous Condenser, Install","type":"substation","voltage_kv":500,"location_ref":"Bull Run (TN/AL/MS/KY/GA/NC/VA)","lat":36.019,"lng":-84.158,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":103,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 103.\nIn-Service Year: 2027\nProject Name: BULL RUN 500 KV SYNCHRONOUS CONDENSER, INSTALL\nDescription: Install breaker, switches, relaying, and metering to support synchronous condensing units at Bull Run 500 kV.\nSupporting Statement: Voltage support and additional capacity is needed for economic development in the area.\nLocated: BULL RUN = OSM substation 'Bull Run Substation' (TN)","reviewed":false,"approximate":false,"requires_review":false},{"id":3072,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Cordova - Yum Yum 161 Kv Transmission Line, Reconductor","type":"transmission line","voltage_kv":161,"location_ref":"Cordova - Yum Yum (TN/AL/MS/KY/GA/NC/VA)","lat":35.186,"lng":-89.579,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":103,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 103.\nIn-Service Year: 2027\nProject Name: CORDOVA - YUM YUM 161 KV TRANSMISSION LINE, RECONDUCTOR\nDescription: Reconductor ~23.5 miles of the Cordova - Yum Yum 161 kV transmission line section with TS - 1098.6 kcmil Ruddy, sag temp 180°C.\nSupporting Statement: Additional thermal capacity is needed for economic development in the Memphis, TN area.\nLocated: CORDOVA = OSM substation 'Cordova Substation' (TN); YUM YUM ~ Fayette County, TN (county centre) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3073,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Hillsboro Solar Generation Interconnection","type":"substation","voltage_kv":161,"location_ref":"Hillsboro (TN/AL/MS/KY/GA/NC/VA)","lat":35.402,"lng":-85.975,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":103,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 103.\nIn-Service Year: 2027\nProject Name: HILLSBORO SOLAR GENERATION INTERCONNECTION\nDescription: Construct new 161 kV station to interconnect new solar generation. Loop in an existing 161 kV transmission line to the new station. Reconductor an existing 161 kV transmission line.\nSupporting Statement: Scope is driven by the interconnection of new generation. This is Q385 in TVA's Interconnection Queue which is publicly available on TVA's OASIS.\nLocated: HILLSBORO = OSM substation 'Hillsboro Substation' (TN)","reviewed":false,"approximate":false,"requires_review":false},{"id":3074,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Kingston Cc And Aeroderivative Ct Generation Interconnection","type":"transmission line","voltage_kv":161,"location_ref":"Kingston Cc - Aeroderivative Ct (TN/AL/MS/KY/GA/NC/VA)","lat":35.903,"lng":-84.513,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":103,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 103.\nIn-Service Year: 2027\nProject Name: KINGSTON CC AND AERODERIVATIVE CT GENERATION INTERCONNECTION\nDescription: Construct new 161 kV station to interconnect new natural gas fired CC and Aeroderivative generation. Loop in area 161 kV transmission lines. reconductor/uprate fifteen existing 161 kV transmission lines to increase the thermal rating of each.\nSupporting Statement: Scope is driven by the interconnection of new generation. This is Q489 in TVA's Interconnection Queue which is publicly available on TVA's OASIS.\nLocated: KINGSTON CC = OSM plant 'Kingston Steam Plant' (TN)","reviewed":false,"approximate":true,"requires_review":false},{"id":3075,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Loving Ky 161 Kv Substation, Construct","type":"substation","voltage_kv":161,"location_ref":"Loving Ky (TN/AL/MS/KY/GA/NC/VA)","lat":36.996,"lng":-86.424,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":104,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 104.\nIn-Service Year: 2027\nProject Name: LOVING KY 161 KV SUBSTATION, CONSTRUCT\nDescription: Construct the Loving, KY 161 kV substation. Reconductor ~26.71 miles of 161 kV transmission line from Bowling Green to Lost City with 1351 ACSS at 140°C. Reconductor ~8.64 miles of 161 kV transmission line from Bowling Green to East Bowling Green with 1351 ACSS at 135°C.\nSupporting Statement: Additional voltage support and thermal capacity is needed in the Bowling Green area for economic development.\nLocated: LOVING KY ~ Warren County, KY (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":3076,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Maury - Monsanto 161Kv","type":"transmission line","voltage_kv":161,"location_ref":"Maury - Monsanto (TN/AL/MS/KY/GA/NC/VA)","lat":35.671,"lng":-87.061,"route":[[35.673,-87.019],[35.668,-87.104]],"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":104,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 104.\nIn-Service Year: 2027\nProject Name: MAURY - MONSANTO 161KV\nDescription: Reconductor/rebuild 6.25 miles of the Maury - Monsanto 161kV TL and replace limiting station equipment at Maury and Monsanto.\nSupporting Statement: To support generation deliverability and operational flexibility in the Johnsonville area.\nLocated: MAURY = OSM substation 'Maury Substation' (TN); MONSANTO = OSM substation 'Monsanto Switching Station' (TN) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3077,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Normandy Lake Tullahoma Solar Generation Interconnection","type":"substation","voltage_kv":161,"location_ref":"Normandy Lake Tullahoma (TN/AL/MS/KY/GA/NC/VA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":104,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 104.\nIn-Service Year: 2027\nProject Name: NORMANDY LAKE TULLAHOMA SOLAR GENERATION INTERCONNECTION\nDescription: Construct new 161 kV station to interconnect new solar generation. Loop in an existing 161 kV transmission line to the new station.\nSupporting Statement: Scope is driven by the interconnection of new generation. This is Q445 in TVA's Interconnection Queue which is publicly available on TVA's OASIS.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3078,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Philadelphia 161 Kv Reactors, Install","type":"substation","voltage_kv":161,"location_ref":"Philadelphia (TN/AL/MS/KY/GA/NC/VA)","lat":32.753,"lng":-89.119,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":104,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 104.\nIn-Service Year: 2027\nProject Name: PHILADELPHIA 161 KV REACTORS, INSTALL\nDescription: Install three reactors at the Philadelphia 161 kV Substation.\nSupporting Statement: Voltage support is needed in TVA's Mississippi area under contingency.\nLocated: PHILADELPHIA ~ Neshoba County, MS (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":3079,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"St. Elmo Ky 161 Kv Substation, Construct","type":"substation","voltage_kv":161,"location_ref":"St. Elmo Ky (TN/AL/MS/KY/GA/NC/VA)","lat":36.892,"lng":-87.493,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":105,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 105.\nIn-Service Year: 2027\nProject Name: ST. ELMO KY 161 KV SUBSTATION, CONSTRUCT\nDescription: Construct the St. Elmo KY 161 kV substation and loop in the Casky - Edgoten 161 kV and the Paradise - Clarksville 161 kV transmission lines.\nSupporting Statement: Voltage support and additional capacity is needed for economic development in the area.\nLocated: ST. ELMO KY ~ Christian County, KY (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":3080,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Trifecta Solar","type":"substation","voltage_kv":161,"location_ref":"Trifecta (TN/AL/MS/KY/GA/NC/VA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":105,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 105.\nIn-Service Year: 2027\nProject Name: TRIFECTA SOLAR\nDescription: Reconductor Sturgis - Bluefield MS 161 kV transmission line (10.6 miles). Replace jumper and switch at Sturgis.\nSupporting Statement: Trifect Solar adds 68.4 MW of solar to the area causing overloads on the Sturgis - Bluefield 161 kV transmission line.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3081,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Trinity 161 Kv Capacitor Bank, Replacement","type":"substation","voltage_kv":161,"location_ref":"Trinity (TN/AL/MS/KY/GA/NC/VA)","lat":34.609,"lng":-87.055,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":105,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 105.\nIn-Service Year: 2027\nProject Name: TRINITY 161 KV CAPACITOR BANK, REPLACEMENT\nDescription: Trinity 161 kV capacitor bank has failed and needs to be replaced.\nSupporting Statement: Trinity 161 kV capacitor bank has failed and needs to be replaced.\nLocated: TRINITY = OSM substation 'Trinity Substation' (AL)","reviewed":false,"approximate":false,"requires_review":false},{"id":3082,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Ts25-422","type":"substation","voltage_kv":161,"location_ref":"Ts25-422 (TN/AL/MS/KY/GA/NC/VA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":105,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 105.\nIn-Service Year: 2027\nProject Name: TS25-422\nDescription: Terminate generator tie into existing 161 kV substation to provide 145 MW of solar generation.\nSupporting Statement: Scope is driven by the interconnection of new generation. This is Q422 in TVA's Interconnection Queue which is publicly available on TVA's OASIS.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3083,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Brownsville 161 Kv Area Capacitor Bank","type":"substation","voltage_kv":161,"location_ref":"Brownsville (TN/AL/MS/KY/GA/NC/VA)","lat":35.587,"lng":-89.274,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":106,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 106.\nIn-Service Year: 2028\nProject Name: BROWNSVILLE 161 KV AREA CAPACITOR BANK\nDescription: BEA requests additional capacity for committed and perspective loads within their service territory. When the feed from Covington is lost, low voltages are seen at Brownsville 161 kV which limits their capacity to 20 MW.\nSupporting Statement: Voltage support and additional capacity is needed for economic development in the area.\nLocated: BROWNSVILLE = OSM substation 'Brownsville Substation' (TN)","reviewed":false,"approximate":false,"requires_review":false},{"id":3084,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Davidson 500 Kv Switch House, Construct","type":"substation","voltage_kv":500,"location_ref":"Davidson (TN/AL/MS/KY/GA/NC/VA)","lat":36.068,"lng":-86.984,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":106,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 106.\nIn-Service Year: 2028\nProject Name: DAVIDSON 500 KV SWITCH HOUSE, CONSTRUCT\nDescription: Construct a new 500 kV switch house with all new assets and replace aging assets in the Davidson Yard.\nSupporting Statement: Additional thermal capacity and voltage support is needed in the Davidson County, TN area under contingency.\nLocated: DAVIDSON = OSM substation 'Davidson Substation' (TN)","reviewed":false,"approximate":false,"requires_review":false},{"id":3085,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Horus Solar Generation Interconnection","type":"substation","voltage_kv":161,"location_ref":"Horus (TN/AL/MS/KY/GA/NC/VA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":106,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 106.\nIn-Service Year: 2028\nProject Name: HORUS SOLAR GENERATION INTERCONNECTION\nDescription: Connect new generation via a new line tap on the Franklin - Portland 161 kV transmission line.\nSupporting Statement: Scope is driven by the interconnection of new generation. This is Q388 in TVA's Interconnection Queue which is publicly available on TVA's OASIS.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3086,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Lagoon Creek","type":"substation","voltage_kv":500,"location_ref":"Lagoon Creek (TN/AL/MS/KY/GA/NC/VA)","lat":35.657,"lng":-89.395,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":106,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 106.\nIn-Service Year: 2028\nProject Name: LAGOON CREEK\nDescription: Construct a new 500kV station to interconnect new combined cycle generation. Connect to exisiting 500kv TL.\nSupporting Statement: Scope is driven by the interconnection of new generation. This is Q624 in TVA's Interconnection Queue which is publicly available on TVA's OASIS.\nLocated: LAGOON CREEK = OSM substation 'Lagoon Creek Substation' (TN)","reviewed":false,"approximate":false,"requires_review":false},{"id":3087,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"North Oakland - Coffeeville 161 Kv Transmission Line, Construct","type":"transmission line","voltage_kv":161,"location_ref":"North Oakland - Coffeeville (TN/AL/MS/KY/GA/NC/VA)","lat":34.035,"lng":-89.784,"route":[[34.079,-89.909],[33.992,-89.658]],"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":107,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 107.\nIn-Service Year: 2028\nProject Name: NORTH OAKLAND - COFFEEVILLE 161 KV TRANSMISSION LINE, CONSTRUCT\nDescription: Construct ~18.0 miles of new 161 kV transmission line from North Oakland - Coffeeville using 954 ACSR at 100°C and reconductor/uprate terminal equipment at Batesville 161 kV substation.\nSupporting Statement: Multiple 161 kV transmission lines overload under contingency.\nLocated: NORTH OAKLAND = OSM substation 'North Oakland Substation' (MS); COFFEEVILLE = OSM substation 'Coffeeville Substation' (MS) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3088,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Spring Valley Solar Generation Interconnection","type":"substation","voltage_kv":161,"location_ref":"Spring Valley (TN/AL/MS/KY/GA/NC/VA)","lat":34.657,"lng":-87.629,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":107,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 107.\nIn-Service Year: 2028\nProject Name: SPRING VALLEY SOLAR GENERATION INTERCONNECTION\nDescription: Construct new 161 kV station to interconnect new solar generation. Loop in an existing 161 kV transmission line to the new station. Reconductor an existing 161 kV transmission line.\nSupporting Statement: Scope is driven by the interconnection of new generation. This is Q387 in TVA's Interconnection Queue which is publicly available on TVA's OASIS.\nLocated: SPRING VALLEY = OSM substation 'Spring Valley Substation' (AL)","reviewed":false,"approximate":false,"requires_review":false},{"id":3089,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Ts25-425","type":"substation","voltage_kv":161,"location_ref":"Ts25-425 (TN/AL/MS/KY/GA/NC/VA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":107,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 107.\nIn-Service Year: 2028\nProject Name: TS25-425\nDescription: Construct new 161 kV station to interconnect new solar generation. Connect to exisiting 161 kV TL. reconductor/uprate existing TL to provide thermal capacity.\nSupporting Statement: Scope is driven by the interconnection of new generation. This is Q425 in TVA's Interconnection Queue which is publicly available on TVA's OASIS.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3090,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Ts25-429","type":"substation","voltage_kv":null,"location_ref":"Ts25-429 (TN/AL/MS/KY/GA/NC/VA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":107,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 107.\nIn-Service Year: 2028\nProject Name: TS25-429\nDescription: Connect to existing TVA substation. reconductor/uprate exising TLs to provide thermal capacity.\nSupporting Statement: Scope is driven by the interconnection of new generation. This is Q429 in TVA's Interconnection Queue which is publicly available on TVA's OASIS.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3091,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Ts25-466","type":"substation","voltage_kv":null,"location_ref":"Ts25-466 (TN/AL/MS/KY/GA/NC/VA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":108,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 108.\nIn-Service Year: 2028\nProject Name: TS25-466\nDescription: Connect to existing TVA substation to interconnect new solar Generation\nSupporting Statement: Scope is driven by the interconnection of new generation. This is Q466 in TVA's Interconnection Queue which is publicly available on TVA's OASIS.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3092,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Ts25-512","type":"substation","voltage_kv":161,"location_ref":"Ts25-512 (TN/AL/MS/KY/GA/NC/VA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":108,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 108.\nIn-Service Year: 2028\nProject Name: TS25-512\nDescription: Construct new 161 kV station to interconnect new solar generation. Connect to exisiting 161 kV TL.\nSupporting Statement: Scope is driven by the interconnection of new generation. This is Q512 in TVA's Interconnection Queue which is publicly available on TVA's OASIS.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3093,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Ts25-514","type":"substation","voltage_kv":230,"location_ref":"Ts25-514 (TN/AL/MS/KY/GA/NC/VA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":108,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 108.\nIn-Service Year: 2028\nProject Name: TS25-514\nDescription: Construct new 230 kV station to interconnect new BESS generation. Connect to exisiting 230 kV TL.\nSupporting Statement: Scope is driven by the interconnection of new generation. This is Q514 in TVA's Interconnection Queue which is publicly available on TVA's OASIS.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3094,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Ts25-515","type":"substation","voltage_kv":161,"location_ref":"Ts25-515 (TN/AL/MS/KY/GA/NC/VA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":108,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 108.\nIn-Service Year: 2028\nProject Name: TS25-515\nDescription: Construct new 161 kV station to interconnect new solar generation. Loop in 2 lines to existing 161 kv TL. Rebuild/reconductor ~50 miles of existing TL to provide thermal capacity\nSupporting Statement: Scope is driven by the interconnection of new generation. This is Q515 in TVA's Interconnection Queue which is publicly available on TVA's OASIS.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3095,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Ts25-587","type":"substation","voltage_kv":null,"location_ref":"Ts25-587 (TN/AL/MS/KY/GA/NC/VA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":109,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 109.\nIn-Service Year: 2028\nProject Name: TS25-587\nDescription: Install two new breakers and terminate gen tie at existing ubstation.\nSupporting Statement: Scope is driven by the interconnection of new generation. This is Q587 in TVA's Interconnection Queue which is publicly available on TVA's OASIS.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3096,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Ts25-600","type":"substation","voltage_kv":null,"location_ref":"Ts25-600 (TN/AL/MS/KY/GA/NC/VA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2028-01-01","end_date":"2028-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":109,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 109.\nIn-Service Year: 2028\nProject Name: TS25-600\nDescription: Connect to existing TVA substation.\nSupporting Statement: Scope is driven by the interconnection of new generation. This is Q600 in TVA's Interconnection Queue which is publicly available on TVA's OASIS.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3097,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Guntersville - Ketona Transmission Line, Rebuild","type":"transmission line","voltage_kv":115,"location_ref":"Guntersville - Ketona (TN/AL/MS/KY/GA/NC/VA)","lat":34.014,"lng":-86.575,"route":[[34.421,-86.394],[33.607,-86.756]],"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":109,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 109.\nIn-Service Year: 2029\nProject Name: GUNTERSVILLE - KETONA TRANSMISSION LINE, REBUILD\nDescription: Rebuild portions of the TVA Guntersville Hydro - AL Power Ketona 115 KV transmission line with single circuit 954k ACSR at 100°C.\nSupporting Statement: Additional thermal capacity is needed in area under contingency.\nLocated: GUNTERSVILLE = OSM substation 'Guntersville Dam Substation' (AL); KETONA = OSM substation 'Ketona Substation' (AL) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3098,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Limestone - Sewell 161 Kv #2 Transmission Line, Construct","type":"transmission line","voltage_kv":161,"location_ref":"Limestone - Sewell (TN/AL/MS/KY/GA/NC/VA)","lat":34.719,"lng":-86.847,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":109,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 109.\nIn-Service Year: 2029\nProject Name: LIMESTONE - SEWELL 161 KV #2 TRANSMISSION LINE, CONSTRUCT\nDescription: Construct ~2.1 miles of 161 kV transmission line with 2034 ACSR at 100°C on the existing Limestone - Sewell 161 kV double circuit towers and add breakers to the 161 kV switchyard to make a double breakered 161 kV station.\nSupporting Statement: Additional thermal capacity and voltage support is needed in the Huntsville, AL area under contingency.\nLocated: LIMESTONE = OSM substation 'Limestone Substation' (AL)","reviewed":false,"approximate":true,"requires_review":false},{"id":3099,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Maury, Tn 161 Kv Cap Bank","type":"substation","voltage_kv":161,"location_ref":"Maury (TN/AL/MS/KY/GA/NC/VA)","lat":35.673,"lng":-87.019,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":110,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 110.\nIn-Service Year: 2029\nProject Name: MAURY, TN 161 KV CAP BANK\nDescription: TVA to install capacitor bank at Maury 500 kV station on the 161 kV side. Capacitor bank to be 3 sections of 72 MVAR/216 MVAR total.\nSupporting Statement: Voltage support is needed in the Maury, TN area under contingency.\nLocated: MAURY = OSM substation 'Maury Substation' (TN)","reviewed":false,"approximate":false,"requires_review":false},{"id":3100,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Midway - S Macon - Dekalb 161 Kv Transmission Line, Construct","type":"transmission line","voltage_kv":161,"location_ref":"Midway - S Macon - Dekalb (TN/AL/MS/KY/GA/NC/VA)","lat":32.939,"lng":-88.758,"route":[[32.782,-88.677],[33.097,-88.839]],"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":110,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 110.\nIn-Service Year: 2029\nProject Name: MIDWAY - S MACON - DEKALB 161 KV TRANSMISSION LINE, CONSTRUCT\nDescription: Construct ~20 miles of new 161 kV transmission line from Midway to S Macon and ~31.3 miles of new 161 kV transmission line from S Macon to Dekalb via Scooba.\nSupporting Statement: Voltage support is needed in TVA's Mississippi area under contingency.\nLocated: DEKALB = OSM substation 'DeKalb Substation' (MS); MIDWAY = OSM substation 'Midway Switching Station' (MS), nearest of 4 same-named (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3101,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Radnor 161 Kv Statcom, Install","type":"substation","voltage_kv":161,"location_ref":"Radnor (TN/AL/MS/KY/GA/NC/VA)","lat":36.057,"lng":-86.771,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":110,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 110.\nIn-Service Year: 2029\nProject Name: RADNOR 161 KV STATCOM, INSTALL\nDescription: With the Nashville Area continuing to rapidly grow, along with spinning generation being replace by inverter bases resources, Planning sees stability concerns in the Nashville area. STATCOMs will help mitigate the issues seen in the area.\nSupporting Statement: Dynamic voltage support is needed in the Nashville area.\nLocated: RADNOR = OSM substation 'Radnor Substation' (TN)","reviewed":false,"approximate":false,"requires_review":false},{"id":3102,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Reservation - Wheeler 161 Kv, Reconductor","type":"transmission line","voltage_kv":161,"location_ref":"Reservation - Wheeler (TN/AL/MS/KY/GA/NC/VA)","lat":33.079,"lng":-89.037,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":110,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 110.\nIn-Service Year: 2029\nProject Name: RESERVATION - WHEELER 161 KV, RECONDUCTOR\nDescription: Reservation - Wheeler was originally constructed in 1940. The original conductor is beyond useful life and should be replaced.\nSupporting Statement: Reservation - Wheeler was originally constructed in 1940. The original conductor is beyond useful life and should be replaced.\nLocated: RESERVATION ~ Winston County, MS (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":3103,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"South Nashville - Smyrna 161Kv Tl","type":"transmission line","voltage_kv":161,"location_ref":"South Nashville - Smyrna (TN/AL/MS/KY/GA/NC/VA)","lat":36.061,"lng":-86.636,"route":[[36.155,-86.746],[35.967,-86.527]],"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":111,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 111.\nIn-Service Year: 2029\nProject Name: SOUTH NASHVILLE - SMYRNA 161KV TL\nDescription: TVA will reconductor and install OPGW on the following transmission lines: South Nashville - Airport 161kV TL, Airport - Murfreesboro Rd 161kV TL, Murfreesboro Rd - Pin Hook 161kV TL, Pin Hook - Hurricane Creek 161kV TL, Hurricane Creek - Smyrna 161kV TL.\nSupporting Statement: Additional thermal capacity is needed in area under contingency.\nLocated: SOUTH NASHVILLE = OSM substation 'South Nashville Substation' (TN); SMYRNA = OSM substation 'Smyrna Substation' (TN), nearest of 2 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3104,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Ts25-510","type":"substation","voltage_kv":161,"location_ref":"Ts25-510 (TN/AL/MS/KY/GA/NC/VA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2029-01-01","end_date":"2029-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":111,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 111.\nIn-Service Year: 2029\nProject Name: TS25-510\nDescription: Construct new 161 kV station to interconnect new solar generation. Connect to exisiting 161 kV TL.\nSupporting Statement: Scope is driven by the interconnection of new generation. This is Q510 in TVA's Interconnection Queue which is publicly available on TVA's OASIS.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3105,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Apalachia Area Improvement Plan","type":"substation","voltage_kv":161,"location_ref":"Apalachia (TN/AL/MS/KY/GA/NC/VA)","lat":35.183,"lng":-84.436,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":111,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 111.\nIn-Service Year: 2030\nProject Name: APALACHIA AREA IMPROVEMENT PLAN\nDescription: Construct Martin's Creek 161 kV substation. Construct ~25 miles of new transmission line from Apalachia 161 kV substation to Ranger 161 kV switching station.\nSupporting Statement: The Apalachia - Basin 161 kV transmission line overloads under contingency.\nLocated: APALACHIA = OSM substation 'Apalachia Substation' (TN)","reviewed":false,"approximate":false,"requires_review":false},{"id":3106,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Clinton - Martin 161 Kv, Reconductor","type":"transmission line","voltage_kv":161,"location_ref":"Clinton - Martin (TN/AL/MS/KY/GA/NC/VA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":111,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 111.\nIn-Service Year: 2030\nProject Name: CLINTON - MARTIN 161 KV, RECONDUCTOR\nDescription: Reconductor the Clinton - Martin 161 kV transmission line.\nSupporting Statement: Clinton - Martin was originally constructed in 1952. The original conductor is near end of life. Planning has identified a potential future overload.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3107,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Colbert - Iron City 161 Kv Reconductor","type":"transmission line","voltage_kv":161,"location_ref":"Colbert - Iron City (TN/AL/MS/KY/GA/NC/VA)","lat":34.982,"lng":-87.624,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":112,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 112.\nIn-Service Year: 2030\nProject Name: COLBERT - IRON CITY 161 KV RECONDUCTOR\nDescription: Reconductor 25.67 mi to 795 ACSS 26/7 at 150°C. reconductor/uprate jumper, secondary device and bus work at Colbert.\nSupporting Statement: Scope is driven by the interconnection of new generation. This is Q385 in TVA's Interconnection Queue which is publicly available on TVA's OASIS.\nLocated: COLBERT = OSM substation 'Colbert Substation' (AL); IRON CITY ~ Lawrence County, TN (county centre) (nearest of 2) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3108,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Dyersburg - Highway 412 161 Kv, Reconductor","type":"transmission line","voltage_kv":161,"location_ref":"Dyersburg - Highway 412 (TN/AL/MS/KY/GA/NC/VA)","lat":36.054,"lng":-89.398,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":112,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 112.\nIn-Service Year: 2030\nProject Name: DYERSBURG - HIGHWAY 412 161 KV, RECONDUCTOR\nDescription: Reconductor the Dyersburg - Highway 412 161 kV transmission line.\nSupporting Statement: The conductor was installed in 1947 and is reaching end of useful life. TPS Planning has also identified potential future overloads.\nLocated: DYERSBURG ~ Dyer County, TN (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":3109,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Hampton 500 Kv Station, Construct","type":"substation","voltage_kv":500,"location_ref":"Hampton (TN/AL/MS/KY/GA/NC/VA)","lat":33.453,"lng":-84.154,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":112,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 112.\nIn-Service Year: 2030\nProject Name: HAMPTON 500 KV STATION, CONSTRUCT\nDescription: Construct new 500/161 kV Hampton station. Loop in existing Montgomery - Wilson 500 kV transmission line (~0.1 mile from station to loop point). Loop in existing double circuit 161 kV from Montgomery to Hemlock.\nSupporting Statement: Additional thermal capacity and voltage support is needed in the Montgomery County, TN and Todd County, KY area under contingency.\nLocated: HAMPTON ~ Henry County, GA (county centre)","reviewed":false,"approximate":true,"requires_review":false},{"id":3110,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Iron City - Loretto 161 Kv Reconductor","type":"transmission line","voltage_kv":161,"location_ref":"Iron City - Loretto (TN/AL/MS/KY/GA/NC/VA)","lat":35.143,"lng":-87.429,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.800000011920929,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":112,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 112.\nIn-Service Year: 2030\nProject Name: IRON CITY - LORETTO 161 KV RECONDUCTOR\nDescription: Reconductor 8.3 mi to 795 ACSS 26/7 at 150°C. reconductor/uprate jumper at Loretto.\nSupporting Statement: Scope is driven by the interconnection of new generation. This is Q385 in TVA's Interconnection Queue which is publicly available on TVA's OASIS.\nLocated: LORETTO = OSM substation 'Loretto Substation' (TN); IRON CITY ~ Lawrence County, TN (county centre) (nearest of 2) (midpoint)","reviewed":false,"approximate":true,"requires_review":false},{"id":3111,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Loretto - Crockett 161 Kv Reconductor","type":"transmission line","voltage_kv":161,"location_ref":"Loretto - Crockett (TN/AL/MS/KY/GA/NC/VA)","lat":35.161,"lng":-87.42,"route":[[35.065,-87.462],[35.257,-87.378]],"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":113,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 113.\nIn-Service Year: 2030\nProject Name: LORETTO - CROCKETT 161 KV RECONDUCTOR\nDescription: Reconductor 18.79 mi to 795 ACSS 26/7 at 150°C. reconductor/uprate jumpers at Loretto and Crockett.\nSupporting Statement: Scope is driven by the interconnection of new generation. This is Q385 in TVA's Interconnection Queue which is publicly available on TVA's OASIS.\nLocated: LORETTO = OSM substation 'Loretto Substation' (TN); CROCKETT = OSM substation 'Crockett Substation' (TN), nearest of 2 same-named (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3112,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Manchester Area Improvement","type":"substation","voltage_kv":161,"location_ref":"Manchester (TN/AL/MS/KY/GA/NC/VA)","lat":35.504,"lng":-86.076,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":113,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 113.\nIn-Service Year: 2030\nProject Name: MANCHESTER AREA IMPROVEMENT\nDescription: TVA to construct two new transmission line segments: an 11-mile 161 kV line from Franklin to the Hillsboro Tap, and an 8-mile 161 kV line from Red Hill to the Manchester station.\nSupporting Statement: Voltage support is needed in the Manchester, TN area under contingency.\nLocated: MANCHESTER = OSM substation 'Manchester Substation' (TN)","reviewed":false,"approximate":false,"requires_review":false},{"id":3113,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Mann Road - Broadview Tap 161 Kv Rebuild","type":"transmission line","voltage_kv":161,"location_ref":"Mann Road - Broadview Tap (TN/AL/MS/KY/GA/NC/VA)","lat":35.145,"lng":-86.274,"route":[[35.107,-86.35],[35.182,-86.198]],"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":113,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 113.\nIn-Service Year: 2030\nProject Name: MANN ROAD - BROADVIEW TAP 161 KV REBUILD\nDescription: Rebuild 10.04 mi to ACSS 636 26/67 set to 150°C.\nSupporting Statement: Scope is driven by the interconnection of new generation. This is Q385 in TVA's Interconnection Queue which is publicly available on TVA's OASIS.\nLocated: MANN ROAD = OSM substation 'Mann Road Switching Station' (TN); BROADVIEW TAP = OSM substation 'Broadview Substation' (TN) (midpoint)","reviewed":false,"approximate":false,"requires_review":false},{"id":3114,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Mt. Pleasant - S. Columbia 161 Kv Reconductor","type":"transmission line","voltage_kv":161,"location_ref":"Mt. Pleasant - S. Columbia (TN/AL/MS/KY/GA/NC/VA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":113,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 113.\nIn-Service Year: 2030\nProject Name: MT. PLEASANT - S. COLUMBIA 161 KV RECONDUCTOR\nDescription: Reconductor 12.19 mi to 954 ACSS 45/7 at 150°C. reconductor/uprate jumper at S. Columbia.\nSupporting Statement: Scope is driven by the interconnection of new generation. This is Q385 in TVA's Interconnection Queue which is publicly available on TVA's OASIS.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3115,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Wheeler 161 Kv Switchyard, Relocation","type":"substation","voltage_kv":161,"location_ref":"Wheeler (TN/AL/MS/KY/GA/NC/VA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":114,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 114.\nIn-Service Year: 2030\nProject Name: WHEELER 161 KV SWITCHYARD, RELOCATION\nDescription: Build a new switchyard, Doublehead, to replace Wheeler HP 161 kV switchyard.\nSupporting Statement: A geological survey was conducted to investigate subsurface conditions within the Wheeler 161 kV switchyard. Flaws within the subgrade in the switchyard were discovered. The soil/rockfill above the bedrock (~ 10-20 ft thickness) is very soft throughout the switchyard.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3116,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Wilson 161 Kv Statcom, Install","type":"substation","voltage_kv":161,"location_ref":"Wilson (TN/AL/MS/KY/GA/NC/VA)","lat":null,"lng":null,"route":null,"cost_usd":null,"start_date":"2030-01-01","end_date":"2030-01-01","start_precision":"year","end_precision":"year","confidence":0.6000000238418579,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":114,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 114.\nIn-Service Year: 2030\nProject Name: WILSON 161 KV STATCOM, INSTALL\nDescription: With the Nashville Area continuing to rapidly grow, along with spinning generation being replace by inverter bases resources, Planning sees stability concerns in the Nashville area. STATCOMs will help mitigate the issues seen in the area.\nSupporting Statement: Dynamic voltage support is needed in the Nashville area.\nNo substation or place match; needs review.","reviewed":false,"approximate":false,"requires_review":true},{"id":3117,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Bradley 500 Kv Switch House, Construct","type":"substation","voltage_kv":500,"location_ref":"Bradley (TN/AL/MS/KY/GA/NC/VA)","lat":35.042,"lng":-84.959,"route":null,"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":114,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 114.\nIn-Service Year: 2031\nProject Name: BRADLEY 500 KV SWITCH HOUSE, CONSTRUCT\nDescription: Construct a new 500 kV switch house.\nSupporting Statement: Additional thermal capacity and voltage support is needed in the Bradley County, TN area under contingency.\nLocated: BRADLEY = OSM substation 'Bradley Substation' (TN)","reviewed":false,"approximate":false,"requires_review":false},{"id":3118,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Dickson 161 Kv Area Improvement","type":"substation","voltage_kv":161,"location_ref":"Dickson (TN/AL/MS/KY/GA/NC/VA)","lat":36.094,"lng":-87.407,"route":null,"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":114,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 114.\nIn-Service Year: 2031\nProject Name: DICKSON 161 KV AREA IMPROVEMENT\nDescription: Construct new Locust Creek 161 kV substation. Construct ~9.5 miles of new 161 kV transmission line from Bon Aqua to Burns. Rebuild ~8 miles of 161 kV transmission line between Dickson and Ponoma tap. Build a new switch house at Dickson.\nSupporting Statement: Voltage support is needed in the Dickson, TN area under contingency.\nLocated: DICKSON = OSM substation 'Dickson Substation' (TN)","reviewed":false,"approximate":false,"requires_review":false},{"id":3119,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Moulton, Al 161Kv","type":"substation","voltage_kv":161,"location_ref":"Moulton (TN/AL/MS/KY/GA/NC/VA)","lat":34.492,"lng":-87.293,"route":null,"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":115,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 115.\nIn-Service Year: 2031\nProject Name: MOULTON, AL 161KV\nDescription: TVA to convert the existing Addison East Tap switching station to 4 position ring bus substation. This will allow the Helcion - Trade 161 kV TL line to be closed under normal configuration.\nSupporting Statement: Voltage support is needed in the Moulton, AL area under contingency.\nLocated: MOULTON = OSM substation 'Moulton Substation' (AL)","reviewed":false,"approximate":false,"requires_review":false},{"id":3120,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Mtn Home Area Improvement","type":"substation","voltage_kv":161,"location_ref":"Mtn Home (TN/AL/MS/KY/GA/NC/VA)","lat":34.607,"lng":-87.113,"route":null,"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":115,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 115.\nIn-Service Year: 2031\nProject Name: MTN HOME AREA IMPROVEMENT\nDescription: TVA to tap the existing Bride's Hill, AL-Trinity, AL 161kV TL and loop in the Mtn Home, AL stations (~5 miles). TVA to convert Mtn Home, AL substation from a ring bus to a breaker and a half configuration.\nSupporting Statement: Voltage support is needed in the Mtn Home area under contingency.\nLocated: MTN HOME = OSM substation 'Mountain Home Substation' (AL)","reviewed":false,"approximate":false,"requires_review":false},{"id":3121,"plan_id":"2e7d338f-1ce0-496d-a714-af240e02352e","utility":"TVA","state":null,"name":"Sequoyah 500 Kv Switch House, Construct","type":"substation","voltage_kv":500,"location_ref":"Sequoyah (TN/AL/MS/KY/GA/NC/VA)","lat":35.227,"lng":-85.094,"route":null,"cost_usd":null,"start_date":"2031-01-01","end_date":"2031-01-01","start_precision":"year","end_precision":"year","confidence":0.949999988079071,"source_url":"https://www.southeasternrtp.com/docs/general/2026/2026_SERTP_Preliminary_Expansion_Plan_Report_(Non-CEII).pdf","source_page":115,"raw_excerpt":"SERTP TVA Balancing Authority Area, page 115.\nIn-Service Year: 2031\nProject Name: SEQUOYAH 500 KV SWITCH HOUSE, CONSTRUCT\nDescription: Construct a new 500 kV switch house with new assets including breakers at the Sequoyah 500 kV substation.\nSupporting Statement: New revision of the TPL expands the single point of failure which results in violations at Sequoyah.\nLocated: SEQUOYAH = OSM substation 'Sequoyah Substation' (TN)","reviewed":false,"approximate":false,"requires_review":false},{"id":1118,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Two Blues Solar","state":"IL","name":"Two Blues Solar, LLC (Solar Photovoltaic, 40 MW)","type":"generation","voltage_kv":null,"location_ref":"Two Blues Solar, LLC, Perry County, IL","lat":38.1633,"lng":-89.37,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 641. Plant 70092 Two Blues Solar, LLC (Two Blues Solar, LLC), Perry County, IL; balancing authority MISO. Planned operation 2027-01.\nGenerator 2BLUE: 40 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2199,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Two Oaks Solar and Storage","state":"VA","name":"Two Oaks Solar and Storage LLC (Batteries, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"Two Oaks Solar and Storage LLC, Louisa County, VA","lat":38.013053,"lng":-77.93117,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1138. Plant 67884 Two Oaks Solar and Storage LLC (Two Oaks Solar and Storage), Louisa County, VA; balancing authority PJM. Planned operation 2027-11.\nGenerator ENX28: 50 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2200,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Two Oaks Solar and Storage","state":"VA","name":"Two Oaks Solar and Storage LLC (Solar Photovoltaic, 118 MW)","type":"generation","voltage_kv":null,"location_ref":"Two Oaks Solar and Storage LLC, Louisa County, VA","lat":38.013053,"lng":-77.93117,"route":null,"cost_usd":null,"start_date":"2029-11-01","end_date":"2029-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1994. Plant 67884 Two Oaks Solar and Storage LLC (Two Oaks Solar and Storage), Louisa County, VA; balancing authority PJM. Planned operation 2029-11.\nGenerator ENX27: 118 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2269,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Two Rivers Wind","state":"WY","name":"Two Rivers Wind Facility (Onshore Wind Turbine, 6.1 MW)","type":"generation","voltage_kv":null,"location_ref":"Two Rivers Wind Facility, Carbon County, WY","lat":41.97508,"lng":-106.1805,"route":null,"cost_usd":null,"start_date":"2028-10-01","end_date":"2028-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1682. Plant 63972 Two Rivers Wind Facility (Two Rivers Wind LLC), Carbon County, WY; balancing authority PACE. Planned operation 2028-10.\nGenerator TR1: 6.1 MW Onshore Wind Turbine; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1316,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Union Electric - (mo)","state":"MO","name":"Castle Bluff Energy Center (Natural Gas Fired Combustion Turbine, 648 MW)","type":"generation","voltage_kv":null,"location_ref":"Castle Bluff Energy Center, St Louis County, MO","lat":38.4017,"lng":-90.3358,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1081, 1082, 1083. Plant 67576 Castle Bluff Energy Center (Union Electric Co - (MO)), St Louis County, MO; balancing authority MISO. Planned operation 2027-10.\nGenerator 1: 216 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator 2: 216 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator 3: 216 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1119,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"United States Solar","state":"IL","name":"USS Lyndon Solar LLC (Solar Photovoltaic, 1 MW)","type":"generation","voltage_kv":null,"location_ref":"USS Lyndon Solar LLC, Whiteside County, IL","lat":41.659472,"lng":-89.92079,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 133. Plant 69616 USS Lyndon Solar LLC (United States Solar Corporation), Whiteside County, IL; balancing authority PJM. Planned operation 2026-09.\nGenerator USLYN: 1 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":743,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"University of Redlands","state":"CA","name":"Energy Center (Natural Gas Fired Combustion Turbine, 0.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Energy Center, San Bernardino County, CA","lat":34.063056,"lng":-117.1639,"route":null,"cost_usd":null,"start_date":"2030-12-01","end_date":"2030-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2100, 2101, 2102. Plant 58168 Energy Center (University of Redlands), San Bernardino County, CA; balancing authority CISO. Planned operation 2030-12.\nGenerator TURB4: 0.3 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator TURB5: 0.3 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated\nGenerator TURB6: 0.3 MW Natural Gas Fired Combustion Turbine; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":627,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Urban Grid Solar","state":"AL","name":"Hillsboro Solar 3 (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Hillsboro Solar 3, Lawrence County, AL","lat":34.669883,"lng":-87.2332,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 811. Plant 66852 Hillsboro Solar 3 (Urban Grid Solar), Lawrence County, AL; balancing authority TVA. Planned operation 2027-05.\nGenerator HILL3: 200 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":635,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Urban Grid Solar","state":"AL","name":"Spring Valley Solar 2 (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Spring Valley Solar 2, Colbert County, AL","lat":34.674983,"lng":-87.66373,"route":null,"cost_usd":null,"start_date":"2028-02-01","end_date":"2028-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1441. Plant 66858 Spring Valley Solar 2 (Urban Grid Solar), Colbert County, AL; balancing authority TVA. Planned operation 2028-02.\nGenerator SPRV2: 200 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":643,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Urban Grid Solar","state":"AR","name":"Fairview Solar (AR) (Solar Photovoltaic, 75 MW)","type":"generation","voltage_kv":null,"location_ref":"Fairview Solar (AR), Ashley County, AR","lat":33.342883,"lng":-91.89495,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1262. Plant 66851 Fairview Solar (AR) (Urban Grid Solar), Ashley County, AR; balancing authority MISO. Planned operation 2027-12.\nGenerator FAIR1: 75 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1673,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Urban Grid Solar","state":"PA","name":"Beaver Creek Solar (Solar Photovoltaic, 34.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Beaver Creek Solar, Franklin County, PA","lat":40.086625,"lng":-77.66283,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 858. Plant 66850 Beaver Creek Solar (Urban Grid Solar), Franklin County, PA; balancing authority PJM. Planned operation 2027-06.\nGenerator BEAC1: 34.2 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1215,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Uriel Renovables S A","state":"MA","name":"Chicopee BESS (Batteries, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Chicopee BESS, Hampden County, MA","lat":42.173653,"lng":-72.6119,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 321. Plant 70386 Chicopee BESS (Uriel Renovables S.A), Hampden County, MA; balancing authority ISNE. Planned operation 2026-10.\nGenerator BESS1: 5 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1220,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Uriel Renovables S A","state":"MA","name":"Framingham BESS (Batteries, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Framingham BESS, Middlesex County, MA","lat":42.313107,"lng":-71.38953,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 322. Plant 70387 Framingham BESS (Uriel Renovables S.A), Middlesex County, MA; balancing authority ISNE. Planned operation 2026-10.\nGenerator BESS1: 5 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1452,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Uss Fletcher Solar","state":"NM","name":"USS Fletcher Solar (Solar Photovoltaic, 1.7 MW)","type":"generation","voltage_kv":null,"location_ref":"USS Fletcher Solar, Hidalgo County, NM","lat":32.366814,"lng":-108.6934,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 290. Plant 69888 USS Fletcher Solar (USS Fletcher Solar LLC), Hidalgo County, NM; balancing authority PNM. Planned operation 2026-10.\nGenerator USFLE: 1.7 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2267,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Us Sfr Owner","state":"WY","name":"Kemmerer Unit 1 (Nuclear, 500 MW)","type":"generation","voltage_kv":null,"location_ref":"Kemmerer Unit 1, Lincoln County, WY","lat":41.705993,"lng":-110.5603,"route":null,"cost_usd":null,"start_date":"2030-12-01","end_date":"2030-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2112. Plant 68635 Kemmerer Unit 1 (US SFR Owner LLC), Lincoln County, WY; balancing authority PACE. Planned operation 2030-12.\nGenerator KU1: 500 MW Nuclear; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1453,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Uss Gold Solar","state":"NM","name":"USS Gold Solar (Solar Photovoltaic, 4.3 MW)","type":"generation","voltage_kv":null,"location_ref":"USS Gold Solar, Luna County, NM","lat":32.26144,"lng":-107.7778,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 571. Plant 69889 USS Gold Solar (USS Gold Solar LLC), Luna County, NM; balancing authority PNM. Planned operation 2026-12.\nGenerator USGOL: 4.3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1454,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Uss Hermanas Solar","state":"NM","name":"USS Hermanas Solar (Solar Photovoltaic, 3.3 MW)","type":"generation","voltage_kv":null,"location_ref":"USS Hermanas Solar, Luna County, NM","lat":32.210444,"lng":-107.8114,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 566. Plant 69881 USS Hermanas Solar (USS Hermanas Solar LLC), Luna County, NM; balancing authority PNM. Planned operation 2026-12.\nGenerator USHER: 3.3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1455,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Uss Jornada Solar","state":"NM","name":"USS Jornada Solar (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"USS Jornada Solar, Dona Ana County, NM","lat":32.431485,"lng":-106.6832,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 568. Plant 69883 USS Jornada Solar (USS Jornada Solar LLC), Dona Ana County, NM; balancing authority PNM. Planned operation 2026-12.\nGenerator USJOR: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1456,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Uss Meadow Lake Solar","state":"NM","name":"USS Meadow Lake Solar (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"USS Meadow Lake Solar, Valencia County, NM","lat":34.79756,"lng":-106.6542,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 569. Plant 69884 USS Meadow Lake Solar (USS Meadow Lake Solar LLC), Valencia County, NM; balancing authority PNM. Planned operation 2026-12.\nGenerator USMED: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1120,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Uss Middle Solar","state":"IL","name":"USS Middle Solar (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"USS Middle Solar, Grundy County, IL","lat":41.413923,"lng":-88.44451,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 567. Plant 69882 USS Middle Solar (USS Middle Solar LLC), Grundy County, IL; balancing authority PJM. Planned operation 2026-12.\nGenerator USMID: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1121,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Uss Mourning Lane","state":"IL","name":"USS Mourning (Solar Photovoltaic, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"USS Mourning, Schuyler County, IL","lat":40.160741,"lng":-90.59832,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 570. Plant 69885 USS Mourning (USS Mourning Lane), Schuyler County, IL; balancing authority PJM. Planned operation 2026-12.\nGenerator USMOU: 2 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1122,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Uss Swank Solar","state":"IL","name":"USS Swank Solar (Solar Photovoltaic, 1 MW)","type":"generation","voltage_kv":null,"location_ref":"USS Swank Solar, Henry County, IL","lat":41.1615,"lng":-90.0285,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 289. Plant 69886 USS Swank Solar (USS Swank Solar LLC), Henry County, IL; balancing authority PJM. Planned operation 2026-10.\nGenerator USSWA: 1 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2108,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Vaca Del Sol","state":"TX","name":"Tiger Solar (Solar Photovoltaic, 250 MW)","type":"generation","voltage_kv":null,"location_ref":"Tiger Solar, Jones County, TX","lat":32.796921,"lng":-99.88089,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 474. Plant 67357 Tiger Solar (Vaca Del Sol, LLC), Jones County, TX; balancing authority ERCO. Planned operation 2026-12.\nGenerator 4666: 250 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":837,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Vaca Dixon Bess","state":"CA","name":"Vaca BESS (Batteries, 59.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Vaca BESS, Solano County, CA","lat":38.398379,"lng":-121.924,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 944. Plant 69541 Vaca BESS (Vaca Dixon BESS LLC), Solano County, CA; balancing authority CISO. Planned operation 2027-07.\nGenerator VACB: 59.5 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":695,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Valley Farms Energy Center","state":"AZ","name":"Valley Farms Energy Center (Batteries, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"Valley Farms Energy Center, Pinal County, AZ","lat":32.94793,"lng":-111.4576,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1405. Plant 70219 Valley Farms Energy Center (Valley Farms Energy Center, LLC), Pinal County, AZ; balancing authority SRP. Planned operation 2027-12.\nGenerator VALLE: 400 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1242,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Vcp Realty","state":"ME","name":"Crooked Trail Solar (Solar Photovoltaic, 68 MW)","type":"generation","voltage_kv":null,"location_ref":"Crooked Trail Solar, Penobscot County, ME","lat":45.144194,"lng":-68.58603,"route":null,"cost_usd":null,"start_date":"2029-10-01","end_date":"2029-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1990. Plant 68416 Crooked Trail Solar (VCP Realty, LLC), Penobscot County, ME; balancing authority ISNE. Planned operation 2029-10.\nGenerator CTS1: 68 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1244,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Vcp Realty","state":"ME","name":"Emery Shute Solar One (Solar Photovoltaic, 1 MW)","type":"generation","voltage_kv":null,"location_ref":"Emery Shute Solar One, Waldo County, ME","lat":44.535591,"lng":-68.86433,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 30. Plant 65045 Emery Shute Solar One (VCP Realty, LLC), Waldo County, ME; balancing authority ISNE. Planned operation 2026-09.\nGenerator VCP14: 1 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1152,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Vermillion Rise Solar","state":"IN","name":"Vermillion Rise Solar (Solar Photovoltaic, 185 MW)","type":"generation","voltage_kv":null,"location_ref":"Vermillion Rise Solar, Vermillion County, IN","lat":39.83182,"lng":-87.42895,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1244. Plant 65935 Vermillion Rise Solar (Vermillion Rise Solar, LLC), Vermillion County, IN; balancing authority MISO. Planned operation 2027-12.\nGenerator 14: 185 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2118,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Vertus Energy Storage","state":"TX","name":"Vertus Energy Storage Plant (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Vertus Energy Storage Plant, Galveston County, TX","lat":29.392994,"lng":-95.03924,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 113. Plant 69255 Vertus Energy Storage Plant (Vertus Energy Storage, LLC), Galveston County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator VESP1: 200 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1832,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Vesi 37","state":"TX","name":"Bird Dog Energy Storage (Batteries, 60 MW)","type":"generation","voltage_kv":null,"location_ref":"Bird Dog Energy Storage, San Patricio County, TX","lat":28.158672,"lng":-97.86231,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 503. Plant 68495 Bird Dog Energy Storage (VESI 37 LLC), San Patricio County, TX; balancing authority ERCO. Planned operation 2026-12.\nGenerator BDOG1: 60 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":708,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Vesper Energy Development","state":"CA","name":"Athens Solar I (Hybrid) (Batteries, Solar Photovoltaic, 500 MW)","type":"generation","voltage_kv":null,"location_ref":"Athens Solar I (Hybrid), Placer County, CA","lat":35.754889,"lng":-121.4071,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1561, 1562. Plant 67982 Athens Solar I (Hybrid) (Vesper Energy Development LLC), Placer County, CA; balancing authority CISO. Planned operation 2028-06.\nGenerator ATHS1: 250 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated\nGenerator ATHSB: 250 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":709,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Vesper Energy Development","state":"CA","name":"Aurora Renewable Energy (Hybrid) (Batteries, Solar Photovoltaic, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Aurora Renewable Energy (Hybrid), Stanislaus County, CA","lat":37.628805,"lng":-121.0714,"route":null,"cost_usd":null,"start_date":"2028-04-01","end_date":"2028-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1500, 1501. Plant 67983 Aurora Renewable Energy (Hybrid) (Vesper Energy Development LLC), Stanislaus County, CA; balancing authority BANC. Planned operation 2028-04.\nGenerator AURRB: 50 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator AURRE: 50 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":768,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Vesper Energy Development","state":"CA","name":"Juniper Creek Storage (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Juniper Creek Storage, Sacramento County, CA","lat":38.554073,"lng":-121.2066,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1463. Plant 67945 Juniper Creek Storage (Vesper Energy Development LLC), Sacramento County, CA; balancing authority CISO. Planned operation 2028-03.\nGenerator JCSIB: 200 MW Batteries; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":823,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Vesper Energy Development","state":"CA","name":"Skylight Renewable Energy (Batteries, Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Skylight Renewable Energy, Sutter County, CA","lat":38.947494,"lng":-121.4792,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1565, 1566. Plant 68032 Skylight Renewable Energy (Vesper Energy Development LLC), Sutter County, CA; balancing authority WALC. Planned operation 2028-06.\nGenerator SKLRE: 100 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated\nGenerator SKREB: 100 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":833,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Vesper Energy Development","state":"CA","name":"Syracuse and Tours Renewable Energy (Batteries, Solar Photovoltaic, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"Syracuse and Tours Renewable Energy, Kern County, CA","lat":34.951078,"lng":-118.3083,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1141, 1142. Plant 68035 Syracuse and Tours Renewable Energy (Vesper Energy Development LLC), Kern County, CA; balancing authority CISO. Planned operation 2027-11.\nGenerator SYTOB: 40 MW Batteries; (T) Regulatory approvals received. Not under construction\nGenerator SYTOR: 40 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1057,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Vesper Energy Development","state":"IL","name":"Meadow Springs Renewable Energy (Hybrid) (Batteries, Solar Photovoltaic, 300 MW)","type":"generation","voltage_kv":null,"location_ref":"Meadow Springs Renewable Energy (Hybrid), White County, IL","lat":38.029,"lng":-88.284,"route":null,"cost_usd":null,"start_date":"2028-06-01","end_date":"2028-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1563, 1564. Plant 67986 Meadow Springs Renewable Energy (Hybrid) (Vesper Energy Development LLC), White County, IL; balancing authority MISO. Planned operation 2028-06.\nGenerator MSPRB: 150 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator MSPRE: 150 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1326,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Vesper Energy Development","state":"MO","name":"Scopus Solar (Batteries, Solar Photovoltaic, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"Scopus Solar, Bollinger County, MO","lat":37.392178,"lng":-89.89929,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1291, 1292. Plant 68031 Scopus Solar (Vesper Energy Development LLC), Bollinger County, MO; balancing authority MISO. Planned operation 2027-12.\nGenerator SCPSB: 200 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator SCPSR: 200 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1329,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Vesper Energy Development","state":"MO","name":"Vichy Solar (Batteries, Solar Photovoltaic, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"Vichy Solar, Maries County, MO","lat":38.167934,"lng":-91.82552,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1295, 1296. Plant 68036 Vichy Solar (Vesper Energy Development LLC), Maries County, MO; balancing authority MISO. Planned operation 2027-12.\nGenerator VCHSB: 200 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator VCHSR: 200 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1616,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Vesper Energy Development","state":"OH","name":"Kingwood Solar (Solar Photovoltaic, 175 MW)","type":"generation","voltage_kv":null,"location_ref":"Kingwood Solar, Greene County, OH","lat":39.782,"lng":-83.83,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1237. Plant 65425 Kingwood Solar (Vesper Energy Development LLC), Greene County, OH; balancing authority PJM. Planned operation 2027-12.\nGenerator KWOOD: 175 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1680,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Vesper Energy Development","state":"PA","name":"Bradford Solar PA (Solar Photovoltaic, 100.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Bradford Solar PA, Bradford County, PA","lat":41.721657,"lng":-76.53663,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1290. Plant 68014 Bradford Solar PA (Vesper Energy Development LLC), Bradford County, PA; balancing authority PJM. Planned operation 2027-12.\nGenerator BRDFS: 100.5 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1695,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Vesper Energy Development","state":"PA","name":"Firefly Solar PA (Solar Photovoltaic, 401.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Firefly Solar PA, Lawrence County, PA","lat":40.930281,"lng":-80.43244,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1288. Plant 67984 Firefly Solar PA (Vesper Energy Development LLC), Lawrence County, PA; balancing authority PJM. Planned operation 2027-12.\nGenerator FFLPA: 401.6 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1945,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Vesper Energy Development","state":"TX","name":"Hornet Solar II (TX) (Hybrid) (Batteries, Solar Photovoltaic, 400 MW)","type":"generation","voltage_kv":null,"location_ref":"Hornet Solar II (TX) (Hybrid), Swisher County, TX","lat":34.483406,"lng":-101.9699,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1464, 1465. Plant 67985 Hornet Solar II (TX) (Hybrid) (Vesper Energy Development LLC), Swisher County, TX; balancing authority ERCO. Planned operation 2028-03.\nGenerator HRNT2: 200 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction\nGenerator HRT2B: 200 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1999,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Vesper Energy Development","state":"TX","name":"Mystic Springs Renewable Energy (Hybrid) (Batteries, Solar Photovoltaic, 500 MW)","type":"generation","voltage_kv":null,"location_ref":"Mystic Springs Renewable Energy (Hybrid), Kaufman County, TX","lat":32.821255,"lng":-96.19042,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1466, 1467. Plant 67987 Mystic Springs Renewable Energy (Hybrid) (Vesper Energy Development LLC), Kaufman County, TX; balancing authority ERCO. Planned operation 2028-03.\nGenerator MYSPB: 250 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator MYSPS: 250 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2049,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Vesper Energy Development","state":"TX","name":"Red Hollow Renewable Energy (Batteries, Solar Photovoltaic, 600 MW)","type":"generation","voltage_kv":null,"location_ref":"Red Hollow Renewable Energy, Archer County, TX","lat":33.564936,"lng":-98.612,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1089, 1090. Plant 68030 Red Hollow Renewable Energy (Vesper Energy Development LLC), Archer County, TX; balancing authority ERCO. Planned operation 2027-10.\nGenerator RDHLW: 300 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated\nGenerator RHLWB: 300 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2092,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Vesper Energy Development","state":"TX","name":"Sunrose Renewable Energy (Batteries, Solar Photovoltaic, 600 MW)","type":"generation","voltage_kv":null,"location_ref":"Sunrose Renewable Energy, Austin County, TX","lat":29.674226,"lng":-96.12137,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1293, 1294. Plant 68033 Sunrose Renewable Energy (Vesper Energy Development LLC), Austin County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator SNRSE: 300 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated\nGenerator SRSEB: 300 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2093,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Vesper Energy Development","state":"TX","name":"Sunscape Renewable Energy (Batteries, Solar Photovoltaic, 1000 MW)","type":"generation","voltage_kv":null,"location_ref":"Sunscape Renewable Energy, Nueces County, TX","lat":27.819197,"lng":-97.79994,"route":null,"cost_usd":null,"start_date":"2028-10-01","end_date":"2028-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1692, 1693. Plant 68034 Sunscape Renewable Energy (Vesper Energy Development LLC), Nueces County, TX; balancing authority ERCO. Planned operation 2028-10.\nGenerator SNSCB: 500 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator SNSCP: 500 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":2099,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Vesper Energy Development","state":"TX","name":"TX Nazareth Solar (Solar Photovoltaic, 201 MW)","type":"generation","voltage_kv":null,"location_ref":"TX Nazareth Solar, Swisher County, TX","lat":34.49,"lng":-101.97,"route":null,"cost_usd":null,"start_date":"2027-08-01","end_date":"2027-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 973. Plant 67575 TX Nazareth Solar (Vesper Energy Development LLC), Swisher County, TX; balancing authority ERCO. Planned operation 2027-08.\nGenerator NZRTH: 201 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2153,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Vesper Energy Development","state":"VA","name":"Axton Solar (Solar Photovoltaic, 201.1 MW)","type":"generation","voltage_kv":null,"location_ref":"Axton Solar, Henry County, VA","lat":36.671684,"lng":-79.68606,"route":null,"cost_usd":null,"start_date":"2028-09-01","end_date":"2028-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1663. Plant 65462 Axton Solar (Vesper Energy Development LLC), Henry County, VA; balancing authority PJM. Planned operation 2028-09.\nGenerator AXTON: 201.1 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1559,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Village of Freeport - (ny)","state":"NY","name":"Plant No 1 Freeport (Landfill Gas, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Plant No 1 Freeport, Nassau County, NY","lat":40.6561,"lng":-73.5922,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 434. Plant 2678 Plant No 1 Freeport (Village of Freeport - (NY)), Nassau County, NY; balancing authority NYIS. Planned operation 2026-12.\nGenerator ENG13: 3 MW Landfill Gas; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":806,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Viracocha Wind","state":"CA","name":"Rooney Ranch (Onshore Wind Turbine, 21 MW)","type":"generation","voltage_kv":null,"location_ref":"Rooney Ranch, Alameda County, CA","lat":37.737366,"lng":-121.6521,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1212. Plant 63088 Rooney Ranch (Viracocha Wind LLC), Alameda County, CA; balancing authority CISO. Planned operation 2027-12.\nGenerator ROONR: 21 MW Onshore Wind Turbine; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":814,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Viracocha Wind","state":"CA","name":"Sand Hill A (Onshore Wind Turbine, 13.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Sand Hill A, Alameda County, CA","lat":37.743809,"lng":-121.6078,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1213. Plant 63126 Sand Hill A (Viracocha Wind LLC), Alameda County, CA; balancing authority CISO. Planned operation 2027-12.\nGenerator SNDHA: 13.5 MW Onshore Wind Turbine; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":815,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Viracocha Wind","state":"CA","name":"Sand Hill B (Onshore Wind Turbine, 17 MW)","type":"generation","voltage_kv":null,"location_ref":"Sand Hill B, Alameda County, CA","lat":37.755007,"lng":-121.5968,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1216. Plant 63652 Sand Hill B (Viracocha Wind LLC), Alameda County, CA; balancing authority CISO. Planned operation 2027-12.\nGenerator SNDHB: 17 MW Onshore Wind Turbine; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":816,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Viracocha Wind","state":"CA","name":"Sand Hill C (Onshore Wind Turbine, 80 MW)","type":"generation","voltage_kv":null,"location_ref":"Sand Hill C, Alameda County, CA","lat":37.769695,"lng":-121.5961,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1217. Plant 63653 Sand Hill C (Viracocha Wind LLC), Alameda County, CA; balancing authority CISO. Planned operation 2027-12.\nGenerator SNDHC: 80 MW Onshore Wind Turbine; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2164,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Virginia Electric & Power","state":"VA","name":"Chesterfield (Natural Gas Fired Combustion Turbine, 1000 MW)","type":"generation","voltage_kv":null,"location_ref":"Chesterfield, Chesterfield County, VA","lat":37.3822,"lng":-77.3833,"route":null,"cost_usd":null,"start_date":"2029-06-01","end_date":"2029-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1901, 1902, 1903, 1904. Plant 3797 Chesterfield (Virginia Electric & Power Co), Chesterfield County, VA; balancing authority PJM. Planned operation 2029-06.\nGenerator CERC1: 250 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator CERC2: 250 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator CERC3: 250 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator CERC4: 250 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2207,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Viridis Solar","state":"VT","name":"Panton (Solar Photovoltaic, 50 MW)","type":"generation","voltage_kv":null,"location_ref":"Panton, Addison County, VT","lat":44.1328,"lng":-73.31151,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1780. Plant 68213 Panton (Viridis Solar), Addison County, VT; balancing authority ISNE. Planned operation 2028-12.\nGenerator 1: 50 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2244,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Vista Sands Solar","state":"WI","name":"Vista Sands Solar (Solar Photovoltaic, 1182 MW)","type":"generation","voltage_kv":null,"location_ref":"Vista Sands Solar, Portage County, WI","lat":44.446256,"lng":-89.57631,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1768. Plant 67551 Vista Sands Solar (Vista Sands Solar LLC), Portage County, WI; balancing authority MISO. Planned operation 2028-12.\nGenerator VISTA: 1182 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1287,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Voyager Energy Storage","state":"MI","name":"Voyager Energy Storage (Batteries, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Voyager Energy Storage, Washtenaw County, MI","lat":42.153167,"lng":-83.8333,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 624. Plant 68426 Voyager Energy Storage (Voyager Energy Storage LLC), Washtenaw County, MI; balancing authority MISO. Planned operation 2027-01.\nGenerator VOYGR: 100 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2121,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Waco Solar Ii","state":"TX","name":"Waco Solar II (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Waco Solar II, Limestone County, TX","lat":31.71062,"lng":-96.7914,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1277. Plant 67354 Waco Solar II (Waco Solar II, LLC), Limestone County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator 5698: 200 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1423,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Walden Renewables Development","state":"NH","name":"Nutes Solar (Solar Photovoltaic, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"Nutes Solar, Strafford County, NH","lat":43.375125,"lng":-71.023,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 270. Plant 69535 Nutes Solar (Walden Renewables Development LLC), Strafford County, NH; balancing authority ISNE. Planned operation 2026-10.\nGenerator NS1: 20 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1253,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Warren Meadow Solar Station","state":"ME","name":"Warren Meadow Solar Station (Solar Photovoltaic, 74.5 MW)","type":"generation","voltage_kv":null,"location_ref":"Warren Meadow Solar Station, Knox County, ME","lat":44.16061,"lng":-69.22341,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1457. Plant 65708 Warren Meadow Solar Station (Warren Meadow Solar Station, LLC), Knox County, ME; balancing authority ISNE. Planned operation 2028-03.\nGenerator WMSS: 74.5 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1125,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Washington Street Solar 1","state":"IL","name":"Washington Street Solar 1 LLC (Solar Photovoltaic, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Washington Street Solar 1 LLC, Mclean County, IL","lat":40.477287,"lng":-89.04986,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 246. Plant 68975 Washington Street Solar 1 LLC (Washington Street Solar 1 LLC), Mclean County, IL; balancing authority MISO. Planned operation 2026-10.\nGenerator 17340: 5 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1288,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Watertown Solar","state":"MI","name":"Watertown Solar (Solar Photovoltaic, 154 MW)","type":"generation","voltage_kv":null,"location_ref":"Watertown Solar, Sanilac County, MI","lat":43.399794,"lng":-82.81425,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 784. Plant 69945 Watertown Solar (Watertown Solar, LLC), Sanilac County, MI; balancing authority MISO. Planned operation 2027-04.\nGenerator WTRTN: 154 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1587,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Watkins Road Solar Ny","state":"NY","name":"SunEast Watkins Road Solar Project (Solar Photovoltaic, 20 MW)","type":"generation","voltage_kv":null,"location_ref":"SunEast Watkins Road Solar Project, Herkimer County, NY","lat":43.06127,"lng":-75.05584,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1128. Plant 62896 SunEast Watkins Road Solar Project (Watkins Road Solar NY LLC), Herkimer County, NY; balancing authority NYIS. Planned operation 2027-11.\nGenerator Q586: 20 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":887,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Waxwing Solar","state":"CO","name":"Waxwing Solar CSG (Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Waxwing Solar CSG, Pueblo County, CO","lat":38.2963,"lng":-104.5525,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 635. Plant 69427 Waxwing Solar CSG (Waxwing Solar), Pueblo County, CO; balancing authority PSCO. Planned operation 2027-01.\nGenerator WAXWI: 3 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2225,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Wec: City of Milwaukee - Airport Expansion","state":"WI","name":"City of Milwaukee- Airport Expansion (Solar Photovoltaic, 4.6 MW)","type":"generation","voltage_kv":null,"location_ref":"City of Milwaukee- Airport Expansion, Milwaukee County, WI","lat":42.930271,"lng":-87.88801,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 158. Plant 70048 City of Milwaukee- Airport Expansion (WEC: City of Milwaukee - Airport Expansion), Milwaukee County, WI; balancing authority MISO. Planned operation 2026-09.\nGenerator AIREX: 4.6 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1186,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Weirs Creek Solar","state":"KY","name":"Weirs Creek (Solar Photovoltaic, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Weirs Creek, Hopkins County, KY","lat":37.423648,"lng":-87.69048,"route":null,"cost_usd":null,"start_date":"2027-05-01","end_date":"2027-05-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 833. Plant 69929 Weirs Creek (Weirs Creek Solar LLC), Hopkins County, KY; balancing authority MISO. Planned operation 2027-05.\nGenerator WC001: 150 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":888,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Weld Energy Storage","state":"CO","name":"Weld Energy Storage (Batteries, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Weld Energy Storage, Weld County, CO","lat":40.613467,"lng":-104.8467,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 590. Plant 70188 Weld Energy Storage (Weld Energy Storage, LLC), Weld County, CO; balancing authority SWPP. Planned operation 2026-12.\nGenerator WES01: 100 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1254,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"West Baldwin Solar Station","state":"ME","name":"West Baldwin Solar Station (Solar Photovoltaic, 17.1 MW)","type":"generation","voltage_kv":null,"location_ref":"West Baldwin Solar Station, Cumberland County, ME","lat":43.867403,"lng":-70.7866,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1755. Plant 65371 West Baldwin Solar Station (West Baldwin Solar Station LLC), Cumberland County, ME; balancing authority ISNE. Planned operation 2028-12.\nGenerator WBSS: 17.1 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1783,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Western Minnesota Mun Pwr Agny","state":"SD","name":"Brookings Solar (Solar Photovoltaic, 4.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Brookings Solar, Brookings County, SD","lat":44.340596,"lng":-96.72945,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 226. Plant 68277 Brookings Solar (Western Minnesota Mun Pwr Agny), Brookings County, SD; balancing authority SWPP. Planned operation 2026-10.\nGenerator 1: 4.9 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":1786,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Western Minnesota Mun Pwr Agny","state":"SD","name":"Toronto Power Plant (Natural Gas Fired Combustion Turbine, 145.2 MW)","type":"generation","voltage_kv":null,"location_ref":"Toronto Power Plant, Deuel County, SD","lat":44.594752,"lng":-96.62219,"route":null,"cost_usd":null,"start_date":"2029-12-01","end_date":"2029-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2033, 2034, 2035, 2036. Plant 69102 Toronto Power Plant (Western Minnesota Mun Pwr Agny), Deuel County, SD; balancing authority MISO. Planned operation 2029-12.\nGenerator U1: 36.3 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator U2: 36.3 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator U3: 36.3 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator U4: 36.3 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":724,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Westlands Cherry","state":"CA","name":"Cherry (Batteries, Solar Photovoltaic, 359.7 MW)","type":"generation","voltage_kv":null,"location_ref":"Cherry, Kings County, CA","lat":36.122457,"lng":-119.9232,"route":null,"cost_usd":null,"start_date":"2027-07-01","end_date":"2027-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 919, 920. Plant 63850 Cherry (Westlands Cherry, LLC), Kings County, CA; balancing authority CISO. Planned operation 2027-07.\nGenerator BESS2: 110 MW Batteries; (T) Regulatory approvals received. Not under construction\nGenerator CHERY: 249.7 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":757,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Westlands Grape","state":"CA","name":"Grape (Solar Photovoltaic, 246.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Grape, Kings County, CA","lat":36.145687,"lng":-119.9051,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 686. Plant 63851 Grape (Westlands Grape, LLC), Kings County, CA; balancing authority CISO. Planned operation 2027-03.\nGenerator GRAPE: 246.4 MW Solar Photovoltaic; (T) Regulatory approvals received. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":1399,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"West River Solar","state":"NC","name":"West River Solar, LLC (Solar Photovoltaic, 40 MW)","type":"generation","voltage_kv":null,"location_ref":"West River Solar, LLC, Guilford County, NC","lat":36.043671,"lng":-79.64174,"route":null,"cost_usd":null,"start_date":"2027-10-01","end_date":"2027-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1073. Plant 63806 West River Solar, LLC (West River Solar, LLC), Guilford County, NC; balancing authority DUK. Planned operation 2027-10.\nGenerator PGR28: 40 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1666,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Wheatridge Optimization I","state":"OR","name":"Wheatridge Optimization I (Batteries, Solar Photovoltaic, 175 MW)","type":"generation","voltage_kv":null,"location_ref":"Wheatridge Optimization I, Morrow County, OR","lat":45.560054,"lng":-119.6224,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1413, 1414. Plant 70420 Wheatridge Optimization I (Wheatridge Optimization I, LLC), Morrow County, OR; balancing authority BPAT. Planned operation 2027-12.\nGenerator BA1: 65 MW Batteries; (U) Under construction, less than or equal to 50 percent complete\nGenerator PV1: 110 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1667,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Wheatridge Optimization Ii","state":"OR","name":"Wheatridge Optimization II (Batteries, Solar Photovoltaic, 190 MW)","type":"generation","voltage_kv":null,"location_ref":"Wheatridge Optimization II, Morrow County, OR","lat":45.559975,"lng":-119.6292,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1415, 1416. Plant 70450 Wheatridge Optimization II (Wheatridge Optimization II, LLC), Morrow County, OR; balancing authority BPAT. Planned operation 2027-12.\nGenerator BA1: 60 MW Batteries; (U) Under construction, less than or equal to 50 percent complete\nGenerator PV1: 130 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":696,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"White Tank Energy Storage","state":"AZ","name":"White Tank Energy Storage (Batteries, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"White Tank Energy Storage, Maricopa County, AZ","lat":33.498,"lng":-112.3176,"route":null,"cost_usd":null,"start_date":"2027-03-01","end_date":"2027-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 734. Plant 70033 White Tank Energy Storage (White Tank Energy Storage LLC), Maricopa County, AZ; balancing authority AZPS. Planned operation 2027-03.\nGenerator WT001: 100 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2079,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Wichita Solar I","state":"TX","name":"Short Creek Solar (Solar Photovoltaic, 606.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Short Creek Solar, Wichita County, TX","lat":34.017622,"lng":-98.8013,"route":null,"cost_usd":null,"start_date":"2028-03-01","end_date":"2028-03-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1471. Plant 68479 Short Creek Solar (Wichita Solar I, LLC), Wichita County, TX; balancing authority ERCO. Planned operation 2028-03.\nGenerator SHRT: 606.4 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2126,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Wildcat Ranch Energy Storage","state":"TX","name":"Wildcat Ranch Energy Storage (Batteries, 120 MW)","type":"generation","voltage_kv":null,"location_ref":"Wildcat Ranch Energy Storage, Cochran County, TX","lat":33.524176,"lng":-102.8773,"route":null,"cost_usd":null,"start_date":"2027-11-01","end_date":"2027-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1145. Plant 68877 Wildcat Ranch Energy Storage (Wildcat Ranch Energy Storage, LLC), Cochran County, TX; balancing authority PNM. Planned operation 2027-11.\nGenerator WLDC1: 120 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":1648,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Willow Creek Energy Storage","state":"OK","name":"Willow Creek Energy Storage (Batteries, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Willow Creek Energy Storage, Pawnee County, OK","lat":36.389624,"lng":-97.02781,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 604. Plant 70408 Willow Creek Energy Storage (Willow Creek Energy Storage, LLC), Pawnee County, OK; balancing authority SPA. Planned operation 2026-12.\nGenerator WCB: 200 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2202,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Willow Solar","state":"VA","name":"Willow Solar (Solar Photovoltaic, 12 MW)","type":"generation","voltage_kv":null,"location_ref":"Willow Solar, Franklin County, VA","lat":36.968749,"lng":-79.93001,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 906. Plant 70410 Willow Solar (Willow Solar, LLC), Franklin County, VA; balancing authority PJM. Planned operation 2027-06.\nGenerator ENX42: 12 MW Solar Photovoltaic; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":840,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Windhub Solar B","state":"CA","name":"Windhub Solar B, LLC (Solar Photovoltaic, 26.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Windhub Solar B, LLC, Kern County, CA","lat":35.0133,"lng":-118.2698,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 192. Plant 59969 Windhub Solar B, LLC (Windhub Solar B, LLC), Kern County, CA; balancing authority CISO. Planned operation 2026-10.\nGenerator GEN01: 26.4 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":1461,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Windy Lane Energy Center","state":"NM","name":"Windy Lane Energy Center (Batteries, Solar Photovoltaic, 158 MW)","type":"generation","voltage_kv":null,"location_ref":"Windy Lane Energy Center, De Baca County, NM","lat":34.587619,"lng":-104.0312,"route":null,"cost_usd":null,"start_date":"2026-12-01","end_date":"2026-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 543, 544. Plant 69524 Windy Lane Energy Center (Windy Lane Energy Center, LLC), De Baca County, NM; balancing authority PNM. Planned operation 2026-12.\nGenerator WLB: 68 MW Batteries; (U) Under construction, less than or equal to 50 percent complete\nGenerator WLS: 90 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2239,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Wisconsin Electric Power","state":"WI","name":"South Oak Creek (Natural Gas Fired Combustion Turbine, 1181.5 MW)","type":"generation","voltage_kv":null,"location_ref":"South Oak Creek, Milwaukee County, WI","lat":42.8457,"lng":-87.8294,"route":null,"cost_usd":null,"start_date":"2028-02-01","end_date":"2028-02-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1434, 1435, 1436, 1437, 1438. Plant 4041 South Oak Creek (Wisconsin Electric Power Co), Milwaukee County, WI; balancing authority MISO. Planned operation 2028-02.\nGenerator 11: 236.3 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator 12: 236.3 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator 13: 236.3 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator 14: 236.3 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction\nGenerator 15: 236.3 MW Natural Gas Fired Combustion Turbine; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":2228,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Wisconsin Power & Light","state":"WI","name":"Edgewater (Batteries, 99 MW)","type":"generation","voltage_kv":null,"location_ref":"Edgewater, Sheboygan County, WI","lat":43.715142,"lng":-87.70586,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 748. Plant 4050 Edgewater (Wisconsin Power & Light Co), Sheboygan County, WI; balancing authority MISO. Planned operation 2027-04.\nGenerator BESS1: 99 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2243,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Wisconsin Power & Light","state":"WI","name":"Vienna Walbec Customer Hosted (Solar Photovoltaic, 1.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Vienna Walbec Customer Hosted, Dane County, WI","lat":43.208435,"lng":-89.41019,"route":null,"cost_usd":null,"start_date":"2026-11-01","end_date":"2026-11-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 359. Plant 68502 Vienna Walbec Customer Hosted (Wisconsin Power & Light Co), Dane County, WI; balancing authority MISO. Planned operation 2026-11.\nGenerator PV1: 1.4 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2256,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Wolf Summit Energy","state":"WV","name":"Wolf Summit Energy (Natural Gas Fired Combined Cycle, 578.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Wolf Summit Energy, Harrison County, WV","lat":39.287039,"lng":-80.32287,"route":null,"cost_usd":null,"start_date":"2028-12-01","end_date":"2028-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1734, 1735. Plant 60206 Wolf Summit Energy (Wolf Summit Energy LLC), Harrison County, WV; balancing authority PJM. Planned operation 2028-12.\nGenerator HCCA1: 207.4 MW Natural Gas Fired Combined Cycle; (L) Regulatory approvals pending. Not under construction\nGenerator HCCT1: 371.5 MW Natural Gas Fired Combined Cycle; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":775,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Wonderful Renewable Energy","state":"CA","name":"Lerdo Middle (Solar Photovoltaic, 2.4 MW)","type":"generation","voltage_kv":null,"location_ref":"Lerdo Middle, Kern County, CA","lat":35.50622,"lng":-119.162,"route":null,"cost_usd":null,"start_date":"2026-08-01","end_date":"2026-08-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 9. Plant 70372 Lerdo Middle (Wonderful Renewable Energy, LLC.), Kern County, CA; balancing authority CISO. Planned operation 2026-08.\nGenerator LERMI: 2.4 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":800,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Wonderful Renewable Energy","state":"CA","name":"Ranch 4220 (Solar Photovoltaic, 1.1 MW)","type":"generation","voltage_kv":null,"location_ref":"Ranch 4220, Kern County, CA","lat":35.60601,"lng":-119.1369,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 173. Plant 70368 Ranch 4220 (Wonderful Renewable Energy, LLC.), Kern County, CA; balancing authority CISO. Planned operation 2026-09.\nGenerator R4220: 1.1 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":801,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Wonderful Renewable Energy","state":"CA","name":"Ranch 4701 (Solar Photovoltaic, 2.3 MW)","type":"generation","voltage_kv":null,"location_ref":"Ranch 4701, Kern County, CA","lat":35.742656,"lng":-119.0809,"route":null,"cost_usd":null,"start_date":"2026-10-01","end_date":"2026-10-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 317. Plant 70370 Ranch 4701 (Wonderful Renewable Energy, LLC.), Kern County, CA; balancing authority CISO. Planned operation 2026-10.\nGenerator R4701: 2.3 MW Solar Photovoltaic; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2130,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Yaupon Solar","state":"TX","name":"Yaupon Solar Project (Hybrid) (Solar Photovoltaic, 200 MW)","type":"generation","voltage_kv":null,"location_ref":"Yaupon Solar Project (Hybrid), Milam County, TX","lat":31.0444,"lng":-96.8514,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 37. Plant 66216 Yaupon Solar Project (Hybrid) (Yaupon Solar, LLC), Milam County, TX; balancing authority ERCO. Planned operation 2026-09.\nGenerator SOL: 200 MW Solar Photovoltaic; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":2131,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Yaupon Solar","state":"TX","name":"Yaupon Solar Project (Hybrid) (Batteries, 100 MW)","type":"generation","voltage_kv":null,"location_ref":"Yaupon Solar Project (Hybrid), Milam County, TX","lat":31.0444,"lng":-96.8514,"route":null,"cost_usd":null,"start_date":"2027-12-01","end_date":"2027-12-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 1246. Plant 66216 Yaupon Solar Project (Hybrid) (Yaupon Solar, LLC), Milam County, TX; balancing authority ERCO. Planned operation 2027-12.\nGenerator BESS: 100 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":683,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Yuma Bn","state":"AZ","name":"Pioneer Clean Energy Center (Batteries, Solar Photovoltaic, 600 MW)","type":"generation","voltage_kv":null,"location_ref":"Pioneer Clean Energy Center, Yuma County, AZ","lat":32.549081,"lng":-114.5974,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 760, 761. Plant 68328 Pioneer Clean Energy Center (Yuma bn, LLC), Yuma County, AZ; balancing authority AZPS. Planned operation 2027-04.\nGenerator ORCH1: 300 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete\nGenerator ORCH2: 300 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":2203,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Zenith Solar","state":"VA","name":"Zenith Solar (Solar Photovoltaic, 60 MW)","type":"generation","voltage_kv":null,"location_ref":"Zenith Solar, Pittsylvania County, VA","lat":36.817763,"lng":-79.23328,"route":null,"cost_usd":null,"start_date":"2030-07-01","end_date":"2030-07-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2072. Plant 64768 Zenith Solar (Zenith Solar, LLC), Pittsylvania County, VA; balancing authority PJM. Planned operation 2030-07.\nGenerator TC001: 60 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":841,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Zeta Solar","state":"CA","name":"Zeta Solar & Storage (Batteries, Solar Photovoltaic, 150 MW)","type":"generation","voltage_kv":null,"location_ref":"Zeta Solar & Storage, Merced County, CA","lat":36.911894,"lng":-120.8101,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 864, 865. Plant 67676 Zeta Solar & Storage (Zeta Solar, LLC), Merced County, CA; balancing authority CISO. Planned operation 2027-06.\nGenerator GEN01: 75 MW Solar Photovoltaic; (U) Under construction, less than or equal to 50 percent complete\nGenerator GEN02: 75 MW Batteries; (U) Under construction, less than or equal to 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":842,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Zeus Bess","state":"CA","name":"Zeus BESS (Batteries, 213.6 MW)","type":"generation","voltage_kv":null,"location_ref":"Zeus BESS, San Joaquin County, CA","lat":37.711754,"lng":-121.4884,"route":null,"cost_usd":null,"start_date":"2031-09-01","end_date":"2031-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 2279. Plant 69654 Zeus BESS (Zeus BESS LLC), San Joaquin County, CA; balancing authority CISO. Planned operation 2031-09.\nGenerator ZEUB: 213.6 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":748,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Zglobal","state":"CA","name":"Gardenia 1 (Batteries, Solar Photovoltaic, 6 MW)","type":"generation","voltage_kv":null,"location_ref":"Gardenia 1, Kings County, CA","lat":35.790785,"lng":-119.8777,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 895, 896. Plant 70105 Gardenia 1 (ZGlobal Inc), Kings County, CA; balancing authority CISO. Planned operation 2027-06.\nGenerator GDNAB: 3 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator GDNAS: 3 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":766,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Zglobal","state":"CA","name":"Jade Solar 3 (Batteries, Solar Photovoltaic, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Jade Solar 3, Madera County, CA","lat":37.056528,"lng":-119.9805,"route":null,"cost_usd":null,"start_date":"2027-06-01","end_date":"2027-06-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 897, 898. Plant 70106 Jade Solar 3 (ZGlobal Inc), Madera County, CA; balancing authority CISO. Planned operation 2027-06.\nGenerator JADEB: 1.5 MW Batteries; (P) Planned for installation, but regulatory approvals not initiated\nGenerator JADES: 1.5 MW Solar Photovoltaic; (P) Planned for installation, but regulatory approvals not initiated","reviewed":false,"approximate":false,"requires_review":false},{"id":778,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Zglobal","state":"CA","name":"Madena 3 (Batteries, 3.9 MW)","type":"generation","voltage_kv":null,"location_ref":"Madena 3, Yuba County, CA","lat":39.026009,"lng":-121.5441,"route":null,"cost_usd":null,"start_date":"2027-01-01","end_date":"2027-01-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 625. Plant 68519 Madena 3 (ZGlobal Inc), Yuba County, CA; balancing authority CISO. Planned operation 2027-01.\nGenerator MDNA3: 3.9 MW Batteries; (V) Under construction, more than 50 percent complete","reviewed":false,"approximate":false,"requires_review":false},{"id":779,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Zglobal","state":"CA","name":"Madena 4 (Batteries, 5 MW)","type":"generation","voltage_kv":null,"location_ref":"Madena 4, Placer County, CA","lat":38.977582,"lng":-121.3765,"route":null,"cost_usd":null,"start_date":"2027-04-01","end_date":"2027-04-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 764. Plant 68520 Madena 4 (ZGlobal Inc), Placer County, CA; balancing authority CISO. Planned operation 2027-04.\nGenerator MNDA4: 5 MW Batteries; (L) Regulatory approvals pending. Not under construction","reviewed":false,"approximate":false,"requires_review":false},{"id":782,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Zglobal","state":"CA","name":"Merced 2 BESS (Batteries, 2 MW)","type":"generation","voltage_kv":null,"location_ref":"Merced 2 BESS, Merced County, CA","lat":37.000929,"lng":-120.6648,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 82. Plant 68518 Merced 2 BESS (ZGlobal Inc), Merced County, CA; balancing authority CISO. Planned operation 2026-09.\nGenerator MRC2B: 2 MW Batteries; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false},{"id":783,"plan_id":"803a96a9-fc8d-45f1-a35f-668624a6ffc0","utility":"Zglobal","state":"CA","name":"Merced BESS (Batteries, 3 MW)","type":"generation","voltage_kv":null,"location_ref":"Merced BESS, Merced County, CA","lat":36.989396,"lng":-120.8775,"route":null,"cost_usd":null,"start_date":"2026-09-01","end_date":"2026-09-01","start_precision":"month","end_precision":"month","confidence":1.0,"source_url":"https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx","source_page":2,"raw_excerpt":"EIA-860M Planned sheet, row(s) 64. Plant 68018 Merced BESS (ZGlobal Inc), Merced County, CA; balancing authority CISO. Planned operation 2026-09.\nGenerator MRCDB: 3 MW Batteries; (TS) Construction complete, but not yet in commercial operation","reviewed":false,"approximate":false,"requires_review":false}]